Page 1: DP3 Accommodation Hook-up - Telford Offshore

www.telfordoffshore.com

TELFORD 28

DP3 AccommodationHook-up

Page 2: DP3 Accommodation Hook-up - Telford Offshore

TELFORD 28Build according to a distinctive hybrid design philosophy, Telford 28 (ex Jascon 28) is equipped with a heave-compensated gangway, a 270t crane and DP3 system allowing her to play an active role in delivering your high POB accommodation.Telford 28 has provided a wide range of accommodation and hook up services in waters around the world, including accommodation projects in Brazil (Saipem – FPSO Cidade de Vitoria for Petrobras’ Golfinho ultra deepwater field) and Angola (ExxonMobil Kizomba B deepwater field).

General• Classification X A1, Barge, X DPS-3, X PAS, CRC

• Flag Gibraltar• Call sign ZDHX5• IMO number 8769638• Delivery April 2007• Upgraded June 2008

Principal dimensions• Lenght overall 111.80m• Breadth 30.48m• Extreme breadth 37.78m• Depth 6.71m• Draft (max) 4.78m• Draft (max) 7.78m

including retr. (3.10m) thrusters

• Gross tonnage 13 062t• Net tonnage 3 918t• Deadweight 6 791t

(summer)

• Displacement 14 303t (summer)

Cranage• Main crane (Seatrax)

270t Main hoist 27t Auxiliary hoist 54.80m boom diesel driven revolving pedestal crane

• Auxiliary deck crane Pedestal type, 34t @ 20m, 22t @ 30m, make TTS

Deck space• 1 100m2

Deck load• 10t/m2

Capacities• Fuel oil (storage) 1 857m3

• Fuel day tank 53m3 (total)

• Fuel purification 64m3

• Lube oil 89m3

• Fresh water 2 430m3 (potable)

• Ballast water 6 420m3

• Sludge oil 60m3

• Dirty oil 41m3

• Black/grey water 1 056m3

• Bilge water 165m3

Service Air• 1 x Quincy Compressor• 28 m3/min FAD at 8 bar• 1 x Stromme compressor• 6.30 m3/min FAD at 7 bar

DP System• Kongsberg K-POS 22 aft working

bridge• Kongsberg K-POS 12 fwd

navigation bridge

DP Reference System• 1 x Radius 1000

(independent/separate) + transponders

• 2 x DGPS receivers• 3 x Gyro compass• 3 x Motion reference units• 1 x Lightweight Tautwire• 1 x HIPAP 500• 1 x Gangway (if connected)• 1 x Cyscan• 3 x Windsensors

Power Plant• 3 x Caterpillar 3516 B diesel

engines (1825kW) each

Propulsion• Bow thruster Wartsila

1 x electrically driven 1355kW• Forward/Aft thrusters

Thrustmaster OD 1500 4 x Fixed pitch hinged azimuth hydraulic driven thrusters, 1200kW

SPECIFICATIONS

Page 3: DP3 Accommodation Hook-up - Telford Offshore

• Midship Thrustmaster OD 1000 2 x Fixed pitch hinged azimuth hydraulic driven thrusters, 600kW

• Center Aft thruster Wartsila 1 x electrically driven retractable fixed pitch thruster, 1000kW

Endurance• Fesh water

making capacity 3 x 50t/24hrs• Fuel consumption (typical)

- In port 5 m3/24hrs

- Transit 20 m3 /24hrs

- DP 13 m3 /24hrs

Helideck• Suitable for Sikorsky S-92A

Helibus• Maximum “D” Value helideck

22.20m• Maximum take-off weight 13t• Helideck Monitoring System 100

Kongsberg• Fixed foam system with 3

monitors• Optional: Heli refuelling

installation with three storage tanks

Accommodation• Fully air-conditioned permanent

accommodation for up to 462 bunks in cabins all with individual bathroom facilities. Including conference room, offices, cinema, gymnasium, recreation rooms, laundry, internet café as well as a medic room with hospital.

Radio/Communication• V-Sat Standard bandwidth

512/256 kB• GMDSS Area 3• EPIRB• SART• Integrated Telephone System• Sound Powered Telephone• Public Address System

Livesaving appliances• Liferafts 56 x 25 persons• Fast rescue boat 1 x 6 persons

Gangway (optional)• Max lenght 42.50m• Lenght in mid

position 36.50m

• Height of pedestral 8.80m

• Make Marine Aluminium, Norway

Mooring System• Anchor windlasses

1 x electrical windlasses with wrapping heads, chain and anchor

• Capstans 2 x 10t

Additional Data• Sewage treatment unit

2 x with nil overboard discharge, make Hamworthy

• Incinerator 800,000 kcal / hrs, make Teamtec

• Yokohama fenders 6.50 x 3.30m

Page 4: DP3 Accommodation Hook-up - Telford Offshore

Telford Offshore Ltd • Reef Tower Floor 31 P.O. Box 500 3365 Jumeirah Lakes Towers Dubai – United Arab Emirates • Tel : +971 4 350 76 00 telfordoffshore.com

All information, data and other technical description in this document are for guidance purposes only and subject to change. © January 2018 – TELFORD OFFSHORE® is a registered UK trade mark – All rights reserved.

LOCATIONS - OPERATIONS

Latin AmericaMexico Calle 35 D, Suite 10 Col Malibran, 24197 Cuidad del Carmen, Campeche Mexico Tel: +52 (1) 5564 151 719 (Mexico)

+54 (9) 11 2790 2463 (Argentina)

Europe The Netherlands Maxwellstraat 2 3316 GP Dordrecht The Netherlands Tel: +31 78 6526 930

West AfricaAngola Condominio Mares do SulCasa no. A07 Talatona - Benfica Luanda Angola Tel: +244 923 522175

Ghana PMB CT 68 Cantonments Accra Ghana Tel: +233 203 654 079

+233 544 312 460

Middle EastUAE - Dubai Headquarters Telford Offshore Ltd Reef Tower, Floor 31P.O. Box 5003365 Jumeirah Lakes Towers Dubai, United Arab Emirates Tel: +971 4 350 7600

Asia-PacificAustralia 77 St Georges Terrace, Level 24 Perth WA 6000 Australia Tel: +61 8 9218 5888

Our locations around the world mean we’re always close to our customers. We serve all operators, from majors, internationals and NOCs to small independents and contractors —

so let’s keep in touch.

[email protected]