Dizdar Park City of Camarillo Community Preliminary Design Meeting March 22, 2022 City of Camarillo Department of Public Works
34

Dizdar Park City of Camarillo Community Preliminary Design ...

Mar 01, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dizdar Park City of Camarillo Community Preliminary Design ...

Dizdar ParkCity of Camarillo

Community PreliminaryDesign Meeting

March 22, 2022

City of CamarilloDepartment of Public Works

jpichardo
Stamp
Page 2: Dizdar Park City of Camarillo Community Preliminary Design ...

AGENDA

Introductions Purpose of meeting Design Progress Preliminary Design EIR Update Next Steps Public Input / Q & A

City of CamarilloDepartment of Public Works

Page 3: Dizdar Park City of Camarillo Community Preliminary Design ...

INTRODUCTIONS

City Staff: Jonathan Pichardo, Associate Engineer/Project Manager James Campero, Deputy Director Public Works/Capital Projects

Consultants: Architect: David Goodale, Goodale Architecture Planning Landscape Architect: Bill Rabben, Rabben Herman Design Landscape Architect: Amy Kim, Rabben Herman Design EIR Consultant: Melissa Whittemore, Rincon Consultants Cultural Lead: Rachel Perzel, Rincon Consultants

City of CamarilloDepartment of Public Works

Page 4: Dizdar Park City of Camarillo Community Preliminary Design ...

PURPOSE OF MEETING

Present Preliminary Project Design

Public Input / Q & A

City of CamarilloDepartment of Public Works

Page 5: Dizdar Park City of Camarillo Community Preliminary Design ...

DESIGN PROGRESS

City of CamarilloDepartment of Public Works

Page 6: Dizdar Park City of Camarillo Community Preliminary Design ...

DIZDAR PARKPROJECT AREA

Page 7: Dizdar Park City of Camarillo Community Preliminary Design ...

COMMUNITY WORKSHOP 1 : COURTHOUSE PROPERTY PROGRAM

January 29,2019

COMMUNITY WORKSHOP 1: DIZDAR PROGRAM

May 20, 2019

CITY COUNCIL REVIEW: COMBINED PROGRAMS

June 26, 2019

COMMUNITY WORKSHOP 2: 3 CONCEPTS PER SITE

September 24, 2019

CITY COUNCIL REVIEW: 3 CONCEPTS

November 20, 2019

CITY COUNCIL WORKSHOP: CONCEPT REFINEMENT

February 26, 2020

PROJECT STATUS MEETING

COMMUNITYENGAGEMENTSUMMARY

Page 8: Dizdar Park City of Camarillo Community Preliminary Design ...

DIZDAR PARK APPROVED CONCEPT PLAN

Page 9: Dizdar Park City of Camarillo Community Preliminary Design ...

PRELIMINARY PROJECT DESIGN

City of CamarilloDepartment of Public Works

Page 10: Dizdar Park City of Camarillo Community Preliminary Design ...

PARK COMPONENTS

City of CamarilloDepartment of Public Works

Entry Plaza / Signage Ventura Boulevard Frontage Trellis Design Sitting Garden / Signage Tot Lot Parking Band shell Restroom

Page 11: Dizdar Park City of Camarillo Community Preliminary Design ...

LANDSCAPE DESIGN INTENT

Dizdar Park�s landscape design will complement new park features and activities. The design will respect its history while introducing a refreshing range of land-scape experiences celebrating the idea that everything old will be new again.

Planting DesignPlant selections feature drought tolerant natives, succu-lents and grasses arranged In natural grouping along with textures and colors requiring minimal maintenance.

Irrigation SystemsThe new park will include fully automatic irrigation systems supporting healthful plant growth and current water conserving consumption guidelines.

Page 12: Dizdar Park City of Camarillo Community Preliminary Design ...

1

2

34

56

7

8

9

10

11

12

26

14

1516

17

18

19

20

21

23

24

10 11

24

23

25

13

13

13

KEYNOTE LEGEND

1 Plaza Shade Trees

New Central Plaza Feature Planters

Native Under-story Edge Definition

Plaza Entry Brick Paving Mat w/ Trellis Framing Centerpiece Planters

Meandering Walkway (Natural Gray P.I.P Concrete with Topcast Finish)

Multiple Seating & Viewing Options

Thematic Fire Truck Playground Structures

D.G Paving with Benches or Sculptural Seating Pods

Bio-swale Feature with Mix Juncus and Carex Evergreen Grasses

Central Trellis Feature w/ Benches

Shaded BBQ Pods with Table/Bench Seating

Holiday Celebration Tree

Bike Racks

Restrooms

2

3

4

5

6

7

8

9

10

11

12

13

14

15 Garden Entry Gateway with Brick Paving

City Sign Location

Band Shell

Flexible Sitting Garden w/ Public Art Display Plaques

Additional Parking Area with Shade Trees and Buffer Shrubs

Flowering Accent Tree w/ Landscape Berm

Dense Background Tree Bosque

Trash Enclosure

16

17

18

19

20

21

22

Enhanced Concrete Paving (Integral Color P.I.P Concrete with Topcast Finish)

Accent Banding (Integral Color P.I.P Concrete with Topcast Finish)

23

24

Relocated Statue25

Niche Seating under Mature Frontage Shade Trees26

Parking Lot Planter Islands27

Flowering Vine Fence Screen28

5

20

28

27

22

Plan

VENTURA BOULEVARD

Page 13: Dizdar Park City of Camarillo Community Preliminary Design ...

KEYMAP (N.T.S)

Gateway Trellis to Sitting Garden

Ventura Blvd. Sidewalk

Public Right-Of-Way

Art Display Walls

Hedge to Screen Ex. Fence Beyond

Bio-swale Feature w/ Informal Sycamore Grouping

Gateway Trellis to Sitting Garden

Evergreen Trees Framing Sitting Garden Edge

Accent Flowering Tree Framing Gateway Feature

Flowering Accent Tree (Crape Myrtle) Shade Tree (Sycamore) Upright Screening Trees (Brisbane Box)

Page 14: Dizdar Park City of Camarillo Community Preliminary Design ...

KEYMAP

Vine Planting to Screen Existing FenceExisting Tree

Ornamental Grass Mix Foreground Planting

Hedge Planting to Screen Existing Fence Evergreen Upright TreesExisting TreeParking Lot Shade Trees

Accent Tree Framing Entry Driveway to South Parking Lot

Existing Sidewalk along Glenn Drive

Public Right-Of-WayParking Lot Shade Trees

Upright Screening Trees(Brisbane Box)

Shade Trees(London Plane Tree)

Evergreen Canopy Trees(Southern Live Oak)

Evergreen Canopy Trees (Australian Willow)

Page 15: Dizdar Park City of Camarillo Community Preliminary Design ...

Gateway Trellis to Sitting Garden

Ventura Blvd.

Accent Shrub Planting

Grass Planting Access to the Park

Circular Bench on D.G Paving

Existing Jacaranda TreesExisting Ficus Trees

Art Display Plaques

City Sign Wall

KEYMAP (N.T.S)

Page 16: Dizdar Park City of Camarillo Community Preliminary Design ...

Fire-Fighting Themed Play Apparatus

Page 17: Dizdar Park City of Camarillo Community Preliminary Design ...
Page 18: Dizdar Park City of Camarillo Community Preliminary Design ...

Color Option A

Color Option B Color Option C

Page 19: Dizdar Park City of Camarillo Community Preliminary Design ...

Bollard Lights

Existing Ventura Blvd Pole Lt. & Bollards

Accent Canopy & Tree Uplights

Pedestrian Pole Lights

10x10 Tent - Typ.Total (20) Shown

VENTURA BOULEVARD

Page 20: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Option A

Page 21: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Option B

Page 22: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Option C

Page 23: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Preferred Public Restroom Option A

Option A

Page 24: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Public Restroom Options B and C

Option B Option C

Page 25: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Page 26: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

DIZDAR PARK

Elevation View of Sitting Garden from Ventura Boulevard

Page 27: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

View of Sitting Garden from Ventura Boulevard

Page 28: Dizdar Park City of Camarillo Community Preliminary Design ...

CEQA PROCESSThe EIR Process

(45 days)

City of CamarilloDepartment of Public Works

Design Status Meeting for the Dizdar Park Renovation and Expansion Project | March 22, 2022

Lead Agency = City of Camarillo

Opportunities for Public Input =

Current Status =

Lead agency

considers certification of Final EIR and makes decision on the project

Lead agency gives public

Notice of Availability of Draft EIR

Public review period

(45 days)

Lead agency

prepares Final EIR, including responses

to comments

on Draft EIR

Page 29: Dizdar Park City of Camarillo Community Preliminary Design ...

NEXT STEPSTask Approximate Timing

Public Design Workshop Early 2022

Design Review to City Council Summer 2022

Draft EIR circulated for public review and comment (for 45 calendar days)

Summer 2022

Complete Final EIR, including responses to public comments Fall 2022

City Council Meeting to consider certification of Final EIR and approval of project

Winter 2022

Finalize construction plans and documents Summer 2023

Construct project Fall 2023

City of CamarilloDepartment of Public Works

Page 30: Dizdar Park City of Camarillo Community Preliminary Design ...

PUBLIC INPUT

City of CamarilloDepartment of Public Works

Page 31: Dizdar Park City of Camarillo Community Preliminary Design ...

Color Option A

Color Option B Color Option C

Play Area Floor Options DIZDAR PARK TOT LOT

Page 32: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Public Restroom Options

Option B Option C

Option A

DIZDAR PARK RESTROOMS

Page 33: Dizdar Park City of Camarillo Community Preliminary Design ...

G O O D A L EARCHITECTURE

PLANNING

Band Shell Options

Option B Option C

Option A

DIZDAR PARK BANDSHELL

Page 34: Dizdar Park City of Camarillo Community Preliminary Design ...

ADDITIONAL QUESTIONS?

City of CamarilloDepartment of Public Works