Page 1: DPR Landscape Maintenance Guidelines

DPR Theme Park Maintenance

GuidelinesWalter Bone, RLA

Area Development Manager

Page 2: DPR Landscape Maintenance Guidelines

Dubai Parks and ResortsDubai, United Arab Emirates – Phase 1

Area Development Manager for Motiongate Zone 5 and Legoland Water Park. Servicesalso included closing out all of Phase 1 Motiongate and Bollywood theme parks.

Page 3: DPR Landscape Maintenance Guidelines
Page 4: DPR Landscape Maintenance Guidelines
Page 5: DPR Landscape Maintenance Guidelines
Page 6: DPR Landscape Maintenance Guidelines

Queue Line Demarcation

February 26, 2017

Page 7: DPR Landscape Maintenance Guidelines

Note door widths and allow for post and rope clearance.

Note door widths and allow for post and rope clearance.

Trash bins are portable, do not take in to account for queue line arrangement. Operations will relocate.

Maintain consistent 900 clearance widths for each queue line. Take in to account fan posts, GRC theming rockwork. Measure from outer edge of any obstruction.

Maintain guest circulation when demarcating the queues.

Two (2) queue lines with switchback around the corner. Do not locate posts blocking theme work.

February 26, 2017

Page 8: DPR Landscape Maintenance Guidelines

Ensure all posts bases are countersunk and flush with the pavement. Uneven pavement surfaces shall be ground down flush.

Maintain consistent queue edging. No sharp zigzags and all posts are to be plumb vertical. Do not angle bases/posts with pavement surface.

D-Ring hooks permitted to be attached to fan/light posts, minimizing use of rail posts. Minimize scratches and damage to post finishes

Posts and rope not required along planter or walls. Maintain clearance @ switchback from BOH maintenance gate and start queue at lamp post +/-.

February 26, 2017

Page 9: DPR Landscape Maintenance Guidelines

Add 2 posts and rope @ entrance to visually block entry.

Posts to be located adjacent to curbing, in line with fence posts.

Survey and locate all planter pistand locate posts a minimum of 150mm from opening and center.

2 queue lines fit between each planter pit, maintain 900mm clearance/ea line. Measure from outermost point of any obstruction. Posts and rails are not required along edges of fenced planters.

Ditto, note no rail along fenced planters and softscape median of round planters.

Maintain door clearances

NOTE:It is anticipated that the queue quantities may be reduced slightly, important to maintain queue width consistency and access for Fast Pass holders.

February 26, 2017

Page 10: DPR Landscape Maintenance Guidelines

Ample room in front, but maintain clearances for ride exiters, Game players and washroom visitors.

Note door widths and allow for post and rope clearance.

Sign fixed, align queue line on outer edges of any protrusions.

Take in to account the door opening. Wrap queue around signage and columns. Locate via survey all fixed elements. Red paint on door is themed, don’t be scared.

Double queue line between column and wall. D-Ring hooks permitted on columns. Operations will relocated trash bin. Containment exposed under trash bin, to be fixed prior to finalizing queue rail installation.

Two (2) queue lines with switchback around the corner. Do not locate posts blocking them work. Note door opening and requirement to wrap around.

February 26, 2017

GameGame Washroom

Ride queue

Page 11: DPR Landscape Maintenance Guidelines

Maintain ingress/egress clearances to sidewalk café.

No queue rail needed along building. Maintain clearance on outside for passersby. Stop switchback in alignment with tree grate +/-.

Fan posts to be reinstalled where base is flush with pavement. Again, all posts to be vertical and plumb. Do not align base with pavement slope.

D-Ring hooks on fan posts. Do not locate posts in front of show props to prevent photo opps.

February 26, 2017

Maintain clearance for measuring or height stick. Pull post and rope behind the downspout and come out perpendicular to building face. Operations to confirm D-Ring hook on building face.

Queue breaks to be in alignment with fan posts. D-Ring hooks permissible on fan posts.

Page 12: DPR Landscape Maintenance Guidelines

Motiongate Maintenance Standards & Goals

Site Walk –Landscape Manager

and Contractor

March 1, 2017 12

Page 13: DPR Landscape Maintenance Guidelines

Motiongate Maintenance Walk 13

Prune and keep manicured effect, prune to follow slope

TYPICAL STANDARD

Prune bougainvilla, create tiered effect

Create clean and crisp lines between species, prune as needed. Create clean and crisp lines between species, prune as needed.

Page 14: DPR Landscape Maintenance Guidelines

14

TYPICAL STANDARD

Page 15: DPR Landscape Maintenance Guidelines

15

Page 16: DPR Landscape Maintenance Guidelines

16

Provide lower clipped hedge at base to showcase finished appearance.

Page 17: DPR Landscape Maintenance Guidelines

17

Provide lower clipped hedge at base with natural form of Caeselpena in the center. Prune alternating branches at varying heights to maintain the natural appearance.

All planters this zone.

Page 18: DPR Landscape Maintenance Guidelines

18

Paint waterproofing black and infill with Leucophyllumclipped hedge along al fence lines…..Very Smurfy.

Page 19: DPR Landscape Maintenance Guidelines

19

Paint waterproofing black and infill with Leucophyllum frutescens clipped hedge along al fence lines…..Very Smurfy. Add Clerodenrum enerme along all walk edges, behind rails, etc to finish out.

Page 20: DPR Landscape Maintenance Guidelines

20

TYPICAL STANDARD

Clean and manicured effect. Note the sand/dirt/mulch ring around the tree and clean lines between plant

species.

Page 21: DPR Landscape Maintenance Guidelines

21

Clean and manicured effect. Definition of each species easily seen.

TYPICAL STANDARD

Page 22: DPR Landscape Maintenance Guidelines

22

TYPICAL STANDARD

Page 23: DPR Landscape Maintenance Guidelines

23

Page 24: DPR Landscape Maintenance Guidelines

24

Page 25: DPR Landscape Maintenance Guidelines

25

Page 26: DPR Landscape Maintenance Guidelines

26

Page 27: DPR Landscape Maintenance Guidelines

27

Page 28: DPR Landscape Maintenance Guidelines

28

Page 29: DPR Landscape Maintenance Guidelines

29

Page 30: DPR Landscape Maintenance Guidelines

30

Page 31: DPR Landscape Maintenance Guidelines

31

Page 32: DPR Landscape Maintenance Guidelines

32

Page 33: DPR Landscape Maintenance Guidelines

33

1

2

2

3

3

4

4

1

1. Typical planting scheme needing to soften edges,create forested effect;

2. Heirarchy of plantings/tiered;3. Transplant lower groundcovers to rock edges, fill in

with mid-level shrubs and back drop to be tallshrubs;

4. BOH plantings can be substituted with Sesuviumportulaca to spread fast covering the ground plane.

Page 34: DPR Landscape Maintenance Guidelines

PROPOSED SECTION thru ADVENTURE RIVER 34

TYPICAL STANDARD

Page 35: DPR Landscape Maintenance Guidelines

BollywoodMaintenance Standards & Goals

Site Walk –Landscape Manager

(Ian Genter) and Contractor (ARCO)

35

Page 36: DPR Landscape Maintenance Guidelines

November 26, 2017 36

Retain cascading effect of pots

Maintain clean formal appearance. No palm beards, keep clean and tidy

Page 37: DPR Landscape Maintenance Guidelines

November 26, 2017 37

Remove lower hanging fronds from the Foxies.

Rotate bamboo stake to back side and change out plastic wrap with thin layer of hessian

XX

X

Page 38: DPR Landscape Maintenance Guidelines

November 26, 2017 38

Seasonal color along edges, shifting from back side. Transplant densely planted shrubs and fill in to create solid mass

Page 39: DPR Landscape Maintenance Guidelines

November 26, 2017 39

Transplant Bouganvillea against wall and relocate seasonal color in front.

Bouganvillea

Seasonal Color or Clerodendrum

Page 40: DPR Landscape Maintenance Guidelines

November 26, 2017 40

Allow horizontal branching to spread creating shade canopy

Conitinue along low wall to screen BOH

Add 3 more trees to screen BOH

Page 41: DPR Landscape Maintenance Guidelines

November 26, 2017 41

Tiered/hierarchy from low seasonal on edges to taller shrub in center.

Clipped evergreen hedge –Leucophyllum or Clerodendrum?

Page 42: DPR Landscape Maintenance Guidelines

November 26, 2017 42

Prune and train back drop shrubs to provide full screen hiding BOH sand area

Page 43: DPR Landscape Maintenance Guidelines

November 26, 2017 43

Remove and transplant red fountaingrass

Page 44: DPR Landscape Maintenance Guidelines

November 26, 2017 44

Relocate shrubs to create backdrop. Push seasonal color forward towards curb

Page 45: DPR Landscape Maintenance Guidelines

November 26, 2017 45

Exchange pots from this terrace to the small white un-themed pots in the arrival plaza.

Page 46: DPR Landscape Maintenance Guidelines

November 26, 2017 46

Create hedge along sloped/stepped wall. Maintain consistent height, stair-stepping down along ramp.

Infill with transplants here – Option 1Along back side, in alignment with trees for irrigation

Stair-step planter hedges

Page 47: DPR Landscape Maintenance Guidelines

November 26, 2017 47

Maintain consistent height, stair-stepping down along ramp.

Page 48: DPR Landscape Maintenance Guidelines

November 26, 2017 48

Create clipped hedge, more formal look

Page 49: DPR Landscape Maintenance Guidelines

November 26, 2017 49

AllowAllow Sesuvium and Wedelia to creep in and cover dirt path, Maintain

clearance around spot light

Page 50: DPR Landscape Maintenance Guidelines

November 26, 2017 50

Allow tree canopies to fill out and close off space. Allow only partial or filtered

views through

Page 51: DPR Landscape Maintenance Guidelines

November 26, 2017 51

Take small clippings of Sesuvium from other plants to upper left and plant at 300mm on center to fill in sandy areas.

Page 52: DPR Landscape Maintenance Guidelines

November 26, 2017 52

Maintain clean pruned edges and angle pruning with the slope. Accentuate the

slope adding more drama

Page 53: DPR Landscape Maintenance Guidelines

November 26, 2017 53

Backfill with 100mm beige decorative Back Of House (BOH) gravel. FM has

extra.

Page 54: DPR Landscape Maintenance Guidelines

November 26, 2017 54

Backfill with 100mm beige decorative Back Of House (BOH) gravel. FM has

extra.

Page 55: DPR Landscape Maintenance Guidelines

November 26, 2017 55

Backfill with 100mm beige decorative Back Of House (BOH) gravel. FM has

extra.

Page 56: DPR Landscape Maintenance Guidelines

November 26, 2017 56

Clean up and remove all deadwood from trees.

Page 57: DPR Landscape Maintenance Guidelines

November 26, 2017 57

Train canopy by pruning to create a mushroom-like top. Allow to overhang by 1500mm past the inside

edge of planter to provide shade for benches

1500 mm