DO IT YOURSELF METHOD STATEMENT By TECH-DRY (INDIA) PVT. LTD., No.769, 1 st Cross, 1 st Stage, Indiranagar, Bangalore 560 038 Phone: 25255294 / 25255406 / 25289159 E-mail – [email protected]
Nov 24, 2014
DO IT YOURSELF METHOD
STATEMENT
By
TECH-DRY (INDIA) PVT. LTD., No.769, 1st Cross, 1st Stage, Indiranagar, Bangalore 560
038Phone: 25255294 / 25255406 / 25289159
E-mail – [email protected]
Items for Waterproofing1. Retaining Walls & Floor.2. Podium Slab with Gutter (Hard & Soft
Scopes)3. * Toilets / Balconies (4” Sunken)
* Utilities / Servants Toilet (9” Sunken)4. * Flat Terrace.
* Curved Roofs.5. OHT’s 6. Sumps7. Expansion Joints8. Detailing for
* Construction Joints* Bore Packing* Beam & Block work joints.* Slab Cracks.
EVOLUTION OF TREATMENT EVOLUTION OF TREATMENT METHODOLOGYMETHODOLOGY
1. Cleaning
2. Defect Removal
3. Permeability reduction
4. Bonding Layers
5. Slope making with water resistant concrete
6. Permeability reduction
7. Water repellency
8. Protective coatings
Soling
PCCProtekta SB
Protekta Base
Protekta Abrasion resist
Foot
ing
RCC
Construction Joint
Protekta Flex Joint
Ret
aini
ng W
all
Protekta BaseProtekta Plastofelt
Protekta Abrasion resist
Soling
Retaining Floor
Injection / Grouting Protekta Grip
Retaining Wall & FloorRetaining Wall:Treatment on + ve side:• Brush / spray application of impregnation product called
Protekta Base which fills the fine pores with crystalline silicate growth, coverage 2 Sq. M / Ltr.
• Brush application of one coat of Protekta Flexjoint on the construction joint only. Thickness of application will be approx. 0.5 mm.
• Plastering at the Starter Joint, Construction joints and any other defects like honeycombs, tie-rod locations etc with polymer sealant 500 modified mortar.
• Brush coat of Protekta Plastofelt primer• Brush coat of Protekta Plastofelt to provide a very strong
coating to resist hydrostatic pressure.• Brush coat of Protekta Top Seal Coat as hard layer. After the
application of this layer, plastering is not required.Treatment on –ve side: · Injections/Grouting at starter joint & construction joints with
Protekta Grip / Protekta Hydro Grout.
FloorTreatment on + ve side:• After PCC has been laid, grout Protekta SB mixed
with Protekta SS and catalyst at regular intervals of every 1 M center to center. This grout material has property of expanding when it comes in contact with water. It forms a water impervious layer and prevents travel of water to the top of PCC.
• Spray of Protekta Base on PCC surface towards porosity reduction.
• Application of a slurry prepared with Protex B & Protekta SLM. This layer is a hard layer & will be abrasion resistant.
• A coat of Protekta Ceal 540 on concreteTreatment on –ve Side• Injection/grouting at a regular intervals at all joints
between floor and column joints and construction joints
Podium Slab with Gutter (Hard & Soft Scapes)
Podium SlabAssumptions Made:• Gradient is provided in the slab at the time
of casting.• Water from this sloped surface flows into
the Gutters.• Ridge points are at the Podium Slab,
midway between the Gutters on either side.
Treatment Steps• Brush / spray application of crystallisation/gel formation
product called Protekta Base which fills the fine pores with crystalline silicate growth, coverage 2 Sq. M / Ltr.
• Brush application of one coat of Protekta Flexjoint on the construction joint only. Thickness of application will be approx. 0.5 mm.
• Plastering 6” wide at the construction joints.• Brush coat of Protekta Plastofelt to provide a very strong
flexible coating.• Application of Protekta Abrasion resist as hard layer. After
the application of this layer, plastering is not required.• Injections/Grouting at construction joints/cracks from below.
• Optional, a coat of Protekta Procoat or Protekta Wall Top
• Please note that we have not suggested any plastering on our treatment since the final surface is abrasion resistant.
Gutter Treatment• Brush / spray application of crystallisation/gel formation
product called Protekta Base which fills the fine pores with crystalline silicate growth, coverage 2 Sq. M / Ltr.
• Brush application of one coat of Protekta Flexjoint on the construction joint only. Thickness of application will be approx. 0.5 mm.
• Plastering 6” wide at the construction joints.• Brush coat of Protekta Plastofelt to provide a very strong
flexible coating.• Application of Protekta Abrasion resist as hard layer. After
the application of this layer, plastering is not required.• Injections/Grouting at construction joints/ Cracks from below.
Slope Creation:• With M20 grade Concrete laid to slope.
Sunken Toilet – 4”Sunken
Protekta Base.
Protekta- Sealant F500 mortar packing
Protekta Flex Joint
Protekta Durocoat
Protekta Unicoat
Sunken Toilet – 4”Sunken
RCC Slab
Protekta Base Protekta Durocoat
Tiles
Sunken Toilet – 4”Sunken
Sunken Toilet – 4” SunkenCleaning:•Surface cleaning by wire brush, removing loose mortar, dirt, grime etc followed by water cleaning using Protekta Cleaning Agent.•Testing by ponding water for 48 hours to know surface defects.Defect Removal:Construction Joint / Crack Repair / Through Hole:•Packing beam and hollow block joint•Create “V” groove to ½ “ depth and clean the surface with cleaning agent.•Pouring of Protekta Base up to the neck of the groove followed by water washing.•Pour additional Protekta Base at areas were ingress is too much.•Remove excess Protekta Base from the surface and clean it again with wire brush•Brush coat Protekta Flexjoint.•Packing the groove with silica sand mixed with Protekta Sealant 400 in the ratio of 1:2 and brush coat Protekta Flexjoint at the same areas after 24 hrs.•Chemical Grouting by Protekta Seal ABC. (If Required)•Block Honeycombs / Voids if excessive leakage found by chemical grouting.
• Spray of crystallization product called Protekta Base with a lowpressure pump followed by water curing for 2 to 3 times at
intervals of 2 hours between each curing (Coverage 2 to 2.5 Sq.M./ Ltr.)
• Spray excessive Protekta Base at weak areas.• Spread Protekta Durocoat slurry (Brush application) Slope Making /Filling:• Slope making with M20 grade concrete (using 12 mm & 20 mm
jelly, mix ratio 1:1). Following additive to be mixed. – Emulsion KR2 towards water resistance (125ml per cement
bag)• After 24 hours of curing, re-spray of Protekta Base with low
pressure pump.• Packing the floor / Wall joints with Protekta Sealant 500 mixed
with Cement.• Brush coat of Protekta Unicoat at Floor and Wall joints up to
300 mm of wall surface.• Final testing for 7 days
Waterproofing
Bore packingBore packing* Brush coat of Protekta Base followed by Protekta Flexjoint surrounding the bore area.* Coat Protekta Flexjoint and smear silica sand for better adhesion between PVC pipe and concrete* Provide shuttering from bottom after pipe is installed.* Fill up the bore with Protekta Sealant 500 based mortar using 6mm down size jelly.* Brush coat of Protekta Flexjoint above the Protekta Sealant 500 based mortar to ensure sealing of pipe to screed joint.* Testing of 24 hours.* After tile laying fill the gap around the pipe with Protekta Sealant 500 based mortar and brush coat of Protekta Flexjoint.* Final testing for 7 days.
RCC Slab
Plastering
CopingProtkta BaseProtekta Durocoat
Weep H
oleSunken Toilet –
9”Sunken
Sunken Toilet – 9” SunkenCleaning: •Surface cleaning by wire brush, removing loose mortar, dirt, grime. Testing by ponding water for 48 hours to know surface defects.Defect Removal:Construction Joint / Crack Repair:•Packing beam and hollow block joint.•Create “V” groove to ½” depth and clean the surface with cleaning.•Pour into of Protekta Base up to the neck of the groove followed by water. •Pour additional Protekta Base at areas were ingress is too much.•Remove excess Protekta Base from the surface and clean it again with brush coat of Protekta Flexjoint.•Packing the groove with silica sand mixed with Protekta Sealant 400.•Block Honeycombs / Voids if excessive leakage found by chemical.
Porosity Reduction: Spray of crystallization product called Protekta Base with a low pressure. Spray excessive Protekta Base at weak area.Surface Preparation: Spread a slurry (Brush application) Protekta
Durocoat on the slab and wall up to 300 mm above floor level. Plastering with C:M 1:4 creating gradient towards
weep hole. Protekta KR2 to be added to mortar at 125 ml/bag of cement. Spray of Protekta Base. Curing cum testing for 7 days.Area Calculation:Floor + Wall up to 300 mm above floor level.
Contd…
RCC Slab
Protex A Protekta FlexjointProtekta Sealant F500 based concrete
Tiles
Bore Packing Bore Packing Sunken Toilet 4 “ sunken Sunken Toilet 4 “ sunken
Bore packing in the wall:· Clean the surface thoroughly.· Brush coat of Protekta Base.· Brush coat of Elastomeric coating, Protekta Flexjoint around the pipe· Application of Protekta Durocoat slurry on the bore surface.· Packing the bore with M20 grade concrete by using 12 mm downsize jelly. Protekta KR2 to be added in the concrete· Brush coat of Protekta Base· Brush coat of Protekta Flexjoint.· Curing for 7 days.
Protekta Base.
Protekta- Sealant F500 mortar packing
Protekta Flex Joint
Protekta Durocoat
Protekta Unicoat
Beam & Block Wall Joints.
RCC Slab
Para
pet w
all
Rai
n W
ater
Pip
e
Protekta Base Duracoat SlurryCoping M20 Grade
concrete
PlasteringCoping
Protekta Unicoat
Terrace
Terrace/Terrace GardenPre Treatment Steps: Chip off loose mortar and clean the surface thoroughly.Defect Removal: Construction joint will be treated by making groove, stagnating Protekta Base and Water Wash. Filling the groove with F400 mortar. Brush coat of Elastomeric coating Protekta Flexjoint only on the construction joint.Porosity Reduction: Brush application of impregnation product called Protekta Base which fills the fine pores with crystalline silicate growth. Coverage 2 Sq. M/Ltr. of Protekta Base. Making coping by polymer modified mortar at slab and parapet wall junction.
oSurface Preparation & Slope Making: Brush application of Protekta Durocoat slurry to a thickness of approximate 1 mm. This slurry coating has a very special chemical, which impregnates through pores and capillaries. It is water based product and can be applied on moist surfaces. Slope Making • With M20 concrete mixed with Emulsion KR2 in proportion of 125 ml/bag of cement. Average thickness estimated – 65 mm to 75 mm. • M-20 Grade RMC supplied free of cost.Waterproofing Spray of Protekta Base. Curing for 7 days. Spray of Protekta G towards water repellency
Contd…
Pre Treatment Steps: Chip off loose mortar and clean the surface thoroughly.Defect Removal: Construction joint will be treated by making groove, stagnating Protekta Base and Water Wash. Filling the groove with F400 mortar. Brush coat of Elastomeric coating Protekta Flexjoint only on the construction joint.Porosity Reduction: Brush application of impregnation product called Protekta Base, which fills the fine pores with crystalline silicate growth. Coverage 2 Sq. M/Ltr. of Protekta Base. Making coping by polymer modified mortar at slab and parapet wall junction. Surface Preparation & Slope Making: Brush application of Protekta Duracoat slurry to a thickness of approximate 1 mm. This slurry coating has a very special chemical, which impregnates through pores and capillaries. It is water based product and can be applied on moist surfaces. Slope Making With M20 concrete mixed with Emulsion KR2 in proportion of 125 ml/bag of cement. Average thickness estimated – 65 mm to 75 mm. M-20 Grade RMC supplied free of cost @ 0.075 Cu. M/Sq. M Waterproofing Spray of Protekta Base. Curing for 7 days. Spray of Protekta G towards water repellency. Brush coat of Protekta Unicoat as additional protective coating.
TERRACE / PODIUM SLAB WITH LANDSCAPING [WATERPROOFING + SCREEDING + ELASTOMERIC COATING]
Concrete
Con
stru
ctio
n Jo
int
Protekta Flex Joint
Protekta BaseProtex B Slurry
Plastering
Protekta Unicoat
Coping
Water Tank
Waterproofing & Plastering
Protekta Base Protekta Unicoat
Protekta Duracoat Protekta G
Gro
utin
g on
star
ter/c
onstr
uctio
n
joint
RCC Slab
OH WATER TANK/SWIMMING POOL/SUMP (INSIDE SURFACE) WATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATING
NOT TO SCALE G
rout
ing
on st
arte
r/con
struc
tion
joint
Defect Removal: Grouting of slab and beam joint with Protekta SB Grout OR Protekta Hydrogrout. Testing by water stagnation for 48 hours. Re-grouting if seepage / dampness is noticed. Surface cleaning by wire brush, removing loose mortar, dirt, grime etc followed by water cleaning using cleaning agent. Coving the slab and wall joint using polymer modified mortar.Porosity Reduction: Brush application of impregnation product called Protekta Base, which fills the pores with crystalline silicate growth. Covering 2 Sq. M/Ltr. Of Protekta Base.Surface Preparation: Brush application of Protekta Duracoat slurry to a thickness of approximate 1 mm. This slurry coating has a very special chemical, which impregnates through pores and capillaries. It is water-based product and can be applied on moist surfaces. Sprinkle Sand to keep the surface rough for plastering/concreting.
OH WATER TANK/SWIMMING POOL/SUMP (INSIDE SURFACE)WATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATING]
[
For Floor: Concreting with M20 mix using (12 mm jelly) average thickness 50 mm. Emulsion KR2 to be added to increase water resistance (125 ml per cement bag)For Wall: Specialized plastering with an average thickness of 15 mm to 18 mm. Emulsion KR2 to be added to increase water resistance (125 ml per cement bag) Curing for two weeks.Waterproofing: Spray of Protekta Base. Spray of Protekta G towards water repellency. Brush coat of Protekta Unicoat on the entire surface. Coverage (1.5 to 2 Sq. M / Ltr.) surface area. Sprinkle Silica Sand to keep the surface rough for plastering. [If required] Note: One coat of Protekta Unicoat for inner surfaces of STP, which is a acid alkali resistant coating.
For Floor:· Concreting with M20 mix using (12 mm & 20 mm
jelly, ratio 50:50) average thickness 50 mm.For Wall:· Specialized plastering with an average thickness of
18 mm to 20 mm.· Emulsion KR2 to be added to increase water
resistance (125 ml per cement bag)· Curing for two weeks.Waterproofing:· Spray of Protekta Base.· Brush coat of Protekta Unicoat on the entire
surface. Coverage(1.5 to 2 Sq. M / Ltr.) surface area.
Waterproofing up to 200 mm above finished floor level. Block Work 20 mm plaster mixed with Emulsion KR2 (sloped to weep hole) Brick bat Coba Protekta Duracoat
50 mm Screed r Protekta Base Grouting No. Item Toilet Utility
01. Sunken Depth 250 mm 150 mm 02. Waterproofing ht. Above Finished Floor level 300 mm 300 mm 03. Waterproofing Plaster thickness 20 mm 20 mm 04. Screed Thickness 50 mm 50 mm 05. Brickbat thickness 175 mm 75 mm
RCC Slab
Floor Slab
Sunken Toilet/Utility Waterproofing + Brickbat + Screed
Weep Hole O
Bore packing as detailed
Covi
ng w
ith p
olym
er m
odifi
ed m
orta
r
Sunken Area Waterproofing – Toilet/Utility/Balcony [200mm Sunk] Pre-treatment steps:• Surface cleaning by wire brush, removing loose mortar, dirt,
grime.• Testing by ponding water for 48 hours to know surface defects.Defect Removal:Construction Joint / Crack Repair• Packing beam and hollow block joint.• Create “V” groove to ½” depth and clean the surface with
cleaning.• Pour into of Protekta Base up to the neck of the groove followed
by water.• Pour additional Protekta Base at areas were ingress is too much.• Remove excess Protekta Base from the surface and clean it again
with brush coat of Protekta Flexjoint.• Packing the groove with silica sand mixed with Protekta Sealant
400.• Chemical Grouting by Protekta Seal ABC (If Required)• Block Honeycombs / Voids if excessive leakage found by chemical.Porosity Reduction:• Spray of Crystallization product called Protekta Base with a low
pressure.• Spray excessive Protekta Base at weak area.
Surface Preparation:• Spread a slurry (Brush application) Protekta Duracoat on
the slab and wall up to 300 mm above finished floor level.Floor & Wall Plastering:• Plastering with C:M 1:4. In the floor creating gradient
towards weep hole. Protekta KR2 to be added to mortar at 125 ml/bag of cement.
• Spray of Protekta Base.• Curing cum testing for 7 days.Area Calculation = Floor + Wall up to 300 mm above
finished floor level.
Bore packing in the wall:• Clean the surface thoroughly.• Brush coat of Protekta Base.• Brush coat of Elastomeric coating, Protekta Flexjoint
around the pipe• Application of Protekta Duracoat slurry on the bore surface.• Packing the bore with M20 grade concrete by using 12 mm
downsize jelly. Protekta KR2 to be added in the concrete• Brush coat of Protekta Base• Brush coat of Protekta Flexjoint.• Curing for 7 days
Waterproofing & Plastering
Coving with polymer modified cement mortar with 500 Sloped screed Protekta Base Protekta Unicoat Protekta G Protekta Duracoat
Gro
utin
g on
star
ter/c
onstr
uctio
n jo
int
RCC Slab
PLANTER BOX WATERPROOFING WATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATING
NOT TO SCALE
Gro
utin
g on
star
ter/c
onstr
uctio
n joi
nt
PLANTER BOX WATERPROOFINGWATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATINGSunken Toilet (100 mm Sunk)• Surface cleaning by wire brush, removing loose mortar, dirt, grime
etc followed by water cleaning using Protekta Cleaning Agent.• Testing by ponding water for 48 hours to know surface defects.Defect Removal:a. Construction Joint / Crack Repair / Through Hole:• Packing beam and hollow block joint• Create “V” groove to ½” depth and clean the surface with cleaning
agent.• Pouring of Protekta Base at areas were ingress is too much.• Remove excess Protekta Base from the surface and clean it again
with wire brush.• Brush coat Protekta Flexjoint.• Packing the groove with silica sand mixed with Protekta Sealant
400 in the ratio of 1:2 and brush coat Protekta Flexjoint at the same areas after 24 hours.
b. Chemical Grouting by Protekta Seal ABC. (If Required)• Block Honeycombs / Voids if excessive leakage found by chemical
grouting.Porosity Reduction:• Spray of crystallization product called Protekta Base with a low
pressure pump followed by water curing for 2 to 3 times at intervals of 2 hours between each curing (Coverage 2 to 2.5 Sq.M. / Ltr)
• Spray excessive Protekta Base at weak areas.
Surface Preparation:• Spread Protekta Duracoat slurry (Brush application)Concreting:• Filling with M20 grade concrete (using 12 mm & 20 mm jelly, mix
ration 2:1). Following additives to be mixed.• Add Protekta Emulsion KR2 towards water resistance (125ml per
cement bag)Waterproofing:• Aftter 24 hours of curing, re-spray of Protekta Base with low-
pressure pump• Packing the floor / wall joints with Protekta Sealant 500 mixed
with cement.• Brush coat of Protekta Unicoat at floor and wall joints up to 300
mm of wall surface.• Final testing for y days.Area CalculationFor Waterproofing = Floor + Wall up to 300 mm above finished
floor levelFor Concreting = Floor only
Bore Packing:• Brush coat of Protekta Base followed by Protekta Flexjoint
surrounding the bore area.• Coat Protekta Flexjoint and smear silica sand for better adhesion
between PVC pipe and concrete.
RCC Slab
Protekta EJR Thermocol Packing
Protekta Flexjoint
Sealant 400 Mortar + Non-stick tape
Expansion Joint
Expansion JointHorizontal Expansion Joint: Removal of thermocole / Shalitex board up to 20 mm from top & Clean the surface thoroughly Brush coat of Protekta Sealant 400 Special as primer on side walls.\• Application of Special Sealant 400 based mortar on top of thermocole / Shalitex Board Fill the joint with Protekta EJR (H) up to top (in multiple fills of app. 3 mm to 4 mm each fill) Application of mortar prepared with sealant 400.• Concreting / Plastering as mechanical protection.Vertical Expansion Joint: Removal of thermocole / Shalitex board up to 15 mm from top &
Clean the surface thoroughly Brush coat of Protekta Sealant 400 Special as primer. Filling the joint with EJR Vertical Brush coat of Protekta Abrasion result as mechanical protection
Construction Joint / SlabCracksProtekta Flexjoint
F400 Mortar Packing
Crystallization Gel of Protekta Base
Construction Joint Crack
Construction Joint / Slab Cracks• Create “V” groove to ½ “ depth and clean the
• surface with cleaning agent.• Pouring of Protekta Base up to the neck of the
groove followed by water washing.• Pour additional Protekta Base at areas was
ingress is too much.• Remove excess Protekta Base from the
surface and clean it again with wire brush.• Brush coat Protekta Flexjoint.• Packing the groove with silica sand mixed with
Protekta Sealant 400 in the ratio of 1:2 and brush coat Protekta Flexjoint at the same areas after 24 hrs
Products Used1. Grouting Products:
• Protekta SB• Protekta Hydrogrout• Protekta ABC• Protekta Grip (2 component)
2. Crystallisation / Gel Formation:
• Protekta Base.
• Bonding Layer* Protekta Duracoat* Protekta Sealant 500
• Admixtures:* Protekta Emulsion KR2* Protekta GL – 8* Anti Shrinkage AC – 1
• Water Repellency:* Protekta G* Protekta Micro emulsion.
•Elastomeric Coating:* Protekta Flexjoint.* Protekta Unicoat.
•Abrasion Resistant Layer:* Protekta Abrasion
•Polymers for Mortar modifying:* Protekta Sealant 400* Protekta Sealant 500
Dow
n ta
nk p
ipe
Waterproofing Treatment
Construction Joint Repair
COMBO SOLUTION FOR THERMAL INSULATION
Additional Thermal insulation layer [Protekta KP]
Waterproofed Lightweight Concrete Average thickness 75 mm to 100 mm
50 mm
Coving
Parapet Wall
TREATMENT DETAILSI. WATERPROOFING:
- Chipping, Cleaning & Testing.- Defect Removal : Repair of Construction Joints.
: Honeycomb / Hollowness- Crystallisation application.- 2 coats of Polyurea Eleastomeric coatings.
II. SLOPE CREATION WITH THERMAL INSULATION MATERIAL:- Density = 780 Kg/Cu. M- Strength = > 10 mpa- Av. Thickness = 100 mm- Thermal Conductivity = 0.125 Kcal/hrs/m2/C
III. PLASTERING LAYER OF 15MM TO 18 MM- 1:4 Mix.- Emulsion KR2 added.- Fibre mesh applied
IV. Additional Thermal Shield:- 2Coats of Protekta Thermal Flexicoat.- Thermal Conductivity = 0.032 Kcal/hrs/m2/C
- Average thickness = 1 mm to 1.5 mm.