  • L&T DOKA L&T DOKA FORMWORK SYSTEMFORMWORK SYSTEM

    PRESENTED BY:PRESENTED BY:

    TUSHAR AKBARI (CPM0106)TUSHAR AKBARI (CPM0106)

    SUBMITTED TO:SUBMITTED TO: MR. DEBASIS SARKARMR. DEBASIS SARKAR

  • DOKA FORMWORK Inc. leading European company

    for concrete formwork. Doka formwork technology

    makes a major contribution towards getting concrete into the desired form - in an economical way.

    EUR 394 Million Doka Group is spreaded in more than 35 countries of world .

  • L & T-ECC in association with DOKA:1985 Collaboration with M/s Doka of Austria1986 Fabrication of steel components through

    vendors commenced1990 Production of timber beams at Chennai

    commenced1991 Marketing of formwork systems to external

    clients1997 Dedicated factory set up at Pondicherry for

    manufacture of steel components2000 1) Timber beam production facility at Chennai

    shifted to Pondicherry2) New line added for timber beam production

    to enhance capacity

  • MERITS OF L&T DOKA!!!!!! Simplicity in assembly of system. The system is flexible, easy to understand

    and versatile. can be made suitable for all applications,

    requires little working skill and helps to achieve uniformly good quality of finish.

    high labor and material productivity with speed and safety.

    Investment need may be made on the minimum quantity of formwork.

    More no. repetitive usage. Greater life span and less labor requirement. Able to resist more lateral pressure of liquid

    concrete. Less chance of burglary & misuse due to

    heavy weight & large size. Easily modifiable as compare to steel

    formwork. accurate, safe and speedy construction

  • DEMERITS OF L&T DOKA !!! High initial investment. would be handicapped

    without tower crane. Require more mechanized

    setup at site. Handling and placing is very

    difficult, it requires separate shade to store them.

    In house training require to increase labor efficiency.

    Proper storage space is required when job is over

  • NEED FOR SYSTEMFORMWORK? Vertical growth Traditionally under mechanized &

    labor intensive. Excessive use of reinforced

    cement concrete. High quality surface finishes for

    exposed R.C.C work Acute shortage of highly skilled &

    competent formwork carpenter. Modular panel with high flexibility

  • LOADS AND DESIGN Density of concrete Slump of concrete Rate of pour Method of discharge Concrete temperature Vibration Height of discharge Dimensions of sections cast Reinforcement detail Stiffness of forms Transfer of loads from floor to floor during constructionShuttering area of 3 to 5 sq m. is required for placing 1 cu.m of

    concrete and formwork therefore contributes a major factor in the cost, this being 25% to 70% of the total cost.

  • H-BEAM: BACKBONE OF L&T DOKA SYSTEMH-BEAM: BACKBONE OF L&T DOKA SYSTEM An engineered timber component Manufactured under strict quality control. The flanges are made of seasoned chemically

    treated timber. The web is made of boiling boiling water proof plywoodwater proof plywood and joined with the flange by unique finger joint.

    Hbeams are light, dimensionally stable and retain their structural properties over a period of time even after repeated usage.

    The H beams can be used more than 100 times and it consumes only 40% of timber volume required.

    H-16 (16 cm depth) and H-20 (20 cm depth), length varying from 1m to 4m. Reduces consumption of timber Minimizes work at site Consistent in strength. Cost ratio per use of H-16 beam to

    conventional timber = 1: 3.5 Economical and long-lasting.

  • FLEX SYSTEM Components

    H-Beam Floor Form Plywood Collapsible Telescopic

    Prop Four way head Removable folding tripod Supporting head Assembly wedge clamp

  • FLEX SYSTEM Advantages

    Effective for slab and beam formwork upto floor heights of 4.4 m.

    Removable folding tripods make selected individual prop self standing

    Flexibility in spacing between and heights of individual props.

    Components are light enough for erecting and dismantling manually.

    Lapping of standard lengths of H-Beams both in primary and secondary layers avoid their cutting at site.

    Avoids skilled labour at site Enables re-propping and frequent reuse of materials. Simple deshuttering operation.

  • FLEX TABLE FORM Components

    H-Beam Plywood Collapsible Telescopic

    Prop Table head / U-Head Assembly wedge clamp

  • Advantages Can be transferred as complete set, hence no loss of

    components Shifting trolley provides superb mobility in horizontal

    direction Quick to shift, faster construction Easy fixing, high labour productivity Less props in relation to area

  • HEAVY DUTY TOWER SYSTEM Components

    Basic Frame size of 0.9 m, 1.2 m, 1.8 m

    Horizontal Brace Diagonal Brace Foot Plate U-Head Tower spindle with lever nut Beam span 2230 Beam span extension 1525 Coupler Brace stirrup Short prop

  • HEAVY DUTY TOWER SYSTEM Advantages

    High load carrying capacity is > 25 tons per tower.

    Rigid and stable with minimum bracings.

    Easy to erect and dismantle using unskilled labour.

    Tower as a whole can be shifted using crane and transport wheels.

    Ideal for heavy floors involving greater heights.

    Can be converted into stair tower with additional standard components.

    Heights upto 700mm can be made by spindles at top and bottom

  • Close Connection Open Connection

  • WALL FORMWORK SYSTEM Components

    H - Beam CT Prop H-Beam Splice Foot Adapter Steel waler Connecting Pin Wing Nut Tie rod Head Adapter Anchor Plate Lifting Bracket Angle Plate Adjustable splice plate Splice plate

  • Lifting Bracket

    Timber Plank

    Scaffold bracket

    Head Adaptor

    Steel Waler

    Working Platform

    Supporting Bracket

    Foot Adaptor

    WALL FORMWORK SYSTEM

  • WALL FORMWORK SYSTEM

    Lifting Bracket

    Timber Plank

    Working Platform

    Scaffold bracket

    Steel Waler

    CT Prop

    Supporting Bracket

    H-Beam

    Foot Adaptor

  • WALL FORMWORK SYSTEM USED IN CEMENT SILO WITH WORKING PLATFORM AND HEAVY DUTY TOWER SYSTEM

    WALL FORMWORK SYSTEM USING ALUMINUM PROPS AND SCAFFOLDING

    Advantages Ideal system for speedy

    construction. Wall panels can be dismantled and

    handled manually. Minimizes the number of sheathing

    joints. Simple shuttering and de-shuttering

    operation. Wall Formwork panels facilitates

    fixing of working platform and alignment system

  • COLUMN FORMWORK SYSTEM Components

    H - Beam CT Prop H-Beam Splice Foot Adapter Steel waler Connecting Pin Wing Nut Tie rod Head Adapter Anchor Plate Lifting Bracket Angle Plate Adjustable splice plate Splice plate

  • Plan

    Section

    Working Platform

    Scaffold bracket

    Foot Adaptor Supporting Bracket

    H-Beam

    Tie Rod Anchor Plate

    H-Beam Plywood

    Steel Waler

    CT Prop

    CT Prop

    COLUMN FORMWORK SYSTEM

  • Typical Column Formwork System

    MODIFIED FORMWORK AS PER REQUIREMENT (DOKA + CONVENTIONAL FORMWORK)

  • ACCESS SYSTEM Components

    Scaffold Frame 0.9 m, 1.2 m, 1.8m

    Spring Locked connected pin

    Foot plate Coupler Scaffold Coupler Scaffold Spindle 2H-225 Bracing Scaffold Board

  • TYPICAL HAND SKETCH SHOWING DETAILS OF ACCESS SCAFFOLDING WORK WITH BRACING TO PERMANENT

    STRUCTURE

  • STAIR TOWER Components

    Basic Frame 1.2 m Foot Plate Tower spindle with lever nut Coupler Spring locked connecting pin Horizontal Brace Scaffolding pipe Swivel coupler Stair Bracket Intermediate Railing Inner hand railing Connection Angle Grid Iron

  • STAIR TOWER

  • STAIRCASE IN HEAVY DUTY TOWER SYSTEN WITH SAFETY NET HT. 40 ft.

    ELEVATION

    TOP VIEW

  • NUCLEAR POWER PLANT FORMWORK : KAIGA UNIT 3&4

  • CLIENT: NUCLEAR POWER CORPORATION OF INDIA LTD. (NPCIL)

    CONTRACTOR FOR INTAKE TUNNEL

    M/S L&T , ECC DIVISION

    CONTRACTORS FOR MECHANICAL WORKS

    M/S BHEL

    MAIN CONTRACTOR FOR CIVIL WORKS

    M/S GAMMON INDIA LTD.

    CONTRACTORS FOR PUMP HOUSE

    M/S EPCIL(ENGG. PROJECTS INDIA LTD.)

    CONTRACTOR FOR EXCAVATION WORKS

    M/S AFCONS INFRASTRUCTURE

    SUB CONTRACTOR FOR TB3,TB4,SRPH,FWPH

    M/S IVRCL (I. VENKAT REDDY CONSTRUCTION

    LTD.

    SUB CONTRACTOR FOR FABRICATION AND FIXING

    OF EPSM/S NSG FABRICATIONM/S SUVARNA FABRICATION

    SUB CONTRACTOR FOR MACHINARY & EQUIPMEN

    SUPPLY

    M/S SETHIA EQUIPMENT

    Major Consultants for 1&2Stup ConsultantsDevelopment consultants pvt. Ltd.Mecon (eng. & drg. Consultant)

    Client is itself the designer of the project as this project is repetition of Kaiga 1 & 2.

    PROJECT BREAK DOWN STRUCTURE

  • JOB: Construction of main plant civil works package II for Kaiga unit 3 & 4.

    AIM: Generation of power using stem from PHWR type nuclear reactor .

    PROJECT TYPE : Infrastructure CONTRACT TYPE: Item rate contract CLIENTS: Nuclear power corporation of India ltd.

    (NPCIL)Kaiga Atomic Power Project 1,2,3&4Post: Kaiga,Karnatka 581400

    CONTRACTOR: Gammon India Ltd.Civil Engineers and ContractorsGammon HouseVeer Sarvarkar Marg,Mumbai 400025

    PROJECT COST: 254.82 Crores (for civil works only) CONTRACT PERIOD: 56 Months (including monsoon) STARTING DATE: 1st October 2001 EXPECTED COMPLITION DATE: 30th June 2006 SCHEDULED COMPLITION DATE: 40 Months (16 months Or earlier) DEFECT LIABILITY PERIOD: 12 Months PLANT AREA: 25 Hectare SITE AREA: 200 X 200 m2

  • FORMWORK OF OUTER CONTAINMENT WALL FROM EL. 93.870 TO EL 96.07 OF RB3

  • THANK THANK YOU!!!!!!!!!!!!!!YOU!!!!!!!!!!!!!!

    Slide 1Slide 2Slide 3MERITS OF L&T DOKA!!!!!!DEMERITS OF L&T DOKA !!!NEED FOR SYSTEMFORMWORK?Slide 7Slide 8Slide 9Slide 10Slide 11Slide 12Slide 13Slide 14Slide 15Slide 16Slide 17Slide 18Slide 19Slide 20Slide 21Slide 22Slide 23Slide 24Slide 25Slide 26Slide 27Slide 28Slide 29Slide 30Slide 31Slide 32Slide 33Slide 34Slide 35Slide 36