Page 1: DoLR Regional Review Meeting on PMKSY – WDC

PANCHAYAT RAJ & RURAL DEVELOPMENT DEPARTMENT, STATE LEVEL NODAL AGENCY, PMKSY – WDC,

ANDHRA PRADESH - AMARAVATI.

DoLR Regional Review Meeting on PMKSY – WDC

@Bengaluru, 29th & 30th July, 2019.

1

Page 2: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 1: Review of Implementation of Watershed Development Component of PMKSY.

District

Batch – I (2009-10)

Batch – II (2010-11)

Batch – III (2011-12)

Batch – IV (2012-13)

Batch – V (2013-14)

Total

Proj. Alloc Exp. Proj. Alloc Exp. Proj. Alloc Exp. Proj. Alloc Exp. Proj. Alloc Exp. Proj. Alloc Exp.

Anantapuramu 15 69 63 26 126 111 29 149 121 16 101 65 0 0 0 86 445 360

Chittoor 9 44 33 18 91 85 20 98 79 11 48 27 0 0 0 58 281 224

Kurnool 13 70 58 16 80 69 22 107 92 8 41 25 0 0 0 59 298 245

Prakasam 14 76 61 18 97 86 20 105 92 10 51 39 0 0 0 62 329 278

Srikakulam 4 23 15 5 25 17 2 9 8 3 20 9 4 18 5 18 95 53

YSR-Kadapa 7 33 29 14 71 65 9 47 43 8 34 22 0 0 0 38 185 158

ITDA, RC.Varam/ East Godavari

14 83 32 14 83 32

ITDA, Seetampet/ Srikakulam

6 37 10 6 37 10

ITDA, Paderu/ Visakhapatnam

15 79 21 15 79 21

ITDA, Parvatipuram / Vizianagaram

10 65 18 10 65 18

ITDA, KR.Puram/ West Godavari

3 17 7 3 17 7

Guntur 4 22 9 4 22 9

TOTAL 62 315 257.9 97* 490 432.9 102 515 434.9 56 295 187 56 321 101.7 373 1936 1414

Rs. In Crores 1.1. Performance of WDC- PMKSY Projects in Andhra Pradesh as on 8th July, 2019:

Note: 1. *One Project in Kummatha Project in Anantapuramu District has been cancelled due to non feasibility of area. 2. Batch I & II projects are completed and Batch III projects are under Consolidation phase.

2

Page 3: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 1: Review of Implementation of Watershed Development Component of PMKSY.

Rs. In Crores 1.2. (A) Utilization of Unspent Balances as on 08.07.2019 in Andhra Pradesh:

Details Amount (In Crores)

Opening Balance 51.45

Grant Releases 0.00

Interest 0.15

Miscellaneous receipt 0.06

Loan from PMKSY (OE) Funds 20.00

Total receipts 71.66

Expenditure as per report R3.1 34.12

Closing Balances 37.54

1.2 (B) Annual Action Plan for the FY 2019-20 in Andhra Pradesh:

Sl District No. of Projects NRM PSI LH Other Total

1 Anantapuramu 94 52.07 4.90 0.00 16.34 73.30

2 Chittoor 53 17.88 3.80 0.00 9.76 31.44

3 East Godavari 17 17.41 5.20 7.49 5.40 35.51

4 Guntur 7 6.65 1.40 2.02 1.82 11.89

5 Kurnool 52 17.55 2.00 0.00 7.45 27.00

6 Prakasam 56 15.94 1.00 0.00 9.06 26.00

7 SPSR Nellore 4 3.58 0.00 0.00 0.40 3.97

8 Srikakulam 24 24.70 4.70 4.94 5.75 40.10

9 Visakhapatnam 15 18.23 4.90 7.11 4.85 35.09

10 Vizianagaram 13 18.89 4.00 5.85 4.59 33.34

11 West Godavari 4 3.06 1.10 1.57 1.19 6.92

12 YSR-Kadapa 35 11.34 2.00 0.00 4.36 17.69

Grand Total 374 207.29 35.00 29.00 70.96 342.25

Rs. In Crores

3

Page 4: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 1: Review of Implementation of Watershed Development Component of PMKSY

1.3. Status on Completion of Batch I, II & III Projects in Andhra Pradesh:

1.4. Status on submission of End line Evaluation report of completed Projects in Andhra Pradesh:

1.5. Projects likely to be completed during 2019-20, especially in 2nd Quarter in Andhra Pradesh:

Sl Batch -I Batch -II Batch -III

No of Proj. Status No of Proj. Status No of Proj. Status

1 62

Completed and

submitted the

End-line

evaluation

report for 62

Projects.

97*

Completed and

submitted the End-line

evaluation report for 96

Projects. One Project of

Kummatha in

Anantapuramu has been

cancelled.

102

Work Phase completed & now in

Consolidation phase and the

impact assessment for 102 Projects

is carrying by third party MEL&D

agencies.

The final end line evaluation

report will be submitted by Sep’

2019.

Sl Batch -I Batch -II Batch -III

No of Proj. Status No of Proj. Status No of Proj. Status

1 62

Submitted

for 62

Projects.

97*

Submitted for 96

Projects. One Project of

Kummatha Projects in

Anantapuramu District

has been cancelled

102

Now in Consolidation phase and the

impact assessment for 102 Projects is

carrying by third party MEL&D

agencies.

The final end line evaluation report

will be submitted by Sep’ 2019.

Sl. Batch No of Projects Status

1 III 102 Work phase is completed and consolidation phase is under progress.

The final end line evaluation report will be submitted by Sep’ 2019(Q2)

4

Page 5: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 1: Review of Implementation of Watershed Development Component of PMKSY

1.6. Implementation of Srishti & Drishti (IWMP-BHUVAN):

Sl. District

No of

Projects

(up to

Batch V)

Total no.

of works

Total Geo-tagged

% of

Achievement Accepted Rejected To be

moderate Total

1 2 3 4 5 6 7 8 (5+6+7) 9 (8/4*100)

1 Chittoor 58 28048 12990 2350 458 15798 56

2 YSR Kadapa 38 10624 7625 987 18 8630 81

3 Prakasam 62 25266 12453 2138 91 14682 58

4 Anantapuramu 86 31469 18162 3908 14 22084 70

5 Vizianagaram 10 1907 707 46 274 1027 54

6 Kurnool 59 27107 17392 1958 171 19521 72

7 Srikakulam 24 5416 2566 624 63 3253 60

8 East Godavari 14 1528 521 121 1 643 42

9 West Godavari 3 532 142 21 0 163 31

10 Visakhapatnam 15 1840 168 33 18 219 12

11 Guntur 4 545 15 61 23 99 18

Total 373 134282 72741 12247 1131 86119 64

5

Page 6: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 1: Review of Implementation of Watershed Development Component of PMKSY

1.7. Implementation of PFMS and level upto which implemented:

1.8. Status of convergence with other schemes and year wise expenditure incurred through convergence in Andhra Pradesh:

The GoI has communicated Minutes of meeting held by the PFMS authorities on 29th January, 2015 to discuss various issues pertaining to implementation of IWMP on PFMS Portal. In the meeting, based on the thorough analysis by the Director, DoLR, it was decided mutually that Andhra Pradesh and Telangana States were permitted to continue to use the existing e-FMS developed by the M/s.TCS, Hyderabad. Further it is indicated that these States can share the data as required by PFMS for MIS purpose as per the format communicated by PFMS, But till date no communication received from the PFMS on data exchange between PFMS & e-FMS. The SLNA-Andhra Pradesh vide Lr.No.186/SLNA/Accts/PFMS/2014, Dt.09.03.2015 & 20.06.2018 has requested the DoLR to nominate a technical person to coordinate and develop the interface module to synchronize data between e-FMS and PFMS applications automatically on regular intervals. The same is still awaited.

Rs. In Crores

Sl. Convergence Scheme Year Expenditure

1

MGNREGS

2011-12 1.94

2 2012-13 23.28

3 2013-14 34.00

4 2014-15 56.29

5 2015-16 184.72

6 2016-17 297.37

7 2017-18 173.87

8 2018-19 91.76

9 2019-20 4.4

Total 867.63

6

Page 7: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 2: Action plan for completion of the projects within the stipulated time frame and year wise funds requirement during the remaining period of the operation of project in Andhra Pradesh.

Sl. Batch’s No of

Projects

Time line for

completion

Funds Requirement

Year Rs. In Crores

1 Batch - IV

(2012-13) 56 31st March 2020 2019-20 106.99

2 Batch - V

(2013-14) 56 31st March 2021

2019-20 132.31

2020-21 88.21

Agenda 3: Success stories/innovation/best practices under WDC- PMKSY in Andhra Pradesh.

Enclosed

7

Page 8: DoLR Regional Review Meeting on PMKSY – WDC

Agenda 4: Progress on Jal Sakthi Abhiyan in Andhra Pradesh.

Out of 68 blocks identified by GoI as water stressed blocks in 9 districts of Andhra Pradesh, among 16 blocks in 4 districts(Anantapuramu, Chittoor, Guntur & YSR-Kadapa) PMKSY-WDC programme is being implementing under Batch IV & V projects. The details of works grounded and proposed action plan upto December’ 2019 in these blocks is submitted here under;

Sl. Indicator Completed/

Existing (as on 31.03.2019)

Ongoing and expected to be completed by December, 2019

1 No. of Water Harvesting Structures

a Newly constructed (No’s)

i Farm Ponds 9352 1230

ii Check Dams 1081 211

iii Percolation Tanks 195 150

iv Ground Water Recharge Structures (Injection Bore Wells) 27 59

v Other (WHS) 1610 116

b Renovated / Rejuvenated (No’s)

i Check Dams 593 94

ii Percolation Tanks 243 64

2 Soil and Moisture Conservation measures

i Staggered Trenches (Ha.) 1377.67 200.94

ii Gully Control Works(No’s) 941 214

8

Page 9: DoLR Regional Review Meeting on PMKSY – WDC

9