San Pablo Park Restroom Renovation Specification No. 18-11210-C Addenda 00 9113-1 DOCUMENT 00 9113 ADDENDA SPECIFICATION NO. 18-11210-C CITY OF BERKELEY SAN PABLO PARK RESTROOM RENOVATION 2800 PARK ST., BERKELEY, CA 94702 The following Addenda were issued, modifying the Project Manual: Addendum No. 1, issued on August 28, 2018 (Addenda have been incorporated into the conformed Project Manual.) END OF DOCUMENT
6
Embed
DOCUMENT 00 9113 ADDENDA SPECIFICATION …...JET TOILET - FLOOR OUTLET - ADA COMPLIANT ACORN ENGINEERING COMPANY PENAL -WARE 1695-W-3-HET-FVL-ADA FV WALL SUPPLY 1.28 GPF. PROVIDE WITH
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
San Pablo Park Restroom Renovation Specification No. 18-11210-C
Addenda 00 9113-1
DOCUMENT 00 9113
ADDENDA
SPECIFICATION NO. 18-11210-C
CITY OF BERKELEY
SAN PABLO PARK RESTROOM RENOVATION
2800 PARK ST., BERKELEY, CA 94702
The following Addenda were issued, modifying the Project Manual:
Addendum No. 1, issued on August 28, 2018
(Addenda have been incorporated into the conformed Project Manual.)
END OF DOCUMENT
ADDENDUM Addendum No.1
08/27/2018 ELS Project No. 201320.20
PROJECT: San Pablo Restroom Remodel OWNER: City of Berkeley CONTRACT: Issue Set
ARCHITECT: ELS Architecture and Urban Design
Description:
The following items are additions, revisions or clarifications to the Permit Set dated January 9, 2018.
ITEM DESCRIPTION
GENERAL
Sheet A201
1. Added dimension on Floor Plan (Detail 2) between urinal screen F11 and Partition Door F6 and between first and second F11 urinal screen in Men Rm. 101
2. Additional clearance dimensions added as well as existing overall dimensions provided for reference.
Sheet A401
1. Removed Restroom Accessory T05 from accessory schedule and where shown on interior elevations.
Sheet MP102
1. Plumbing fixture schedule updated to show correct model numbers for WC-1 and WC-2
Sheet MP201
1. WC-1 and WC-2 designation added to WC’s on Floor Plan 3 (Plumbing).