Major Rev 3 Goals
• Booting to –50°C, or colder
• Memory Interface Layout• PMT Waveform integrity:
Ringing, Clamping, Baseline Bounce
• Component Substitutions
Deferred:-- Front-End Pulser -- Local Coincidence
We’re
On Track
Rev 3 First Items (4)
• Boot at -70°C, measured by on-board sensor: from Flash and from Configuration Memory
• Memory test OK at -50°C, at 40 MHz, long term...• Good PMT waveforms. Good clamping. No bounce.• Perfect MB – to – Delay board fit• Power Under 3W (at CPU @ 80MHz & Memory @ 40MHz)
• 2 boards: -60°C, 160 MHz CPU, 125 MHz Mem• RAP at -60°C
Rev 3 Problems• PC Fab House Testing Failure
Shorts on Top Layer: 2 pcs. 4 shorts
• Two New Schematic Errors (Mentor/EDIF)
• Loading/Bill-of-Materials errors• Two Footprint errors (QFP-100, Oscillator)
• Minor, but Unsightly Quirks in Front-End Pulser Waveform - product/brand dependency
- Suppressible
Rev 4 Changes
• Component Value Changes -- optimizations -- schematic corrections
• Power Supply Load Balancing (One trace, one resistor)
• On-Board LED Pulser Power (Several parts)
• Component Substitutions for Reliability,- A few; mainly inductors… 99% finalized- Availability issues
• Front End Pulser Corrections
• Layout Design Rule Optimizations
Open Issues• Chevette vs. Buick vs. Cadillac quality PCBs (Class 1, 2, 3)
• Verification (Qualtest) Split between LBNL and UWe.g. Thermal Cycling: How many? What range?e.g. Vibration Testing: What acceleration? Where?e.g. Humidity: Will UW measure RH at -40°C? at -70°C?? in purged and sealed DOM…(VPH2O 0.002mm Hg@-70°C vs. 0.1mm Hg@-40°C vs. 24mm Hg@25°C)>> No problem, says RI…<<
Design for EMS, when mature (what measure of maturity?)
Late Breaking News
• Receiving & Testing 12 More Rev 3 Boards- 6 Evenstar boards, 6 Data Circuits boards- Looking good so far; Many loading changes in batch
• Rev 4 Schematic Updates In Progress - 90% of schematic pages to date- Few additional Components.- Working from Detailed List; Configuration Control
Rev 4 schedule Ongoing test stand parallel development (STF)
-- To be available 1/23 -- Move to room 50a-6105 11/21Modification Review/approval of Spreadsheet and File
III11/25 Design rules Review 12/15 - 12/19 “line-by-line” Reviews 12/24 - 1/6 Fab 1/7 - 1/20 Assembly 1/23 - 2/19 Acceptance Testing at LBNL (STF based) 2/20 First 20 cards to UW 2/23 - 5/21 integration at UW, verification testing at UW and
LBNL
The End
Changes Spreadsheet
Bob… you can change this link to point to your copy of the changes spreadsheet
Digital Optical Module Block Diagram
FPGA
CPU
CPLDFlash Flash
PMT Power
SDRAM
SDRAM
ATWD
ATWD
fADC
DAC
Monitor& Control
LPF
LC
x16
x2
x0.25
FlasherBoard
Pulser
DACs & ADCs
Corning Frequency Ctl (was Toyocom)
4Mb 4Mb
16Mb
16Mb
+/-5V, 3.3V, 2.5V, 1.8V
64 Bytes
Trigger (2)ADC
Oscillator
20 MHz
40 MHzMUX
(n+1)
(n–1)
DOR
OB-LED
1 5
4 8
x 2.6 x 9
10b
10b
10b
10b
8b
32b
16b
8b
8b, 10b, 12b
DPRam
1 megabaud
DC-DC
ConfigurationDevice
8Mbit
Delay
DOMFPGABlock
Diagram
ATWD Readout Engine
Communications Engine
Control & Status Registers