Nokia Siemens Networks Flexi

BSC, S14, Site documentation,

issue 02

Installation work check list for Flexi BSC

and TCSM3i

DN70596578

Issue 1-0

 

Page 2: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 2/18

2 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804d6a14

The information in this document is subject to change without notice and describes only the

product defined in the introduction of this documentation. This documentation is intended for the

use of Nokia Siemens Networks customers only for the purposes of the agreement under whichthe document is submitted, and no part of it may be used, reproduced, modified or transmitted

in any form or means without the prior written permission of Nokia Siemens Networks. The

documentation has been prepared to be used by professional and properly trained personnel,

and the customer assumes full responsibility when using it. Nokia Siemens Networks welcomes

customer comments as part of the process of continuous development and improvement of the

documentation.

The information or statements given in this documentation concerning the suitability, capacity,

or performance of the mentioned hardware or software products are given "as is" and all liability

arising in connection with such hardware or software products shall be defined conclusively and

finally in a separate agreement between Nokia Siemens Networks and the customer. However,

Nokia Siemens Networks has made all reasonable efforts to ensure that the instructions

contained in the document are adequate and free of material errors and omissions. Nokia

Siemens Networks will, if deemed necessary by Nokia Siemens Networks, explain issues which

may not be covered by the document.

Nokia Siemens Networks will correct errors in this documentation as soon as possible. IN NO

EVENT WILL Nokia Siemens Networks BE LIABLE FOR ERRORS IN THIS DOCUMENTA-

TION OR FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO SPECIAL, DIRECT, INDI-

RECT, INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSES, SUCH AS BUT NOT LIMITED

TO LOSS OF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS OPPORTUNITY

OR DATA,THAT MAY ARISE FROM THE USE OF THIS DOCUMENT OR THE INFORMATION

IN IT.

This documentation and the product it describes are considered protected by copyrights and

other intellectual property rights according to the applicable laws.

The wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademark

of Nokia Corporation. Siemens is a registered trademark of Siemens AG.

Other product names mentioned in this document may be trademarks of their respectiveowners, and they are mentioned for identification purposes only.

Copyright © Nokia Siemens Networks 2009/10/19. All rights reserved

f Important Notice on Product SafetyElevated voltages are inevitably present at specific points in this electrical equipment.

Some of the parts may also have elevated operating temperatures.

Non-observance of these conditions and the safety instructions can result in personal

injury or in property damage.

Therefore, only trained and qualified personnel may install and maintain the system.

The system complies with the standard EN 60950 / IEC 60950. All equipment connected

has to comply with the applicable safety standards.

The same text in German:

Wichtiger Hinweis zur Produktsicherheit

In elektrischen Anlagen stehen zwangsläufig bestimmte Teile der Geräte unter Span-

nung. Einige Teile können auch eine hohe Betriebstemperatur aufweisen.

Eine Nichtbeachtung dieser Situation und der Warnungshinweise kann zu Körperverlet-

zungen und Sachschäden führen.

Deshalb wird vorausgesetzt, dass nur geschultes und qualifiziertes Personal die

 Anlagen installiert und wartet.

Das System entspricht den Anforderungen der EN 60950 / IEC 60950. Angeschlossene

Geräte müssen die zutreffenden Sicherheitsbestimmungen erfüllen.

Page 3: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 3/18

DN70596578

Issue 1-0

3

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804d6a14

Table of ContentsThis document has 18 pages.

Summary of changes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2 Check list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

2.1 Checking the availability of documents and tools . . . . . . . . . . . . . . . . . . 7

2.2 Unpacking and checking the equipment . . . . . . . . . . . . . . . . . . . . . . . . . 7

2.3 Preparing the cabinets for installation . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

2.4 Installing the cabinets on their own feet. . . . . . . . . . . . . . . . . . . . . . . . . . 8

2.5 Installing the cabinet on floor rails . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

2.6 Installing the Side cable conduit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

2.7 Grounding (earthing) the cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

2.8 Connecting the site power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

2.9 Attaching and filling in the labels and stickers . . . . . . . . . . . . . . . . . . . . 13

2.10 Installing the internal cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

2.11 Replacing Fan Trays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

2.12 Creating a temporary ESD-protected area for fieldwork . . . . . . . . . . . . 14

2.13 Equipping the cartridges with plug-in units . . . . . . . . . . . . . . . . . . . . . . 14

2.14 Cabling to environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

2.15 Installing the External Alarm Unit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

2.16 Finishing the installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

2.17 Additional information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

3 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

Page 4: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 4/18

4 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804d6a14

Page 5: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 5/18

DN70596578

Issue 1-0

5

Installation work check list for Flexi BSC and TCSM3i Summary of changes

Id:0900d805804c569a

Summary of changesChanges between document issues are cumulative. Therefore, the latest document

issue contains all changes made to previous issues.

Issue 1-0

This is the first issue of Installation Work Check List for Flexi BSC and TCSM3i , based

on document Installation Work Check List, BSC3i and TCSM3i Installation. Flexi BSC

product family has been introduced on S14 level, and therefore the title has been

changed.

Page 6: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 6/18

6 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804a7d6f 

Overview

1 OverviewThe purpose of the installation work is to check the delivery, to install the Flexi BSC and

the TCSM3i to the site, to prepare the network elements, and to check that the site is

ready for commissioning.

The purpose of Installation work check list for Flexi BSC and TCSM3i is to ensure the

quality of installation work. It provides Check list and, in the Appendix, Installation Cer-

tificate of Completion for checking the installation of the Flexi BSC and the TCSM3i. The

Check list is to be updated after each work phase.

 Also, Site Deficiency Report and Failure Report are generated during the work. The fol-

lowing documents are referred to in the Check list :

• Installing Flexi BSC and TCSM3i 

• Installation Site Requirements for Flexi BSC and TCSM 

• Connector Panels and External Cables in Flexi BSC and TCSM3i 

• Engineering for Flexi BSC 

• Engineering for TCSM3i 

• Interconnection cables in Flexi BSC 

• Interconnection cables in TCSM3i 

• Cabling Instructions for Flexi BSC 

• Cabling Instructions for TCSM3i 

• Equipment List for Flexi BSC 

• Equipment List for TCSM3i 

• Packing List  and/or Despatch Note

Page 7: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 7/18

DN70596578

Issue 1-0

7

Installation work check list for Flexi BSC and TCSM3i Check list

Id:0900d805804bf2ac

2 Check listThe tables in the following sections provide check lists to be updated after each work

phase.

2.1 Checking the availability of documents and tools

Check the availability of documents and tools needed for installation.

2.2 Unpacking and checking the equipment

Prepare the equipment room and unpack and check the equipment.

Preparing the equipment room

Installation phase and related documents Completed

Check the availability of the documents needed for installation.

 Acquire missing documents.

See: Installing Flexi BSC and TCSM3i, section About the installa-

tion of Flexi BSC 

Check the availability of the tools needed for installation. Acquiremissing tools.

See: Installing Flexi BSC and TCSM3i, section About the installa-

tion of Flexi BSC and TCSM3i 

Installation phase and related documents CompletedEnsure that all basic work such as installation of lighting, fire extin-

guishing and air conditioning equipment has been completed.

See: Installing Flexi BSC and TCSM3i, section Unpacking and 

checking the equipment 

Check against the floor plan for the site that all cable shelves and

gratings separate from the equipment itself are ready.

See: Installing Flexi BSC and TCSM3i, section Unpacking and 

checking the equipment 

Ensure that the site power supply system has been properly

installed and that it is ready for use.

See: Installing Flexi BSC and TCSM3i, section Unpacking and checking the equipment 

Ensure that the ventilation equipment has been properly installed

and that the temperature in the equipment room is within the limits

allowed for the DX 200 equipment.

See: Installing Flexi BSC and TCSM3i, section Unpacking and 

checking the equipment, and Installation site requirements for 

Flexi BSC and TCSM3i section Cooling of DX 200 equipment 

Make the needed additional holes in raised floors and correct

installation floor plan.

Ensure that the premises are properly cleaned.

See: Installing Flexi BSC and TCSM3i, section Unpacking and checking the equipment 

Page 8: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 8/18

Page 9: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 9/18

DN70596578

Issue 1-0

9

Installation work check list for Flexi BSC and TCSM3i Check list

Id:0900d805804bf2ac

2.5 Installing the cabinet on floor rails

Install the cabinets on floor rails according to the floor plan.

Installing the floor rails

Installation phase and related documents Completed

Study the floor plan.

See: Installation site requirements for Flexi BSC and TCSM3i  section Equipment room layout 

 Adjust all four feet of the cabinet (or cabinets) to an initial height

of about 50 mm (2 in).

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on their own feet 

Place the cabinet to its final place according to the floor plan.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on their own feet 

Level off the cabinet in the width and depth direction using a spirit

level as a reference.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on their own feet 

If two or more Flexi BSCs or TCSM3is are installed, repeat the

steps mentioned above.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on their own feet 

 Attach the cabling cabinet to the equipment cabinet by using bolts

for attachment.

When installing an upgrade-delivery Flexi BSC, attach the base

cabinet and the extension cabinet by using bolts for attachment.

When installing the TCSM3i for combined BSC/TCSM installation

option, attach the TCSA cabinet to the BSC-part by using bolts for 

attachment.

In a row consisting of several network elements, attach the

network elements firmly to one another, but do not use any bolts

for attachment.

Installation phase and related documents Completed

Study the floor plan.

See: Installation site requirements for Flexi BSC and TCSM  

section Equipment room layout 

Determine the insertion points on the floor for the attachment

screws for the first rail.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Page 10: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 10/18

10 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804bf2ac

Check list

Installing the Floor Rail Installation Set

Mounting the cabinet on floor rails

Drill the holes for the screws and lodge a wedge anchor in each

hole.

See: Installing Flexi BSC and TCSM3i, section Installing thecabinets on floor rails

Repeat the procedure mentioned above for the other rail.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Place the rails to their final places and level them off.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

In IBN installation, mount the insulation tube in the first hole,

followed by the insulation washer, the washer and the attachment

screw. Screw in the screw loosely.

Repeat the procedure mentioned above to all attachment pointsfor both rails.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

 After attaching all screws, tighten them.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

In IBN installation, check that the attachment screws are not elec-

trically connected to the rail.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Installation phase and related documents Completed

Insert the cabinet attachment pieces inside the floor rails.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Place the support bars crosswise to the rails, each bar on a pair 

of cabinet attachment pieces.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Move the support bars to approximately their final positions

lengthwise on the rails.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Installation phase and related documents Completed

Remove the feet from the cabinet.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Installation phase and related documents Completed

Page 11: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 11/18

DN70596578

Issue 1-0

11

Installation work check list for Flexi BSC and TCSM3i Check list

Id:0900d805804bf2ac

2.6 Installing the Side cable conduit

Install the Side cable conduit (SCC). It can be installed at either side of the equipment

cabinet. When the SCC is used, the cabling cabinet cannot be used.

It is recommended to install and tie the cables entering the cabinet through the conduit

before installing the conduit panel.

2.7 Grounding (earthing) the cabinet

Ground (earth) the cabinets.

Place the installation ramp in front of the rail, between the

support bars for the cabinet and press the support bars against

the sides of the ramp.See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Roll the cabinet along the ramp onto the support bars.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Loosely attach the cabinet to the attachment pieces using

M10x40 hex bolts.

See: Installing Flexi BSC and TCSM3i, section Installing the

cabinets on floor rails

Push the cabinet sideways along the rails to its final position.

See: Installing Flexi BSC and TCSM3i, section Installing thecabinets on floor rails

 Attach the equipment cabinet by using bolts for attachment.

 Attach the cabling cabinet to the equipment cabinet by using

bolts for attachment.

When installing the TCSM3i for combined BSC/TCSM installa-

tion option, attach the TCSA cabinet to the BSC-part by using

bolts for attachment.

In a row consisting of several network elements, attach the

network elements firmly to one another, but do not use any bolts

for attachment.

Installation phase and related documents Completed

Installation phase and related documents Completed

Install two mounting brackets in the upper and lower holes of the

cabinet using screws, washers and nuts.See: Installing Flexi BSC and TCSM3i, section Installing the

Side cable conduit 

Install the conduit panel on the mounting brackets using

washers and screws.

See: Installing Flexi BSC and TCSM3i, section Installing the

Side cable conduit 

Page 12: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 12/18

12 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804bf2ac

Check list

Connecting the standard ground cable

In installations on a raised floor, the main ground cable is routed through the SCC onto

the cable structures under the floor, and to the main ground bar of the site.

Connecting the ground cable with NEBS-compliant bracket

In installations on a raised floor, the main ground cable is routed through the SCC onto

the cable structures under the floor, and to the main ground bar of the site.

2.8 Connecting the site power supply

Connect the site power supply.

Installing Earth comb panels (CPGOs)

Installation phase and related documents Completed

Install the main ground cable to the grounding connector.

See: Installing Flexi BSC and TCSM3i, section Grounding the

cabinets

Measure and cut a 25 mm² (AWG 4) cable which connects the

network element to the main ground bar of the site (one cable

per network element).

See: Installing Flexi BSC and TCSM3i, section Grounding the

cabinets

Installation phase and related documents Completed

Install the NEBS-compliant cable bracket to the grounding con-

nector.

See: Installing Flexi BSC and TCSM3i, section Grounding the

cabinets

Install the grounding lug, with a cable crimped to it, to the

grounding bracket with two M6 hex socket screws.

See: Installing Flexi BSC and TCSM3i, section Grounding the

cabinets

Measure and cut a 25 mm² (AWG 4) cable which connects the

network element to the main ground bar of the site (one cable

per network element).

See: Installing Flexi BSC and TCSM3i, section Grounding the

cabinets

Installation phase and related documents Completed

Install the Earth comb panel (CPGO) at the BSCC cabinet top

in the hole on right-hand side (seen from front) of the Connector 

panel (CPRJ45-A). Secure it with four Allen-head screws.

See: Installing Flexi BSC and TCSM3i, section Connecting the

site power supply 

Page 13: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 13/18

DN70596578

Issue 1-0

13

Installation work check list for Flexi BSC and TCSM3i Check list

Id:0900d805804bf2ac

Connecting power supply cables

2.9 Attaching and filling in the labels and stickers

 Attach and fill in the labels and stickers.

Note, however, that in first deliveries, the network element identification sticker is

attached to the cabinet at the factory.

2.10 Installing the internal cablesInstall the internal cables.

2.11 Replacing Fan Trays

The equipment cabinet contains four Fan Trays (FTRB-A or FTRB) for forced cooling.

The Fan Trays have been installed at the factory into special slots contained on shelves

2 and 4 (BSCC and BSCD) and on shelves 1 and 4 (TCSA) in the cabinet. If you haveto replace them, follow the instructions given in the installing document.

Installation phase and related documents Completed

Connect the main supply cables from the rectifiers to the four 

power connector blocks (PSCG3-B) on the top structure of the

cabinet.

See: Installing Flexi BSC and TCSM3i, section Connecting the

site power supply 

Installation phase and related documents Completed

 Attach labels (the network element identification sticker and

cabinet identification and positioning sticker).

See: Installing Flexi BSC and TCSM3i, section Attaching iden-

tification stickers and marking labels

Fill in the labels.

See: Installing Flexi BSC and TCSM3i, section Attaching iden-

tification stickers and marking labels

Installation phase and related documents Completed

Check that the cabling lists are available.

See: Installing Flexi BSC and TCSM3i, section Installing the

internal cables

See also: Site Documents Interconnection Cables in Flexi 

BSC , Interconnection Cables in TCSM3i , Cabling Instructions

for Flexi BSC and Cabling Instructions for TCSM3i 

Install the internal cabling according to the cabling lists.

See: Installing Flexi BSC and TCSM3i, section Installing the

internal cables

See also: Site Documents Interconnection Cables in Flexi 

BSC , Interconnection Cables in TCSM3i , Cabling Instructions

for Flexi BSC and Cabling Instructions for TCSM3i 

Page 14: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 14/18

14 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804bf2ac

Check list

Removing a Fan Tray

Installing a Fan Tray

2.12 Creating a temporary ESD-protected area for fieldwork

Create a temporary ESD-protected area (EPA) for field work.

It is strongly recommended that the entire installation site be constructed according to

EPA rules.

2.13 Equipping the cartridges with plug-in units

Equip the cartridges with plug-in units.

Installation phase and related documents Completed

Remove cables from the FTRB-A (FTRB).

See: Installing Flexi BSC and TCSM3i, section Installing and 

replacing Fan Trays

Pull the FTRB-A out of the shelf.

See: Installing Flexi BSC and TCSM3i, section Installing and 

replacing Fan Trays

Installation phase and related documents Completed

Insert the FTRB-A (FTRB) into the shelf: slide the locks on thefront of the FTRB-A (FTRB) towards each other and push the

Fan Tray gently into its shelf (positions 2 and 4, or positions 1

and 4) until it clicks into place.

See: Installing Flexi BSC and TCSM3i, section Installing and 

replacing Fan Trays

Connect cables into the FTRB-A (FTRB):

• connect the power cable from connector P7 in the corre-

sponding PDFU-B (S11.5 onwards) PDFU-A (S11 or 

S10.5) to the back connector of the FTRB

• connect Alarm cabling from CLOC-B to the back connec-

tor of the FTRB-A (FTRB)

• connect grounding cable from the shelf to the FTRB-A(FTRB).

See: Installing Flexi BSC and TCSM3i, section Installing and 

replacing Fan Trays

Installation phase and related documents Completed

Create a temporary EPA.

See: Installing Flexi BSC and TCSM3i, section Creating a

temporary ESD protected area (EPA) for fieldwork 

Page 15: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 15/18

DN70596578

Issue 1-0

15

Installation work check list for Flexi BSC and TCSM3i Check list

Id:0900d805804bf2ac

Preliminary checks

Precautions

Replacing DCAR1-A

Installing plug-in units

Install plug-in units if they have not been installed at the factory. Follow the instructions

below.

Installation phase and related documents Completed

Check the following:

• PROM versions of the plug-in units

• interchangeability codes of the plug-in units

•  jumper connectors on the plug-in units.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Installation phase and related documents Completed

Familiarise yourself with precautions to be taken.See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Ensure that you are working in an electrostatic free environ-

ment.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Handle the plug-in units with care at all installation phases.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Installation phase and related documents Completed

Replace the DCAR1-A.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Installation phase and related documents Completed

Check the code of the plug-in unit positions. Record and

correct the differences according to jumper setting instruc-

tions.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

See also: Site Document Equipment list for Flexi BSC , Equip-

ment list for TCSM3i 

Install the EMC shielding springs.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Page 16: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 16/18

16 DN70596578

Issue 1-0

Installation work check list for Flexi BSC and TCSM3i

Id:0900d805804bf2ac

Check list

2.14 Cabling to environment

Install the cables to environment.

2.15 Installing the External Alarm Unit

Install the External Alarm Unit (EXAU-A).

2.16 Finishing the installation

Finish the installation.

Use an EDS wrist strap earthing device!

Insert all the plug-in units (including I/O devices) in the car-

tridges after checking of identification labels.

Leave the plug-in units unconnected.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

See also: Site Document Equipment list for Flexi BSC , Equip-

ment list for TCSM3i 

Install the power supply units.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Switch power supply units on. Check the function of the units

from the LED indicators.

See: Installing Flexi BSC and TCSM3i, section Equipping the

cartridges with plug-in units

Installation phase and related documents Completed

Installation phase and related documents Completed

For information on connector panel types, see: Installing 

Flexi BSC and TCSM3i, section Interfaces to environment 

For information on installing connector panels, see: Installing Flexi BSC and TCSM3i, section Interfaces to environment 

For information on connector panels and external cables,

see: Connector Panels and External Cables in Flexi BSC 

and TCSM3i 

Installation phase and related documents Completed

Mount the External Alarm Unit on the wall and connect thealarm cable.

See: Installing Flexi BSC and TCSM3i, section Installing the

External Alarm Unit (EXAU-A)

Installation phase and related documents Completed

Remove all temporary markings.

Page 17: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 17/18

DN70596578

Issue 1-0

17

Installation work check list for Flexi BSC and TCSM3i Check list

Id:0900d805804bf2ac

2.17 Additional information

Information on powering down of the network element is found in Installing Flexi BSC 

and TCSM3i, section Powering down. Information on the external cables including

requirements specifications for the cables is found in Connector Panels and External 

Cables in Flexi BSC and TCSM3i .

Check the corrections in drawings used during the installa-

tion.

Reinstall the doors.

See: Installing Flexi BSC and TCSM3i, section Finishing the

installation

Connect the grounding cables between the doors and the

cabinet frame.

See: Installing Flexi BSC and TCSM3i, section Finishing the

installation

Clean the installation site.

Fill in the Installation certificate of completion, in the Appen-

dix.

Installation phase and related documents Completed

Page 18: dn70596578.pdf

7/28/2019 dn70596578.pdf

http://slidepdf.com/reader/full/dn70596578pdf 18/18

18 DN70596578

Installation work check list for Flexi BSC and TCSM3i

Id:0900d8058049d01c

 Appendix

3 Appendix

Installation certificate of completion

STAGE

Date

Network element installed by

(Also Print Name)

Customer 

(Also Print Name)

COMPLETE/OK (Initials)

COMMENTS/DEFICIENCY

CUSTOMER NAME

DELIVERY NO.

SITE NAME

SITE NO.

SITE ADDRESS

SOFTWARERELEASE

DN02198294

Checking the availability of documents and toolsUnpacking and checking the equipmentPreparing the cabinet for installationInstalling the cabinet on its own feetInstalling the cabinet on floor railsInstalling the Side Cable ConduitGrounding (earthing) the cabinetConnecting the site power supply

 Attaching and filling in the labels and stickersInstalling the internal cablesReplacing Fan TraysCreating a temporary ESD-protected areaEquipping the cartridges with plug-in units

Cabling to environmentInstalling the External Alarm UnitFinishing the installation