Document of The World Bank Report No: ICR00001950 IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47300) ON A LOAN IN THE AMOUNT OF US$ 39.5 MILLION TO THE GOVERNMENT OF INDIA FOR THE Karnataka Urban Water Sector Improvement Project November 30, 2011 Sustainable Development Department Urban, Water and Disaster Risk Management Unit, India Country Management Unit South Asia Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
67
Embed
Document of The World Bankdocuments.worldbank.org/curated/en/234761468044084979/pdf/ICR… · Proposal to establish the Water Council is under Finance Department review. The Urban
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
C.2 Detailed Ratings of Bank and Borrower Performance (by ICR)
Bank Ratings Borrower Ratings
Quality at Entry: Satisfactory Government: Satisfactory
Quality of Supervision: Satisfactory Implementing
Agency/Agencies: Satisfactory
Overall Bank
Performance: Satisfactory
Overall Borrower
Performance: Satisfactory
iv
C.3 Quality at Entry and Implementation Performance Indicators
Implementation
Performance Indicators
QAG Assessments
(if any) Rating
Potential Problem Project
at any time (Yes/No): Yes
Quality at Entry
(QEA): None
Problem Project at any
time (Yes/No): Yes
Quality of
Supervision (QSA): None
DO rating before
Closing/Inactive status: Satisfactory
D. Sector and Theme Codes
Original Actual
Sector Code (as % of total Bank financing)
Sub-national government administration 5 5
Water supply 95 95
Theme Code (as % of total Bank financing)
Administrative and civil service reform 14 14
Decentralization 14 14
Other urban development 29 29
Pollution management and environmental health 14 14
Urban services and housing for the poor 29 29
E. Bank Staff
Positions At ICR At Approval
Vice President: Isabel M. Guerrero Praful C. Patel
Country Director: Roberto Zagha Michael F. Carter
Sector Manager: Ming Zhang Sonia Hammam
Project Team Leader: Raghava Neti Oscar E. Alvarado
ICR Team Leader: Srinivasa Rao Podipireddy
ICR Primary Author: Srinivasa Rao Podipireddy
v
F. Results Framework Analysis
Project Development Objectives (from Project Appraisal Document) The objectives of the project are to; (i) launch Government of Karnataka's urban water
sector reform process based on the "Urban Drinking Water and Sanitation Policy
Statement of GOK", and (ii) improve urban water supply services in the participating
urban local bodies (Hubli-Dharwad, Belgaum, and Gulbarga) and demonstrate that
sustainable, efficient, and commercially-oriented service provision can be achieved.
Revised Project Development Objectives (as approved by original approving authority)
The PDO was not revised.
(a) PDO Indicator(s)
Indicator Baseline Value
Original Target
Values (from
approval
documents)
Formally
Revised
Target
Values
Actual Value
Achieved at
Completion or
Target Years
Indicator 1 : 1.1 The reform base is established and initial reform activities are carried out
Value
quantitative or
Qualitative)
Water Council
established and
reform studies are
completed and
implementation
commenced.
Proposal to
establish the Water
Council is under
Finance
Department review.
The Urban
Technical Cell is
active in its place
as required.
Five out of six
studies were
completed and
implementation is
ongoing.
Date achieved 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
Indicator 2 : 1.2 The ground for private sector participation is prepared as a realistic option for
water and sanitation provision
Value
quantitative or
Qualitative)
Project
demonstrated the
need for PPPs in
the sector.
Project exceeded
target. Both urban
and rural water
sectors are using
PPPs extensively in
several programs,
vi
building on the
experience gained
under this project.
Date achieved 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
Indicator 3 : 1.3 Enabling legal, regulatory and financing frameworks are established for the
sector
Value
quantitative or
Qualitative)
Legal, regulatory
and financing
frameworks are
established.
Financing
framework was
established.
Work continues on
establishing legal
and regulatory
frameworks
Date achieved 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
Indicator 4 : 2.1 Feasibility of Continuous water supply is demonstrated
Value
quantitative or
Qualitative)
One to two hours every
two days in Belgaum and
Gulbarga, and one to two
hours supply every three
to five days in Hubli-
Dharwad
24X7 water supply
demonstrated
24X7water is fully
achieved and
proved sustainable
and commercially
viable.
Date achieved 04/08/2004 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
Indicator 5 : 2.2 Priority bottlenecks to improve quantity of water supply are solved
Value
quantitative or
Qualitative)
Improve bulk
water in the three
ULBs: Belgaum
10 MLD;
Gulbarga 22
MLD; Hubli-
Dharwar 11 MLD
Increase in the bulk
supply in Belgaum
27 MLD; Gulbarga
30 MLD and Hubli-
Dharwar 11MLD
24X7supplies in
demonstration
zones.
Date achieved 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
Indicator 6 : 2.3 Increased consumer awareness, commitment, and ownership for reform are
attained
Value Awareness in Consumers are
vii
quantitative or
Qualitative)
consumers created
and consumers are
committed; have
ownership on
reforms
fully aware of
reforms
implemented (based
on the 2010
consumer survey),
and are paying bills
regularly, and
conserving water
Date achieved 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
Indicator 7 : 2.4 Capacity, Institutional structures, and accountability for water and sanitation
operations of the participating ULBs are improved
Value
quantitative or
Qualitative)
Capacity,
institutional
structure,
accountability for
water supply
operations
demonstrated in
the three ULBs
ULBs appointed an
operator,
introduced
volumetric tariffs,
and are supporting
scaling up of
operations. ULBs,
through the
operator, are
accountable for
water supply
service.
Date achieved 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
(b) Intermediate Outcome Indicator(s)
Indicator Baseline Value
Original Target
Values (from
approval
documents)
Formally
Revised
Target Values
Actual Value
Achieved at
Completion or
Target Years
Indicator 1 : State Urban Water Council proposal ready for presentation to cabinet
Value
(quantitative
or Qualitative)
No policy/ regulation
body for urban water in
the state. Proposal for
creation of State Urban
Water Council to be
presented for adoption to
competent authorities
Council
established and
operational
covenant complied
with when note is
presented to
cabinet
Proposal to
establish the State
Urban Water
Council presented
to the Government.
Date achieved 04/08/2004 12/31/2008 03/31/2011
Comments
(incl. %
achievement)
viii
Indicator 2 : Demonstration zones in the three participating ULBs achieve proposed service
(Source: Analysis of Revenues, Operator Report, Sept 2010)
12
No need to pump water, thus saving energy
charges at the household level.
Number of public
fountains in demo-
zones
433 0 All households in the demo zones now
have water connections. No more
drudgery in collection of water; or loss of
employment due to long waiting hours at
stand posts.
Loss of water (non
Revenue Water)
About 50% About 7% Efficient delivery of water – more revenue
water meant increased water available for
the consumer thus reducing the need to
treat more water. This is a climate change
friendly outcome.
Customer service Non-existent 24X7 customer
care center and
ongoing public
awareness
program
established
Operator provides dependable water
services and responds to customers‟
requests and concerns
(Source: Operator‟s Progress Report)
3.2.10 In addition to the investments and efforts on the part of the operator to optimize
hardware systems, social mediation through intensive communications, IEC activities,
use of pro-poor policies, and customer satisfaction surveys was a significant factor
contributing to commercially viable operations. This was unheard of before in the
country.
3.2.11 The project also had a major influence on the way UWS is viewed by the
population in India, thus creating demand for a 24X7 supply across all urban areas in the
nation. This is visible by the sheer number of teams visiting the demo-zones from various
states consisting of elected representatives like Mayors, civil society representatives,
engineers, NGOs, and donors. This is regarded as an outstanding achievement, paving
the way for an effective Private Sector Participation in UWS sector for operators. Further,
there has been a notable change in the way government agencies are currently performing,
as seen in their more professional and consumer oriented approach to UWS service
delivery.
3.3 Efficiency
3.3.1 The Economic Rate of Return (ERR) for the project investments (Component B1
and B3) estimated at project completion is higher than the estimate at appraisal (29%
compared to 16%, respectively), indicating that the economic benefits of the project
investments are higher than initially expected. The main economic benefits from Priority
Investments (Component B1) are the increase in the bulk supply of water and power
savings. At completion, the estimated ERR for the Priority Investments is 30% is
substantially higher than the ERR estimated at appraisal (18%) because the investments
resulted in a larger increase in bulk water supply than estimated at appraisal. The main
economic benefit from the introduction of the 24X7 supply (Component B3) is the
reduction in coping costs associated with intermittent water supply. At completion the
ERR for 24X7 water supply in the demonstration zones is 28% compared to 14% at
appraisal because the coping costs associated with intermittent water supply were found
to be substantially higher than those estimated at appraisal (see Annex 3).
13
3.3.2 A financial analysis was carried out on the basis of data provided in the Operator‟s
Progress Report. The analysis shows that the project‟s objectives in terms of sustainable
operation of the water supply defined at appraisal have been achieved. Due to the new
volumetric tariff framework adopted in the ULBs, the average price of water billed is Rs.
11.7/m3. The average billing efficiency is 87% and collection efficiency reaches 95%,
implying that 83% of the water distributed is actually bringing revenues to the utility.
This is well above the objective of 70% set at appraisal and leads to an average revenue
per cubic meter distributed of 9.67 Rs./m3. Based on the estimated unit cost of water
distributed of 8.1 Rs./m3, the level of O&M cost recovery is estimated at 119%, also well
above the target of 80% set at appraisal.
3.4 Justification of Overall Outcome Rating
Rating: Satisfactory
3.4.1 The overall outcome rating is “Satisfactory” on the basis of the following:
The PDOs continue to be highly relevant in the country context and their impact,
in terms of influencing the UWS sector policy at the national level far exceeded
expectations from the standpoint of tariff policy, the involvement of the private
sector, and expansion of the 24X7 supply approach to other parts of Karnataka.
The main outcomes of the project were fully achieved and continue to be
relevant.
The ERR and the IRR exceeded expectations at project appraisal.
The project not only influenced state policy on water supply, but influenced
national policies on the importance and feasibility of 24X7 water supply
services, the involvement of the private sector in water supply delivery, and
tariff policies designed to ensure financial sustainability of the water supply
service.
The poor now have greater access to water supply services due to the project
and their satisfaction is reflected in their willingness to pay the tariff on a timely
basis.
As a result of the project, private operators are now accepted in UWS delivery
in Karnataka, and in other parts of India, thus far exceeding expectations at
appraisal.
The institutional systems worked in harmony; there was high degree of
coordination among the public and private agencies involved in the project.
The project design proved to be optimal for the conditions prevailing in the
project ULBs, particularly the approach adopted to upgrade from an intermittent
to a 24X7 supply.
3.4.2 Although the project did not succeed to operationalize the Water Council or
implementing the new legal and regulatory frameworks for the water supply sector, these
shortcomings did not affect achievement of the PDO, and are considered minor compared
to the significant impact this project has had on water sector reform at the national level.
14
3.5 Overarching Themes, Other Outcomes and Impacts
(a) Poverty Impacts, Gender Aspects, and Social Development
3.5.1 Based on the interactions with the primary stakeholders, especially the slum
dwellers in the demo-zones, the following impacts were observed.
Due to the project, the poor now have direct access to a water supply. Every
household has a water connection on their premises. There is no more waiting for
water for days because it is now available round the clock, thus allowing the time
saved to be used for gainful employment.
The poor benefitted the most from the continuous water supply. This population is
highly satisfied with the new service level as evidenced by the large number of
households making timely water tariff payments.
The poor benefited more than the higher income groups because they are solely
dependent on public water systems; the others have alternate sources such as deep
tube wells.
The beneficiaries of the improved water supplies perceive a significant reduction in
water borne diseases due to the availability of good quality water. Women and
children appear to have benefitted the most in this regard.
Women historically walk long distances to obtain water for their families. In the
demo zones, this is no longer the case. The marked reduction in the drudgery
associated with fetching water is a major gain for women who now have more time
for their family.
There is increased social interaction and social cohesion due to reduced poverty and
health related problems.
(b) Institutional Change/Strengthening:
3.5.2 Public Private Partnerships. The private operator played a pivotal role in
delivering a 24X7 water supply in the demo-zones, thus providing an alternative to the
state agencies in management. Based on the success of the project, several of the new
24X7 initiatives across India are relying on the newly found private “operators” instead
of their state agencies. The operators are employed on a performance based DBO
contract (bonus paid for achieving results) which is unique in India.
3.5.3 Strengthening State Institutions. By observing the work of the operator,
KUWS&DB strengthened its own internal systems and capacity, and is expecting to
establish 24X7 water supplies in selected small towns. This will help improve
KUWS&DB‟s performance in the towns for which it continues to be responsible for
water supply. Recently, a proposal to provide 24X7 water supplies in 17 towns (for
example, Shimoga, Bijapur, and Mandaya) was submitted by KUWS&DB to the
government for approval.
3.5.4 Recognition of Prerequisites for Improved UWS. Through the project-financed
institutional strengthening, the state now recognizes the importance of making provider
agencies accountable, placing stress on achieving sustainability in operations, and
implementing supportive capacity building measures as prerequisites for improved UWS
service delivery. The GoI‟s Planning Commission also recognized the importance of
these measures and is likely to reflect this in the country‟s 12th plan.
15
(c) Other Unintended Outcomes and Impacts (positive or negative)
3.5.5 As an unintended outcome of the project, there is now reduced dependency on
state agencies, which are deemed to be inefficient to deliver services. ULBs are gearing
up to hire operators independently to improve UWS services. State agencies remain as
facilitators but with diminishing role as providers. Another positive outcome is the
increased use of water meters even in ULBs that cannot yet dream about a 24X7 supply.
This is likely to promote the use of volumetric billing and thus water conservation and
financial sustainability.
3.6 Summary of Findings of Beneficiary Survey and/or Stakeholder Workshops
3.6.1 A full beneficiary assessment was not carried out. However, an independent
survey was carried out in 2010 confirmed that the project has had important benefits,
particularly in the demonstration zones, where the population reported a reduction in
coping costs, increase in water consumption, and time-savings. Annex 5 presents a more
detailed summary of the survey findings. Annex 6 summarizes the results of stakeholder
meetings carried out in September 2011.
4. Assessment of Risk to Development Outcome
Rating: Moderate.
4.1 The state water supply authorities and ULBs consider the project to be a major
success. They endorse the use of a private operator and the delivery of 24X7 supplies.
Many are planning improvements according to the principles established through the
project. The project processes are already institutionalized in several national programs
(for example, JNNURM) and state governments. There are no remaining perceived risks,
and there is no expectation of any future risks from external factors such as changes in
political or policy environments.
4.2 Nonetheless, some project specific risks remain. The reform processes “launched”
still need to be fully implemented; the project only supported initial measures such as
technical assistance studies. Similarly, demonstration of the 24X7 water supply was
limited to the demo-zones, which are relatively small in scale. Thus, there is an urgent
need to demonstrate commercial viability at the town level or the initial high visibility
created around 24X7 may start to dissipate.
5. Assessment of Bank and Borrower Performance
5.1 Bank Performance
(a) Bank Performance in Ensuring Quality at Entry Rating: Satisfactory
5.1.1 The Bank‟s performance in ensuring quality at entry is rated Satisfactory,
considering all aspects of quality at entry as shown in Table 4.
16
Table 4. Matrix on Bank’s Performance in Quality at Entry
Strategic
relevance and
approach
Project PDOs are highly relevant both at the time of entry and exit. The Bank
proceeded with the investment on the basis of the Government‟s assigning priority
to urban water sector reforms and demonstrating its commitment through a policy
statement. The resulting project design was a bold yet risky move to demonstrate a
24X7 water supply for the first time in India, thus opening the door for a dramatic
change in the way these services are delivered. Another step was to introduce private
sector participation in the area previously monopolized by the public sector.
Technical,
financial and
macro-economic
aspects
At a time when no one understood how to switch to 24X7 in India, the Bank hired
high quality consultants to show how to accomplish this. The investments
recommended a technical approach designed to turn around the water supply with a
high degree of precision, well adapted to the prevailing conditions. Priority was
given to cost recovery and financial sustainability. This was a first attempt to show
that water operations can be commercially viable and attract private finance.
Poverty, gender,
and social
development
aspects
The Bank ensured that the focus was on the poor and that women in particular would
gain from the improved services because they have the main responsibility for
obtaining the household‟s water. In this context, the project incorporated pro-poor
policies and build in the necessary social intermediation programs.
Environmental
aspects
Because the project largely depended on an increased bulk water supply; instead of
creating a new treatment facility that would use more raw water, the team was
justified in focusing on improving efficiency to prevent water losses. From the
supply side, this was a highly environmental friendly approach. However, the
project did not assign any priority to ensuring adequate wastewater management.
Fiduciary Aspects Adequate arrangements were established for project implementation.
Policy and
Institutional
aspects
The Bank was justified in supporting the use of existing institutional structures for
project implementation, taking into account a role for all stakeholders in this
program. With few exceptions, the Bank demonstrated a realistic approach to the
reform agenda.
Implementation
Aspects
KUIDFC was given key responsibility for implementing Component B, while
Component A was expected to be driven by the Government through the Water
Council that was expected to be created under this project. However, the Water
Council was not established during the project period which may have been due to
the failure of the project to include financial support for its operational costs. This
risk was not recognized during the design of the project.
Monitoring and
Evaluation
Arrangements
The Bank could have ensured that the M&E system was functional prior to or at
least soon after implementation started. The indicators for measuring outcome also
could have been more appropriate for monitoring changes during the course of
project implementation. However, the project did use third party auditing and the
operator‟s contract was “performance based” which meant that the operator was
expected to report on project achievements.
Risk Assessment The Bank realistically assessed most project risks and ensured that appropriate
mitigation measures were put in place. However, the Bank was too optimistic in
expecting more dramatic reforms related to the establishment of the Water Council
(see below) and new legal and regulatory framework.
(b) Quality of Supervision
Rating: Satisfactory
5.1.2 Bank supported the project extensively through regular supervision missions
involving multidisciplinary teams including international consultants. The Bank team
took timely actions as needed to resolve any issues that arose and provided sound
supervision support. Close support on the following critical areas after project
effectiveness helped to establish a strong foundation for success: selection of demo
zones and citywide investments, competitive selection of the operator, and intense social
interaction and communications campaign. In addition, the Bank‟s close supervision
17
helped to ensure that the project did not face any fiduciary or safeguards problems.
Proactive engagement with the client agencies led to timely identification of challenges
and identification of suitable actions to mitigate them.
(c) Justification of Rating for Overall Bank Performance
Rating: Satisfactory
5.2 Borrower Performance
(a) Government Performance
Rating: Satisfactory
5.2.1 The rating is based on its strong ownership of the project from its initial issuance
of a policy statement in support of the project and throughout project implementation. Its
continued commitment is also reflected in its accepting and acting on study findings in
support of reforms. The latter included its decision to implement volumetric tariffs in
demo zones and a state wide tariff framework for urban water supply in general. In the
case of using the private operators, the government‟s support is not limited to this project;
it is now using private operators liberally in delivering other public services, including
rural water supply. In addition, the government‟s performance in the fiduciary aspects
and in the coordination between agencies and timely resolution of project issues was
satisfactory. The government also was proactive in formulating pro-poor policies in
UWS delivery. In this regard, the GoK targeted the urban poor by giving them
incentives to pursue house connections with a meter (with 100% subsidy on house
connection fee, but charging for meters in installments), which eliminated the need for
public stand posts entirely in the demo zones. This allowed every poor household to own
a tap at home. Nonetheless, due to the fluid state of politics during the implementation
period, decisions on reforms were delayed. The Water Council was not operationalized
as planned and other reforms progressed only up to the point envisaged in the project.
(b) Implementing Agency or Agencies Performance
Rating: Satisfactory
5.2.2 KUIDFC, the implementing agency, remained highly committed to achieving the
PDOs and sustained throughout the project period its broader focus on outcomes,
including replication in several other interested ULBs. The central office in Bangalore
and its regional office are all highly focused and assigned utmost importance to getting
timely outputs from KUWS&DB and from the operator through close monitoring.
(c) Justification of Rating for Overall Borrower Performance
Rating: Satisfactory
Both the government and the implementing agencies played key roles in the success of
this project. The performance of both is rated Satisfactory, and the combined rating is
Satisfactory.
18
6. Lessons Learned
24X7 for Policy Makers
A continuous water supply (24X7) is achievable in India. However, this requires strong
commitment at both local and state levels and should be accompanied by strong pro-poor
policies (see below) and reform measures.
A continuous water supply does not require more treated bulk water supply. The project
proved that a 24X7 supply is achievable even at reduced rates of supply. Consumption in
the demo-zones with a 24X7 supply is 18.4 MLD as opposed to 22.14 MLD with
intermittent water supplies.
Good governance measures are vital for sustainability. Introducing new water meter
connections and affordable volumetric tariffs that promote water conservation proved
essential for ensuring the sustainability of the 24X7 supplies.
24X7/and Pro-Poor Pricing/Social Mediation
Individual household water supply connections increase consumer satisfaction and cost
recovery and conserve water. Public stand posts not only limit accessibility but result in
water wastage. Barriers to securing household connections for all households, regardless
of income, should be addressed through pro-poor pricing policies.
The poor benefit more from the 24X7 water supply than the higher income groups. They
seldom have alternate potable water sources and perceive that continuous water gives
them significant socio-economic and health benefits. The project also proved that the
poor are good customers and pay bills more promptly than the higher income customers.
Social intermediation is critical to secure the support of the beneficiary population. The
project incorporated a robust communication strategy during both the preparation and
implementation phases of the project. The strategy involved door-to-door distribution of
regularly updated FAQs, establishing public information centers in the demo zones to
ensure transparent access to information for all citizens, ward level meetings, media tours,
information sharing with media on a regular basis, and paid advertisements to place
factual information in the public domain. NGOs played a key role in the door to door
communications to ensure that the local communities had a clear understanding of the
project approach, project progress, billing and tariff arrangements, grievance redress
arrangements, and user responsibilities in a 24X7 water supply system. These measures
ensured consumer ownership and willingness to pay for the improved water supply.
PPPs in 24X7 Water Supply
PPPs are critical for introducing efficiency into water operations. The private sector is
willing to enter the water market and will bring technical and managerial skills if the
contracts are well designed with accountability clearly defined, risks evenly allocated,
and transparent procurement processes incorporated.
Building flexibility into the procurement process, where possible, will help to expedite
project implementation. The operator was dependent on purchaser approval for petty
purchases which led to some delays in completing the contract. Building flexibility into
petty purchases by building appropriate checks, balances, and a robust internal control
mechanism can help expedite timely completion of works.
19
Monitoring and Evaluation
In designing similar projects, it would be helpful to carry out comprehensive benefit
monitoring and evaluation. The evaluation would focus on aspects such as (a)
improvements in the water quality, (b) reduction in instances of water logging, (c)
avoidance of cross contamination, (d) reduction in wastage of water at house hold level,
(e) change in storage of water and other coping strategies by the consumer, (f) impacts on
soil quality, (g) specific health improvements, (h) changes in habits of personal hygiene,
and (i) changes in wastewater generation, before and after the project. The resulting data
for these parameters could be used as a baseline for project M&E and thus demonstrate
the full impact of the project and highlight areas for improving project performance.
7. Comments on Issues Raised by Borrower/Implementing Agencies/Partners
(a) Borrower/implementing agencies KUIDFC‟s comments on the project identified many positive lessons from the project,
including: the need to ensure adequate bulk water supply; the need for ULBs to authorize
the operator to issue house connections and adopt pro-poor polices; the need to ensure an
uninterrupted power supply; the advantage of using HDPE pipes; the importance of a
communication strategy to support reform implementation; and the advantages of using a
strategic approach to roll out volumetric tariffs, and delinking collection of arrears
accumulated under the previous flat rate regime. With regard to procurement, KUIDFC
noted their negative experience with two procurement delays. However, these delays
occurred through the application of the Bank‟s normal procedures. They also contributed
useful suggestions related to future contracting arrangements, particularly in regard to
operator pre-qualification requirements and performance payments.
(b) Cofinanciers
(c) Other partners and stakeholders (e.g. NGOs/private sector/civil society)
The operator provided a small list of challenges it faced during project implementation
and made a few suggestions on the way forward for future projects which are reflected in
the lessons learned section.
20
Annex 1. Project Costs and Financing
Project Cost by Component (in USD Million equivalent)
Components
Appraisal
Estimate (USD
millions)
Actual/Latest
Estimate (USD
millions)
Percentage of
Appraisal
Component A
Component B
Component C
2.55
40.95
1.39
0.84
43.11
1.16
33%
105%
83%
Total Baseline Cost 44.89 45.11 100.50%
Physical Contingencies
1.73
0.00
0.00
Price Contingencies
4.51
0.00
0.00
Total Project Costs 51.13 45.11 88%
Front-end fee PPF 0.00 0.00 0.00
Front-end fee IBRD 0.40 0.20 50%
Total Financing Required 51.53 45.31 88%
(b) Financing
Source of Funds Type of
Cofinancing
Appraisal
Estimate
(USD
millions)
Actual/Late
st Estimate
(USD
millions)
Percentage
of Appraisal
Borrower 12.03 9.00 75%
International Bank for
Reconstruction and
Development
39.50 36.31 92%
21
Annex 2. Outputs by Component
1. Outputs of Component A1 & A2 Activity Status Action taken
TA Studies to Support State Level Reform
Karnataka state urban water supply
council (KSUWSC)
Study completed;
recommendation
sent to
government
Proposal to set up KSUWSC is
pending with the government
Strengthening service delivery in ULBs Draft
recommendations
provided
State government not convinced
of the draft recommendations
and their feasibility; the draft
recommendations were studied
again under a broader a WSP
funded study
Development of Water and Sanitation
Information System (WASIS)
Completed Established and being used
Water and Sanitation Sector investment
and tariff framework
Completed State government issued
government order and a circular
–investment pattern and tariffs
are implemented all over the
state
Establishment of legal and regulatory
framework
Draft
recommendations
provided
State government not convinced
of the draft recommendations
and their feasibility; the draft
recommendations were studied
again under a broader WSP
funded study.
Preparation of UWS legislation Not carried out Legislative changes are not
required as it is largely governed
by 74 CAA – decentralization
agenda.
Strengthening Service Delivery and Preparation of Follow-on project
Preparation of citywide engineering
feasibility studies
Delayed start as
results from demo
zone took time –
the study work
envisaged
preparation of a
proposal
TATA consulting engineers are
working on this
This was financed by the project
till its closure and thereafter GoK
is financing.
Transition plans
Other studies related to the PPP
preparation
Strategy to scale up in other cities No study is required; already
initiated in cities like Mysore
22
2. Outputs of Component B1: Priority Investments
2.1 Water Supply Improvements in Belgaum City:
Sl.
No
. Details of Works
WB
R N
o.
Na
me
of
the
Co
ntr
act
or
Co
ntr
act
Va
lue
Act
ua
l
Ex
pen
dit
ure
(Rs
in ‘
00
000
)
Sti
pu
late
d
Per
iod
fo
r
com
ple
tio
n
Du
e D
ate
fo
r
com
ple
tio
n
Act
ua
l D
ate
fo
r
com
ple
tio
n Major reasons for delay
1 BGW01
a) Providing 1100 mm dia(8 Kg/cm2) PSC Gravity Main (14900 Rmtr) from Rakkaskop to Hindalga
b) 1000 mm dia K-9 Class DI Transmission main (3210 Rmtr) from Hindalga to Laxmitek in Belgaum.
c) Repairs and Reconditioning of Existing service road from Rakkaskop to Hindalga and Hindalga to Laxmitek.
d) Construction of RCC Intake tower cum Control room on U/s Side of Rakaskoppa Dam with allied works.
e) Construction of RCC Foot Bridge to Intake Tower cum control room on U/s Side of Rakaskoppa Dam with
allied works.
3
7-4-2005
M/s
. T
aher
Ali
Indust
ries
& P
roje
cts
(P)
Ltd
.,
Hyder
abad
1330.3
3
1383.7
5
18 m
onth
s
31
-08-2
006
14
-5-2
008
Permission from PWD
Authorities for road
cutting, Laying of pipeline
was not taken in paddy
fields and muddy roads in
rainy season .Floods in
river, Shifting of Electric
power line.
2 BGW02
a) Providing 508 mm dia 6.40 mm thick (1620 Rmtr) MS Transmission Main from Hindawadi to Anagol
b) Providing 1168 mm dia 9.50 mm thick (10000 Rmtr) MS Transmission main from Kundargi to
Tummaraguddi
c) Construction of 55 Lakh Liters capacity RCC GLSR at Laxmitek, Belgaum.
4
7-4-2005
M/s
. IV
RC
L I
nfr
astr
uct
ure
s
& P
roje
cts
Ltd
.,
Hy
der
abad
17
88
.95
17
64
.54
18
mo
nth
s
07-0
9-2
00
6
01
.06
.20
09
KEB pole Shifting,
Flooded area, Delayed
shutdown for linking,
Delay from various
agencies for permission of
laying pipelines (Military,
PWD, KEB, National
Highway, Railway) and
Extra Items and variation.
Additional Works under Package BGWO2 a) Providing Water Supply arrangement to 2nd stage Ranichamnamma Nagar, Belgaum - 200mm dia DI
pipeline 1400M in length.
b) Construction of 15 lakh liters capacity RCC Shaft type OHT on 15 m staging at TB Ward, Civil Hospital,
Belgaum.
c) Construction of Sump cum pump house at TB Ward, Belgaum, Supply, Erection and Commissioning of 2
Nos. 40 HP pumping machineries at TB Ward pump house.
d) Removing and relaying of 525/ 500mm dia CI/DI pipeline from Laxmitek to Gumatmal, CI-2700m, DI-
2600m in length
23
M/s.
IVRCL
Infrastr
uctures
&
Project
s Ltd.,
Hydera
bad
289
.19
234.6
4
6
month
s for
all
works
and 9
month
s for
OHT.
04.0
1.20
07
04.0
4.20
07
for
OH
T
1.6.
200
9
3 Installment of suitable capacity pumps at pump House 1 (PH1): HBGO1 Providing Centrifugal pump sets at Amminbhavi in Hubli-Dharwad and at Hindalga in Belgaum
At Hubli-Dharwad : 3 No of Pumps are commissioned in July 2007.
At Belgaum : 3 No of Pumps are commissioned in May 2007.
19
20-7-2006 M
/s. A
run
Engin
eeri
ng
Pro
ject
s
Pvt.
Ltd
., B
angal
ore
375.7
8
329.1
2
6 m
onth
s
27
-10-2
006
17
-11-2
007
Non-clearance of site due
to existing running pump
sets and execution of
additional items and delay
in clearance from the
electrical inspectorate.
4 Capacity expansion of feeder mains to some of the reservoirs within the system BGWO4
Providing 200 mm dia DI pipeline from Parsi Grave Yard to Kalmeshawar NAGAR CROSS Ward No.44 to
provide water supply to non Demo Zone area adjoining Belgaum(North) Demo Zone
M/s
Mal
oo
Const
ruct
io
ns
Ban
gal
ore
84.4
2
85.1
6
6 m
onth
s
3/1
1/2
010
4.2
.2011
24
2.2 Water Supply Improvements in Hubli-Dharwad City
S
l.
N
o
.
Details of Works
WB
R N
o.
Na
me
of
the
Co
ntr
act
or
Co
ntr
act
Va
lue
Act
ua
l
Ex
pen
dit
ure
(R
s
in ‘
00
000
)
Sti
pu
late
d P
erio
d
for
com
ple
tio
n
Du
e D
ate
fo
r
com
ple
tio
n
Act
ua
l D
ate
fo
r
com
ple
tio
n
Ma
jor
rea
son
s fo
r
del
ay
5 HDW01 Providing 1168 mm
dia 9.50 mm thick MS
Transmission Main
(23000 Rmtr) from
Amminbhavi
to Nrupathungabetta at
Hubli-Dharwad.
8
30
-6-2
005
M/s
. P
rati
bh
a In
du
stri
es L
td.,
Mu
mb
ai
31
83
.24
31
36
.36
18
mon
ths
18
-10
-200
6
31
-07
-200
7 1.Delay in land acquisition.
2.Delay due to prolonged & heavy
monsoon in the year 2005 and
2006 . Hence lining and gunitting
works are not taken up.Also,
resulting excavation trenches were
completely collapsed and partially
submerged.
Pumps installed at Ameenbhavi
6 HBGO1 Providing Centrifugal
pump sets at
Amminbhavi in Hubli-
Dharwad and at
Hindalga in Belgaum
19
20
-7-2
00
6
M/s
. A
run
En
gin
eeri
ng
Pro
ject
s P
vt.
Ltd
., B
ang
lore
3
75
.78
32
9.1
2
6 m
on
ths
27
-10
-200
6
17
-11
-200
7 Non-clearance of site due to
existing running pump sets and
execution of additional items and
delay in clearance from the
electrical inspectorate.
25
2.3 Water Supply Improvements in Gulbarga City S
l. N
o. Details of Works
WB
R N
o.
Na
me
of
the
Co
ntr
act
or
Co
ntr
act
Va
lue
Act
ua
l E
xp
end
itu
re
(Rs
in ‘
00
000
)
Sti
pu
late
d P
erio
d
for
com
ple
tio
n
Du
e D
ate
fo
r
com
ple
tio
n
Act
ua
l D
ate
fo
r
com
ple
tio
n
Ma
jor
reaso
ns
for
del
ay
Rehabilitation of only Transmission Main
7 GBW01 Providing 1118 mm
dia 10 mm thick MS
Transmission Main
(19200 Rmtr) from
Head works to IPS at
Kotnoor in
Gulbarga.
__
_ 9
__
_
30-6
-20
05
M/s
.Bho
ora
thno
m
Const
ruct
ion
Co.(
P)
Lim
ited
,
Sec
un
der
abad
28
76
.24
27
46
.47
18
mo
nth
s
17
-10-2
00
6
22
-04-2
00
7 1) Land acquisition
2) Shifting of Electrical poles
on the alignment of the
transmission main,
8 GBW02
a) Providing 914mm
dia 7.9 mm thick MS
Transmission Main
(7900 Rmtr) from
Kotnoor to
Shorgumbaz and
b) Removing and
relaying of 600mm
dia CI Transmission
main(10500 Rmtr)
from Bennithora to
BP Tank in
Gulbarga.
10
30-6
-2005
M/s
. P
rati
bha
Indust
ries
Ltd
., M
um
bai
1130.2
6
851.2
4
15 m
onth
s
17
-07-2
006
22
-04-2
007 1) Railway crossing work
2) Handing over of land by
KRDCL
9 Package GBWO4 Removing of
existing 600 mm
dia CI Pipes &
replacing the same
with 610 mm dia
(OD) M.S
Transmission Main
from Bennithora
Head works to BP
Tank in Gulbarga
23
3-9-
2010
M/s
Meg
ha
En
gig
& I
nfr
astr
uct
ure
s L
td.
Hy
der
abad
73
1.9
8
34
9.6
9
12
mo
nth
s
30-0
5-2
011
Nea
rly
com
ple
ted
(b
y e
nd o
f A
ugust
20
11) Shifting of poles
Construction of additional filter beds at Shor Gumbaz
26
1
0 GBW03 Providing 15 MLD
capacity Water
Treatment Plant at
Shorgumbaz in
Gulbarga.
1
1
30-6
-20
05
M/s
.Goel
Pro
ject
s P
vt.
Ltd
.,
His
sar,
Har
ayan
a
12
9.9
0
12
9.9
0
12
mo
nth
s
11-0
4-2
00
6
19-0
1-2
00
7 Completion of Rising Main and
Pumping Machinery
Upgrade the Pumping Station at the Head Works
1
1 GBGO1 Providing Deep
well Turbine Pump
sets at Saradagi and
Centrifugal pump
sets at Kotnoor in
Gulbarga
1
4
20
-7-2
00
6
M/s
. A
run
Engin
eeri
ng
Pro
ject
s
Pvt.
Ltd
., B
angal
ore
40
2.0
1
37
9.6
7
8 m
onth
s
27
-12-2
00
6
22
-04-2
00
7 1) Approval of drawings, issue
of PIA certificate.
2) Renovation of existing pump
house 3)Clearance from
electrical inspectorate.
27
3. Outputs of Component B2:
1. Distribution Network Improvements
S
l.
N
o
Details of Works
WB
R N
o.
Na
me
of
the
Co
ntr
act
or
Co
ntr
act
Va
lue
Act
ua
l E
xp
end
itu
re
(Rs
in ‘
00
00
0)
Sti
pu
late
d P
erio
d
for
com
ple
tio
n
Du
e D
ate
fo
r
com
ple
tio
n
Act
ua
l D
ate
fo
r
com
ple
tio
n
Ma
jor
rea
son
s fo
r
del
ay
1
2 HBQFXW01 Strengthening and
Extension of
Distribution Mains in
Hubli City ( DI Pipe
length 16230 m of
Diameter ranging from
150mm to 300mm)
5
7-2
-20
06
M/s
. S
ub
has
h P
roje
cts
& M
ark
etin
g L
td.,
Ban
gal
ore
33
8.0
9
32
1.9
7
8 m
on
ths
18
-06
-200
6
11
/7/2
00
8 National Highway authorities
have stopped the work for
want of written permission
from higher authorities, Delay
due to existing, telephone
cables, 11 KV UG cable all
along the pipeline trench and
also due to small and narrow
road.
DWQFXW01 Strengthening and
Extension of
Distribution Mains in
Dharwad City ( DI
Pipe length 9185 m of
Diameter ranging from
150mm to 400mm)
M/s
. S
het
h &
Su
ra
En
gin
eers
Pv
t. L
td.,
Pu
ne
15
3.0
1
15
1.5
9
6 m
on
ths
19
-04
-200
6
31
-07
-200
6 Delay due to National
Highway authorities and
PWD authorities have not
allowed to carry out the
pipeline work
In Gulbarga, Remodeling of Distribution network system to Gulbarga City has been taken up by Board. In
Belgaum there is already existing distribution system
Other Miscellaneous work
1
3 HBGGO1-B Manufacture, supply,
assembly, erection, testing, and
commissioning of Woltman
Helical Type Bulk Flow Water
Meters at various locations in
Belgaum, Hubli-Dharwad and
Gulbarga cities. M/s
. C
het
as C
on
tro
l
Sy
stem
Pv
t L
td,
Pu
ne
10
9.0
0
46
.20
4 m
on
ths
20
-09
-200
7 Work rescinded since the
agency has not completed the
work.
1
4
Rehabilitation works at Gulbarga
GBWO5 a) Repairs to 8.0 Lakh Gallons
Capacity GLSR at Old Filter
Bed
Sri
S.Y
Pat
il,
Gu
lbar
ga
36
.51
25
.92
4 m
on
ths
31
-01
-
20
09
15
-01
-
20
10 1) Handing over of Reservoir
site by the Corporation
Authorities
2) Change in structural
designs
b) Overhauling of Filters Beds
at old filter bed in Gulbarga
city.
---- Sri
M.N
.
Ram
akri
sh na,
Dh
arw
ad
22
.03
21
.18
4 M
on
ths
9/7
/20
10
28
-06
-
20
10
28
c) Supply and Installation of
Laboratory Equipments at Old
Filter Bed in Gulbarga city
---- M/s
Rav
i
Sci
nti
fic
Inst
rum
ent
s C
o.
Hu
bli
. 5
.86
3.4
6
2 M
on
ths
9/5
/20
10
29
-12
-
20
10 Change in laboratory
installation site
d) Overhauling of 7.5 HP,
9.0HP, 50 HP and 60 HP Pump
sets and accessories
M/s
Pu
nee
t
Ele
ctri
cals
,
Hu
bli
13
.27
16
.13
2 m
on
ths
30
-11
-
20
08
11
-03
-
20
10 Handing over of site by the
Dept. for 600mm dia MS
pipeline which is under
progress
e) Supply, Erection,
Electrification and
Commissioning of 60H.P
Centrifugal Pump set
f) Supply, Erection,
Electrification and
Commissioning of 50 H.P
Centrifugal Pump set
M/s
Ch
agi
Ele
ctri
cals
,
Gu
lbar
ga
18
.64
18
.9
3 m
on
ths
30
-12
-200
8
04
-07
-200
9 1) Handing over of site by the
Dept. for 600mm dia MS
pipeline which is under
progress
2) Third party inspection
4. Outputs of Component B3
Sl
No. Component
Sub-Contractor /Agency
through which executed Quantity
Expenditure
(in millions Rs)
1. Pipe line works and
House Service
Connections (HSCs)
M/s. Jain Irrigation Systems
Jalagaon
WBR No.: 1259170 - 1A
237.77 kms of
pipeline &
25383 no. of
connections
(HSCs)
181.43
2. Procurement of
customer water meters
and test benches
M/s. Actaris Industries Ltd.,
WBR No.: 1259137- 1B
22450 nos. of
customers water
meters & 3 nos.
of test benches (as
per contract)
25553 at the end
of contract
26.53
3. Road Restoration City Corporations of
Belgaum, Gulbarga and
Hubli-Dharwad
25.67
4. Billing and Collection
and Customer Support
Software
M/s. Debind Business
Solutions / National
Informatics Centre Bangalore
4.39
1.26
5. Hardware and Software
and other peripherals
for Billing and
Collection System
On quotation basis 4.57
6. Water quality analysis M/s. Jalvahini Management
Services Pvt., Ltd., 0.84
7. Operation and
Maintenance
On quotation basis 33.97
8. Training 1.40
Total 280.06
29
Annex 3. Economic and Financial Analysis
1. The ERR for the project investments (Component B1 and B3) estimated at project
completion is higher than the estimate at appraisal (29% compared to 16%, respectively),
indicating that the economic benefits of the project are higher than initially expected.
(See Table 3). The following compares the ERR at completion with the ERR at appraisal
for Priority Investments (Component B1) and 24X7 water supply investments
(Component B.3). The main data inputs and assumptions used for the analysis are listed
in Table 4.
2. Priority Investments. The main economic benefits from Priority Investments
(Component B1) are the increase in the bulk supply of water and power savings. At
completion, the estimated ERR for the Priority Investments is 30%, which is higher than
the ERR estimated at appraisal (18%) (see Table 3). The ERRs at project appraisal were
13% for Belgaum, 16% for Gulbarga, and 21% for Hubli-Dharwar. The higher economic
returns of the component is due to the higher than expected benefits of the project
investments; overall, the investments resulted in a larger increase in bulk water supply
than the estimates at appraisal (see Table 1). For example, in Belgaum, the increase in
water supply is more than twice the estimate at appraisal (27 MLD compared to 10
MLD). A significant part of the increase in the bulk water supply has been attained
through leakage reduction, rather than capital investments.
Table 1: Priority Investments - Increase in Bulk Water Supply (MLD)
ULBs Appraisal(1)
Completion
Belgaum 10 27
Gulbarga 22 30
Hubli-Dharwar 11 11
Total 43 68 Note: (1) Project Appraisal Document.
3. 24X7 water supply demonstration zones. The main economic benefit from
continuous water supply in the demonstration zones (Component B3) is the reduction in
the coping costs associated with intermittent water supply. For households with piped-
connections, coping costs encompass those for investment in water-related equipment
and those related to the need to supplement water consumption with more expensive
water-sources. For households that rely on public-taps, coping costs include the value of
time spent in fetching water. Eighty focus group discussions (FGDs) were carried out to
estimate the coping costs at completion in the demonstration zones. The FGDs indicate
that all of the households that relied on water-fountains received a private connection,
thus eliminating the need for queuing for water. Moreover, the water supply service level
increased from 2 hours in 3 days to a 24X7 (continuous) water supply, thus reducing the
need to supplement water consumption with expensive water from tankers or other
vendors for those households who could not afford private water storage.
30
4. The results of the FGDs show that the coping costs associated with intermittent
water supply are significantly higher than the estimates at appraisal. At appraisal, coping
costs were estimated to be on average Rs 350/HH/month in 2010 prices1 (equivalent to
the cost of supplementing piped water supply with additional water sources and the loss
of productive time to cope with securing adequate water on a daily basis). The FGDs
indicate that coping costs are on the order of Rs 1,500/HH/month, with significant
variation across users, and on average almost five times the estimates at appraisal (see
Table 2). At appraisal, the assumption was made that coping costs would be reduced to 0
after the project. The FGDs revealed however that even after the 24X7 water supply was
achieved, households still invested a smaller share of their income in containers, water
tanks, and the like. Part of these expenditures can be considered “insurance costs” in the
event that the water system breaks down. Over the long-run, as household gain
confidence in the system, it is possible that these expenditures may be reduced as well.
The average insurance costs at completion are Rs 744 Rs/HH/months. Even with the so
called insurance costs, the net economic benefits associated with continuous water supply
(771 Rs/HH/month) are considerably higher at completion than the estimate at appraisal
(350 Rs/HH/month) in 2010 prices. Thus, the ERR for the 24X7 water supply in the
demonstration zones at completion (28%) is substantially higher than the estimate at
appraisal (14%). See Table 3.
Table 2: Demonstration Zones – Coping Costs (Rs/HH/month)
Appraisal(1)
Completion(2)
Before
project
After
Project
Chang
e
Before
project
After
Project
Chang
e
Hubli-Dharwad
General Households na na na 750 300 450
Slum households (without prior
connection) na na na 1596 0 1596
Slum households (with prior
connection) na na 1. na 1376 0 1376
Belgaum and Gulbarga
General Households na na na 2250 1350 900
Slum households (without prior
connection) na na 2. na 2496 900 1596
Slum households (with prior
connection) na na na 2276 900 1376
Overall
All ULBs 350 0 350 1,516 744 771 Source: (1) Project Appraisal Document; (2) 80 Focus Group Discussions.
5. The FGDs indicate that the economic benefits from the 24X7 water supply are
substantial, and go beyond the reduction in monetary coping costs. Additional socio-
economic benefits from 24X7 water supply projects include: (a) a reduction in health
risks and costs resulting from the ingress of contaminated groundwater and raw sewerage
into the water system (such as lost productive time while sick); (b) improved quality of
1 Equivalent to 250/HH/month, 2004 prices.
31
service and less customer inconvenience; (c) increase in property values; and (d) social
benefits associated with the ability to access water whenever it is needed. For example,
the Voluntary Health Association of India estimates that the country loses 73 million
working-person days because of illnesses caused by water-borne diseases.2 Continuous
water supply also improves the functioning and overall efficiency of the water system by
allowing leakage detection and more efficient demand and supply management.
Table 3: Economic Benefits, by Component
Component ERR - Appraisal1
ERR - Completion2
Priority
Investments(1)
18% 30%
Belgaum 13% 81%
Gulbarga 16% 24%
Hubli-Dharwar 21% 21%
Demonstration
zones 14% 28%
Total 16% 29% Notes: (1) The overall ERR for Priority investments is calculated as the weighted average of the ERR for
individual components.
Source: (1) Project Appraisal Document; (2) 80 Focus Group Discussions as well as project data.
Financial Analysis
6. The financial analysis included in the PAD presents an analysis of the ULBs financial
situation, and highlights the fact that, at project appraisal, none of the ULBs covered even
half of their O&M costs through tariff revenues. The financial analysis then describes
how the project was designed to support the long term objective set out by GoK to
“establish an appropriate cost recovery mechanism through adequate tariffs to ensure
that revenues cover O&M costs, debt service, plus a reasonable return on capital”. The
proposed contributions are outlined at the State, ULB, and Demonstration Zones levels.
7. At the state level, the project would assist GoK in carrying out the state sector
development strategy/action plan, including detailed fiscal allocation of state resources.
At the ULB level, the project would assist the ULBs through studies and capacity
building on: (i) ring fencing the water supply and sanitation operations and recording of
separate accounts; (ii) improvement in billing and collection; and (iii) definition of a
water tariff structure. As reported in Section 3.2. of the present report (“Achievement of
Project Development Objectives”), all relevant studies have been successfully delivered
under the project. These include the following specific studies:
“Establishment and Operationalization of Karnataka State Urban Water Supply
Council” carried out by a consortium including Tahal, TERI, and CRISIL
“Study on Tariff and Investment Framework” carried out by A.F. Ferguson & Co.
Development of Water and Sanitation Information System, including components
related to billing and collection.
2 Patil, Ashik, K.V. Somasundaram and R. C. Goyal (2002). “Current Health Scenario in Rural India”.
Aust. Journal of Rural Health.
32
8. At the Demonstration Zones level, the Project would support the development and
pilot implementation of a volumetric tariff system, using the following methodology and
principles:
Careful transition to volumetric pricing by using both flat rate and volumetric
billing in parallel for a few months, accompanied with social intermediation and
communication activities.
Volumetric rate of at least Rs. 10/m3.
Examination of a policy for connection subsidies
Initial target for tariffs to cover no less than 50% of O&M costs and progressively
increase to no less than 80% of O&M cost by the end of the project.
9. The principles regarding the transition to volumetric pricing and the policy for
connection subsidies were applied successfully during project implementation. The
ULBs used flat tariffs for six months while producing dummy volumetric billing, prior to
the actual application of the volumetric tariffs. A pro-poor policy for connections was
devised, consisting of a waiver of the connection deposits for households residing in a
dwelling with an area under 600 sq.ft., which allowed most of the poor to have individual
house connections, thus paving the way for the removal of public stand posts.
10. An analysis of the Operator‟s progress report on operation of water supply in the
Demo Zones has been carried out to verify whether the following financial sustainability
objectives outlined in the PAD have been achieved:
Volumetric rate of at least Rs. 10/m3
Billing and Collection Rate to exceed 70%3
80% Cost Recovery of O&M cost by the end of the project
Application of Volumetric Tariffs
11. Based on the tariff framework study supported by the Project4, the GoK developed a
general increasing block tariff structure. In accordance with this general framework, a
tariff structure was developed to be applied specifically to each demonstration zone. The
following table presents the volumetric tariffs in use in the three demonstration zones by
project completion.
3 This objective was included as one of the key output indicators in the PAD results framework.
4 Study on Tariff and Investment Framework in the Water and Sanitation Sector
R. R. Mohan Sr. Social Development Specialist SASDS
Stephen D Myers Sr. Consultant SASDU
Mariapa Kullappa State Coordinator WSP
Anup Wadhawan Country Team Leader WSP
Ritu Thomas Senior Program Assistant DECOS
Lilian Mc Arthur Program Assistant SASDU
Sunita Singh Program Assistant SASDU
ICR
Srinivasa Rao Podipireddy Sr. Water and Sanitation Specialist SASDU Primary Author
William D. Kingdom Lead Water and Sanitation
Specialist SASDU Peer Reviewer
Philippe Marin Sr. Water and Sanitation Specialist MNSWA Peer Reviewer
David Michaud Sr. Water and Sanitation Specialist LCSUW Peer Reviewer
Augustin Pierre Maria Urban Specialist SASDU Financial Analysis
Janis D. Bernstein Sr. Environmental Specialist SASDU Peer Reviewer
Elisa Muzzini Economist SASDU Economic Analysis
(b) Staff Time and Cost
Stage of Project Cycle
Staff Time and Cost (Bank Budget Only)
No. of staff weeks USD Thousands (including
travel and consultant costs)
Lending
FY03 180.14
FY04 78.89
FY05 21.43
Total: 280.46
Supervision/ICR
FY06 37.96
FY07 25.40 136.49
FY08 19.56 100.56
FY09 18 91.77
FY10 21.64 108.16
FY11 11.95 40.70
Total: 96.55 515.64
38
Annex 5. Beneficiary Survey Results
1. A full beneficiary assessment was not carried out. However, an independent survey
was carried out in 2010 to determine the extent to which the project was achieving its
objectives. The survey involved both qualitative and quantitative methods: focus group
discussions with the three municipal corporations, user groups, and operator; and
interviews with users. The survey revealed that the main benefits of the project included
reduction in coping costs, increase in water consumption, and time-savings. More
detailed findings are the following:
The project achieved 100% metered house service connections in the demonstration
zones with illegal connections reduced to near zero. All customers responded that
they are happy with the metering although some of these households (56%) had
opposed metering earlier.
The main benefit is the increase in income of the consumers in real terms. The
incremental increase in net income is on the order of Rs. 90 to Rs. 200 per week in
Hubli-Dharwad, Rs. 300 to Rs. 700 per week in Belgaum, and Rs. 50 to Rs. 300 per
week in Gulbarga.
About 20% of the customers in Hubli and Belgaum, 24% in Dharwad, and 21% in
Gulbarga, are paying less than Rs. 50 per month as water tariff. This is a large
reduction from the tariff they were paying. Presently, they are paying less while
receiving continuous water supply in their houses.
The project resulted in a substantial reduction in water borne diseases. The
information collected from the medical centers reveal that, when compared to 2006
disease prevalence levels, ameobiasis was reduced by 73.5%, dysentery by 64.1%,
and jaundice by 88.6%.
Attendance in schools in the demonstration zones improved in comparison with 2006
levels; in Hubli, it went from 82% to 96%, in Dharwad, from 85% to 98%, in
Belgaum, 75% to 92%, and in Gulbarga, 81% to 97%. In general, there was a
reduction in the girl child drop-out rate from schools in these areas as they no longer
spent their time in collection of water..
Because there is no more storage and pumping to overhead tanks at household level,
there are considerable energy savings to the consumers: 20 to 50 units (KWH) in
Hubli-Dharwad, 15 to 145 in Belgaum, and 15 to 40 in Gulbarga. This energy savings
also has additional environmental benefits.
Discussions with the municipal corporations reveal that their water tariff collection
increased to nearly 80 to 98% which enhanced ULB revenues.
There is an increased sense of pride among the beneficiaries because many teams,
both national and international, visit them frequently. Enquiries and interactions with
stakeholders reveal that more than a dozen teams visited the demonstration zones and
interacted with beneficiaries. All of these teams expressed appreciation for the project
and its outcomes.
There is an increased awareness on reforms among the consumers.
The morale of the water works staff has increased considerably.
39
Annex 6. Stakeholder Workshop Report and Results
Stakeholder Meeting in Gulbarga town – Meeting with Primary Stakeholders in
their neighborhood (of a Slum) in Ward 44 on 11 Sept 2011
1. The meeting was organized on a Sunday evening in the temple premises. About 30
men and women gathered for the meeting. The other participants include Mrs. Chandrika
Alandikar (Elected member of Municipal Corporation), Mr. Desphande (KUIFDC
official), Mr. Prakash (Operator representative), Mr. Prakash Honde (KUWS&DB
Engineer), a representative of third party auditor and Mr Vishwanath Swamiji, Head of
Vishwa Seva Mission, the NGO that facilitated IEC campaign for the project. The
discussions were centered on three project phases, that is, the situation prevailing before
the project (24x7) was implemented, during its implementation, and post project.
In the Intermittent Water Supply regime
The women said that mostly they depended on public stand posts for water which
were „a few‟ in number for a large population. The taps were under deep pits as
pressure was low and so drainage water used to seep into the pits making water
highly polluted. People stand in queue for hours and days for water as there was no
fixed time of supply. This erratic supply system put lot of mental tension and women
had to stay at home worrying for water all the time.
Often, disorder in queue resulted in quarrels with neighbors making life in the
neighborhood very unpleasant. Yet, the water collected was barely meeting the
requirements.
If water was released in the morning time, children used to miss schools as they too
stand in the queue for another pot of water and had to carry from a far off distance to
home.
The water supply engineer confirmed that main water supply lines; more importantly
the transmission line used to leak a lot requiring repairs and so no fixed times were
followed for water supply. Water availability was also for a very small period (upto
one hour) as production of treated water was less.
During Construction Time
Monthly meetings were organized by the NGO. People used to be provided with lot
of information about the program in a questions and answers format (FAQs).
Poor and middle class used to be concerned over tariffs. There was delay in finalizing
tariffs by the ULBs (a committee of three ULBs representatives took a decision on the
tariffs based on the GoK policy and actual costs). Middle class whosoever own a tap
used to pay flat tariff of Rs 40.
The communities informed that the construction program did not cause any serious
inconvenience.
Operator said that although removing public taps is not part of the project, it was
found necessary as each and every household are now provided with an individual tap.
The public taps were redundant.
40
Continuous Water Supply regime:
The men and women of the neighborhood univocally said that it was a big change in
their lives. The amount of convenience and peace they have now is unexpected. They
are completely satisfied with the services now (a very low rate of complaints at the
service centre is an indicator).
Initially, consumers were asked to pay (old) flat tariff while serving dummy bills
based on volumetric tariffs to make them understand the real variation. This strategy
has worked.
Individually, each poor family is paying less than Rs 100 including capital cost of
water meter (deducted @ Rs 30 a month). A local leader made a request to reduce
the tariff further for the poor. However, all the poor are promptly paying the monthly
bills.
The drainage board official said that there is overall improvement in the water supply
all over the town due to bulk water improvements (increased from 50 lpcd to 105
lpcd).
The NGO representative suggested that a small body of consumers/ local
representatives of the demo-zone should have been formed into a committee to
monitor 24X7 water supply.
2. In the closing remarks, the elected member and other officials concluded that there is
a huge change in the quality of life; and socio-economic conditions in this poor
community after switching over to 24X7 water supply – now the neighborhood is clean;
people take regular bath and wear clean clothes; there is good social bonding; and
apparently reduced poverty although there are no clear direct linkages.
Stakeholder Meeting on 12 September 2011, Gulbarga
3. The meeting was held with Elected Members of the Municipal Corporation: Mr.
Saibgouda Patil (Ward 23), Mr. Hanumanthu Gauda (Ward 43); Mr. Udaya Kumar
(Ward 34), Mr S.N. Sirkar (Ward 9) and Mr. Ramesh Kannakeler (Ward 35). This
meeting was also joined by the officials and NGO representatives.
4. It did not go like a conventional meeting discussing issue after an issue – collectively
the elected members pleaded for the Bank support to scale up of 24X7 in the entire town.
They promised sustainability (further increase in tariff if required) and said this is
important for the town. Some of the ward members whose wards partly receive 24X7
water do face problems convincing the people served by intermittent water supply.
41
Annex 7. Summary of Borrower's ICR and/or Comments on Draft ICR
Comments of KUIDFC (Implementing Agency)
1. The Karnataka Urban Water Sector Improvement Project (KUWASIP) is a project for
reforms in water and sanitation sector and service improvements in water sector. The
project is proposed to be implemented in a phased manner. The Government of
Karnataka implemented the first phase of the project (estimated cost: US $ 51.53 million
or Rs.237.04 crores) with World Bank assistance. Karnataka Urban Infrastructure
Development and Finance Corporation (KUIDFC) was the nodal agency for
implementing the project.
2. The three cities selected for investments in the first phase were Belgaum, Gulbarga,
and Hubli-Dharwad. The project was successfully implemented and the primary
objective of demonstrating feasibility of continuous (24x7) pressured water supply was
achieved. The experience and lessons learnt from the above project are summarized
below:
Sector Development and Technical Assistance:
3. While the studies carried out under the above component were quite useful in tariff
structuring and other aspects relating to reforms in water sector, they did not help in
preparation of guidelines or any model documents for 24x7 water supply system. It
would have been quite useful if the project developed “guidelines/ procedures for
preparing project reports for the conversion of an intermittent water supply into 24x7
water supply covering technical and financial aspects,” “Manual on O&M of 24x7 water
supply,” and “model bidding document for performance based management contract for
O&M of 24x7 water supply system” etc.
Priority Investments - Procurement Issues:
4. Procurement of 610 mm dia Transmission Main Work in Gulbarga (Package No.
GBW-04): The time taken for procurement of the above work was one year (23.3.2009 to
1.4.2010). The process of clearance to the draft bid documents by the World Bank itself
took 5 months (23.3.2009 to 21.8.2009). This was due to the fact that comments were
raised by the World Bank in a piece meal manner.
5. Procurement of Electromagnetic Bulk Flow Meters (package No. HBGG01-A):
The procurement process in respect of the above goods was started on 27.11.2008. But,
the same did not materialize even after 11 months. The contract could not be awarded, as
the World Bank communicated its inability to finance the contract due to internal legal
issues with the principal company (M/s. SIEMENS Ltd.,) on 23.10.2009, after expiry of
validity period of the bid. The details are as under:
The World Bank gave permission to go for re-tendering on 21.10.2008.
Accordingly, the tenders were invited and bid evaluations were sent to the Bank
on 15.06.2009.
On 22.06.2009 the World Bank sought clarifications, which were furnished on
03.08.2009, in which the only issue regarding Siemens that was raised was as to
how the authorized agent could quote less than the manufacturer itself. After this,
one more clarification was furnished on 24.08.2009, as desired by the Bank.
42
It was never informed by the Bank that there was any problem in procuring
Siemens meters.
The Bank did not provide any document as to how voluntary settlement between
the World Bank and Siemens would affect the bids called by the borrower.
When the project is rated on performance and delays are examined, the onus will
otherwise to be on the borrower. Obviously, these delays are beyond the control
of the borrower.
The related issue is commitment charges that the State Government has to bear on
account of the delays.
6. It would be appreciated if the World Bank takes appropriate steps to avoid delays in
procurements and keeping the borrower informed about changes in policy/legal issues etc.
that may affect procurements.
Demonstration Project – Selection of Operators:
7. While the very high pre-qualification criteria adopted for selection of the Operator for
the Demonstration Project (viz., experience in management of 24x7 water supply
covering 100,000 connections as against the requirement 25,000 connections under the
Demonstration Project), no doubt helped in procuring services of a good Operator and
lead to the success of the Pilot Project, the Operator remuneration (Rs.22.40 crores with a
provision for bonus for higher performance at maximum 25% of the Operator
remuneration, totalling to Rs.28.00 crores) was exorbitant considering the estimated
capital investment of Rs.42.00 crores. The Operator remuneration works out to 53%
(excluding bonus) and 66% (including bonus) of the capital investment. Hiring services
of Operators at such high costs is not viable.
8. Lesson: While the Demonstration Project has established technical feasibility of 24x7
water supply project, it is necessary to adopt appropriate experience criteria for selection
of Operator for future projects based on the size and complex cities involved, so as to
have good competition and to procure services of Operators at reasonable fee.
Operator Contract:
9. As per the Operator contract, the Operator is to be paid a bonus on achieving higher
performance better than the mandatory performance targets in improving the service
provision. Savings in total expenditure (as a percentage of estimated investments of Rs.
420 million) is one of the components to decide the bonus.
10. On detailed examination of the savings claimed by the Operator the following 2
categories of savings are observed:
(a) Category 1: The following 4 items under the Investment Programme were not
executed / operated by the Operator:
(i) Public Fountains
(ii) Public awareness programme
(iii) Paper advertising and pretender expenses and
(iv) Provision of medical facilities
11. “Public fountains” was not operated because all the consumers in the Demo Zones
opted for individual house service connections. “Public Awareness Programme” was very
43
effectively carried out by KUIDFC, which was one of the main factors for the success of
the Demonstration Project and hence no public awareness programme was needed to be
done by the Operator. Similarly, the other two items were not operated as there was no
need for the same.
12. The bonus is meant for over and above the normal performance. The items not
executed on account of lack of need and not arising out of any superior performance on
the part of the Operator cannot be considered as savings for the purpose of determining
performance bonus.
(b) Category 2: There were a few items which were not primarily related to managing
O&M and which were included in the Investment Programme as “Lump Sum”. These
items had expenditure which was considerably lower than the estimated cost in the
Investment Programme. The details are as under:
(Rs. in lakhs)
Item Estimated cost Expenditure incurred
Training and seminars 80.00 13.98
Insurance 40.00 0.51
Contingencies 261.77 0.00
Taxes 443.11 282.00
13. The Investment Programme was prepared by the Operator himself in which he had
estimated these items as lump sum, which turned out to be far above the actual
expenditure incurred. Since items like tax and insurance are regulatory requirements and
what is legally due has to be paid anyway, such savings cannot be considered for
performance related bonus. It is possible that the original lump sum estimates on these
items which were done by the Operator himself may have been unrealistic when
compared to norms.
14. Similarly, savings in respect of training and seminar cannot be treated as effect of O
& M performance as it was based on client‟s requirement.
15. Thus, the clauses relating to “Bonus for higher performance” were not very clear in
the “Operator Contract.”
16. Lesson: The clauses in the contract document for assessing performance of the
operator need to be quite clear and precise without any ambiguity. In addition, rigorous
procedures need to be stipulated for scrutinizing the project cost with reference to the
relative physical components.
Bulk Water Supply:
17. One of the main reasons for extension of the Operator Contract by 17 months was
due to delay in completion of priority investment works which were crucial to provide
bulk water to the Demonstration Zones.
18. Lesson: In providing 24x7 water supply system in a city, availability of adequate
bulk water to all parts of the city has to be ensured.
44
House Service Connections:
19. Another main reason for extension of the Operator Contract by 17 months was due
to delay in authorization of House Service Connections by ULBs to the Operator.
However, one of the main factors for success of the Demonstration Project was that
provision of house service connections was part of the Operator Contract.
20. Lesson: House service connections should be included in the scope of Operator
Contract. Authorization of house service connections by ULB takes considerable time.
Hence, while converting intermittent water supply into 24x7 water supply system in a
city, the ULB has to properly plan and authorize house service connections to the
Operator well in advance.
Adoption of Policies by ULBs:
21. One of the important factors for success of the Demonstration Project was adoption
of pro-poor policy and a policy for house service connections by the city corporations of
Belgaum, Gulbarga and Hubli-Dharwad apart from tariff policy.
22. Lesson: For smooth implementation of 24x7 water supply project in a city, the ULB
has to adopt relevant policies such as pro-poor policy, house service connection policy
etc., apart from tariff policy well before selection of an Operator.
Power Supply:
23. During the O&M of continuous (24x7) pressured water supply in the Demonstration
Zones, it was observed that supply of bulk water to the Demo Zones was affected due to
interruptions in power supply. In order to overcome the problem of frequent interruptions
in power supply at 100 KVA HT installations in Belgaum (North) Demo Zone, which
was crucial for water supply, an additional work (express feeder main) was carried out.
24. Lesson: Availability of continuous power supply is to be ensured for implementing
24x7 water supply system.
Use of HDPE Pipes:
25. HDPE pipes of PE 100, PN 10 of smaller dia meter (63 mm) were used by the
Operator for distribution network in the Demonstration Project, which resulted not only
in significant savings but also in better performance due to flexible nature of the pipes
and seamless joints. The system is functioning satisfactorily.
26. Lesson: HDPE pipes of smaller diameter of appropriate class may be used for
distribution system in water supply projects, as per the design requirement.
Customer Water Meters:
27. Multi-jet customer water meters class “B” (25000 nos.) conforming to IS779/ISO
4064-1 and compliant with IP68 and capable of operating in ambient temperatures up to
500C were procured and installed by the Operator in the Demonstration Zones. But, a
considerable number of customer water meters developed “Dial not Visible” defect,
during the O&M period of two years. The supplier, after detailed inspection of meters
reported that the defect was not to condensation but due to vaporization of silicon oil
applied on the surface of rubber rings. It was also reported that the meters were
functioning well in European countries and did not have any such problem. Action was
taken to get all the customer water meters repaired / replaced by the supplier to ensure
that the meters functioned properly.
45
28. Lesson: Additional conditions such as (i) the meter shall be free from “Dial not
visible” defect due to vaporization of any chemical or oil used for gaskets or any parts of
the meters (ii) in case the meter develops “Dial not visible” or condensation defects, the
supplier shall replace the total lot / batch of such meters within 30 days etc., are to be
incorporated in the bidding documents for future procurements.
Social Intermediation and Communication Activities:
29. “Social Intermediation and Communication Strategy" (SICS) was an important
component of the project and its effective implementation helped in (i) creating
awareness among all category of stake holders and convincing them that the project was
to their benefit (ii) dispelling their notions that improvement in water supply meant
abnormally high tariff (iii) overcoming initial resistance for implementation of the project
with private sector participation (iv) convincing the poor on the pro-poor dimension of
the project and (v) inculcating habit of paying monthly water charges based on quantity
of water consumed. This was achieved through use of clear and consistent messages
through pamphlets/posters, personal communication with stakeholders and dissemination
of the pro-poor policy which contained tariff reforms /reliefs for this segment of
stakeholders.
30. Lesson: Communication strategy and awareness generation is essential for
implementing reform oriented projects and the same needs to be a component of the
project.
Implementation of tariff for 24X7 water supply:
Allowing sufficient time to consumers to switch over to the new system:
31. Continuous (24x7) pressured water supply was operationalized in Hubli Demo Zone
on 1.12.2007. The Hubli-Dharwad Municipal Corporation (HDMC) directed the Operator
to raise bills in Hubli Demo Zone based on the approved volumetric tariff for 24x7 water
supply w.e.f 1.l.2008. Accordingly, the Operator issued bills to the consumers in
February 2008 for the water consumed during January 2008. There was agitation from
678 consumers on the ground that they had not actually consumed such high quantity of
water. A detailed analysis was carried out which indicated that 77% of the water billed
was actually consumed and the remaining 23% was on account of leakage inside
consumer premises, leakage into old network etc. It took several months to resolve the
issue. The agitation was not only a setback for Hubli Demo Zone but it sent wrong
signals to Dharwad and Belgaum Demo Zones, consequent to which implementation of
the tariff for 24x7 water supply was delayed in the said Demo Zones. Also, it lead to
downward revision in the tariff for 24x7 water supply in the Demo Zones of Hubli-
Dharwad and Belgaum cities. This was due to the hasty decision of HDMC in
implementing the volumetric tariff for 24x7 water supply, without allowing sufficient
time to the consumers to switch over to the new system and to rectify any leaks or
wastages within the customer premises.
32. Whereas, the volumetric tariff for 24x7 water supply was implemented smoothly in
the Demonstration Zone of Gulbarga, as the City Corporation took the consumers in to
confidence by allowing sufficient time to switch over to the new system.
33. Lesson: When an intermittent water supply system is converted into 24x7 water
supply system, the tariff for 24x7 water supply has to be implemented after allowing
sufficient time (say about 6-9 months) to the consumers (i) to get confidence about
46
reliability of 24x7 supply (ii) to get an idea about monthly water charges (iii) to control
consumption and to undertake any repairs in internal plumbing of the consumer. During
this period, the consumers are to be charged at the ULB‟s prevailing water tariff and
dummy bills based on the volumetric tariff for 24x7 water supply are to be issued to the
consumers, so as to give an idea about the monthly charges.
De-linking Arrears:
34. Smooth implementation of volumetric tariff for 24x7 water supply in Gulbarga
Demo Zone was also due to the fact that the City Corporation of Gulbarga delinked the
arrears and started fresh billing system. This was whole heartedly accepted by the
community. Whereas, in-case of Belgaum and Hubli-Dharwad Demo Zones, the bills
raised included arrears and the same was disputed by certain consumers. Based on the
experience of smooth implementation of the billing system in Gulbarga, it was suggested
to the City Corporations of Belgaum and Hubli-Dharwad to delink the arrears.
35. Lesson: When an intermittent water supply is converted in to 24x7 water supply,
delinking arrears relating to intermittent water supply and starting a fresh billing system
not only facilitates easy accounting but also in taking stringent action against defaulters,
as there is general satisfaction amongst the consumers about improved services and
reasonableness of the tariff.
47
Annex 8. Comments of Co-financiers and Other Partners/Stakeholders
Comments from the Operator
Execution of KUWASIP Project
1. The Project was divided into Three Phases. During the first phase of Preparatory
Period-A, the Operator carried out the initial assessment of the existing dilapidated
system, underground and above, in order to evaluate the usability of the existing pipelines
and equipments. A customer survey was carried out to know the actual number of people
who will be beneficiaries of the project based on which the quantum of water to be
supplied by the KUWS&DB in order to maintain the 24x7 water supply in the
demonstration area on the basis of 135 lpcd per capita consumption was to be agreed. A
topographic survey was undertaken to understand the levels of the terrain in order to
decide on the pressure control system to be deployed. Soil investigation was carried out
to understand the details of the earth strata where the pipelines were to be laid and the
nature of the pipe laying technology to be deployed. Based on all the above information,
a hydraulic modeling of the network was carried out to cater not only to the present but
also to the future requirements.
2. Consequently the Operator prepared a Draft Investment Program (DIP) which
detailed various options to convert the existing system to a fully pressurized 24X7
continuous water supply system and recommended the optimum option. Based on this
option, a BoQ was prepared which became part of the DIP. This DIP was discussed
extensively with all the stake holders and changes wherever necessary were incorporated
in the Final Investment Program (FIP) which was subsequently approved by KUIDFC.
3. During the second phase of Preparatory Period-B, the Operator implemented the
technical solutions identified in the agreed FIP by procuring the goods and works as per
the procurement guidelines of The World Bank and achieved all the Performance
Targets set in the Contract. During this time, the Operator prepared an O&M Plan which
was discussed and agreed by the stake holders and subsequently approved by KUIDFC.
4. During the third phase of O&M Period covering two years, the Operator maintained
continuous and pressurized water supply in all Demo Zones and providing round the
clock customer service management through the service centers in each of the Demo
Zones, During this time, the Operator carried out monthly meter readings, bills
generation and distribution, fulfilling service connection requests, providing new pipeline
extensions within the Demo Zones and carrying out routine maintenance works etc.
Challenges
The Operator was to transform the existing intermittent water supply system to a
full-fledged 24X7 pressurized water supply system.
Non-acceptance of this new concept by some stake holders as they considered
entry of Private Operators into their domain as a threat to the organizations they
work for. Managing this was a matter of expertise required in dealing with the
existing system and the personnel who manages the system.
Reluctance of the beneficiaries and nodal agencies to adhere to the new set of
conditions with respect to procurement and the payment mechanism stipulated in
the contract. The issue for them was that the conditions in the contract were not
48
in line with that of Karnataka Transparency Act (KTP). The Operator was hence
forced to adhere to KTP act as well as the World Bank‟s procurement guidelines.
This delayed the procurement process as well as the project. For the same reasons,
payments were delayed well beyond the period mentioned in the contract. This
put serious pressure on fund management by the Operator and also eroded the
margins of the Operator.
Since this sort of time bound and technology oriented project was not very
common in water utility management in India. The Technical Auditor, mainly
consisting of Indian personnel, did not have adequate knowledge and exposure to
the materials and methodologies used by the Operator. This caused delays for
project implementation.
Further, there was an apprehension within the population whether they will ever
be able to enjoy the benefit of 24X7 in the near future because this project was
been talked about for a long time without any tangible result. They were also
apprehensive that the project may lead them to cough up more money towards
their basic needs of life, that is, water.
Lessons Learnt
The question whether to refurbish or replace depends on the condition of the asset,
performance targets to be achieved, and the time set in the contract. In this
project, the majority of the assets have been replaced considering the above.
It is proved that non-availability of water is not the main issue, but managing the
available water effectively is the solution.
By having an effective billing system, it is possible to have an effective
management of water demand.
Consumers are willing to accept reasonable water charges provided services are
efficient and quality is maintained.
An effective communication program is essential for success.
Way forward
Based on the success of this Project, similar projects should be implemented in
other cities in order to conserve the precious resource “water.”
Move from demo zones to full cities as a couple of pilot projects are successfully
implemented in the country; demo zones are a little expensive
While implementing similar projects in future, care shall be taken on following
core principles:
Appropriate prequalification of the bidders to ensure a level playing field; the
core competence required for this type of projects is “experience in O&M”
and hence the lead bidders shall always be an Operator only.
Structured and balance the contract - the contract should distribute the risks
and rewards in an even manner among the parties to the contract; it should not
be a one sided contract.
Set pragmatic targets – the performance targets to be achieved should be
commensurate to the capital investment available and feasible for the project.
The time period to achieve the performance targets or completing the capital
expenditure program shall be practically feasible.
49
Communications program – the Client should ensure a healthy social/ political
environment for project implementation through a meticulously designed
communication program which should commence well before Operator can
start his on-ground work. It is important to create a real and clear perception
of the project in the minds of people well in advance before mis-perceptions
are spread by unscrupulous players.
50
Annex 9. Performance Indicators
1. Performance Indicators of Component A
At the State Level:
Establishment and operationalization of the Karnataka State
Urban Water Supply Council (KSUWSC);
Recommended to GoK ;
proposal under active
consideration at the
finance ministry and is
expected to be established
with some modifications
Implementation of capacity strengthening activities to
support the ULB level reform;
Studies completed;
progress is based on
WSPs‟ study
Development of the State Water and Sanitation Information
System (WASIS);
WASIS established
Establishment of urban WSS sector investments and tariff
frameworks;
Implemented across the
state
Establishment of legal and regulatory framework and
Preparation of WSS legislation.
Likely when reforms
reach next stage (may be
during scale up) At the ULB Level:
Completion of city-wide engineering feasibility studies;
Implementation of transition plans, including ring-fencing of
WSS accounts and improvements in billing and collection
system;
Definition of the scope and scale of follow-on Private Sector
Participation (PSP) and
Completed - draft report
received from Consultants
on October 2011.
Scaling-up in other ULBs Done in Mysore; more
cities to follow
2. Performance Indicators for Component B:
At the ULB Level:
Improved overall water supply availability and quality
resulting from priority investments for bulk water supplies
and distribution network improvements; and
Fully achieved in all the three
ULBs
Implementation of the social awareness and
communication strategy.
Implemented in three ULBs
and found very effective
For each demonstration zone:
Volumetric tariff adopted according to agreed principles in
order to recover no less than 50 percent of Operation and
Maintenance (O&M) costs at initial stage and no less than
80 percent by the end of the Project and
% on Bulk + O&M
Hubli 120%
Dharwas 117%
Belgaum(S) 160%
Belgaum (N) 195%
Gulberga 245%
Weighted average of 75 percent or higher achieved for
eight indicators (see Table B below)
As reflected in the
performance targets set for
the Operator with minor
modifications – See table B
below
51
Table B. Performance Targets as per Clause 5 of Operator Contract
Performance
Target Hubli Dharwad
Belgaum
South
Belgaum
North Gulbarga
(a) Continuous
pressured water
supply to every
connected property
Complied6 Complied
1 Complied
1 Complied
1 Complied
1
(b) Emergency
stoppages shall not
exceed 12 hours
Complied:
no stoppages
Complied:
no stoppages
Complied:
no stoppages
Complied:
no stoppages
Complied:
no
stoppages
(c) 100% of all
connections
metered & records
maintained
Complied:
Oct 10: 7765
Nov 10:
7782
Dec 10: 7800
Complied:
Oct 10: 5892
Nov 10:
5899
Dec 10: 5909
Complied:
Oct 10: 4518
Nov 10:
4533
Dec 10: 4538
Complied:
Oct 10: 4248
Nov 10:
4275
Dec 10: 4280
Complied:
Oct 10:
3316
Nov 10:
3313
Dec 10:
3310
(d) 100% of
customer meters
read every month
and a bill issued
Complied:
Oct 10: 7765
Nov 10:
7782
Dec 10: 7800
Complied:
Oct 10: 5892
Nov 10:
5899
Dec 10: 5909
Complied:
Oct 10: 4518
Nov 10:
4533
Dec 10: 4538
Complied:
Oct 10: 4248
Nov 10:
4275
Dec 10: 4280
Complied:
Oct 10:
3316
Nov 10:
3313
Dec 10:
3310
(e) Physical losses
in the distribution
network <
23l/c/d/m
Complied:
Oct 10: 4.63
Nov 10: 4.96
Dec 10: 4.43
Complied:
Oct 10: 3.47
Nov 10: 2.73
Dec 10: 3.76
Complied:
Oct 10: 5.13
Nov 10: 5.64
Dec 10: 5.39
Complied:
Oct 10: 9.48
Nov 10: 11.0
Dec 10:
12.41
Complied:
Oct 10: 0.96
Nov 10:
1.14
Dec 10:
1.09
(f) System
connection
requests must be
fulfilled within 7
days
Complied:
Oct 10:
17/17
Nov 10:
18/18
Dec 10:
24/24
Complied:
Oct 10: 7/7
Nov 10:
10/10
Dec 10:
13/13
Complied:
Oct 10:
15/15
Nov 10: 6/6
Dec 10:
15/15
Complied:
Oct 10:
28/28
Nov 10: 7/7
Dec 10:
19/19
Complied:
Oct 10: 5/5
Nov 10:4/4
Dec 10: 8/8
(g) 24 hours
working customer
service centre
Complied:
24hrs CSC
Complied:
24hrs CSC
Complied:
24hrs CSC
Complied:
24hrs CSC
Complied:
24hrs CSC
6 Continuous water supply provided and maintained at minimum 6m pressure at critical zonal point at all times except
during the period when there is no minimum required water tank levels in the tank or when there is no electricity supply at booster pumping station
52
(h) Customer
queries and
complaints to be
responded within
stipulated time
Complied;
Received
and
Resolved
Oct 10: 29
Nov 10: 26
Dec 10: 28
Complied;
Received
and
Resolved
Oct 10: 122
Nov 10: 71
Dec 10: 78
Complied;
Received
and
Resolved
Oct 10: 61
Nov 10: 15
Dec 10: 44
Complied;
Received and
Resolved
Oct 10: 49
Nov 10: 51
Dec 10: 95
Complied;
Received
and
Resolved
Oct 10: 87
Nov 10: 78
Dec 10: 91
(i) Leaks
appearing at the
surface must be
repaired within 24
hours of
notification/
observance.
Complied:
Complied:
Complied:
Complied:
Complied:
(Source: Certified Progress Report of the Operator for March 2011)]]
As can be seen above, all the above performance indicators were fully achieved. It is
notable that the Operator earned a bonus on the basis of achieving the sub indicators in
Table B (which were included in the contract with some modification).
53
Annex 10. List of Supporting Documents
1. Project Grant and Financing Agreements
2. Project Appraisal Document
3. Supervision Mission Reports (Aide Memoires, Implementation Status Reports)
4. Management Letter and correspondence with Department of Economic Affairs
(DEA)
5. Operator‟s contract and progress report (more importantly the report of March 2010)
6. Presentations made by KUIDFC (Implementing agency) at various workshops,
seminars etc
7. Sector Studies conducted under component 1
8. Rapid Social Assessment and Communication Strategy, Samaj Vikas Development
Support Organization, Feb 2004
9. Documentation Study of Demonstration Project for providing continuous water
(24X7) pressurized water services in three ULBs in Karnataka state, Final Report,
WSP, April 2009
10. Karnataka Urban Water and Sanitation Program, KUIDFC, WSP, Main Volume
11. World Bank. India Country Assistance Strategy
54
MAP SECTION
Pandavapura
Belur
Tarikere
Shimoga
Hiriyur
Hospet
Sindhnur
Krishna
Lingsugur
Sagar
BagalkotKaladgi
Sankeshwar
NargundSanndatti
Khanapur
Kumbharwad
Londa
Mudgal
Kolar
BANGALORE
Chitradurga
Tumkur
Mandya
Mysore
Hassan
Mangalore
Chikkamangalore
Madikeri
Bellary
Hubli-Dharward
Karwar
Belgaum
Raichur
Bijapur
Gulbarga
Bidar
ChikBallapur
Gadag
Haveri
Koppal
Davangere
Udupi
Chamrajnagar
BhadraR.
Vedava R
.
Cauveri R.
Vard
a
R.
Tungabhadra
R.
Krishna R.
Bhima
R.
Arabian
Sea
7674
12
14
16 16
18
74 76 78
18
14
12
78
This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other informationshown on this map do not imply, on the part of The World BankGroup, any judgment on the legal status of any territory, or anyendorsement or acceptance of such boundaries.