PHASOR SIMULATION FOR OPERATOR TRAINING (PSOT) Event Libraries and Integration with TSAT and RTDS for Real Time Simulations DOE Grant Award DE-OE0000702 NASPI Presentation Cost Share Partners- Bill Blevins, ERCOT and Frank Ashrafi, SCE Prime Contractor – Jim Dyer, EPG October 15, 2015
12

DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

Apr 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

PHASOR SIMULATION FOR OPERATOR TRAINING (PSOT)

Event Libraries and Integration with TSAT and RTDS for Real Time Simulations

DOE Grant Award DE-OE0000702

NASPI Presentation Cost Share Partners- Bill Blevins, ERCOT and Frank Ashrafi, SCE

Prime Contractor – Jim Dyer, EPG October 15, 2015

Page 2: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

PSOT Project Participants

1

3.24.15

Southern California Edison (SCE) – Cost Share Participant – Project Manager - Frank Ashrafi

Electric Reliability Council of Texas (ERCOT) - Cost Share Participant – Project Manager - Bill Blevins

Electric Power Group, LLC – Prime Contractor and Cost Share Participant – Project Manager - Jim Dyer

Dominion Virginia Power (Dominion) – Adviser/Observer - Matt Gardner

Powertech Labs Inc. – Added to Project for Real Time Simulations with TSAT/ePMU – Project Management - Lie Wang

© Electric Power Group 2015. All rights reserved

Page 3: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

What is PSOT?

Page 2

A Phasor-based training simulator to train power system operators on the use of

synchrophasor technology

Training simulator utilizes

1. Industry Standard Power System Simulation Tools to perform event simulations

using dynamic models to build a library of system events

– Off-line Simulation Tools including PSLF, PSS/E, TSAT/ePMU

– On-the-fly Simulation Tools including TSAT/ePMU, RTDS

2. RTDMS is used for Visualization

Page 4: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

PSOT Architecture – Two Approaches to Operator Training

Page 3

Event library Approach – Events are stored in an event library prior to training session

Real Time Approach – During training session, instructor runs an on-the-fly event simulation and

students get to observe the system impact of events and event mitigation

Page 5: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

Event Library Approach

Page 4

1. Using Off-line Simulations Tools

2. Event Library consists of Simulated + Actual Recorded events

3. Event Streamer & Manager is used to replay events from library to RTDMS

4. Visualization Tool – RTDMS

1

2 3 4

Page 6: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

Event Library Approach – Project Example

Page 5

Islanding in SCE’s Northern Region

Pre-event Islanding – Out Of Step Relay Operation (RAS)

System Frequency Correction – RAS Generation Runback and Tripping

Local SVC Automatically Adjusts Local Voltage

Double 230 kV Line Fault

Page 7: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

Real Time Approach – ERCOT & SCE

Page 6

1 1

2

1. Using On-the-fly Simulations Tools

2. Visualization Tool – RTDMS

2

Page 8: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

N-5 Event Simulation

Page 7

1. N-3 Units Trip - Loss of 650 MW of Generation

2. N- 4 and 5 – Loss of two 345kV lines

Page 9: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

PSOT Demo Using Real Time Approach (TSAT/ePMU-RTDMS)

Page 8

Page 10: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

Event Summary

Page 9

Loss of 3 units (650 MW)

Frequency declines to 59.91 Hz

Angle Difference - increases from 12 to 21 degrees

Voltage – 3% voltage drop in the Region

Loss of 2 - 345 kV lines

Angle Difference increased from 21 to 45 deg

10% drop in Voltage – Approaching Stability Limit.

Corrective Action & Restoration: Prepare for the next contingency

Drop 700 MW of Load in the Valley Region and angle difference decreased from 45 to 25 deg

Reclose Relayed Lines after checking Phase Angles and angle difference decreased from 25 to 12 deg

Restore the 700 MW of Load, angle difference increased from 12 to 20 deg

The system is back to normal conditions and operating within safe operating limits

Page 11: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

|

PSOT – Status & Looking Ahead

Page 10

PSOT Event Library installed at ERCOT and SCE

PSOT Event Library Demonstrated to ERCOT and SCE

Real Time PSOT demonstrated to ERCOT – Deployment in Process

At SCE, evaluating the capability of performing on-the-fly simulations with RTDS – In Progress

PSOT Event Library with Generic Model – 4Q15

Project Documentation - 4Q15

Training for project participants - 4Q15

Commercialization plan - 4Q15

Final Report - 1Q16

Page 12: DOE Grant Award DE-OE0000702 NASPI Presentation · 2019-02-22 · PSOT Project Participants . 1. 3.24.15 Southern California Edison (SCE)– Cost Share Participant – Project Manager

Thank You!

Jim Dyer

[email protected]