Top Banner
Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau A Briefing for FPAW August 8, 2012
9

Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Dec 16, 2015

Download

Documents

Philippa Cannon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Weather Integration and Concepts of Integration (CONINT) through

FY12

Mark Huberdeau

A Briefing for FPAWAugust 8, 2012

Page 2: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Weather Integration – Definition

“…inclusion of weather information into the logic of a decision process or a decision aid such that [the impacts of] weather constraints are taken into account when the [ATM] decision is made or recommended”

(ATM-Weather Integration Plan V2.0, Executive Summary, September, 2010)

From.. the Idea – to Concept – to Plan – to Research & Engineering – to Reality into the Operational Decision Processes

Page 3: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Operational Decision-Making Events

3

P Time

Strategic Tactical

-120-240-360 -45-60

Out In

Off On

Tower TRACONTRACON

ARTCC

Tower

StrategicPlanningNational

view

Flightplanning

DEPPath

Tactical TFM

Reroutes

ApproachPath

SurfaceCon-

ditions

Tactical Sector

Controller/Pilot

Avoidance

Page 4: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

The Operational“Actors”*

PilotDispatcherRamp Controller

GA Operators / Flight Plan Service ProvidersAOC

ATCGround ControllerLocal ControllerClearance DeliveryEn-route ControllerFLMTMC’s

4*not limited

Page 5: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Airport

P Time-240-720 -45-90

Off On

TowerTRACON

TRACON

ARTCC

Tower

+Time En-Route

En-routeTactical

AdjustmentsAirport

Conditions: winds, visibility

icing, etc.

Key flightplanning period

StrategicPlanning

National view/Int’l DEP

Tactical TFMReroutes

Approachpath

ITWSAWOSASOSMETARRVRLLWSLightning

CIWSNCWFNexRad

ITWSCIWSTAFAWOSASOSMETAR

VariousWx

ModelsTAFCCFP

Prog’s ForecastCCFPTAF

CIWSNexRad

CIWSITWSMETARSAWOSASOSRVRNexRad

WX

Departure path

HDFLEX

TBOCATM

HDFLEX

ATCSCC ATCARTCC TMU

Airborne holding, flight diversionsFlight deviationsMIT managementAdjacent Center/Sector impactsRoute status

StrategicATCSCC

TacticalATCSCC

Departure stopAPREQsESP/DSPEDCTMIT/MINIT

Impactdelays

StrategicARTCC

TacticalARTCC

GAGo/no go

Ceiling and Visibilities

(Fog)CAT II/III

operations

AirportIcing ..

Snow and runway

contamination

Page 6: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Airport

TowerTRACON

TRACON

ARTCC

Tower

En-routeTactical

AdjustmentsAirport

Conditions: winds, visibility

icing, etc.

Key flightplanning period

StrategicPlanning

National view/Int’l DEP

Tactical TFMReroutes

Approachpath

Departure path

GAGo/no go

Ceiling and Visibilities

(Fog)CAT II/III

operations

AirportIcing ..

Snow and runway

contamination

Dispatcher’s/Pilot’s Interest:

Gate to Gate

Controller’s Area of Specialization

Page 7: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Weather Integration Concept Paper and Diagram (“Ketchup/Mustard Chart”) FY10

Page 8: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Levels of ATM-Weather Integration

Level Zero – No integration

Level Four – Automation Alternatives

Level One – “On-the-Glass”

Level Two – Translation

Level Three – Impact

Page 9: Document Number Here © 2012 The MITRE Corporation. All rights reserved. Weather Integration and Concepts of Integration (CONINT) through FY12 Mark Huberdeau.

Document Number Here© 2012 The MITRE Corporation. All rights reserved.

Make Weather Integration Real Concepts of Integration (CONINTs) of

Weather into both TBFM and Surface Systems (Coordination drafts)