Page 2: download form Source

Outline of Presentation• Procedure for Submission of Plans

• Common Mistakes Made in Plan Submission

• Common Issues Raised at Pre-consultation Sessions

Page 3: download form Source

Procedure for Submission of Plans

Page 4: download form Source

Submission Stages

Industrial Allocation

Application for Sewerage & Drainage Information

Development Control

Building Plans & Detailed Plans

Application for Temporary Occupation Permit

Application for Certificate of Statutory Completion

Page 5: download form Source

Plan SubmissionSubmission Procedure

• Developer/QPs applies to CBPU and obtains clearance on the use of industrial land

• QPs apply for SIP/DIP

• QPs submission for DC/BP,

• Specialist consultants to carry out QRA/PCS and submit DPs on PCE

Page 6: download form Source

Industrial Allocation

• Application for approval of location and type of industrial development

• Sited in designated industrial estates and compatible with the surrounding land use

• Siting requirements for industries and pollution control requirements are contained in the Code of Practice on Pollution Control

Page 7: download form Source

Industrial Allocation

• To facilitate evaluation, prospective industrialists shall complete the IA application form available online in CBPU’s Industrial Allocation System (IAS) at website address

http://ias.nea.gov.sg/PublicApplicant/Homepage.aspx

Page 8: download form Source

Application for Sewerage and Drainage Information

• QPs apply for sewerage and drainage information related to their development site

• Sewerage Interpretation Plan (SIP) indicates the location and alignments of public sewers

• Drainage Interpretation Plan (DIP) indicates drainage reserves or land safeguarded for future drainage schemes

• Minimum Platform Level (MPL)

• Building Height Constraint, Health & Safety buffer, MRT setback, noise contour for airbase, nuisance buffer from industries etc.

Page 9: download form Source

Development Control CBPU check building plan layout for

compliance with the following:

• Adequate setbacks between MRT above ground and residential buildings

• Do not encroach into public sewers/pumping mains/drainage reserves/common drain

• MPL, nuisance/H&S buffer, building height constraint etc.

Page 10: download form Source

Building Plans and Detailed Plans

• QP shall prepare building plans (BPs) on PC and EH and details plans (DPs) on Sewerage and Drainage in compliance with NEA’s and PUB’s Codes of Practice

• BP on EH and DPs on SEW/DRA are registered without checking based on QP declaration

• CBPU checks BP plans on pollution control because of health & safety impact by industries

Page 11: download form Source

Application for TOP Upon completion of building works on

sewerage/sanitary system and/or pollution control equipment/measures

• QP submit TOP application to CBPU with the necessary certificate of completion and inspection

• CBPU conduct inspection on PC equipment/measures for compliance.

• CBPU issue TOP clearance after ensuring compliance of building works with approve BP and DP

Page 12: download form Source

Application for CSC• TOP requirements are met

• Certificate of Supervision/Completion on related building works for EH matter/and surface water drainage system has been submitted to CBPU

• CBPU issue CSC clearance after ensuring building works compliance with approve BP and DP

Page 13: download form Source

Pre-consultation Sessions for QPs

• QPs may walk in to consult CBPU on the preparation of building plans for clarification/waiver of technical requirement/procedure from Monday to Friday morning (9 am to 12 noon)

• Besides the pre-consultation sessions, QPs can also contact CBPU officers via telephone/email for consultation.

• The contact number, email of CBPU officers are available at website address

http://app.nea.gov.sg/cms/htdocs/article.asp?pid=383

Page 14: download form Source

Common Mistakes Made in Plan Submission

Page 15: download form Source

Common Mistakes• Procedural mistakes

• Non-compliance with technical requirement

Page 16: download form Source

Procedural mistakes QPs did not follow the submission

procedures

• Did not consult and obtain IA clearance

• Did not apply SIP/DIP before submitting DC

• Did not obtain DC clearance before submitting BP

Page 17: download form Source

Procedural mistakes

• Did not obtain technical assessment reports on noise etc as specified in the BP clearance before TOP/CSC clearance

• Did not submit certificate of completion and inspection for SEW/DRA during TOP/CSC application

Page 18: download form Source

Common MistakesDC Plan

• Did not declare activities to be carried out

• Did not indicate whether the building height is affected by BHC

• Did not indicate the proposed dormitory affected by H&S buffer

• Did not indicate the setback from MRT track above ground

Page 19: download form Source

Common MistakesDC Plan

• Did not indicate the nuisance buffer

• Did not indicate the trade effluent treatment plant on submission layout

Page 20: download form Source

Common MistakesBP Submission - General

• The use of the respective areas not indicated

• The sources of trade effluent generation, air

pollution & noise emission not indicated

Page 21: download form Source

Sources of trade effluent generation and air pollution

Page 22: download form Source

Chemical/Oil Bulk Storage Tanks

To be highlighted on BP and labelled

Elevated storage tank not provided with measures to contain a shooting jet of chemical/oil escaping from a leak/rupture in the tank.

To be highlighted on BP and labelled

Location of the bulk storage tanks and secondary containment not indicated on BP

To submit calculationsNo calculations showing that secondary containment can contain the capacity of the largest tank

AdviceError

Page 23: download form Source

Retaining Wall for Storage Tank

Page 24: download form Source

Chemical Warehouses

To be indicated / labeled on BPThe floor of the warehouse is not

coated with a layer of chemical-

resistant material

To be indicated/labeled on BPFail to indicate the goods/materials

stored in the warehouse

To highlighted on BP and labelledSeparate compartments not

provided for the storage of

substances that can react

dangerously with one another

AdviceError

Page 25: download form Source

Fuel Burning Equipment

To be highlighted on BP and labelled

Locations of fuel burning equipment and chimney not indicated on plan

To submit calculations for chimney height taking account of the heights of building in the vicinity

Calculations for chimney height not provided

A list of equipment, type of fuel used and fuel consumption rate to be submitted

Information on fuel burning equipment not submitted

AdviceError

Page 26: download form Source

Exhaust Stack – Cap or bend are not allowed

Page 27: download form Source

Air Pollution Control

To be highlighted on BP and labelled

Proposed air pollution control equipment eg scrubber etc not indicated or highlighted on BP

To ensure safe dispersion, the minimum height of an exhaust stack is 3m above roof or 15m above ground level whichever is higher

Exhaust stack does not terminate above roof of a building or meet the minimum height requirement stipulated in COPPC

Explanatory notes would help us understand the effectiveness of the proposed treatment system

No explanatory notes on proposed air pollution control equipment submitted

AdviceError

Page 28: download form Source

Common MistakesBP Submission – DP on PCE

• Fail to submit technical details of the trade

effluent treatment plant, air pollution control

equipment, fuel burning equipment and its

chimney/exhaust stack for approval before

installation

Page 29: download form Source

Trade Effluent Treatment Plant

To be highlighted on BP and labelled

Location of trade effluent treatment plant, pH monitoring system, sampling sump not highlighted on BP

Explanatory notes would help us understand the effectiveness of the proposed treatment system

Explanatory notes on the concept of operation of the trade effluent treatment plant not submitted

AdviceError

Page 30: download form Source

Location of penstock with PH monitroing system

Page 31: download form Source

Common PC Issues Raised at Pre-consultation Sessions

Page 32: download form Source

Common Issues Raised Water Pollution Control – Chemical/Oil

Storage Tank

• Secondary containment facilities shall be provided to contain accidental release of the entire content of the largest storage tank

• Contaminated rainwater from unsheltered containment facilities shall be collected and treated before discharge into the watercourse

Page 33: download form Source

Water Pollution Control

Discharge Limits for public sewer/watercourse

Trade effluent shall be treated to the allowable limits before discharge into a public sewer or watercourse(where public sewers are not availabe).

Trade effluent containing Biochemical Oxygen Demand (BOD) and Total Suspended Solids (TSS) exceeding the allowable limits may be discharged into a public sewer subject to payment of trade effluent fees

Page 34: download form Source

Common Issues Raised Air Pollution Control – General requirement

Developments which can generate air impurities, are required to install, operate and maintain air pollution control equipment designed to comply with the allowable emission standards

For air impurities with no prescribed emission standards,

best practical means shall be adopted to minimize air pollution.

Exhaust gases from the pollution control equipment shall

be emitted into the atmosphere through an appropriately designed discharge stack to ensure safe dispersion.

Page 35: download form Source

Common Issues RaisedAir Pollution Control – Technical Requirement

• Fuel burning equipment shall be efficiently operated and maintained. The fuel burning equipment shall use fuel cleared by PCD

• A chimney of an approved height shall be provided for the safe dispersion of flue gases from fuel burning equipment

• Sampling ports shall be provided for manual installation of portable sampling equipment. The ports shall be installed such that they are accessible.

Page 36: download form Source