Top Banner
Janice Buffler DoD OSBP Associate Director Subcontracting Policy DoD Subcontracting Program TRIAD September 26. 2013
12

DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

Jul 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

Janice Buffler

DoD OSBP

Associate Director

Subcontracting Policy

DoD Subcontracting Program

TRIAD

September 26. 2013

Page 2: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

Agenda

2

Emphasis on Subcontracting and Data

Updates

Policy Changes

Resources

Page 3: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

3

Emphasis on Subcontracting and Data

DoD Subcontracting Accounting Procedures Report submitted to House Armed Services Committee (2/13)

Department’s existing procedures do account for SB subcontracting at all tiers of a contract, even though that activity is not reported by the prime contractor and the prime contractor does not get “credit” for SB efforts of its subcontractors.

Page 4: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

4

NDAA FY 13 included many SB provisions

Section 1613 – Requires independent

assessment of Federal procurement

contracting performance of DoD in 7

areas.

• 2/7: Quality and reliability of data on SB

prime and subcontracting by DoD, and the

reliability of the IT systems that the

Department uses to track such data.

Emphasis on Subcontracting and Data

Page 5: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

5

Mr. Kendall’s issuance of Better Buying

Power to achieve greater efficiency and

productivity in defense spending

Promote effective competition – increase

SB roles and opportunities

• Director, SBP – identify deficiencies in

Department’s subcontracting program,

Government systems, and data and develop

recommendations for improvements.

Emphasis on Subcontracting and Data

Page 6: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

6

Updates

CSP Test Program

Authorized through Dec 31, 2014

OSBP completed study

Issues to be addressed

• Inefficient subcontracting data collection

system

• Transition plan which considers several

options

Page 7: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

7

Updates

Class Deviation (2012-O0014), providing

Accelerated Payment to SB Subcontractors

was rescinded 2/21/13 and is still in effect

even though OMB issued an extension to

the original policy (7/11/13).

Page 8: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

8

Policy Changes

Class Deviation (2013-O0014)

Only affects SSRs required under an

Individual Subcontract Plan. Does not

affect the ISR.

Beginning with FY 14 reporting, the SSR

will be submitted annually for the twelve

month report period (Oct 1 – Sep 30)

Page 9: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

9

Policy Changes

Class Deviation (2013-O0014)

For FY 13 reporting

• Contractors submit their consolidated SSR in

eSRS to the Department of Defense (9700)

and not to the department/agency which

administers majority of subcontract plans or,

for construction contractors, to each

department/agency which awarded such type

contracts

Page 10: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

10

Policy Changes

Class Deviation (2013-O0014)

For FY 13 reporting

• Contractors do not submit the “SDB Year-End

Report” or the “SDB Participation Report” as

they are no longer authorized since 10 U.S.C

2323 has expired.

Page 11: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

11

Training

October 16, 2:30-3:30 (Central)

North Central Regional Council (NCRC)

hosting web-based training session

Subcontract Reporting – ISRs and SSRs

Designed for small business professionals

from government and industry

POC: Ed Beussink, SB Director,

618-229-0401

Page 12: DoD Subcontracting Program · 2017-05-18 · 4 NDAA FY 13 included many SB provisions Section 1613 – Requires independent assessment of Federal procurement contracting performance

Resources

12

http://www.acq.osd.mil/osbp/

“Electronic Subcontracting Reporting System

(eSRS), Part 1 and 2, July 2013” training

presentation

“Tips for DoD Contractors Submitting

Subcontracting Reports (Aug 2013)”

DoD Subcontracting Program: The Basics

(Aug 2013)

[email protected] (questions and comments)

http://www/acq.osd.mil/dpap/

https://acc.dau.mil/smallbusiness