  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    1/11

    December 21, 2010

    Kimberly D. Bose, SecretaryFederal Energy Regulatory Com888 First Street, NE, Room 1AWashington, DC 20426

    RE: Docket Nos. CP10-31-0Calais LNG Project Com

    Dear Secretary Bose:

    On December 17, 2010deciding whether to continue proinappropriate for the Commissiresources to this project.

    Calais LNG recently witProtection for reasons that woulManaging Members and that thiManaging Members have been i

    There are some new tterminate the FERC application p

    Last July the puof financial capconsisted of the

    On Septemberthe constructioapparently alsocame forward la

    At present, Calais LNG dthe financial capacity to move for

    I have attached a copythe history of this project and proby that Board except that Calais

    Sincerely,

    Ronald S. Rosenfeld, M.D.FERC ID: F019366

    Enc: Draft Board Order from Mai

    RonaldS.Rosenfe

    ission

    0 and CP10-32-000pany LLC and Calais Pipeline Company, LLC.

    , Arthur Gelber of Calais LNG requested further delessing their applications. This request should be denn staff as well as for the public to continue to d

    hdrew its application from before the Maine Board ofequally apply to the FERC process. To claim that t

    s is a reason for delay obscures the fact that thesevolved with the project since its onset.

    ings that occurred, but neither warrants a further delarocess:

    blic became aware that the LLC member that was procity had withdrawn. But the remaining member wassame people, as this so-called new member.

    , 2010, Calais LNG lost title, right and interest in propof this project. That fact was concealed from t

    from FERC and the Maine BEP, until the property ownst month.

    oes not have property on which to build the project anard. There seems little reason for the FERC process

    f a draft Board Order for the MAINE BEP process whivides insight into the issues. This order would have bNG withdrew its application prior to the scheduled Boa

    ne Bureau of Environmental Protection

    ld,M.D. P.O. Box 208281 Birch Point RoadPerry, ME 04667

    y by FERC inied as it seemsvote time and

    Environmentalhere are newo called new

    y in deciding to

    iding evidencethe same, and

    rty required forhe public, anders themselves

    does not haveto continue.

    ch summarizesen considered

    rd meeting.

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    2/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    3/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    4/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    5/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    6/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    7/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    8/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    9/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.

    10/11

    20101221-5054 FERC PDF (Unofficial) 12/21/2010 11:26:50 AM

  • 8/8/2019 Dr. Rosenfeld Response re. FERC extension of Calais LNG deadline.