Page 1: Douglas Street Transit Discussion

Douglas Street Transit DiscussionTransit Discussion

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

11

Page 2: Douglas Street Transit Discussion

AgendaAgenda

• Transit Future Plan• Transit Future Plan

Vi t i R i l R id T it P j t• Victoria Regional Rapid Transit Project

• Uptown to Downtown – Moving Forward

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

22

Page 3: Douglas Street Transit Discussion

HistoryDecember 2010 • City of Victoria & Municipality of Saanich

• Endorse Transit Future Plan• Support rail based transit as preferred technology on Douglas Street• Endorse Douglas Street as rapid transit corridor between Uptown and Downtown

• Resolutions direct staff to continue to work with BC Transit to: • Resolutions direct staff to continue to work with BC Transit to: • Identify and support the Transit Future Network and facilities transportation and land‐use 

plans • Finalize the detailed Rapid Transit configuration on Douglas Street comparing side running p g g p g g

and curb options• Finalize details regarding the south terminus

May 2011• Transit Future Plan adopted• Rapid Transit Phase 1 Complete

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

33

Page 4: Douglas Street Transit Discussion

Transit  Future Plan

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

Page 5: Douglas Street Transit Discussion

Completed• Limited stop service on future Rapid Transit corridors on McKenzie & 

Fort St to Uvic• Google Transit Trip Planner• McTavish Transit Exchange and Park & Ride• McTavish Transit Exchange and Park & Ride

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

55

Page 6: Douglas Street Transit Discussion

In Progress

• Victoria Regional Rapid Transit Project – Local Funding Task Force• Identifying and implementing transit priority opportunities

h l• Investing in on‐street amenities ‐ BC Transit Shelter Program

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

66

Page 7: Douglas Street Transit Discussion

Upcoming 

• Develop Transit Service Guidelines and conduct a System Performance Review

• Identify and implement cost neutral or cost saving Transit Future Plan network changes

• Limited stop service on future Rapid Transit Corridors between the West Shore and Victoria, and Esquimalt Rd

dd h h d• Address current service issues such as passups to the University and Camosun College  

• Development of the Frequent Transit Network McKenzie/Admirals UVic‐Development of the Frequent Transit Network McKenzie/Admirals UVicDockyard route, new service areas in Bear Mountain and Dean Park

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

77

Page 8: Douglas Street Transit Discussion

Developing Critical Facilities

• University of Victoria Exchange

• Uptown Exchange

• New transit operations and maintenance facilities• New transit operations and maintenance facilities

• West Shore Park and Rides

• Partnerships

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

88

Page 9: Douglas Street Transit Discussion

RecommendationVictoria Regional Rapid Transit ProjectRecommendationg p j

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

99

Page 10: Douglas Street Transit Discussion

Moving Forward: Uptown to Downtown

1. Uptown Exchange Exchange 

Development

3. Finalize 3configuration on Douglas 

Street2. Complete Transit Signal 

Priority 

4. Transit Priority Interim 

Measures

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1010

Page 11: Douglas Street Transit Discussion

Uptown Transit Exchange

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1111

Page 12: Douglas Street Transit Discussion

Transit Signal Priority on Douglas

• In 2011, the project was reactivated by BC Transit, City of Victoria, Municipality of Saanich and Ministry of Transportation of Infrastructure 

• The traffic signal controllers and software are almost updated • The buses that are equipped with transponders are being updated in March• Testing is scheduled to occur in March or April

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1212

Page 13: Douglas Street Transit Discussion

Transit Way Configurations• Curbside 

• Median

• Side Running

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1313

Page 14: Douglas Street Transit Discussion

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1414

Page 15: Douglas Street Transit Discussion

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1515

Page 16: Douglas Street Transit Discussion

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1616

Page 17: Douglas Street Transit Discussion

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1717

Page 18: Douglas Street Transit Discussion

Evaluation of Alignment Options

Hillside to Humboldt StreetUptown to Hillside Rank Weighted 

ScoreAlignment  Option

1 210 Douglas Side Running

Hillside to Humboldt StreetRank Weighted 

ScoreAlignment  Option

1 211 Douglas Side Running

Uptown to Hillside 

2 186 Douglas Curbside

3 182 Douglas Median

4 139 Douglas/BlanshardCouplet

2 176 Douglas Curbside

3 170 Douglas Median

5 137 Douglas/Government Couplet

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1818

Page 19: Douglas Street Transit Discussion

Finalize Configuration OptionsFinalize Configuration Options

• Informs daily land use and re‐zoning decisions• Allows for transit priority measures to be 

implemented as interim or phased solution• Enables informed decisions for underground 

utilities, property acquisition, station locations and bike infrastructurebike infrastructure

• Provides more certainity on cross street bus stop locations (as part of Transit Future Plan)locations (as part of Transit Future Plan)

• Informs discussion on terminus location

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

1919

Page 20: Douglas Street Transit Discussion

The Need for Interim Transit MeasuresTotal Passengers By CorridorPeak Direction (4pm to 5pm) 

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

2020

Page 21: Douglas Street Transit Discussion

The Need for Interim Transit MeasuresThe Need for Interim Transit Measures

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

2121

Page 22: Douglas Street Transit Discussion

The Need for Interim Transit MeasuresThe Need for Interim Transit Measures

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

2222

Page 23: Douglas Street Transit Discussion

Transit Priority

Queue jumper lanes

Signal Pre-emption

Coordinated signals

Peak bus lanes Bus lanes Fully segregated right-of-way

Presentation to Joint Council: Saanich & VictoriaFeb 29, 2012

2323

Page 24: Douglas Street Transit Discussion

Recommendation*Recommendation

1. That Councils request BC Transit to seek funding to complete the Douglas q g p gCorridor Transit study including the identification of preferred routing (median, side running, etc)

2. That BC Transit continue to pursue provincial funding for the implementation of rail based transit on the Douglas Corridor

3.  That Councils request BC Transit to make the Downtown to Uptown phase of rapid transit the first priority for the route.