onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03) 9939 8250 Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015
79

Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Jul 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03) 9939 8250

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design

14094TIA004B-F.docx

26 October 2015

Page 2: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 2

onemilegrid ABN: 79 168 115 679

(03) 9939 8250

1/59 Keele Street

COLLINGWOOD, VIC 3066

www.onemilegrid.com.au

DOCUMENT INFORMATION

Prepared For MPA

File Name 14094TIA004B-F.docx Report Date 26 October 2015

Prepared By Ross Hill Authorised By Trevor Waugh

Signature

Signature

© One Mile Grid Pty Ltd. This document has been prepared by onemilegrid for the sole use and benefit of the

client as per the terms of engagement. It may not be modified or altered, copied, reproduced, sold or

transferred in whole or in part in any format to any person other than by agreement. onemilegrid does not

assume responsibility or liability to any third party arising out of use or misuse of this document.

Page 3: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 3

CONTENTS

1 INTRODUCTION ............................................................................................................. 4

2 INTERSECTION ANALYSIS ................................................................................................ 4

3 INTERSECTION DESIGN ................................................................................................... 4

4 BRIDGE/CULVERT DESIGN .............................................................................................. 5

5 ROAD DESIGN .............................................................................................................. 6

6 LAND TAKE AREAS ........................................................................................................ 7

APPENDICES

APPENDIX A ROAD, INTERSECTION AND BRIDGE PROJECTS ................................................................... 8

APPENDIX B INTERSECTION ANALYSIS REPORT ..................................................................................... 9

APPENDIX C ULTIMATE INTERSECTION DESIGNS .................................................................................. 10

APPENDIX D INTERIM INTERSECTION DESIGNS .................................................................................... 11

APPENDIX E BRIDGE/CULVERT DESIGNS ........................................................................................... 12

APPENDIX F LAND TAKE AREAS ...................................................................................................... 13

Page 4: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 4

1 INTRODUCTION

onemilegrid has been requested by MPA to undertake a range of engineering works in relation to

the Donnybrook and Woodstock PSP areas, including the following items to inform the

Development Contributions Plan:

Intersection Analysis;

Intersection Design;

Bridge/Culvert Design; and

Road Design.

The following report compiles the analysis and designs for the various road, intersection and

bridge/culvert projects shown in Appendix A.

2 INTERSECTION ANALYSIS

Analysis of various intersections within the PSP area has been undertaken to assist in the design of

intersections, with the Intersection Analysis report attached in Appendix B.

It should be noted that since the preparation of the traffic modelling (undertaken by others), and

the intersection analysis within the attached report, the road network layout and intersection

locations have been modified. As a consequence, the traffic modelling and intersection analysis is

considered to be inaccurate to the current design.

Regardless, given the modelling undertaken previously, and the spare capacity generally

available, it is expected that the intersection designs will accommodate the likely flows.

3 INTERSECTION DESIGN

Working with each of the project consultants, detailed concept design for the intersection located

within the Donnybrook/Woodstock PSP area have been prepared. The design of the intersections

takes into consideration the vertical geometry of the connecting arterial road network and

bridge/culvert design requirements.

Intersections designs for both the ultimate and interim stages of the area have been provided, and

can be found in Appendix C and Appendix D respectively.

In preparing the intersections designs, the following assumptions have been made:

Digital Cadastral information provided by the MPA has been used to determine the existing

road reserve and property boundaries;

The design of the interim and ultimate Arterial Road intersections is based on standard VicRoads

intersection treatment templates;

Turn lane lengths have been based upon deceleration lengths for the anticipated posted

speed of each approach roadway;

Preliminary swept path analysis for suitable design vehicles have been undertaken to ensure

that the concept design can be developed into a detailed functional design as required; and

The design of the horizontal geometry for each of the intersections has been undertaken in

accordance with Austroads Guide to Road Design Part 4A, taking into consideration VicRoads

Supplement to Austroads Guide to Road Design Part 4A.

Page 5: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 5

4 BRIDGE/CULVERT DESIGN

The ADAMS bridge and culvert details are presented in Appendix E.

Bridge structure elevations and cross sections are based on implementation of conventional

precast concrete ‘Super T’ deck beam construction. Super T’s have become a preferred

economical and durable long spanning bridge deck solution across Australia. As far as practicably

possible, selected beam spans and depths are generally consistent and spans are in the

economical range for the selected Super T beam size.

Support structures, i.e.; cross heads, piers, pile caps and bored piles are all conventional for this

type of application. Assumptions have been made regarding bridge foundation conditions. The

Victorian Geological Survey Map for Sunbury suggest that the bridges will be founded in one of the

newer volcanic rocks found predominantly in the area.

Bridge geometry has been determined to comply with the clearance requirements of the Victorian

Rail Industry Operators Group Standards: VRIOGS 001 - Structure Gauge Envelopes – Minimum

Clearances for Infrastructure Adjacent to the Railway: Revision B, Issue Date: 04/06/12 and V/Line

standard NIST-2616, Railway Structures Design Requirements, revision 02 dated 31/10/2014. AS5100:

Bridge Design has also been referred to for the setting of geometry to protect bridge structures from

rail and flood impact loads. Bridge spans over the rail tracks have been based on an allowance

for 4.5 m between adjacent track centrelines for four number sets of rail tracks, with 4.5 m clear

zone to one side of the tracks and 6.0 m clear zone to the other to allow for an access track for

maintenance vehicles. This includes provision for a forth track for future installation where not

currently installed. These allowances are in accordance with information received from MPA via

email dated 17th September 2015. Vertical clearances under the bridges over the railway tracks

accommodate the clearances specified for double stacked container freight trains.

Approach road fill embankments are shown as being restrained using the Reinforced Earth precast

concrete panel system, which again is relatively conventional, economical, durable and well

accepted in this application. They are shown as not extending down into either the Q100 flood

zones or the bridge code specified rail impact zones. The retaining structures shown should perform

well and have maximised expected life spans in this application.

Minor local adjustments to existing land contours under bridges in flood zones have been proposed

to allow maintaining of equivalent Q100 flood conveyance and storage cross sections and yet to

also allow for sensible reductions in overall bridge lengths that might otherwise not occur.

Bridge crash barriers have been selected to be robust and durable. Alternative more visually

permeable barrier solutions may be achieved within a similar order of price magnitude. Anti-throw

and fall prevention screens are also required for the bridges over the railway tracks in accordance

with V/Line standard NIST-2616 where pedestrian access is accommodated by the bridge. These

may take the form of a non-climbable screen in addition to the vehicle barriers installed to the

bridges. It is anticipated these screens would have a significant architectural input to their form for

aesthetics given the minimum required heights. Posts are anticipated to be hot dipped galvanised

steel, with secondary structure and cladding elements to suit architectural requirements. We

assume these are required for the extent of the bridge span over the railway tracks (including

maintenance access track and clear zone either side of the railway tracks) only.

Box culvert selections are based on precast inverted ‘U’ culvert cell segments placed over in situ

base slabs, with economical link slabs being utilised wherever possible. Concrete wingwalls at

each end of the culverts are shown with a geometry compliant with VicRoads standards.

Wingwalls may be cast in situ, or may utilise precast elements where economies suggest.

Page 6: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 6

5 ROAD DESIGN

The civil road design is based on 3D LIDAR data of existing conditions for the purposes of assessing

and creating preliminary vertical geometry using 12D design software. Horizontal road geometry

and intersection layouts were provided by onemilegrid. The road gradings have been optimised

where possible to minimise the extents of typical 1 in 3 cut and 1 in 5 fill batters.

Culverts have been analysed and sized according to flow rates provided by Dennis Price Miller at

the required locations. An additional culvert is included at BR-09.

Vertical road geometry and levels also take into account:

Austroads Standard – Guide to Road Design, Part 3: Geometric Design, taking into

consideration VicRoads Supplement to Austroads Guide to Road Design Part 3;

Clearance requirements of V/Line standard NIST-2616, Revision 02, Issue Date: 31/10/2014;

Bridge clearance of 8.8m as advised by MPA, to allow for double stacked containers;

Overall structural depth of bridges (including pavement);

Q100 flood levels provided by Melbourne Water;

Catchment for drainage network is limited to road reservation, assuming that the road drainage

network does not cater for lot drainage; and

Culvert sizes and pavement depth above.

Page 7: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 7

6 LAND TAKE AREAS

The land take area for each road, intersection and bridge projects have been calculated, and are

shown on plans attached in Appendix F.

In calculating the land take areas, the following assumptions have been made:

Intersection land take areas are based on the chainage at the point where the interim design

matches back into the standard road cross-section;

Road Reserve boundaries generally accord with the standard MPA cross-sections;

Widening for batter slopes has been provided where the expected batter slope width extends

more than 5m beyond the standard road reserve boundary, and then the widening roughly

matches the expected batter slope extents;

Land take areas take into account the road reserve boundaries modified by the expected

batter slopes; and

Connector roads have not been included in the land take areas, other than localised flaring for

intersections.

Page 8: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 8

Appendix A Road, Intersection and

Bridge Projects

Page 9: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP100.d

gn

04-09-2015

Date Plotted:

11:46:39 A

M

Preliminary - Not for construction

25 45

1020

10101425

1050

1070

1090

1110

1490

15

30

1400

1370

1350

45

55

145

155

150

130

120

80

135

65

50

DONNYBROOK

6.10

56

25

26

27

62

35

4.0

2

ELIZABETH

28

29

30 31

GRANTS RD

1

1

3

5

6.10

1

2

3

4

GRANTS

SH

ERID

AN

CT

32 33 34

1

23

36

6.0

0

6.00

6.00

D

D

D

E

E

E

Dr

&

Sew

Emt

ELIZABETH

PL

PL

ELIZ

AB

ET

H

PL

37

38

40

65

61

60

59

4.0

0

Dr.

&

Sew.

Emt.

64

5

O-419

L.P. 75809

DONNYBROOKRD

SH

ERID

AN

CT

ELIZABETH

PL

ELIZ

AB

ET

H

PL

Parish of

Parish of

L.P. 132049

L.P. 132049

L.P. 13

2049

L.P. 13

2049

L.P. 132

049

L.P. 13

2049

L.P. 13

2049

L.P. 13

2049

L.P. 13

2049

L.P. 132049

L.P. 132049

L.P. 203459

L.P. 203459

L.P. 203458

L.P. 203481

L.P. 9

1619

LP75809L.P. 91619

12.00

ELECRICIT

Y

E

2 1

4

5

20.00

20.0

0

20.00

20.00

14.00

E

65

3

1 2

2.0

1D

E

of Kalkallo

Pt. C.P. 27

Pt. C.P. 27

Parish of Kalkallo

Parishof Merriang

Parish of Kalkallo

MerriangParish of

O-430

9

10

11

12

O-430

0-403

J-689H-331

B-898

1 1

35.0

0

Gas

Ease

ment

and

Fuel

Pipelin

e

[ Keon Park-Shepparton-

Wodonga ]

[ Keon Park-Shepparton-

Wodonga ]

C/W

3.05

RD

DONNYBROOK

ROAD

ROAD

RD

EPPIN

G

NORMAN

20.0

0

20.12

ELEC.

EA

SE

ME

NT

1 2

2

1

1

7

1 C.P. 15

Pt. C.P. 22

RDRD

RD

5.0

0

El

Emt

El

Emt

DR

AVELIN RD

1

1

6

7

1

DONNYBROOK

RD

LA

NG

LE

Y

PA

RK

DR

6.10

4.5

7

5.00

5.00

5.00

D

DE

E

D

E

EA

SE

ME

NT

4.57

4.5

7

4.5

7

20.12 C'WAY EASEMENT

Easement

35.0

0Gas

and

Fuel

Park-Shepparton-

Wodonga]

Pipeline

Ease

ment

[Keon

[Keon

Park

-Shepparton

-W

odonga

]Pipeline

Ease

ment

and

Fuel

2.0

1

DONNYBROOKRD

1

2

1

C.P.15

Pt C.P.22

8.04

Dr

E

2

1

2

Pt.C.P.28

Pt.C.P.22

1

C'way

1

2

2

C.P.15

2

3.0

5

3.0

5

3.0

5

3.05

3.05

6.10

DONNYBROOK RD

EPPIN

G

3.0

5

15.00

D

9.0

0

El

E

1 2 16172 3 1920

14

15

1

12 3

801-239-1583

ROAD

EPPIN

G

RD

20.0

0D

E

3.0

5

1

Pt.C.P.29 & Pt.C.

P.28

2

3

1

2

1

2

8

13

2

3

C.P.21

2

1

RD

ME

RRIA

NG

RD

EPPIN

G

RD

Dr

Emt

2

2

2

PIP

ELIN

E

EA

SE

ME

NT

35.0

0

GA

S

AN

D

FUEL

PIP

ELIN

E

EASE

ME

NT

1

2

RD

855

1200

1190

1220

1405

1425

1185

1025

1035

1045

1055

1065

1075

1085

1105

1115

1125

1131

1135

1145

1165

1315

90

1140 1150

1260 1280

1085 114513251305128512651255

910

870

780 800

840

75

804

14601470

960

1410 1430 1440

7.62

7.6

2

7.62

7.62

7.6

2

7.62

2 3 4 5 6

1

85

90

5

40

X

810

200

1445

300

11A

PT15

6

LP112192

LP11

6445

LP117710

LP11

7710

LP11

814

2

LP118142

LP119618

LP119619

LP120688

LP123196

LP123641

LP123641

LP12

3745

LP130685

LP132357

LP135874 LP143205LP143205

LP208748

LP208748

LP208748

LP208748 LP208748

LP208748

LP38239

LP5364

LP5364

TP394032

LP56455

LP56455

LP56455

LP56455

LP67181

LP67181

LP67181

LP67181

LP75809

LP77332

LP77367

TP843230

LP82581

LP83456

LP85024

LP85292

LP93036

LP93036

LP93036

LP93036

LP97909

LP97909

LP98632

LP99885

CP159200

TP13

7224

TP13

7224

PS334583

PS334583

PS405559

12

1025

1343

1100

1235

895

870

1145

1145A

10

X

1405

1130

65

1475

65

35

55

300

PS449806

RO

AD

1025

975915905

875

817

11055

1440

823

130

130

130

1000 1380

1180

1391 1395

945

1015

1030960

25

825

835

845

1 2

1805

TP443550

1

TP443550

1

TP443550

1300

1325

TP13

7224

4

2

TP137224

TP137224

3

1

2

821

1

TP222158

21

TP411620

1

TP334376

1

TP11

41

TP533054

1

1

TP133106

130

3

6

22

A

22B22C

TP74589

TP74589

PS533467

1

TP843230

1025

2

TP843230

1265

1235

TP327601

1

2

PS533467

X X1 1

TP599592 TP225463

1

TP332315

1440

X1

1

TP220528

TP369724

1371

1020

B

210B

PS641056

1 1

TP224808

TP946722

2

1

TP243049

TP243049

PtC.A.22

NUA

1190

BUSLANE

BUSLANE

BUS

LANE

BUSLANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

0

1:20000 @ A3 14094 CLP100 J

RBHTCW

METROPOLITAN PLANNING AUTHORITY

100 200 400

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

OVERALL SITE LAYOUT

367

ME

LB

OU

RN

E - S

YD

NE

Y R

AIL

WA

Y

ULTIMATE KEY PLAN

DONNYBROOK ROAD

ME

RRIA

NG R

OA

D

CAMERON STREET

PA

TTE

RS

ON B

OU

LE

VA

RD

HAYES HILL BOULEVARD

ROAD

GUNNS G

ULLY

IN-01 IN-02 IN-03 IN-04

IN-05

IN-06

RD-01

RD-02

RD-0

3

DRIV

EK

OU

KO

UR

A

RD-0

5

RD-04

BO

ULE

VA

RD

PATTERS

ON

(OPTION 2)

BR-01

BRIDGE

IN-07 IN-08

IN-9

IN-10 IN-11

IN-12

IN-13

IN-14

IN-15

IN-16

BR-02

CULVERT

BR-04

CULVERT

BR-06

CULVERT

BR-07

BRIDGE

BR-8

BRIDGE

BR-05

CULVERT

BR-03

CULVERT

BR-09

CULVERT

(OPTION 1)

BR-01

BRIDGE

GAS-01

GAS-02

GAS-03

GAS-04

GAS-05

GA

S E

AS

ME

NTSIGNALS - 01

OPERATEDPEDESTRIAN

SIGNALS - 02OPERATEDPEDESTRIAN

SIGNALS - 03OPERATEDPEDESTRIAN

SIGNALS - 04OPERATEDPEDESTRIAN

SIGNALS - 05OPERATEDPEDESTRIAN

BRIDGE LOCATIONEXISTING V-LINE

Page 10: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 9

Appendix B Intersection Analysis Report

Page 11: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03) 9939 8250

Donnybrook & Woodstock PSP Intersection Analysis

14094TIA001B-F.docx

4 February 2015

Page 12: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 2

onemilegrid ABN: 79 168 115 679

(03) 9939 8250

1/59 Keele Street

COLLINGWOOD, VIC 3066

www.onemilegrid.com.au

DOCUMENT INFORMATION

Prepared For MPA

File Name 14094TIA001B-F.docx Report Date 4 February 2015

Prepared By Ross Hill Authorised By Trevor Waugh

Signature

Signature

© One Mile Grid Pty Ltd. This document has been prepared by onemilegrid for the sole use and benefit of the

client as per the terms of engagement. It may not be modified or altered, copied, reproduced, sold or

transferred in whole or in part in any format to any person other than by agreement. onemilegrid does not

assume responsibility or liability to any third party arising out of use or misuse of this document.

Page 13: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 3

CONTENTS

1 INTRODUCTION .................................................................................................................. 4

2 TRAFFIC VOLUME REVIEW .................................................................................................... 4

3 INTERSECTION ANALYSIS ..................................................................................................... 6 3.1 Sidra Assumptions and Details ................................................................................................. 6 3.2 Analysis Results ......................................................................................................................... 7

4 REVISED ROAD NETWORK .................................................................................................... 7

TABLES

Table 1 SIDRA Intersection Parameters ..................................................................................................... 6

APPENDICES

APPENDIX A SIDRA SUMMARIES ..................................................................................................... 8

Page 14: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 4

1 INTRODUCTION

onemilegrid has been requested by MPA to undertake a range of engineering works in relation to

the Donnybrook and Woodstock PSP areas.

The following report outlines the analysis related to intersection design, including a review of the

traffic volumes provided, and intersections analysis for selected intersections.

2 TRAFFIC VOLUME REVIEW

A review of the traffic volume data provided by GTA was undertaken, in order to determine which

intersections may require specific treatments to accommodate the expected volumes. The review

included assessment of:

Total intersection volumes (>4000vph);

Right turn volumes by lane (>400vph);

Through volumes by lane (>800vph); and

Left turn volumes by lane (>500vph).

As a result of the review, three intersections were nominated for further analysis under Ultimate

conditions, as below, and as highlighted in Figure 1:

IN-13 (previously IN-17) – High total intersection and through volumes

IN-14 (previously IN-18) – High total intersection and right turn volumes

IN-16 (previously IN-20) – High total intersection and right turn volumes

Under Interim conditions, no intersections were identified as requiring further analysis.

It was also noted that traffic volumes were not provided for intersection IN-01.

Following discussion with MPA, of the above intersections, further analysis was elected to be

undertaken on IN-14 and IN-16 under Ultimate conditions only.

Page 15: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 5

Figure 1 Intersection Analysis Locations

IN-16

IN-13

IN-14

Page 16: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 6

3 INTERSECTION ANALYSIS

3.1 Sidra Assumptions and Details

To assess the operation of the intersection the traffic volumes have been input into SIDRA

Intersection, a traffic modelling software package.

The SIDRA Intersection software package has been developed to provide information on the

capacity of an intersection with regard to a number of parameters. Those parameters considered

relevant are, Degree of Saturation (DoS), 95th Percentile Queue, and Average Delay as described

below.

Table 1 SIDRA Intersection Parameters

Parameter Description

Degree of Saturation (DoS)

The DoS represents the ratio of the traffic volume making a

particular movement compared to the maximum capacity for

that particular movement. The value of the DoS has a

corresponding rating depending on the ratio as shown below.

Degree of Saturation Rating

Up to 0.60 Excellent

0.61 – 0.70 Very Good

0.71 – 0.80 Good

0.81 – 0.90 Acceptable

0.91 – 1.00 Poor

Above 1.00 Very Poor

It is noted that whilst the range of 0.91 – 1.00 is rated as ‘poor’,

it is acceptable for critical movements at an intersection to be

operating within this range during high peak periods, reflecting

actual conditions in a significant number of suburban signalised

intersections.

Average Delay (seconds) Average delay is the time delay that can be expected for all

vehicles undertaking a particular movement in seconds.

95th Percentile (95%ile) Queue

95%ile queue represents the maximum queue length in metres

that can be expected in 95% of observed queue lengths in the

peak hour

The following assumptions and analysis details have been applied to each intersection, unless

otherwise noted in the analysis. Where no commentary is provide, SIDRA defaults are retained.

1. SIDRA Version 6.0.24.4877 has been utilised for the analysis;

2. Performance Measure and Level of Service Method have been set to Degree of Saturation, to

better represent the operation of SCATS;

3. Where left turn slip lanes have not been provided, separate left turn lanes have been included;

4. Diamond right turn phasing has been adopted for both the main road and side road, with fully

controlled turns;

5. Heavy vehicle volumes have been adopted as follows:

a) 4% of arterial road through traffic volumes; and

b) 2% of local streets (including turns from the arterial road).

6. Pedestrian volumes have been adopted as 50 pedestrians per hour

Page 17: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 7

7. Cycle times adopted as120 seconds

8. Pedestrian movements will operate every cycle during the peak periods.

9. Intergreen times have been assumed at 6 seconds, comprising 4 seconds of yellow and 2

seconds of all-red. Some variation in these times can be expected, although on average, 6

seconds of intergreen is considered appropriate.

10. Pedestrian walk and clearance times based on SIDRA defaults, which is considered to be

conservative;

11. No additional peak flow factor has been used;

12. Bus priority typically only impacts on signal operation where a bus is provided with a ‘head start’

lantern, which delays through traffic on the main road for a few seconds. This only occurs when

a bus does not pass through the intersection on the green phase. Given the expected

frequency of buses, and the limited impact on intersection operation, bus operations have not

been included in the analysis;

13. Bicycles have not been included in the analysis;

14. The length of a short lane utilised in the SIDRA analysis is taken as the length of the straight

section of the turn lane, plus half of the taper length. This is considered to be the effective turn

lane length, as the first half of the taper is considered too narrow to accommodate a full

vehicle width.

15. The length of deceleration/turn lanes has been adopted as the Minimum required for

deceleration (based on the posted speed limit);

a) 80km/h = 100m deceleration = 85m in SIDRA;

b) 60km/h = 55m deceleration = 45m in SIDRA;

c) 50km/h = 40m deceleration = 30m in SIDRA; and

d) 40km/h = 25m deceleration = 20m in SIDRA.

16. Lane widths of 3.5m have been adopted for all lanes;

17. Median widths of 2.5m have been adopted for all approaches;

18. Arrival Type retained as the SIDRA default, which assumes random arrivals:

19. The following targets have been adopted with regard to intersection operation:

a) Intersection Degree of Saturation below 0.9; and

b) Maximum 95th percentile queue lengths of less than 250m.

3.2 Analysis Results

The results of the analysis are provided in Appendix A.

The analysis also identifies the required intersection treatment to accommodate the expected

volumes, within the targets above.

4 REVISED ROAD NETWORK

Subsequent to the above analysis, modifications to the road network occurred, resulting in removal

and relocation of intersections and roads. A change in traffic volumes can therefore be expected

as a result of the road network changes.

The modelling previously undertaken by GTA has not been amended to reflect the road network

changes, therefore revised intersection analysis has not been undertaken.

Page 18: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Intersection Analysis 14094TIA001B-F 4 February 2015

Page 8

Appendix A SIDRA Summaries

Page 19: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Signals \\auvics01\Company\Projects\2014\14094\Sidra\14094SID001B.sip6[IN-14AM]

Phase Grn Red Total %

A 43 2 49 40.83

B1 13 2 19 15.83

B2 0 2 1 0.833

C 30 2 36 30

D1 9 2 15 12.5

App R T L 120

43.7 61.4 38.2 7.3

48.9 48.9 46.7 4.8

0.554 0.554 0.278 0.051

586 236 276 74

23 9 11 3

563 227 265 71

L 6.5 6.4 0.091 141 6 135 1325 55 1380 133.8 32.3 App

T 29.7 65.5 0.313 647 26 621 65 3 68 14.2 64.5 R

R 66.5 32.4 0.548 150 6 144 1132 47 1179 133.8 33.3 T

App 32.1 65.5 0.548 938 38 900 128 5 133 9 7.3 L

3387 336 187 76 599 LV*

141 14 8 3 25 HV*

3528 350 195 79 624 Total Vol* *Output Volumes

0.571 0.364 0.203 0.2 0.364 D.o.S.

133.8 68.4 32.6 15.7 68.4 95th %ile Back of Queue (m)

33.3 14 38.2 59.6 27.4 Average Delay (sec)

Intersection L T R App

IN-14: Gunns Gully/Pattersons

AM Peak, Ultimate

RoadName 4

Yel

4

4

4

4

RoadName RoadName

0.571

0.248

0.571

0.1

RoadName

N

\\auvics01\Company\Projects\2014\14094\Calcs\14094SID001B.xlsm 01 9/12/2014 1:56 PM Page 1 of 4

Page 20: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Signals \\auvics01\Company\Projects\2014\14094\Sidra\14094SID001B.sip6[IN-14PM]

Phase Grn Red Total %

A 33 2 39 32.5

B1 9 2 15 12.5

C 31 2 37 30.83

D1 7 2 13 10.83

D2 10 2 16 13.33

App R T L 120

45.5 72.6 38.4 16.9

52.6 52.6 49.3 27.6

0.826 0.826 0.292 0.162

659 226 290 143

26 9 12 6

633 217 278 137

L 8 35 0.288 381 15 366 1367 57 1424 140 43.2 App

T 36.7 257.4 0.826 1767 71 1696 174 7 181 43.1 75.7 R

R 55.2 94.5 0.672 470 19 451 1057 44 1101 140 42.1 T

App 35.8 257.4 0.826 2618 105 2513 136 6 142 15.9 9.7 L

5128 291 252 73 615 LV*

214 12 10 3 26 HV*

5342 303 262 76 641 Total Vol* *Output Volumes

0.85 0.273 0.264 0.278 0.278 D.o.S.

257.4 50.9 44.2 15.9 50.9 95th %ile Back of Queue (m)

38.2 12.9 38.1 64.8 29.3 Average Delay (sec)

Intersection L T R App

IN-14: Gunns Gully/Pattersons

PM Peak, Ultimate

RoadName 4

Yel

4

4

4

4

RoadName RoadName

0.85

0.85

0.695

0.132

RoadName

N

\\auvics01\Company\Projects\2014\14094\Calcs\14094SID001B.xlsm 02 9/12/2014 1:56 PM Page 2 of 4

Page 21: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Signals \\auvics01\Company\Projects\2014\14094\Sidra\14094SID001B.sip6[IN-16AM]

Phase Grn Red Total %

A 36 2 42 35

B1 7 2 13 10.83

B2 0 2 5 4.167

C 28 2 34 28.33

D1 20 2 26 21.67

App R T L 120

50.2 68.4 38.3 43.9

33 21.5 33 33

0.463 0.463 0.212 0.212

150 50 50 50

3 1 1 1

147 49 49 49

L 28.4 12.4 0.066 50 1 49 997 40 1037 92.8 32.4 App

T 35.6 72.1 0.376 649 26 623 49 1 50 18 52.2 R

R 55.3 57 0.479 291 12 279 776 32 808 92.8 36.8 T

App 41 72.1 0.479 990 39 951 172 7 179 12.6 7.3 L

2770 395 98 183 676 LV*

109 16 2 8 26 HV*

2879 411 100 191 702 Total Vol* *Output Volumes

0.523 0.341 0.187 0.523 0.523 D.o.S.

92.8 52.2 31.7 40 52.2 95th %ile Back of Queue (m)

35.2 9.4 35.6 63.1 27.8 Average Delay (sec)

Intersection L T R App

IN-16: Gunns Gully/Koukoura

AM Peak, Ultimate

RoadName 4

Yel

4

4

4

4

RoadName RoadName

0.468

0.162

0.468

0.139

RoadName

N

\\auvics01\Company\Projects\2014\14094\Calcs\14094SID001B.xlsm 03 9/12/2014 1:56 PM Page 3 of 4

Page 22: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Signals \\auvics01\Company\Projects\2014\14094\Sidra\14094SID001B.sip6[IN-16PM]

Phase Grn Red Total %

A 28 2 34 28.33

B1 6 2 12 10

B2 0 2 5 4.167

C 28 2 34 28.33

D1 7 2 13 10.83

D2 16 2 22 18.33

App R T L 120

49.3 70.2 40.4 46

51.6 22 51.6 51.6

0.541 0.541 0.325 0.325

200 50 100 50

4 1 2 1

196 49 98 49

L 34.7 14.1 0.081 50 1 49 1179 48 1227 129.5 41.7 App

T 26.6 105.6 0.44 1057 42 1015 49 1 50 21.5 68.3 R

R 52.4 130.4 0.735 648 26 622 933 39 972 129.5 46.8 T

App 36.4 130.4 0.735 1755 68 1687 197 8 205 27.9 11 L

3838 412 98 268 777 LV*

152 17 2 11 31 HV*

3990 429 100 279 808 Total Vol* *Output Volumes

0.834 0.344 0.187 0.834 0.834 D.o.S.

130.4 63.2 31.7 64.8 64.8 95th %ile Back of Queue (m)

38.4 10.9 35.6 71.5 34.9 Average Delay (sec)

Intersection L T R App

IN-16: Gunns Gully/Koukoura

PM Peak, Ultimate

RoadName 4

4

Yel

4

4

4

4

RoadName RoadName

0.723

0.463

0.723

0.202

RoadName

N

\\auvics01\Company\Projects\2014\14094\Calcs\14094SID001B.xlsm 04 9/12/2014 1:56 PM Page 4 of 4

Page 23: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 10

Appendix C Ultimate Intersection Designs

Page 24: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP100.d

gn

04-09-2015

Date Plotted:

11:46:39 A

M

Preliminary - Not for construction

25 45

1020

10101425

1050

1070

1090

1110

1490

15

30

1400

1370

1350

45

55

145

155

150

130

120

80

135

65

50

DONNYBROOK

6.10

56

25

26

27

62

35

4.0

2

ELIZABETH

28

29

30 31

GRANTS RD

1

1

3

5

6.10

1

2

3

4

GRANTS

SH

ERID

AN

CT

32 33 34

1

23

36

6.0

0

6.00

6.00

D

D

D

E

E

E

Dr

&

Sew

Emt

ELIZABETH

PL

PL

ELIZ

AB

ET

H

PL

37

38

40

65

61

60

59

4.0

0

Dr.

&

Sew.

Emt.

64

5

O-419

L.P. 75809

DONNYBROOKRD

SH

ERID

AN

CT

ELIZABETH

PL

ELIZ

AB

ET

H

PL

Parish of

Parish of

L.P. 132049

L.P. 132049

L.P. 13

2049

L.P. 13

2049

L.P. 132

049

L.P. 13

2049

L.P. 13

2049

L.P. 13

2049

L.P. 13

2049

L.P. 132049

L.P. 132049

L.P. 203459

L.P. 203459

L.P. 203458

L.P. 203481

L.P. 9

1619

LP75809L.P. 91619

12.00

ELECRICIT

Y

E

2 1

4

5

20.00

20.0

0

20.00

20.00

14.00

E

65

3

1 2

2.0

1D

E

of Kalkallo

Pt. C.P. 27

Pt. C.P. 27

Parish of Kalkallo

Parishof Merriang

Parish of Kalkallo

MerriangParish of

O-430

9

10

11

12

O-430

0-403

J-689H-331

B-898

1 1

35.0

0

Gas

Ease

ment

and

Fuel

Pipelin

e

[ Keon Park-Shepparton-

Wodonga ]

[ Keon Park-Shepparton-

Wodonga ]

C/W

3.05

RD

DONNYBROOK

ROAD

ROAD

RD

EPPIN

G

NORMAN

20.0

0

20.12

ELEC.

EA

SE

ME

NT

1 2

2

1

1

7

1 C.P. 15

Pt. C.P. 22

RDRD

RD

5.0

0

El

Emt

El

Emt

DR

AVELIN RD

1

1

6

7

1

DONNYBROOK

RD

LA

NG

LE

Y

PA

RK

DR

6.10

4.5

7

5.00

5.00

5.00

D

DE

E

D

E

EA

SE

ME

NT

4.57

4.5

7

4.5

7

20.12 C'WAY EASEMENT

Easement

35.0

0Gas

and

Fuel

Park-Shepparton-

Wodonga]

Pipeline

Ease

ment

[Keon

[Keon

Park

-Shepparton

-W

odonga

]Pipeline

Ease

ment

and

Fuel

2.0

1

DONNYBROOKRD

1

2

1

C.P.15

Pt C.P.22

8.04

Dr

E

2

1

2

Pt.C.P.28

Pt.C.P.22

1

C'way

1

2

2

C.P.15

2

3.0

5

3.0

5

3.0

5

3.05

3.05

6.10

DONNYBROOK RD

EPPIN

G

3.0

5

15.00

D

9.0

0

El

E

1 2 16172 3 1920

14

15

1

12 3

801-239-1583

ROAD

EPPIN

G

RD

20.0

0D

E

3.0

5

1

Pt.C.P.29 & Pt.C.

P.28

2

3

1

2

1

2

8

13

2

3

C.P.21

2

1

RD

ME

RRIA

NG

RD

EPPIN

G

RD

Dr

Emt

2

2

2

PIP

ELIN

E

EA

SE

ME

NT

35.0

0

GA

S

AN

D

FUEL

PIP

ELIN

E

EASE

ME

NT

1

2

RD

855

1200

1190

1220

1405

1425

1185

1025

1035

1045

1055

1065

1075

1085

1105

1115

1125

1131

1135

1145

1165

1315

90

1140 1150

1260 1280

1085 114513251305128512651255

910

870

780 800

840

75

804

14601470

960

1410 1430 1440

7.62

7.6

2

7.62

7.62

7.6

2

7.62

2 3 4 5 6

1

85

90

5

40

X

810

200

1445

300

11A

PT15

6

LP112192

LP11

6445

LP117710

LP11

7710

LP11

814

2

LP118142

LP119618

LP119619

LP120688

LP123196

LP123641

LP123641

LP12

3745

LP130685

LP132357

LP135874 LP143205LP143205

LP208748

LP208748

LP208748

LP208748 LP208748

LP208748

LP38239

LP5364

LP5364

TP394032

LP56455

LP56455

LP56455

LP56455

LP67181

LP67181

LP67181

LP67181

LP75809

LP77332

LP77367

TP843230

LP82581

LP83456

LP85024

LP85292

LP93036

LP93036

LP93036

LP93036

LP97909

LP97909

LP98632

LP99885

CP159200

TP13

7224

TP13

7224

PS334583

PS334583

PS405559

12

1025

1343

1100

1235

895

870

1145

1145A

10

X

1405

1130

65

1475

65

35

55

300

PS449806

RO

AD

1025

975915905

875

817

11055

1440

823

130

130

130

1000 1380

1180

1391 1395

945

1015

1030960

25

825

835

845

1 2

1805

TP443550

1

TP443550

1

TP443550

1300

1325

TP13

7224

4

2

TP137224

TP137224

3

1

2

821

1

TP222158

21

TP411620

1

TP334376

1

TP11

41

TP533054

1

1

TP133106

130

3

6

22

A

22B22C

TP74589

TP74589

PS533467

1

TP843230

1025

2

TP843230

1265

1235

TP327601

1

2

PS533467

X X1 1

TP599592 TP225463

1

TP332315

1440

X1

1

TP220528

TP369724

1371

1020

B

210B

PS641056

1 1

TP224808

TP946722

2

1

TP243049

TP243049

PtC.A.22

NUA

1190

BUSLANE

BUSLANE

BUS

LANE

BUSLANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

0

1:20000 @ A3 14094 CLP100 J

RBHTCW

METROPOLITAN PLANNING AUTHORITY

100 200 400

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

OVERALL SITE LAYOUT

367

ME

LB

OU

RN

E - S

YD

NE

Y R

AIL

WA

Y

ULTIMATE KEY PLAN

DONNYBROOK ROAD

ME

RRIA

NG R

OA

D

CAMERON STREET

PA

TTE

RS

ON B

OU

LE

VA

RD

HAYES HILL BOULEVARD

ROAD

GUNNS G

ULLY

IN-01 IN-02 IN-03 IN-04

IN-05

IN-06

RD-01

RD-02

RD-0

3

DRIV

EK

OU

KO

UR

A

RD-0

5

RD-04

BO

ULE

VA

RD

PATTERS

ON

(OPTION 2)

BR-01

BRIDGE

IN-07 IN-08

IN-9

IN-10 IN-11

IN-12

IN-13

IN-14

IN-15

IN-16

BR-02

CULVERT

BR-04

CULVERT

BR-06

CULVERT

BR-07

BRIDGE

BR-8

BRIDGE

BR-05

CULVERT

BR-03

CULVERT

BR-09

CULVERT

(OPTION 1)

BR-01

BRIDGE

GAS-01

GAS-02

GAS-03

GAS-04

GAS-05

GA

S E

AS

ME

NTSIGNALS - 01

OPERATEDPEDESTRIAN

SIGNALS - 02OPERATEDPEDESTRIAN

SIGNALS - 03OPERATEDPEDESTRIAN

SIGNALS - 04OPERATEDPEDESTRIAN

SIGNALS - 05OPERATEDPEDESTRIAN

BRIDGE LOCATIONEXISTING V-LINE

Page 25: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP101 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-01

DONNYBROOK ROAD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP101.d

gn

04-09-2015

Date Plotted:

11:46:40 A

M

Project Number Drawing Number Revision

1 2

2.0

1D

E

J-689

ELEC.

EA

SE

ME

NT

1

1

DR

855

870

840

LP117710

LP132357

PS334583

870

PS449806

875835

845

2

Page 26: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP102 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-02

DONNYBROOK ROAD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP102.d

gn

04-09-2015

Date Plotted:

11:46:40 A

M

Project Number Drawing Number Revision

H-331

2

1

910

LP123641

915905

BU

S

LA

NE

BUS

LANE

BUS

LANE

BU

S

LA

NE

Page 27: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP103 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-03

DONNYBROOK ROAD

PA

TTE

RS

ON B

OU

LE

VA

RD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP103.d

gn

04-09-2015

Date Plotted:

11:46:41 A

M

Project Number Drawing Number Revision

DONNYBROOK

C.P.15

BU

S

LA

NE

BUS

LANE

BUS

LANE

BU

S

LA

NE BUS

LANE

BUS

LANE

Page 28: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP104 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-04

DONNYBROOK ROAD

KO

UK

OU

RA D

RIV

E

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP104.d

gn

04-09-2015

Date Plotted:

11:46:41 A

M

Project Number Drawing Number Revision

5

2

2

DONNYBROOK

9.0

0

El

E

2

1

1200

11901150

1145

LP135874LP143205

LP208748

1145A

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

Page 29: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP105 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-05

DONNYBROOK ROAD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP105.d

gn

04-09-2015

Date Plotted:

11:46:42 A

M

Project Number Drawing Number Revision

15.00

1 21920

1 2 3

1260 1280

1305128512651255

LP120688

LP130685

LP56455

1300

1265

Page 30: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP106 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-06

PA

TTE

RS

ON B

OU

LE

VA

RD

HAYES HILL BOULEVARD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP106.d

gn

04-09-2015

Date Plotted:

11:46:42 A

M

Project Number Drawing Number Revision

Page 31: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP107 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-07

KO

UK

OU

RA D

RIV

E

HAYES HILL BOULEVARD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP107.d

gn

04-09-2015

Date Plotted:

11:46:43 A

M

Project Number Drawing Number Revision

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

Page 32: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP108 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-08

ME

RRIA

NG R

OA

D

HAYES HILL BOULEVARD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP108.d

gn

04-09-2015

Date Plotted:

11:49:10 A

M

Project Number Drawing Number Revision

1070

1090

3

9

10

2

8

1065

1075

1085

1105

LP93036

Page 33: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP109 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-09

CAMERON STREET

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP109.d

gn

04-09-2015

Date Plotted:

11:46:44 A

M

Project Number Drawing Number Revision

RD

Page 34: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP110 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-10

CA

ME

RO

N S

TR

EE

T

PATTERSON BOULEVARD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP110.d

gn

04-09-2015

Date Plotted:

11:46:44 A

M

Project Number Drawing Number Revision

RO

AD

2

TP843230

Page 35: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP111 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-11

CA

ME

RO

N S

TR

EE

T

KOUKOURA DRIVE

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP111.d

gn

04-09-2015

Date Plotted:

11:46:45 A

M

Project Number Drawing Number Revision

2

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUSLANE

BUS

LANE

BUS

LANE

Page 36: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP112 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-12

CAMERON STREET

ME

RRIA

NG R

OA

D

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP112.d

gn

04-09-2015

Date Plotted:

11:46:45 A

M

Project Number Drawing Number Revision

1

L.P. 9

1619

EPPIN

G

3.0

5

3.0

5

RD

3.0

5

1

2

3

1

21125

1131

1135

1145

1165

LP56455

LP83456

LP99885

1130

Page 37: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP113 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-13

GUNNS G

ULLY R

OAD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP113.d

gn

04-09-2015

Date Plotted:

11:46:46 A

M

Project Number Drawing Number Revision

BUSLANE

BUSLANE

BUS

LANE

BUSLANE

BUS

LANE

Page 38: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP114 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-14

GUNNS G

ULL

Y R

OAD

PATTER

SON B

OULEVA

RD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP114.d

gn

04-09-2015

Date Plotted:

11:46:46 A

M

Project Number Drawing Number RevisionC'way

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUS

LANE

BUSLANE

Page 39: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP115 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-15

GUNNS GULLY ROAD

KO

UK

OU

RA D

RIV

E

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP115.d

gn

04-09-2015

Date Plotted:

11:46:47 A

M

Project Number Drawing Number Revision

ROAD

1235

Page 40: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP116 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

ULTIMATE INTERSECTION CONCEPT LAYOUT

IN-16

PATTERS

ON B

OULE

VA

RD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP116.d

gn

04-09-2015

Date Plotted:

11:46:47 A

M

Project Number Drawing Number Revision

6

TP394032

300

Page 41: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 11

Appendix D Interim Intersection Designs

Page 42: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP200.d

gn

04-09-2015

Date Plotted:

11:46:48 A

M

Preliminary - Not for construction

25 45

1020

10101425

1050

1070

1090

1110

1490

15

30

1400

1370

1350

45

55

145

155

150

130

120

80

135

65

50

DONNYBROOK

6.10

56

25

26

27

62

35

4.0

2

ELIZABETH

28

29

30 31

GRANTS RD

1

1

3

5

6.10

1

2

3

4

GRANTS

SH

ERID

AN

CT

32 33 34

1

23

36

6.0

0

6.00

6.00

D

D

D

E

E

E

Dr

&

Sew

Emt

ELIZABETH

PL

PL

ELIZ

AB

ET

H

PL

37

38

40

65

61

60

59

4.0

0

Dr.

&

Sew.

Emt.

64

5

O-419

L.P. 75809

DONNYBROOKRD

SH

ERID

AN

CT

ELIZABETH

PL

ELIZ

AB

ET

H

PL

Parish of

Parish of

L.P. 132049

L.P. 132049

L.P. 13

2049

L.P. 13

2049

L.P. 132

049

L.P. 13

2049

L.P. 13

2049

L.P. 13

2049

L.P. 13

2049

L.P. 132049

L.P. 132049

L.P. 203459

L.P. 203459

L.P. 203458

L.P. 203481

L.P. 9

1619

LP75809L.P. 91619

12.00

ELECRICIT

Y

E

2 1

4

5

20.00

20.0

0

20.00

20.00

14.00

E

65

3

1 2

2.0

1D

E

of Kalkallo

Pt. C.P. 27

Pt. C.P. 27

Parish of Kalkallo

Parishof Merriang

Parish of Kalkallo

MerriangParish of

O-430

9

10

11

12

O-430

0-403

J-689H-331

B-898

1 1

35.0

0

Gas

Ease

ment

and

Fuel

Pipelin

e

[ Keon Park-Shepparton-

Wodonga ]

[ Keon Park-Shepparton-

Wodonga ]

C/W

3.05

RD

DONNYBROOK

ROAD

ROAD

RD

EPPIN

G

NORMAN

20.0

0

20.12

ELEC.

EA

SE

ME

NT

1 2

2

1

1

7

1 C.P. 15

Pt. C.P. 22

RDRD

RD

5.0

0

El

Emt

El

Emt

DR

AVELIN RD

1

1

6

7

1

DONNYBROOK

RD

LA

NG

LE

Y

PA

RK

DR

6.10

4.5

7

5.00

5.00

5.00

D

DE

E

D

E

EA

SE

ME

NT

4.57

4.5

7

4.5

7

20.12 C'WAY EASEMENT

Easement

35.0

0Gas

and

Fuel

Park-Shepparton-

Wodonga]

Pipeline

Ease

ment

[Keon

[Keon

Park

-Shepparton

-W

odonga

]Pipeline

Ease

ment

and

Fuel

2.0

1

DONNYBROOKRD

1

2

1

C.P.15

Pt C.P.22

8.04

Dr

E

2

1

2

Pt.C.P.28

Pt.C.P.22

1

C'way

1

2

2

C.P.15

2

3.0

5

3.0

5

3.0

5

3.05

3.05

6.10

DONNYBROOK RD

EPPIN

G

3.0

5

15.00

D

9.0

0

El

E

1 2 16172 3 1920

14

15

1

12 3

801-239-1583

ROAD

EPPIN

G

RD

20.0

0D

E

3.0

5

1

Pt.C.P.29 & Pt.C.

P.28

2

3

1

2

1

2

8

13

2

3

C.P.21

2

1

RD

ME

RRIA

NG

RD

EPPIN

G

RD

Dr

Emt

2

2

2

PIP

ELIN

E

EA

SE

ME

NT

35.0

0

GA

S

AN

D

FUEL

PIP

ELIN

E

EASE

ME

NT

1

2

RD

855

1200

1190

1220

1405

1425

1185

1025

1035

1045

1055

1065

1075

1085

1105

1115

1125

1131

1135

1145

1165

1315

90

1140 1150

1260 1280

1085 114513251305128512651255

910

870

780 800

840

75

804

14601470

960

1410 1430 1440

7.62

7.6

2

7.62

7.62

7.6

2

7.62

2 3 4 5 6

1

85

90

5

40

X

810

200

1445

300

11A

PT15

6

LP112192

LP11

6445

LP117710

LP11

7710

LP11

814

2

LP118142

LP119618

LP119619

LP120688

LP123196

LP123641

LP123641

LP12

3745

LP130685

LP132357

LP135874 LP143205LP143205

LP208748

LP208748

LP208748

LP208748 LP208748

LP208748

LP38239

LP5364

LP5364

TP394032

LP56455

LP56455

LP56455

LP56455

LP67181

LP67181

LP67181

LP67181

LP75809

LP77332

LP77367

TP843230

LP82581

LP83456

LP85024

LP85292

LP93036

LP93036

LP93036

LP93036

LP97909

LP97909

LP98632

LP99885

CP159200

TP13

7224

TP13

7224

PS334583

PS334583

PS405559

12

1025

1343

1100

1235

895

870

1145

1145A

10

X

1405

1130

65

1475

65

35

55

300

PS449806

RO

AD

1025

975915905

875

817

11055

1440

823

130

130

130

1000 1380

1180

1391 1395

945

1015

1030960

25

825

835

845

1 2

1805

TP443550

1

TP443550

1

TP443550

1300

1325

TP13

7224

4

2

TP137224

TP137224

3

1

2

821

1

TP222158

21

TP411620

1

TP334376

1

TP11

41

TP533054

1

1

TP133106

130

3

6

22

A

22B22C

TP74589

TP74589

PS533467

1

TP843230

1025

2

TP843230

1265

1235

TP327601

1

2

PS533467

X X1 1

TP599592 TP225463

1

TP332315

1440

X1

1

TP220528

TP369724

1371

1020

B

210B

PS641056

1 1

TP224808

TP946722

2

1

TP243049

TP243049

PtC.A.22

NUA

1190

0

1:20000 @ A3 14094 CLP200 F

RBHTCW

METROPOLITAN PLANNING AUTHORITY

100 200 400

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

OVERALL SITE LAYOUT

367

INTERIM KEY PLAN

ME

LB

OU

RN

E - S

YD

NE

Y R

AIL

WA

Y

DONNYBROOK ROAD

ME

RRIA

NG R

OA

D

CAMERON STREET

PA

TTE

RS

ON B

OU

LE

VA

RD

HAYES HILL BOULEVARD

ROAD

GUNNS G

ULLY

IN-01 IN-02 IN-03 IN-04

IN-05

IN-06

RD-01

RD-02

RD-0

3

DRIV

EK

OU

KO

UR

A

RD-0

5

RD-04

BO

ULE

VA

RD

PATTERS

ON

(OPTION 2)

BR-01

BRIDGE

IN-07 IN-08

IN-9

IN-10 IN-11

IN-12

IN-13

IN-14

IN-15

IN-16

BR-02

CULVERT

BR-04

CULVERT

BR-06

CULVERT

BR-07

BRIDGE

BR-8

BRIDGE

BR-05

CULVERT

BR-03

CULVERT

BR-09

CULVERT

(OPTION 1)

BR-01

BRIDGE

GAS-01

GAS-02

GAS-03

GAS-04

GAS-05

GA

S E

AS

ME

NTSIGNALS - 01

OPERATEDPEDESTRIAN

SIGNALS - 02OPERATEDPEDESTRIAN

SIGNALS - 03OPERATEDPEDESTRIAN

SIGNALS - 04OPERATEDPEDESTRIAN

SIGNALS - 05OPERATEDPEDESTRIAN

BRIDGE LOCATIONEXISTING V-LINE

Page 43: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP201 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-01

DONNYBROOK ROAD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT

OF

WO

RKS

LIMIT

OF

WO

RKS

LIMIT OF WORKS

LIMIT OF WORKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP201.d

gn

04-09-2015

Date Plotted:

11:46:54 A

M

Project Number Drawing Number Revision

1 2

2.0

1D

E

J-689

ELEC.

EA

SE

ME

NT

1

1

DR

855

870

840

LP117710

LP132357

PS334583

870

PS449806

875835

845

2

Page 44: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP202 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-02

DONNYBROOK ROAD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF WORKS

LIMIT OF WORKS

LIMIT

OF

WO

RKS

LIMIT

OF

WO

RKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP202.d

gn

04-09-2015

Date Plotted:

11:46:55 A

M

Project Number Drawing Number Revision

H-331

1 C.P. 15

910

LP123641

915905

Page 45: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP203 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-03

DONNYBROOK ROAD

INTERIM INTERSECTION CONCEPT LAYOUT

PATTERS

ON B

OULE

VA

RD

LIMIT OF WORKS

LIMIT OF WORKS

LIMIT

OF

WOR

KS

LIMIT

OF

WOR

KS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP203.d

gn

04-09-2015

Date Plotted:

11:46:55 A

M

Project Number Drawing Number Revision

DONNYBROOK

C.P.15

Page 46: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP204 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-04

DO

NNYBRO

OK R

OAD

INTERIM INTERSECTION CONCEPT LAYOUT

KO

UK

OUR

A D

RIV

E

LIMIT OF W

ORKS

LIMIT OF W

ORKS

LIMIT OF

WORKS

LIMIT OF

WORKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP204.d

gn

04-09-2015

Date Plotted:

11:46:56 A

M

Project Number Drawing Number Revision

5

2

2

DONNYBROOK

9.00

El

2

11200

1190

1150

1145

LP135874

LP143205

LP208748

1145A

Page 47: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP205 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-05

DONNYBROOK ROAD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF WORKS

LIMIT

OF

WO

RKS

LIMIT

OF

WO

RKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP205.d

gn

04-09-2015

Date Plotted:

11:46:56 A

M

Project Number Drawing Number Revision

15.00

1 21920

1 2 3

1260 1280

1305128512651255

LP120688

LP130685

LP56455

1300

1265

Page 48: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP206 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-06

PATTERSO

N BO

ULEVARD

HA

YES HIL

L B

OULE

VA

RD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMI

T OF W

ORKS

LIMI

T OF W

ORKS

LIMIT

OF

WOR

KS

LIMIT

OF

WOR

KS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP206.d

gn

04-09-2015

Date Plotted:

11:46:56 A

M

Project Number Drawing Number Revision

Page 49: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP207 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-07

KOUKOURA DRIVE

HA

YES HIL

L B

OU

LE

VA

RD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF WORKS

LIMIT OF WORKS

LIMIT

OF

WO

RKS

LIMIT

OF

WO

RKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP207.d

gn

04-09-2015

Date Plotted:

11:46:57 A

M

Project Number Drawing Number Revision

Page 50: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP208 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-08

MER

RIA

NG R

OA

D

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF

WORKS

LIMIT OF WORKS

LIMIT OF WORKS

HAYES HILL B

OULE

VARD

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP208.d

gn

04-09-2015

Date Plotted:

11:51:53 A

M

Project Number Drawing Number Revision

1070

1090

1110

1

3

9

10

3.05

2

8

1065

1075

1085

1105

LP82581

LP93036

Page 51: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP209 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-09

CAMERON STREET

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF WORKS

LIMIT OF WORKS

LIMIT

OF

WO

RKS

LIMIT

OF

WO

RKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP209.d

gn

04-09-2015

Date Plotted:

11:46:58 A

M

Project Number Drawing Number Revision

RD

Page 52: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP210 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-10

CA

MERO

N S

TREET

PATTERSO

N B

OULEVARD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF

WORKS

LIMIT OF

WORKS

LIMIT OF W

ORKS

LIMIT OF W

ORKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP210.d

gn

04-09-2015

Date Plotted:

11:46:58 A

M

Project Number Drawing Number Revision

ROAD

2TP84

3230

Page 53: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP211 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-11

CA

ME

RO

N S

TR

EE

T

INTERIM INTERSECTION CONCEPT LAYOUT

KOUKOURA DRIVE

LIMIT OF WORKS

LIMIT OF WORKS

LIMIT

OF

WO

RKS

LIMIT

OF

WOR

KS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP211.d

gn

04-09-2015

Date Plotted:

11:46:59 A

M

Project Number Drawing Number Revision

2

Page 54: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP212 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-12

CA

MER

ON S

TREET

MERRIA

NG R

OAD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMI

T OF W

ORKS

LIMIT OF W

ORKS

LIMIT OF W

ORKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP212.d

gn

04-09-2015

Date Plotted:

11:46:59 A

M

Project Number Drawing Number Revision

1

L.P. 91619

EPPIN

G

3.05

3.05 RD

1

2

3

1

2

1125

1131

1135

1145

1165

LP564

55

LP834

56

LP99885

1130

1180

Page 55: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP213 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-13

GUNNS G

ULLY R

OAD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF WORKS

LIMIT OF

WORKS

LIMIT

OF

WOR

KS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP213.d

gn

04-09-2015

Date Plotted:

11:47:00 A

M

Project Number Drawing Number Revision

Page 56: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP214 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-14

GUNNS G

ULL

Y R

OAD

PATTER

SON B

OULEVA

RD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT OF

WORKS

LIMIT OF W

ORKS

LIMIT OF

WORKS

LIMIT

OF

WO

RKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP214.d

gn

04-09-2015

Date Plotted:

11:47:00 A

M

Project Number Drawing Number RevisionC'way

Page 57: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP215 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-15

GUNNS GULLY ROAD

INTERIM INTERSECTION CONCEPT LAYOUT

KO

UK

OU

A D

RIV

E

LIMIT OF WORKS

LIMIT OF WORKS

LIMIT

OF

WO

RKS

LIMIT

OF

WO

RKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP215.d

gn

04-09-2015

Date Plotted:

11:47:01 A

M

Project Number Drawing Number Revision

Page 58: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

0

1:1500 @ A3 14094 CLP216 E

RBHTCW

DONNYBROOK PSP

NA

7.5 15 30

IN-16

PATTERS

ON B

OULE

VA

RD

INTERIM INTERSECTION CONCEPT LAYOUT

LIMIT

OF

WOR

KS

LIMIT OF WORKS

LIMIT OF WORKS

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP216.d

gn

04-09-2015

Date Plotted:

11:47:01 A

M

Project Number Drawing Number Revision

6

TP394032

300

Page 59: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 12

Appendix E Bridge/Culvert Designs

Page 60: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx
Page 61: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

DESIGN CENTRELINE GRADING

HORIZONTAL GEOMETRY

CHAINAGE

EXISTING SURFACE

DESIGN CENTRELINE

DATUM 212

BRIDGE 1 (OPTION 1) LONGITUDINAL SECTIONHOR 1 : 200

VER 1 : 200

0 % 0 %

L= 150m VC

Melbourne | Sydney | Geelong

Page 62: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

CH 37

0.000

ELV.

236.0

00

L= 100m VC

BRIDGE 1 (OPTION 2) LONGITUDINAL SECTIONHOR 1 : 200VER 1 : 200

L= 150m VC

CH 37

0.000

CH 42

7.000

ELV.

236.0

00

ELV.

236.0

00

L= 100m VC

0 % 0 %

DESIGN CENTRELINE GRADING

0.000

227.0

2922

7.028

DESIGN CENTRELINE GRADING

HORIZONTAL GEOMETRY

CHAINAGE

EXISTING SURFACE

DESIGN CENTRELINE

DATUM 212

BRIDGE 1 (OPTION 2) LONGITUDINAL SECTION - CONTINUATIONHOR 1 : 200VER 1 : 200

Melbourne | Sydney | Geelong

Page 63: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

1 in 33.3 1 in 50

BRIDGE 1 (INTERIM) TYPICAL CROSS SECTION ADJACENT TO RAILWAY ZONESCALE 1:50

SCALE 1:50

A A1500-D 'T' BEAM BARRIER DETAIL

SCALE 1:50

Melbourne | Sydney | Geelong

Page 64: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

1 in 33.3 1 in 50

BRIDGE 1 (FINAL) TYPICAL CROSS SECTION ADJACENT TO RAILWAY ZONESCALE 1:50

A

1 in 33.31 in 50

A

SCALE 1:50

Melbourne | Sydney | Geelong

Page 65: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

1.69 % 0 % 0 %

L= 50m VC

3883

.138

254.7

8825

6.647

3885

.000

254.7

5225

6.678

3900

.000

253.9

5525

6.893

3910

.000

253.5

0425

6.994

3935

.000

252.0

0925

7.100

3950

.000

249.5

1525

7.100

3950

.179

249.4

4425

7.100

0 % 0.5 %DESIGN CENTRELINE GRADING

15.00

025

2.948

257.1

00

Melbourne | Sydney | Geelong

Page 66: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

1 in 100 1 in 50 1 in 100 1 in 33.31 in 100 1 in 100

1 in 33.3 1 in 100 1 in 50 1 in 100

BRIDGE 7 TYPICAL CROSS SECTIONSCALE 1:50

A A

SCALE 1:50

SCALE 1:50

Melbourne | Sydney | Geelong

Page 67: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

BRIDGE 8 LONGITUDINAL SECTIONHOR 1 : 200

VER 1 : 200

0 %

IN-16 LONGITUDINAL SECTION

HOR 1 : 200

VER 1 : 200

RAILWAY ZONE

DESIGN CENTRELINE GRADING

HORIZONTAL GEOMETRY

CHAINAGE

EXISTING SURFACE

DESIGN CENTRELINE

DATUM 243

Melbourne | Sydney | Geelong

Page 68: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

1 in 33.3 1 in 50

BRIDGE 8 TYPICAL CROSS SECTION ADJACENT TO RAILWAY ZONESCALE 1:50

A A

SCALE 1:50

SCALE 1:50

Melbourne | Sydney | Geelong

Page 69: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

A

1 in 33.31 in 50

A

BRIDGE 8 TYPICAL CROSS SECTION ADJACENT TO CREEKSCALE 1:50

SCALE 1:50

SCALE 1:50

Melbourne | Sydney | Geelong

Page 70: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx
Page 71: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx
Page 72: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 14094TIA004B-F.docx 26 October 2015

Page 13

Appendix F Land Take Areas

Page 73: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP300.d

gn

04-09-2015

Date Plotted:

11:47:02 A

M

Preliminary - Not for construction

ME

LB

OU

RN

E - S

YD

NE

Y R

AIL

WA

Y

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP303

AREA 1541sqmAREA 715sqm

AREA 255sqmAREA 1488sqm

AREA 1278sqm

AREA 250sqm

0

1:5000 @ A3 14094 CLP300 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 1 OF 7

AREA 253sqm

AREA 38sqm

AREA 100sqm

AREA 3107sqm

AREA 3774sqm

AREA 237sqm

AREA 125sqm

AREA 474sqm

AREA 10sqm

FO

R

CO

NTIN

UA

TIO

N

REFER IN

SET

A

INSET A

AREA 15185sqm

AREA 4398sqm

AREA 4400sqm

AREA 5328sqm

AREA 7505sqm

AREA 8005sqm

AREA 12121sqm

AREA 9991sqm

445.4

DONNYBROOK ROAD

HAYES HILL BOULEVARD

IN-01

IN-02

IN-03

IN-06R

D-0

3P

ATTE

RS

ON B

OU

LE

VA

RD

36

38

34

35

40 41 31A

Page 74: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP301.d

gn

04-09-2015

Date Plotted:

11:47:02 A

M

Preliminary - Not for construction

801-239-1583

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP303

0

1:5000 @ A3 14094 CLP301 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 2 OF 7

AREA 15406sqm

AREA 5700sqm

AREA 1139sqmAREA 248sqm

AREA 24258sqm

AREA 17418sqm

AREA 364sqmAREA 260sqm

AREA 2394sqmAREA 4916sqmAREA 3143sqm

AREA 9326sqm

622.2

IN-04

IN-05

DRIV

EK

OU

KO

UR

A

RD-0

5

IN-07

BOULEVARDHAYES HILL

DONNYBROOK ROAD

22B22A 19

Page 75: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General Notes

Designed Approved Melway Ref

Status

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP302.d

gn

04-09-2015

Date Plotted:

11:47:03 A

M

Preliminary - Not for construction

L.P. 91619

0

1:5000 @ A3 14094 CLP302 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 3 OF 7

FOR CONTINUATION REFER

ONE MILE GRID DRG No. 1409CLP303

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Warning

Copyright

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

AREA 229sqm

AREA 417sqm

AREA 355sqm

AREA 314sqm

AREA 242sqm

AREA 8108sqm

AREA 18145sqm

612.6

AREA 72sqm

AREA 153sqm

MERRIANG ROAD IN-08IN-12

RD-0

2

17 16 15

11 910

23

Page 76: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP303.d

gn

04-09-2015

Date Plotted:

11:47:03 A

M

Preliminary - Not for construction

FOR CO

NTIN

UATIO

N

REFER

ONE

MIL

E GRID

DR

G

No. 14

09CLP305

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP305

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP301

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP300

FO

R

CO

NTIN

UA

TIO

N

REFER

ON

E

MIL

E

GRID

DR

G

No. 14

09CLP304

0

1:5000 @ A3 14094 CLP303 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 4 OF 7

AREA 3805sqm

AREA 18660sqm

AREA 10528sqm

AREA 2733sqm

AREA 9640sqm AREA 578sqm

AREA 7968sqm

AREA 7234sqm

AREA 4232sqm

AREA 4928sqm

AREA 3438sqm

AREA 8282sqm

AREA 19767sqmAREA 25758sqm

AREA 11849sqm

AREA 7390sqm

AREA 1291sqm

AREA 10221sqm

AREA 6361sqm

AREA 8902sqm

AREA 11685sqm

AREA 8430sqm

AREA 1362sqm

AREA 7303sqm

FO

R

CO

NTIN

UA

TIO

N

REFER

ON

E

MIL

E

GRID

DR

G

No. 14

09CLP302

AREA 4348sqm

AREA 10489sqm

AREA 9696sqm

AREA 2713sqm

AREA 14949sqm

AREA 36sqm

212.8

111.3

961.9

214.6

848.6

326.8

183.7

38.6

RD-0

5R

D-0

5

DRIV

EK

OU

KO

UR

A

IN-11

IN-15

BR-06

CULVERT

IN-14

BR-04

CULVERTIN-10

BR-02

CULVERT

RD-01CAMERON STREET

RD-0

3P

ATTE

RS

ON B

OU

LE

VA

RD

RD-02

ROADGUNNS GULLY

RD-02

RD-0

3

RD-01

RD-02

31D31C

24C

31B

31B

23

22C

22B

31A

40

41

Page 77: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP304.d

gn

04-09-2015

Date Plotted:

11:47:04 A

M

Preliminary - Not for construction

NUA

RAIL

WA

Y

ME

LB

OU

RN

E - S

YD

NE

Y

FO

R

CO

NTIN

UA

TIO

N

REFER

ON

E

MIL

E

GRID

DR

G

No. 14

09CLP303

0

1:5000 @ A3 14094 CLP304 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 5 OF 7

AREA 2130sqm

AREA 2256sqm

AREA 2599sqm

AREA 705sqmOPTION 1BRIDGE BR-01

AREA 28377sqmOPTION 1BRIDGE BR-01

AREA 48sqm

390.6

440.2

CAMERON STREETRD-01

IN-9

(OPTION 2)

BR-01

BRIDGE

RD-01

(OPTION 1)

BR-01

BRIDGE

32

40

33

Page 78: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP305.d

gn

04-09-2015

Date Plotted:

11:47:04 A

M

Preliminary - Not for construction

RAIL

WA

YM

EL

BO

UR

NE - S

YD

NE

Y

FOR CO

NTIN

UATIO

N

REFER

ONE

MIL

E GRID

DR

G

No. 14

09CLP303

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP306

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP303

0

1:5000 @ A3 14094 CLP305 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 6 OF 7

AREA 11275sqm

AREA 23306sqm

AREA 47227sqm

AREA 30036sqm

522.2

936.9

230.6

PA

TTE

RS

ON B

OU

LE

VA

RD

ROAD

GUNNS GULLYRD-02

RD-0

3

IN-13

BR-7

BRIDGE

RD-02

31D

31C

Page 79: Donnybrook & Woodstock PSP - VPAvpa.vic.gov.au/wp-content/uploads/2015/11/Donnybrook-Woodstock... · Donnybrook & Woodstock PSP Road, Intersection and Culvert/Bridge Design 4 14094TIA004B-F.docx

Drawing Title

Project Number Drawing Number Revision

Client

Scale

Project

General NotesWarning

Copyright Designed Approved Melway Ref

Status

BEWARE OF UNDERGROUND SERVICES

BE PROVEN ON SITE.APPROXIMATE ONLY AND THEIR EXACT POSITION SHOULDTHE LOCATIONS OF UNDERGROUND SERVICES SHOWN ARE

Unauthorised use of this document in any form is prohibited.transmitted without the written authority of onemilegrid. No part of this document may be reproduced, modified orThis document may only be used for its commisioned purpose.

CA

D File:

N:\Proje

cts\2014\14094\Dra

win

gs\14094

CLP306.d

gn

04-09-2015

Date Plotted:

11:47:04 A

M

Preliminary - Not for construction

RAIL

WA

Y

ME

LB

OU

RN

E - S

YD

NE

Y

FOR CONTINUATION REFER ONE MILE GRID DRG No. 1409CLP305

0

1:5000 @ A3 14094 CLP306 C

RBHTCW

METROPOLITAN PLANNING AUTHORITY

25 50 100

DONNYBROOK

INFRASTRUCTURE COSTING

PRECINCT STRUCTURE PLAN (1067 PSP)

DONNYBROOK PSP

367

CONCEPT ULTIMATE INTERSECTION

LAND TAKE AREAS - SHEET 7 OF 7

AREA 9283sqm

AREA 24180sqm

AREA 4873sqm

AREA 13991sqm

AREA 4536sqm

861.0

RD-0

4

BO

ULE

VA

RD

PA

TTE

RS

ON

BR-07

BRIDGE

IN-16

RD-0

4

RD-0

3

43

44

31C31D

125.0