Doran Street and Broadway/Brazil Safety and Access Project
18

Doran Street and Broadway/Brazil Safety and Access Projectmedia.metro.net/projects_studies/rr/doran_st...Permanently closes Broadway/Brazil crossing ... Microsoft PowerPoint - 2014-12-09

Feb 02, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Doran Street and Broadway/Brazil Safety and Access Project 

  • Aerial Overview

    Doran StreetAt‐Grade Crossing

    Broadway/Brazil At‐Grade Crossing

  • Project Introduction

    • Background / Context– L.A. County At‐Grade Incident History– Doran History– Current Improvements

    Year Accidents Fatalities Injuries

    2009 24 5 4

    2010 20 6 9

    2011 21 5 11

    2012 20 9 19

    2013 32 12 35

    Totals 117 37 78Source:  Federal Railroad Administration

  • Project Objectives

    • Improve safety by separating vehicle and pedestrians from trains at railroad crossings

    • Maintain easy access for emergency responders to business and residential areas

    • Develop context sensitive solution that will enhance mobility and quality of life for the community

    • Develop long range solution to minimize program costs and impacts to community

  • Approach to Alternatives Analysis

    • Safety• Two points of access north of Colorado

    • Focus on traffic objectives• Active Transportation 

    – Pedestrians– Bicycle

    • Consistency with L.A. River Revitalization Plan

  • Alternative 1:Doran Overpass

    Broadway/Brazil at‐grade crossing remains open

    Doran at‐grade crossing closed

    Approximate Limit of L.A. River Revitalization Plan

  • Alternative 1: Doran Overpass

  • Alternative 2:Fairmont and Salem/Sperry Overpass

    Broadway/Brazil at‐grade crossing closed

    Doran at‐grade crossing closed

    Extension of Glendale River Walk Path

    Approximate Limit of L.A. River Revitalization Plan

  • Alternative 2: Fairmont and Salem/Sperry Overpass

  • Alternative 2: Fairmont and Salem/Sperry Overpass

  • Alternative 3:Fairmont and Zoo Drive Connector

    Broadway/Brazil at‐grade crossing remains open

    Doran at‐grade crossing closed

    Approximate Limit of L.A. River Revitalization Plan

    Extension of Glendale River Walk Path

  • Alternative 3: 

    Fairmont and Zoo Drive Connector

  • Alternative Comparison

    Issue Alt 1 Alt 2 Alt 3

    Permanently closes Doran crossing √ √ √

    Permanently closes Broadway/Brazil crossing √

    No future grade separation required √

    Keeps traffic on arterials √ √

    Both crossings open during construction √ √

    Consistent with L.A. River Revitalization √

    Consistent with funding sources √ √

  • Project Development Phases

    Current Phase of Work

    ALTERNATIVES ANALYSIS

    FALL 2013-WINTER 2014

    PHASE 1

    ENVIRONMENTAL STUDIES &

    PRELIMINARY ENGINEERING

    WINTER 2014-FALL 2015

    PHASE 2

    FINAL DESIGN

    FALL 2015-WINTER 2016

    PHASE 3

    CONSTRUCTION

    START:WINTER 2016

    PHASE 4

  • Project Funding

    • Metro ‐Measure R

    • Federal ‐ American Recovery and Reinvestment Act  (ARRA) through the Federal Railroad Administration (FRA)

    • State – California High Speed Rail Authority (CHSRA)

  • Contact Information

    • Mail: Don Sepulveda, Project ManagerMetroOne Gateway Plaza, 99‐18‐52Los Angeles, CA 90012

    • E‐mail: [email protected]• Helpline: 888.937.4797• Website: metro.net/regionalrail• Social Media: facebook.com/doranstreet

    @DoranStreet

  • Doran Street and Broadway/Brazil Safety and Access Project 