Top Banner
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory
13

DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Jan 29, 2016

Download

Documents

Shannon Flynn
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

DOM Main BoardRev 3/Rev 4

Status

December 2, 2003

Gerald Przybylski

Lawrence Berkeley National Laboratory

Page 2: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Major Rev 3 Goals

• Booting to –50°C, or colder

• Memory Interface Layout• PMT Waveform integrity:

Ringing, Clamping, Baseline Bounce

• Component Substitutions

Deferred:-- Front-End Pulser -- Local Coincidence

Page 3: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

We’re

On Track

Page 4: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Rev 3 First Items (4)

• Boot at -70°C, measured by on-board sensor: from Flash and from Configuration Memory

• Memory test OK at -50°C, at 40 MHz, long term...• Good PMT waveforms. Good clamping. No bounce.• Perfect MB – to – Delay board fit• Power Under 3W (at CPU @ 80MHz & Memory @ 40MHz)

• 2 boards: -60°C, 160 MHz CPU, 125 MHz Mem• RAP at -60°C

Page 5: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Rev 3 Problems• PC Fab House Testing Failure

Shorts on Top Layer: 2 pcs. 4 shorts

• Two New Schematic Errors (Mentor/EDIF)

• Loading/Bill-of-Materials errors• Two Footprint errors (QFP-100, Oscillator)

• Minor, but Unsightly Quirks in Front-End Pulser Waveform - product/brand dependency

- Suppressible

Page 6: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Rev 4 Changes

• Component Value Changes -- optimizations -- schematic corrections

• Power Supply Load Balancing (One trace, one resistor)

• On-Board LED Pulser Power (Several parts)

• Component Substitutions for Reliability,- A few; mainly inductors… 99% finalized- Availability issues

• Front End Pulser Corrections

• Layout Design Rule Optimizations

Page 7: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Open Issues• Chevette vs. Buick vs. Cadillac quality PCBs (Class 1, 2, 3)

• Verification (Qualtest) Split between LBNL and UWe.g. Thermal Cycling: How many? What range?e.g. Vibration Testing: What acceleration? Where?e.g. Humidity: Will UW measure RH at -40°C? at -70°C?? in purged and sealed DOM…(VPH2O 0.002mm Hg@-70°C vs. 0.1mm Hg@-40°C vs. 24mm Hg@25°C)>> No problem, says RI…<<

Design for EMS, when mature (what measure of maturity?)

Page 8: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Late Breaking News

• Receiving & Testing 12 More Rev 3 Boards- 6 Evenstar boards, 6 Data Circuits boards- Looking good so far; Many loading changes in batch

• Rev 4 Schematic Updates In Progress - 90% of schematic pages to date- Few additional Components.- Working from Detailed List; Configuration Control

Page 9: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Rev 4 schedule Ongoing test stand parallel development (STF)

-- To be available 1/23 -- Move to room 50a-6105 11/21Modification Review/approval of Spreadsheet and File

III11/25 Design rules Review 12/15 - 12/19 “line-by-line” Reviews 12/24 - 1/6 Fab 1/7 - 1/20 Assembly 1/23 - 2/19 Acceptance Testing at LBNL (STF based) 2/20 First 20 cards to UW 2/23 - 5/21 integration at UW, verification testing at UW and

LBNL

Page 10: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

The End

Page 11: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Changes Spreadsheet

Bob… you can change this link to point to your copy of the changes spreadsheet

Page 12: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

Digital Optical Module Block Diagram

FPGA

CPU

CPLDFlash Flash

PMT Power

SDRAM

SDRAM

ATWD

ATWD

fADC

DAC

Monitor& Control

LPF

LC

x16

x2

x0.25

FlasherBoard

Pulser

DACs & ADCs

Corning Frequency Ctl (was Toyocom)

4Mb 4Mb

16Mb

16Mb

+/-5V, 3.3V, 2.5V, 1.8V

64 Bytes

Trigger (2)ADC

Oscillator

20 MHz

40 MHzMUX

(n+1)

(n–1)

DOR

OB-LED

1 5

4 8

x 2.6 x 9

10b

10b

10b

10b

8b

32b

16b

8b

8b, 10b, 12b

DPRam

1 megabaud

DC-DC

ConfigurationDevice

8Mbit

Delay

Page 13: DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.

DOMFPGABlock

Diagram

ATWD Readout Engine

Communications Engine

Control & Status Registers