DIVISION 800 INCIDENTAL CONSTRUCTION 801 MOBILIZATION Payment of Mobilization (DBE) 801-1 802 CONTRACTOR CONSTRUCTION STAKING Recapitulation of Construction Staking 802-1 Checking of Contractor Construction Staking 802-1a Payment of Right-of-Way Survey Monuments 802-2 803 FIELD OFFICE AND LABORATORY Recapitulation of Field Office and Laboratory 803-1 804 MAINTENANCE AND RESTORATION OF HAUL ROAD Record of Restoration and Maintenance of Haul Roads (Set) 804-1 805 WORK ZONE TRAFFIC CONTROL AND SAFETY Recapitulation of const. sign (*), Const. Barricade (**) and const. warning lights 805-1 Work Zone Sign Special (**) 805-2 Recapitulation of drums,arrows,and tubular markers 805-3 Recapitulation of Pavement Marking Paint (*) (**) 805-4 Flagger (Set) 805-5 Flagger (Set) 805 5 Recapitulation of Temporary Traffic Signals 805-6 Recapitulation of Pavement Marking Temporary Raised Pavement Marker (**) 805-7 Recapitulation of Traffic Control (Lump Sum) 805-8 Traffic Control (Initial Setup) 805-9 806 DURABLE PAVEMENT MARKING Recapitulation of Durable Pavement Marking (*) (**) 806-1 Recapitulation of Pavement Marking (Plowable Pavement Marker) (**) 806-2 Recapitulation of Durable Pavement Marking (*) (**)(***) 806-3 807 PAINTED PAVEMENT MARKING Recapitulation of Pavement Marking Paint (*) (**) 807-1 Recapitulation of Pavement Marking Paint Symbols 807-2 808 REMOVAL OF EXISTING PAVEMENT MARKINGS Removal of Existing Pavement Markings 808-1 Removal of Plowable Raised Markers 808-2 809 CONCRETE SAFETY BARRIER Recapitulation of Concrete Safety Barrier (*) (**) 809-1 810 INERTIAL BARRIER SYSTEM Recapitulation of Inertial Barrier System 810-1 Recapitulation of Modules (*) 810-2
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
DIVISION 800INCIDENTAL CONSTRUCTION
801 MOBILIZATIONPayment of Mobilization (DBE) 801-1
802 CONTRACTOR CONSTRUCTION STAKINGRecapitulation of Construction Staking 802-1Checking of Contractor Construction Staking 802-1aPayment of Right-of-Way Survey Monuments 802-2
803 FIELD OFFICE AND LABORATORYRecapitulation of Field Office and Laboratory 803-1
804 MAINTENANCE AND RESTORATION OF HAUL ROADRecord of Restoration and Maintenance of Haul Roads (Set) 804-1
805 WORK ZONE TRAFFIC CONTROL AND SAFETYRecapitulation of const. sign (*), Const. Barricade (**) and const. warning lights 805-1
Work Zone Sign Special (**) 805-2Recapitulation of drums,arrows,and tubular markers 805-3Recapitulation of Pavement Marking Paint (*) (**) 805-4Flagger (Set) 805-5Flagger (Set) 805 5Recapitulation of Temporary Traffic Signals 805-6Recapitulation of Pavement Marking Temporary Raised Pavement Marker (**) 805-7
Recapitulation of Traffic Control (Lump Sum) 805-8Traffic Control (Initial Setup) 805-9
806 DURABLE PAVEMENT MARKINGRecapitulation of Durable Pavement Marking (*) (**) 806-1Recapitulation of Pavement Marking (Plowable Pavement Marker) (**) 806-2
Recapitulation of Durable Pavement Marking (*) (**)(***) 806-3
807 PAINTED PAVEMENT MARKINGRecapitulation of Pavement Marking Paint (*) (**) 807-1Recapitulation of Pavement Marking Paint Symbols 807-2
808 REMOVAL OF EXISTING PAVEMENT MARKINGSRemoval of Existing Pavement Markings 808-1Removal of Plowable Raised Markers 808-2
810 INERTIAL BARRIER SYSTEMRecapitulation of Inertial Barrier System 810-1Recapitulation of Modules (*) 810-2
811 IMPACT ATTENUATORImpact Attenuator (*) 811-1
812 PERMANENT SIGNINGRecapitulation of Signs 812-1Recapitulation of Wood Post (**) 812-2Recapitulation of Steel Posts (*) 812-3Recapitulation of Sign Posts (* U Steel) 812-4Recapitulation of (*) 812-5Recapitulation of (*) Diameter Concrete Footings 812-6Sign (Removal and Reset) 812-7
813 RUMBLE (Milled) and RUMBLE STRIPS (Milled) (Centerline)Recapitulation of Rumble Strips (*) (**) 813-1
814 ELECTRIC LIGHTING SYSTEMS AND TRAFFIC SIGNALSRecord of Electric Lighting System 814-1Record of Electric Conduit (**) 814-2Record of Electrical Service Boxes 814-3Traffic Signal Installation 814-4Traffic Signal Interconnect 814-5
815Recapitulation of (*) (**) 815-1CATCH BASINS, INLETS, OUTLETS, MANHOLES, JUNCTION BOXES Recapitulation of ( ) ( ) 815 1
816Recapitulation of Adjusted Drainage Structures 816-1Structural Steel 816-2Tested Material Received Used and On Hand 816-2a
817Installation of Pipe and Other Material 817-1Record of Pipe Received and Used 817-2Recapitulation of Fly Ash Slurry Grout 817-3
ADJUSTMENT OF INLETS, MANHOLES AND OTHER STRUCTURES
822 UNDERDRAINSRecapitulation of (*) Pipe Underdrains (Type**) 822-1Recapitulation of Aggregate for Blanket Underdrains 822-2Recapitulation of (*) Pipe Underdrains (Type**) 822-3
824 CONCRETE SIDEWALK, STEPS AND RAMPSRecapitulation of Sidewalk 824-1Recapitulation of Sidewalk Ramps 824-2Recapitulation of Grade 3.0 Concrete (Misc) and Reinforcing Steel for Steps 824-3
825 CURB AND GUTTERRecapitulation (*) 825-1
826 SHOT-CRETE CONCRETERecapitulation of Shot-Crete 826-1
827 GUARDRAIL AND GUIDEPOSTSRecapitulation of Guard Fend (*) and Guard fence post 827-1
PREFABRICATED INTERCEPTION DEVICE AND SLOTTED DRAIN
Recapitulation of Guard Fend ( ) and Guard fence post 827 1Recapitulation of Guideposts(*) 827-2
828 FENCINGRecapitulation of Fence(*) 828-1Removal of Fence and Reset 828-2Recapitulation of Post (*)(**) 828-3Recapitulation of Gates (*) and Floodgates 828-4
829 RIPRAPRecapitulation of Riprap 829-1
830 SLOPE PROTECTIONRecapitulation of Bedding for Slope Protection 830-1Recapitulation of Slope Protection 830-2Recapitulation of Geotextile 830-3
831 DITCH LININGRecapitulation of Ditch Lining 831-1Measurement of Ditch Lining 831-2
832 GABIONSRecapitulation of Cubic Yards of Stone for (*) 832-1
833 PAVEMENT PATCHINGRecapitulation of Aggregate for HMA (*) course (**) Patching 833-1Recapitulation of Portland Cement Concrete Pavement (*) Patching (**) 833-2
846 TRANSPORTING SALVAGEABLE MATERIALSRecapitulation of Transporting Salvageable Material (*) 846-1
847 MAILBOX ADJUSTMENTSRecapitulation of Mailbox Installation 847-1
Line number Quantity amount of
accum enter
percent % into DBE requestDate Lsum LSUM CMS Contractor Date Remarks Insp
Payment of Mobilization (DBE)
8001-1
Mobilization will be paid with the CMS and no enter need in a book. Mobilization (DBE) will be enter as showed above. The contractor has to submit a written request (s) requesting partial payment on the behalf of the DBE. The amount requested shall be limited to the amount of mobilization necessary to begin work.
The Engineer may adjust the payment schedule if the contractor fails to accomplish the expected work. When 5 % of the contract is completed the expected work completed shall be as follows: set reference tie to endangered PLSS corners, verify all right-of-way survey monuments and set all reference points to center line points. When 25 % of the contract is completed the expected work completed should be the following: provide all construction survey . When 50 % of the contract completed the expected work that should be completed as follows: provide standard bound field notebooks with legible field notes. When 70 % of the contract is completed the expected work to be completed is the follows: Verify or reset the project centerline and references, establish and verify project benchmarks and provide the Engineer as built plans. When completed project received a certification from contractor that states all the requirements have been met. The contractor shall use two survey party. The first survey party will stake and the other survey shall check the first survey party.
Line number
Date Date
First SecondItem checked Checked Found Insp. Checked Found Remarks Insp
Checking of Contractor Construction Staking
802
This plate is set up to check the first survey party stakes with another survey party using separate books.
2-1a
Line number Quantity
Date
Point Pay Accum Enter Date No. Sta. Location Distance Side Quantity Quantity CMS Remarks Insp.
Payment of Right-of-Way Survey Monuments
8002-2
When the monument has been set it should be enter on this plate. This material will be accept on the bases of visual inspection and compliance with dimensional set forth in the contract.
On intermediate estimates, forty percent of the lump sum price of the laboratory is allowed on the first estimate after it is furnished for state use. Seventy percent of the lump sum is paid three months later. One-hundred percent is when the lab is released to the contractor. Write a test report on the Field Office and Laboratory when paid for on the first estimate based on Section 803.
Line number
First Final Restore
Inspection Inspection to ExistingDate Location of Haul Road Condition Insp. Date Condition Condition insp.
Record of Restoration and Maintenance of Haul Road
8004-1
All the haul roads will be listed at the beginning of the project excluding state highways. The list will be listed above as to the condition at the start of the project and check as the project progress. This bid item will be pay for at the completion of the project.
Line number
enter
intoDate Location each accum each accum each accum CMS Insp
Recapitulation of const. sign(*) ,Const Barricade(**) and const warning lights.
(**)
80
Const. warning
(light Type B)
Const. Barricades
Const. Sign (*)
(*) denotes the sign size: (0 to 9.25 sq ft), (9.26 to 16.25 sq ft.), and (16.26 sq ft and over) (**) denotes (Type I or II), (Type III-4 to 8 lin ft), or (Type III-9 to 14 lin ft.)
05-1
Line Number
Date Insp.
** Si
805-2
Work Zone Sign Special (**) Plan Quantity
LocationEnter CMS Estimate #
Work Zone Sign Special (**)
Each Accum
** Size
2
Line number
Tubular enter
Markers intoDate Location each accum each accum each accum CMS Insp
80
Recapitulation of drums, arrows, and tubular markers
Arrow
Reflectorized
Drum
Sequencing
* Use for Portable Changeable Signs, Channelizer (Fixed), Channelizer (Portable)
05-3
Line number
accum enter intoDate Sta. to Sta length length CMS Insp
Recapitulation of Pavement Marking (Paint) (*) (**)
80
(*) Denotes White or Yellow (**) denotes width (***) denotes length.
First payment made when lights are put in useLast payment made when lights are removed from project.
05-6
Line number
Enter intoDate Sta to Sta. Each Accum CMS Insp
Recapitulation of Pavement Marking (Plowable Raised Pavement Marker) (**)
80
(**) denotes the color
05-7
Line number Bid Item Quantity
Contract Quantity
enter
50% 5% 100% 10% 100% intoDate Location T C contract T C Contract T C CMS Insp
80
All Work
Pay
completed completed
Pay either Pay either
Recapitulation of traffic Control (Lump Sump)
when When
10% contract 80 % contract
When
Completed
05-8
T C is the abbreviation for Traffic Control. Always pay whichever is lesser of the traffic control or contract. When computing the percentage of the original contract amount completed, do not include monies earning for mobilization, material stored, traffic control (when bid as lump sum) and contractor construction staking.
Line Number
Insp.
805-9
Date Completed
Traffic Control (Initial Setup) Plan Quantity - Lump Sum
Date Started Date Entered in CMS
9
Line number
Accum Enter intoDate Sta to Sta. length length CMS Insp
10/01/03 34+56 54+00 1944 1944 RDD
10/02/03 54+00 64+56 1056 3000 RDD
10/15/03 estimate no. 7 3000 LLM
Recapitulation of Durable Pavement Marking (*) (**) (***)
8006-1
(*) denotes the type of pavement marking : Cold Plastic, Patterned Cold Plastic, Epoxy, High Durability Tape, Thermoplastic, Thermoplastic-Preformed, Thermoplastic-spray, Multi-Component, or Polymer-Modified Cementations (**) denotes the color (***) denotes the width of pavement marking.
Line number
Enter intoDate Sta to Sta. Each Accum CMS Insp
Recapitulation of Pavement Marking (Plowable Raised Pavement Marker)(**)
8006-2
(**) denotes the color.
Line number
Symbol
(****) Enter intoDate Sta each accum CMS Insp
10/01/03 34+56 2 2 RDD
10/02/03 54+00 2 4 RDD
10/15/03 estimate no. 7 4 LLM
Recapitulation of Durable Pavement Marking (*) (white) (****)
8006-2
(*) denotes the type of pavement marking : Cold Plastic, Patterned Cold Plastic, Epoxy, High Durability Tape, Thermoplastic, Thermoplastic-Preformed, Thermoplastic-spray, Multi-Component, or Polymer-Modified Cementations (****) denotes the type of Symbo
Line number
Accum Enter intoDate Sta to Sta. length length CMS Insp
Recapitulation of Pavement Marking (*) (**)(Paint)
8007-1
* Color ** Width
Line number
Symbol Symbol Symbol
Lt Arrow Rt Arrow "ONLY" enter intoDate Sta. Each Accum Each Accum Each Accum CMS Insp
80
Recapitulation of Pavement Marking (Paint) Symbols
07-2
Line number Quantity
AccumDate Sta to Sta. Side Type Location Length Length Remarks Insp
Removal of Existing Pavement Marking
80
08-1
Line number Quantity
AccumDate Sta to Sta. Side Type Location Each Each Remarks Insp
Removal of Existing Pavement Marking (Plowable Raised Marker)
80
08-1
Line number Quantity
enter
Accum intoDate Sta to Sta. Side Location length Length Remarks CMS Insp.
Recapitulation of Concrete Safety Barrier (*) (**)
8009-1
(*) denotes Type and (**) denotes (Permanent), (Temporary), (Temporary-Installation Only) or (Temporary-Relocate) The Inspector will make remarks on the bottom of this sheet to explain why more of less was needed.
Line number
enter
intoDate Sta Side Location Each accum CMS Insp.
Recapitulation of Inertial Barrier System
81
Inertial barrier system shall be measured per each completed in place.
10-1
Line number
enter
Used Accum intoDate Sta Side Location (*) (*) Remarks CMS Insp.
Recapitulation of Modules (*)
81
(*) denotes (F-200), (F-400), (F-700), (F-1400), or (F-2100)
10-2
Line Number
Date Each (*) Insp.
Impact Attenuator (*) Plan Quantity
Location Accum
Impact Attenuator
Remarks
* T
811-1
* Type
1
Line number
Daily accumDate Sta Location Side Sq Ft Sq Ft Remarks Insp
Recapitulation of Signs (*)
81
(*)Flat Sheet, Reinforcing Panel of Overlay
12-1
Line number
Daily accumDate Sta Location Side lin ft lin ft. Remarks Insp
12/2/02 12+90 K-32 Lt 5 5 RDD
12/4/02 13+90 K-32 Rt 3 8 RDD
12/5/02 estimate no. 3 RCB
Recapitulation of (4x6) wood Posts (**).
81
(**) denotes designate for flat signs or for structural panels signs.
12-2
Line number
Daily accumDate Sta Location Side lin ft lin ft. Remarks Insp
Recapitulation of Steel Beam Posts. *
81
* Size and weight of post.
12-3
Line number
Daily accumDate Sta Location Side lin ft lin ft. Remarks Insp
Recapitulation of Sign Posts (* U Steel)
81
* 2 or 3 Lbs. per Foot.
12-4
Line number
accumDate Sta Location Side Each each Remarks Insp
Recapitulation of (*)
81
(*) denotes(**) Steel beam posts, (**) steel beam stub Post with breakaway Base Plate, (***) Breakaway Base Plates.(**) denotes size and weight and (***) denotes size Can be used for all line items paid and recorded by "Each".
12-5
Line number
Accum
Linear LinearDate Sta Location Side Feet Feet Remarks Insp
Recapitulation of (*) Diameter Concrete Footings (**)
81
(*) denotes size and (**) denotes designate for Wood Post or Steel Post
12-6
Line Number
Date Quantity Accum Quantity Accum Insp.
Sign (Remove and Reset) Plan Quantity - Lump Sum
Location%
Complete
Signs Removed Signs ResetAccum
% Complete Remarks
812-77
Line number
Date
end Start Accum EnterDate Sta Start Side Location Sta Sta CMS Remarks Insp
Electric lighting - Record for Partial Payment of Lump Sum Items This plate is a worksheet used for keeping a record of the work to determine the percent of contract price completed for progress of payment purposes. Items completed are multiplied by unit cost supplied by the contractor The sum of the unit cost calculations are divided into the lump sum bid to obtain percent complete.
* Denotes the size of the conduit. This item is paid as lump sum or linear feet or meters. This plate is a record of the linear feet of meters of the electrical conduit used and will be used as accepted material.
Line number Quantity
Accum
Number Number enter inDate Sta. Side of Boxes of Boxes CMS Insp
81
Record of Electrical Service Boxes
LocationRemarks
14-3
This plate is a record of the electric service boxes placed on the project. The junction boxes can be kept track on the same way.
Line Number
Date Insp.
814-4
Estimate #
Traffic Signal Installation Plan Quantity - Lump Sum
Location
Traffic Signal
Pedestals
Traffic Signal Head
Wire Ln FtFoundation
Traffic Signal Poles
% Complete
Accum % Complete
4
Line Number
Date Insp.Estimate #Accum % Complete
% Complete
Thi t l t b d f E V hi l S t
814-5
Traffic Signal Interconnect Plan Quantity - Lump Sum
This template can be used for Emergency Vehicle System.
5
Line number
(*) (**)Date Sta Location Side each accum Remarks Insp
Recapitulation of (*) (**)
81
(*) denotes Catch Basin, Inlet, Outlet, Manhole, Junction Box.(**) denotes type of drainage structures
15-1
Line number
adjusted structure*Date Sta location Side each accum Remarks Insp
Recapitulation of adjusted drainage structures
81
* denotes the type of adjusted structures such as Manhole, Catch basins, or Curb inlets
16-1
Line Number
Date Insp.
Structural Steel Plan Quantity
LocationQuantity
UsedAccum
Quantity
Thi t l t b d f C t St l d C t I
816-2
This template can be used for Cast Steel and Cast Iron.
2
Material: Structural Steel
CMS ID Ident. Quantity Ident. Quantity Date Used On Hand Insp.
Tested Material Received, Used and On Hand
Insp.Date
Checked Received
Distribution of MaterialsTest Report Data Field Data
Thi t l t b d f C t St l d C t I
816-2a
This template can be used for Cast Steel and Cast Iron.
a
accum quantity enter
Date Number length actual Accum end end paid in into Accum.Installed Sections section Length Length section section CMS CMS Headwall Headwall Insp.
Installation of Pipe and other material
81
May be used for all types of pipe paid for by linear foot.This plate is the inspector record of the actual material used at this location .
17-1
Line number
Marked Test Number Accum Accum
ID on Report of Length of Total Total TotalDate pipe Number Section section Received Received Used Used on hand Remarks Insp
Record of Pipe (*-**-***) Received and used
81
* denotes size of Pipe. ** BC denotes HMA - coated No entry denotes without HMA - Coating.*** Denotes types: CMP, CSP, CAP, CMMAC CSMAC etc.
17-2
A field record of tested material is necessary to eliminate the possibility of using untested material or cause unnecessary delays due to performing checks of the office records. This plate supplies the field inspector with a complete record of the amount of material received, tested, and when it was used. The erosion pipe can be mark when it has been inventoried.
Line number
Cu Yd Accum enter
Used Cu Yd intoDate Sta Side Location Daily Used Remarks CMS Insp.
Recapitualtion of Fly Ash Slurry Grout( *)
81
(*) denotes Low Strength of High Strength
17-3
Line number Plan Quantity
Date Location Sta. length accum Insp
Pipe Measurement (Linear Foot)
8228-1
Line number Plan Quantity
Date Location Sta. length accum Insp
Pipe Measurement (Linear Foot)
8228-1
Line number Plan Quantity
intoDate sta to sta side Location each accum each accum CMS Insp.
Recapitulation of Flume Inlets (*) and slope drains (**)
Inlet Flumes (*)
82
Slope Drains (**)
(*) denotes AE (air entrained) or no entry means with out air(**) denotes AE (air entrained), no entry means without air, or asphaltic concrete.The asphaltic concrete shall be BM-2 or BM-3
20-1
Line number Plan Quantity
Accum Enter
Daily Daily intoDate Sta. Side Location Placed Total CMS Insp
Recapitulation of Flapgates (*)
82
(*) Denotes the size.
21-1
Line number Plan Quantity
Accum enter
Daily Daily Ref Ref intoDate Sta Side Location (*) (**) (*) (**) Bk Pg Remarks CMS Insp
Recapitulation of (*) Pipe Underdrains (Type **)
82
(*) denotes the size, Diameter(**) denotes type [B], [F], [H], or [L] for underdrain Pipe and [A], [E], [G], [K] or Special for underdrain Outlet Pipe
22-1
Line number Plan Quantity
Accum
Daily Daily Date Sta Side Location Ton(*) Tons (*) Remarks Insp
Recapitulation of Aggregate for Blanket Underdrains
82
(*) denotes Tons or Cu Yd.
22-2
Station 34+00 Plan Quantity of (*) Pipe Underdrain (type**)
Lt US 36 Plan Quantity of (*) Pipe Underdrain Outlet Pipe
Plan quantity of (Ton or Cu Yd ) of Aggregate for Blanket Underdrain
Test Test Test
Under drain Pipe Report Outlet Pipe Report Aggregate ReportDate length Total No. length Total No. Ton (***) Total No. Insp
Recapitulation of (*) Pipe Underdrains (Type **) at Station 34+00
82
(*) denotes the size, Diameter(**) denotes type [B], [F], [H], or [L] for underdrain Pipe and [A], [E], [G], [K] or Special for underdrain Outlet Pipe(***) denotes that the aggregate will be paid for as tons or cu yds.
22-3
Line Number
Date Insp.
Prefabricated Interception Device (*) Plan Quantity
LocationEach
QuantityAccum
Quantity
* T
823-1
* Type
1
Line Number
Date Insp.Ln Ft
Quantity
Accum Ln Ft
Quantity
** Di t f CMP
823-2
Slotted Drain (**) Plan Quantity
Location
** Diameter of CMP
2
Line number
Total PlanDate Sta to Sta Side Location Width Length Sq. Yd. Sq. Yd Quantity Insp
Recapitulation of Sidewalks
82
Explain why there is a increase or decrease at the bottom of the quantity.
24-1
Line number
Plan quantity enter
intoDate Sta. to Sta Side width Length Sq. Yd Remarks CMS Insp
Recapitulation of Sidewalk Ramps
82
The sidewalk ramp will be calculated to the nearest 0.1 sq. yd.
24-2
Line number Quantity Quantity
Accum Accum
Daily Total Daily Total Date Sta Side Location Cu Yd Cu Yd Lbs Lbs Remarks Insp
Recapitulation of Grade 3.0 Concrete (Misc) and Reinforcing Steel for steps
82
This plate show how to keep track of cubic yard of concrete and pounds of reinforcing steel used on steps.
24-3
Line number Quantity
Accum
daily Total Date Sta to Sta Side Location length length Insp
Recapitulation of (*)
82
(**) denotes size, height or special(***) denotes AE for air entrained No entry denotes without air.
25-1
(*) denotes [Curb, Edge (**)(***)], [ Curb, Heater(***)], [Curb and Gutter, Combined (***)], [Gutter(***), [Curb, Protection (**)(***)],[Curbs, Asphaltic Concrete, [Gutters, Asphaltic Concrete] or [Curb and Gutters, Asphltic Concrete].
Line number
Plan quantity
Units Date Sta. to Sta Length width in Place Remarks Insp
Recapitulation of Shot-Crete
82
* Unit designated in contract documents
26-1
Line number
enter
daily accum intoDate sta to sta side Location Length Length each accum CMS Insp.
Recapitulation of Guard Fence (*) and Guard fence post
Guard Fence
82
Guard fence post
27-1
(*) Denotes the type of guard fence Steel Plate, Cable, Removal of Steel Plate, Removal of Cable, Removal of Timber, Reconstruction of Steel Plate, Reconstruction of Cable , Removal and Reconstruction of Steel Plate and Removal and Reconstruction of Cable, and End Terminals.
Line number
daily accum Date sta to sta side Location Length Length each accum Insp.
Recapitulation of Guideposts (*)
Guard Fence
82
Guard fence post
(*) Denotes Setting of, Removal of , Resetting of, Removal and Resetting of
27-2
Line number
Date Location Sta. to Sta length accum Insp
Recapitulation of Fence (*)
Fence (*)
8228-1
(*) Denotes (Woven Wire (**) (Chain Link), or (Barbed Wire) (**) Denotes Type A or B means either Type A or Type B is permissible, Type A means only Type A is permissible, Type B means type B is permissible .
Line number
Date Location Sta. to Sta length accum Insp
Recapitulation of Fence (*)
Fence (*)
82
(*) denotes (Removal and resetting wire) (Removal and Resetting ChainLink) (Removal of existing) or (Single Wire Cable)
28-2
Line number Plan Quantity
pull post Date Location each accum each accum each accum Insp
Recapitulation of post (*) (**)
end post
82
Corner post
28-3
(*) denotes Corner, End or Pull post (**) denotes type of fence woven wire or chain link. Note: You need to keep track of all the line post for test report.
Line number Plan Quantity
Gate Date Location each accum each accum Insp
Recapitulation of Gates (*) and Floodgates
Floodgates
82
(*) denotes the size of the gates
28-4
Line number Plan Quantity
AccumDate Sta Side Location SqYd SqYd Remarks Insp
Recapitulation of Riprap (*)
8229-1
Line number Plan Quantity
Daily AccumDate Sta Side Location CuYd CuYd Remarks Insp.
Recapitulation of Bedding for Slope Protection
83
(*) denotes ton or cubic yardUse 150 mm filter Course (Type I)
30-1
Line number Plan Quantity
Daily AccumDate Sta Side location CuYd CuYd Remarks Insp.
Recapitulation of Slope Protection
83
(*) denotes ton or cubic yard
30-2
Line number
Plan quantity
Sq Yd Accum %Date Sta. to Sta Length width Used Sq Yd Comp Remarks Insp
Recapitulation of Pavement Interlayer Geotextile
8330-3
The Engineer will measure the geotextile placed and accepted by the square yard (measure to the nearest 0.1 sq yd, pay to the nearest sq yd.)
Line number Plan Quantity
Accum
Ref Ref. Date Sta to Sta Side * * Book Page Remarks Insp
Recapitulation of Ditch Lining
83
* Quantity in units of tons or square yards for concrete or aggregate ditch lining.This plate is used to enter into CMS
31-1
Line number Plan Quantity
SqDate Sta to Sta. side location length width1 width 2 Yd Remarks Insp.
Measurement of Ditch Lining
83
The plate show the measurement of the ditch lining or backslope ditch lining at different location.
Circle area equal 0.7854 x d2
31-2
Line number Plan Quantity
** Accum
Used ** Date Sta to Sta Side Location Daily Used Remarks Insp.
Recapitulation of Cubic Yards of Stone for (*)
83
** Units could be square or cubic yards(*) denotes Gabions or Revet Mattresses.
32-1
Line number Plan Quantity
Used accumDate Sta to Sta Side Location Tons Tons Remarks Insp
Recapitulation of Aggregate for HMA (*) course (**) Patching
83
(*) denotes whether it is Base of Surface and (**) denotes the type and grade.
33-1
Line number Plan Quantity
Date Sta to Sta Side Location length width Sq Yd Remarks Insp.
Recapitulation of Portland Cement Concrete Pavement (*) Patching (**)
83
This template can also be used for PCCP Edge Joint Patching, PCCP Joint Patching (Full Depth) and PCCP Joint and Crack Patching.
33-2
Line number Plan Quantity
AccumDate Sta. to Sta Side Location Length Length Remarks Insp
Recapitulation of Extra Work Saw Cut
8333-3
Line Number
Date Insp.
Reinforced Concrete Box (*) (Pre Cast) Plan Quantity
Accum Tons Used
Location
Station to Station Tons Used
834-11
Line Number
Date Insp.
834-2
Injection holes Plan Quantity
Accum Quantity
Location
QuantityStation to Station Remarks
2
Line Number
Date Insp.
Sealing PCCP Joints (Longitudinal) Plan Quantity
Ln Ft Sealed
Accum Ln Ft
Sealed
Location Ln Ft CleanedStation to Station Remarks
Thi t l t b d f S li PCCP J i t (T ) S li PCCP C k (>1/8"
835-1
This template can be used for Sealing PCCP Joints (Tranverse), Sealing PCCP Cracks (>1/8" <2"), Sealing Spalled PCCP Joints & Cracks (>2" ≤3"), Sealing Spalled PCCP Joints & Cracks, Type A of B (>2" ≤3"), Sealing Asphalt Cracks (>1/8" ≤1/2"), Sealing Asphalt Cracks (>1/2" <2"), and Sealing Longitudinal Asphalt Shoulder Joint.
1
Material: Hot Joint Sealing Compound
Date CMS ID Ident. Quantity Ident. Quantity Insp.
Material Received, Used, On Hand
Insp. Received Date Used On Hand
Test Report Data Field Data
Thi t l t b d f th R id S t C t P t hi M t i l d th P l l
835-1A
This template can be used for the Rapid Set Concrete Patching Material and the Polypropylenefibers.
A
Line number Plan Quantity
Daily Accum Date Sta. to Sta. Side Location Unit Unit Remarks Insp
Recapitulation of *
83
Aggregate
* Temporary Surfacing, Surfacing for Side Roads and Entrances.
This plate is used to keep track of surfacing material.
36-1
Line number Plam Quantity
Daily Accum Date Sta to Sta Side Location Station Station Remarks Insp.
Daily Accum Date Sta to Sta Side Location Ton Ton Remarks Insp.
Recapitulation of (*)
83
(*) denotes Bid Items: Aggregate for Shoulders (AS-1) or Pavement Edge Wedge (Rock)
37-2
Line Number
Date Insp.
837-3
Water for Earthwork Compaction(Set) Plan Quantity
Tank Number
Pay MGAL
Accum Pay
MGALPay MGAL per Load
Number of Loads
Location
Station to Station Remarks
Thi t l t h ld b d i j ti ith t l t 152 1 'W t H li E i t
3
This template should be used in conjunction with template 152-1 - 'Water Hauling EquipmentData."
Line Number
Date Side Insp.
838-1
Grinding Concrete Surface Plan Quantity
Length Ln Ft
Width Ln Ft Sq Ft
Location
Station to Station Sq YdsAccum Sq Yds Remarks
1
Line Number
Date Insp.Length Ln Ft
Width Ln Ft
Depth Inches
Accum Cu Yds Remarks
83
Crushed Stone for Backfill Plan Quantity
Location Station Cu Ft Cu Yds
Patch Size
Conversion Factor - 0.0833 feet per inch Conversion Factor - 27 cubic feet per cubic yard Note - Cu. Ft. = Length (Ft) x Width (Ft) x Depth (inches) x 0.0833 ft / inch
39-1
Line Number
Date Side Insp.
839-2
Removal of Asphalt Material Plan Quantity
Length Ln Ft
Width Ln Ft Sq Ft
Location
Station to Station Sq YdsAccum Sq Yds Remarks
Thi t l t b d f 'R bbli d C t '
2
This template can be used for 'Rubblized Concrete.'
Line Number
Date Insp.
Temporary Surfacing Material (Aggregate) (Set Price)
LocationDaily Unit
Accum UnitSideStation to Station Remarks
AggregateBit Material
84
Daily Unit
Accum Unit
Date Enter CMS
40-1
Line number Plan Quantity
Accum Date Sta. Side Location Each Each Remarks Insp.
Recapitulation of Drilling and Grouting (*)
84
(*) denotes repair or new.
42-1
Line number Plan Quantity
Accum Date Sta. Side location CuYd CuYd Remarks Insp
Recapitulation of Flowable Fill
84
This template can be used for slurry grout also.
43-1
Use this material to backfill open excavation where soil or aggregate is not called for of is impractical to used This material will be accepted on the basis of approved mix design.
Line Number
Date Insp.
845-1
Cleaning Existing Structures Plan Quantity - Lump Sum
% Complete
Accum %
CompleteLocation Structures
to be Cleaned Structures Cleaned Est Date Est #Entered to
CMS
1
Line Number
Date Insp.
84
Remarks
Cleaning Existing Underdrains Plan Quantity
Location Ln FtAccum Ln FtLn Ft
Accum Ln Ft
Cleaned Video Inspected
45-2
Line number
Quantity of material to be hauled
AccumDate Sta. Side Location to Location Sta Side * * Remarks Insp
Recapitulation of Transporting Salvageable Material (*)
84
* Units are in contract documents.
46-1
This plate is used to pay for hauling salvageable material off the project at a location designated on the plans. The salvageable material will be measured at the stockpiled location to be used later.
Line number Plan Quantity
Accum
Mail box Mail box Date Sta. Side Location Unit Unit Remarks Insp.
Recapitulation of Mailbox Installation
8447-1
Acceptable mailbox supports shall be commercially available units intended for this purpose and will be accepted on the basis of visual inspection