Page 1 (Distribution Southern Zone, Chittagong) SL.No ID-No Date of Birth Name, District and Qualification and Date of joining Designation and Present Posting Topics of Foreign Training and Duration Country Inspection Topics and its Duration Comments 1 1-0510 31.01.61 Mr. Md. Azharul Islam Pabna B.Sc.Engg. (Elec.) 31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN) 10.09.13(SE) 13.12.15 (Addl. CE) Addl. CE Distribution Southern Zone Chittagong. 1) Grid Connected Wind Energy from 01.09.96 to 30.08.97 Germany, 1) Technical orientation & quality test witness on 10 Nos.- 5/6.67 MVA, 33/11 KV Power Transformer from 15.11.13 to 21.11.13 in China. 2) Quality acceptance test of 33 KV ACR from 20.06.14 to 26.06.14 for 7 days in Australia. 3) Detail drawing against Shahjibazar 330 CCPP Project from 26.07.15 to 08.08.15 in China. 2 1-0732 23.02.61 Mr. Iqbal Karim, Chittagong, B.Sc.Engr.(Elec.), 19.5.86(AE) 21.11.99(SDE) 10.07.05(XEN) 08.02.16 (SE) SE Attach to CE Distribution Southern Zone Chittagong. i) Power Transformer from 25.07.03 to 07.08.03 ii) Pre-Paid Metering from 16.08.01 to 26.08.01 iii) Training on Pre-Payment Metering System From 15.01.06 to 15 Days Iran South Africa, Tanzania, U.K. 1) Technical orientation & quality test witness of insulator against Chitt. zone power dist. system dev. project from 28.08.15 to 03.09.15 in China. 3 1-01747 25.08.75 Mr. Md. Kenoyar Hossain, Bogra B.Sc.Engr (Elec.) 07.04.2006 (AE) 16.06.14 (SDE) 05.11.14 (XEN, Incharge) Asstt. CE (XEN) incharge Distribution Southern Zone Chittagong. 1) Supply of 11KV Lighting Arrester & 11KV DOFC the Program titled “Technical Orientation and Quality Test Witness” for 07 (seven) days in China at March/11 2) Quality acceptance test against Chittagong Hill Track Electrification Project from 04.04.15 to 10.04.15 in India. 3) Inspection of generator test against Bibiana south project from 09.05.16 to 15.05.16 in Germany.
1073
Embed
(Distribution Southern Zone, Chittagong) Southern Zone Chittagong. ZRS, PDB, ... PSCDP tarining program on ... of steam turbine from 28.10.13 to 08.11.13 Italy
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1
(Distribution Southern Zone, Chittagong)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1) Grid Connected WindEnergy from 01.09.96 to30.08.97
Germany, 1) Technical orientation &quality test witness on 10 Nos.-5/6.67 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China. 2) Quality acceptance test of 33KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 3) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina.
Asstt. CE (XEN) incharge Distribution SouthernZone Chittagong.
1) Supply of 11KV LightingArrester & 11KV DOFC theProgram titled “TechnicalOrientation and Quality TestWitness” for 07 (seven) days inChina at March/11 2) Quality acceptance testagainst Chittagong Hill TrackElectrification Project from04.04.15 to 10.04.15 in India. 3) Inspection of generator testagainst Bibiana south projectfrom 09.05.16 to 15.05.16 inGermany.
Page 2
4 11-0373 31.12.57 Mr. Md. Shafiur Rahman Comilla Diploma (Elec.)
29.07.82(SAE), 22.04.10(AE) 25.06.15 (SDE)
SDE Office of CE,Distribution SouthernZone Chittagong.
ZRS, PDB, ChittagongSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1) Training on LV Protection ofDistribution Transformer fromSeptember/05 for 15 days. 2) “Factory Training" aganistDohazari 100 MW PeakingPower Plant ConstructionProject for 30 (Thirty) daysfrom 15.06.2011 to14.07.2011(Excluding traveltime) (bond for 5 years)
China
China
1) inspection (Factory visit atsite) against Chittagong PowerStation 1No Unit (Turbine,Boiler, Electrical, I & C &Operation) from 13.09.10 to20.09.10 for 08 days in China. 2) Technical orientation &Quality test witness from20.04.15 to 30.04.15 in China.
1) Single Phase Electronic Meterfrom 02.01.05 to 06.02.05 in India.
2) "Technical Orientation &Quality test witness" of 11 KVSingle Phase PotentialTransformer from 01.10.13 to07.10.13 in China. 3) Technical orientation &quality test witness from13.06.15 to 19.06.15 in China. Participation in the Electricitytransmission and distribution ofSouth Asia from 23.04.16 to07.05.16 in USA.
Page 4
S & D Division, Mohra1 1-01751 01.10.78 Mr. Mithu Kumar Biswas
XEN(Incharge), S & DDivision,Mohra,PDB,Chittagong.
1) "Technical Operation &Quality Test Witness" from07.09.09 to 16.09.09 in China. 2) "Technical Orientation &Quality Test Witness for Meter &Meter Enclosure" from 16.03.14to 25.03.14 in China.A20 3) Factory acceptance Test of 33KV guy insulator against Ctg.Power Distribution dev. Projectfrom 10.11.15 to 17.11.15 in China
2 1-01975 18.07.83 Mr. Md. Abdullah Al MamunSardar Rajshahi B.Sc. Engg. (Elect.) 02-10-11 (AE) 01717853702 [email protected]
AE
Sales and DistributionDivision Hathazari, PDB,Chittagong.
Page 5
S & D Division,Fauzdarhat1 1-01356 01.03.74 Mr. Shakh Md. Mahfuzul
1) Training on Split Bolt Lien Tape ConnectorG-452 (Greater Rajshahi Proj).For March/06 for 07 days
India 1)"Workshop on NumericalRelays in MV/LT Systems" from27.09.10 to 29.09.10 in India. 2) Technical orientation &quality test witness againstSCADA Project from 23.03.15 to31.03.15 in China.
S & D Division, Barabkundo1 1-01302 10.05.73 Mr. Prasenjit Chakraborty,
1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Singapore 1) Technical know-how &Technology Transfer onoperation & maintenance of 400kw & 3150kw Feed pump motors"from 22.11.07 to 28.11.07 inChina. 2) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSep/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand.
1)145KV &36KV CT & PT From08.10.03 to 08.01.04 for 90 days
2)VCB & Control Panel From02.07.04 for 14 Days
3) Management of WindPower Development (Sida)from 27.08.07 to 28.09.07 for33days
China,
India &China
Sweden
1)15.01.02 to 24.01.02 inSingapore 2) 300 Nos 11KV CurrentTransformer (CT) 11KV PotentialTransformer (PT) from Oct/2006for 07 days in China 3) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland.
A proposal sent toministry onOct/2015 for"FactoryAcceptance Test "of insulatoragainst Chitt. Dist.Project from08.11.15 to 14.11.15in China
Distribution Division, Potia1 1-01401 13.04.73 Mr. Md. Abu Sayed,
1) "Technical orientation &Quality test witness " from01.10.13 to 07.10.13 in China. 2) Factory test witness ofinsulator from 30.08.15 to05.09.15 in China.
1)25.9.02 to 30.9.02 in India 2) "Technical Orientation &Quality Test Witness" on 11KVLighting Arrester from 20.07.13 to26.07.13 in China. 3) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia. 4) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
Page 7
Distribution Division, Coxs'Bazar1 1-01212 01.07.68 Mr. Md. Mostafizur Rahman,
Potuakhali, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN Distribution Division PDB, Cox'bazar.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina. 2) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia. 3) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
SE O & M Circle, ChittagongMetro (East), PDB,Chittagong.
1) 1)GIS From 15.06.04 for 07Days
Germany 1)25.9.02 to 30.9.02 in India 2) "Technical Orientation &Quality Test Witness" on 11KVLighting Arrester from 20.07.13 to26.07.13 in China. 3) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia. 4) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
2 11-0347 02.04.58 Mr.Md. Kazi Nurul Islam Chittagong. Diploma (Elec.) 12.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE SCADA, System ControlCentr, O & M Circle,Chittagong Metro (East),PDB, Chittagong.
1)A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand
S & D Division, Kalurghat1 1-01735 28.12.78 Mr.A.F.M. Nur Uddin Ahmed
1) Metering & Backup meteringSystem Ges Current Transformer(CT) against "Factory TestWitness" from 28.07.09 to05.08.09 for 09 days in India. 2) Technical orientation &quality test witness on 10 Nos.-5/6.67 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China. 3) Technical Orientation &Quality Test Witness of 33/11 KVPower Transformer from01.02.2015 to 07.02.2015 in China.
1) “Supply of 110V, 3X5(6) AMPS, 3-Phase, 4-Wire, 3-Element,Outdoor Type Double TariffProgrammable Consumer EnergyMeter with Remote AutomatedReading System” from 30.11.09 to14.12.09 in Singapore. 2) Technical Orientation andQuality Witness aganist CentralZone Power Distribution ProjectJune/11 for 07 days in China. 3) Factory acceptance test of 33KV disc insulator against Chitt.zone power dist. system dev.project from 25.10.15 to 31.10.15in India & China.
2 Mr. Md. Jahangir Alam Diploma Engr. SAE 04.02.16(AE)
S & D Division, Stadium1 1-01217 01.01.65 Mr. Ashok Kumar Chowdhury
Rangamati, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN S & D, Stadium, PDB,Chittagong.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 2) PSCDP training program on"Instrumentation & Controlsystem of Steam TurbinePower Plant" from 26.08.13 to06.09.13 3) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 . 4) Training against Hil TractsProject A60from 12.03.15 to28.03.15 .
NewZealand
Vietnam.
Singapore
1)Power Transformer From12.07.04 for 07 Days In China, 2) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project fromJanuary/11 for 07(Seven) days inChina.
1)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 foro One Month 2) "Orientation &Manufacture's Test Prosses atManufacture's Workshop"from 21.04.08 to 30.04.08 for 10days.
China,
CzechRepublic
1) Witnessing of manufacturingprocess against shikalbaha 150MW P/S from 18.11.15 to 24.11.15in China.
1) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from October/10 for 10days in China. 2) "Pre-Paid e-metering SystemSoftware Development" from09.01.2012 to 19.01.2012 for 10(Ten) days (excluding traveltime) in China. 3) Quality test witness of 11 KVdisk insulator against Chitt.Zone power dist. system dev.project from 15.01.16 to 21.01.16in India & China.
1) Design,Installation,Testing,Operation & Maintenance on CT, PT,CTV, Against G/Ctg. FromAug./04 for 10 days. 2) Training on Design, Supply,Installation, Testing andCommissioning of 1000KWCapacity Wind Mill PowerPlant (WBHPP) on turnkeybasis at Kutubdia Island,cox's Bazar ``TechnicalOrientation and Quality TestWitness from 18.12.07 to31.12.07 for 14 days.
China,
China,
1) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117for 7 days Dec/2015 in India &China.
O & M Circle, Chittagong (West)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0620 10.03.61 Mr. Prabir Kumar Sen, Chittagong, B.Sc.Engr.(Elec.),
'Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) daysfrom 30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years)
China 1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program named of 11KVCapacitor Bank on April/2011 for07(Seven) days in India. 2) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117for 7 days Dec/2015 in China.
1) Purchasing Double tariff non-programmable energy meterfrom 30.10.12 to 09.11.12 inIndia. 2) Basic design Approvalmeeting from 21.07.15 to 04.08.15in China.
4 1-02022 02.11.82 Mr. Sayed Amir Hossain Rajshahi B.Sc. Engg. (Elect.) 16-10-11 (AE)
1) Training on GraterChittagong Power DistributionProject Against 33KV CapacitorBank for 29.05.07 to 09.06.07for 10 days 2) Administration ofEnvironmental and socialconsideration process forimplementation from 18.05.08to 31.05.08 for 15 days
China 1) Technical orientation &quality test witness on 10 Nos.-10/13.33 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China. 2) international trainingprogram on Solar EnergyTechnology & Applications from10.11.14 to 28.11.14 in India.
A proposal sent toministry onOct/2015 for"FactoryAcceptance Test "of insulatoragainst Chitt. Dist.Project from08.11.15 to 14.11.15in China
S & D Division,Numuring1 11-0222 07.01.58 Mr. Md. Akkach Ali
Kishorgonj, Diploma(Power)
19.06.80.(SAE),
17.09.09(AE) 25.06.15 (SDE)
XEN, Incharge S & D Division,Numuring
S & D Division, Pahartali1 1-01724 01.10.80 Mr.A.S.M. Mizanur Rahman
1) Training on "ThermalPower Engineering Course"for Gas Turbine and CoalFired steam turbine from12.05.09 to 05.07.09 2) Chandpur 150 MW CCPPProject aganist Operation GBCUnit Including Gas FillingMetering Unit etc. GBC ChiefOperator from 30.05.2011 to12.08.2011 for 75 days (Bond for 5 years)
Japan
France &China
S & D Division, Halishahar1 1-01207 18.07.67 Mr.Bireswar Shaha
1) Training on Tower Design &Transmission Line Design &Installation, Testing &Maint.for 06 Weeks in July/06.
China. 1) Engine & Generator TestWitness against Thohazari100MW Power StationConstruction Project PDB, Chittagong fromNovember/10 for 10 days in Italy& Finland.
2 Ismail Hossain AE
1) Quality test witness of 11 KVdisk insulator against Chitt.Zone power dist. system dev.project from 15.01.16 to 21.01.16in India & China.
O & M Circle, Rangamati
Page 15
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0778 13.09.61 Mr. Md. Motiur Rahman, Kustia, B.Sc.Engr.(Mech.),
1)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 for ThreeMonth (Bond for 03 Years) 2) Technology TransferTraining from 07.07.15 to13.07.15
China,
India
1)Preshipment Inspection onTwist Type Wire Seal From15.8.02 to 20.8.02 in USA. 2) Inspection on 01.09.03 to10.09.03 in Germany. 3) witnessing of manufacturingprocess against Shajibazar 330mw Project Feb/2016 in China.
Distribution Division, Rangamati1 1-01779 20.12.83 Mr.Sabuj Kanti Mojumder
XEN, Incharge Distribution Division,PDB, Rangamati.
1) Gopalganj 100 MW PeakingPower Plant ConstructionProject on a Training programtitled ''Operation &Maintenance Training onEngine Generation Unit (HFOfired) at manufacturers'factory” from 12/09/2011 to11/10/2011 for 30 (thirty) days. (Bond for 5 years)
Norway 1) Inspection against Faridpur50MW Peaking Power PlantConstruction Project from08.02.11 to 16.02.11 for 07 days inGermany. 2) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117for 7 days Oct/2015 in China.
A proposal sent toministry onOct/2015 for"FactoryAcceptance Test "of insulatoragainst Chitt. Dist.Project from08.11.15 to 14.11.15in China
SDE, Incharge Distribution Division,PDB, Rangamati.
1)Training agains Chit. HillTracts for 7 days /2015
India A proposal sent toministry dated21.04.16 forTraining ofTechnologytransfer againstChitt. Hill tracksproject from20.05.16 to 26.05.16in India.
Distribution Division, Khagrasari
Page 16
1 1-01128 14.06.60 Mr. Md. Abu Jafar, Chittagong, B.Sc.Engr.(Mech.),
19.07.84(AE) 27.04.04 (SDE) 31.10.13 (XEN)
XEN Distribution Division,Khagrasari
1) Central Zone PowerDistribution Project, a "TechnicalOrientation and Quality TestWitness" Program named of11KV Capacitor Bank inApril/2011 for 07(Seven) days inChina. 2) Technical Orientation andQuality Test witness of 03 Nos.-33/11 KV, 16/20 MVA PowerTransformer from 20.12.2013 to26.12.13 in China.
A proposal sent toministry dated12.07.15 forManufacturerFactory TestWitness &Inspection againstShahjibazar 330MW CCPP projectfrom 25.07.15 to31.07.15 inGermany.
XEN (Incharge) Distribution Division,PDB, Bandarban.
1) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSept/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand. 2) Factory Acceptance Test from28.06.14 to 04.07.14 in Bangalore,India.
Addl. CE (Incharge) Distribution CentralZone, Mymensingh
1)Combined Cycle PowerStation Operation &Maintenance in August/98 for03 Month
Japan 1)Witness of Transformer TestFrom 25.07.04 for 11 Days InChina. 2) Inspection against CentralZone Distribution Project,Mymensingh from 12.05.2012 to21.05.2012 for 7 days in India. 3) Witness of factory test of 33 &11 KV POwer Cable from 15.04.14to 21.04.14 in China.
Asst. CE (XEN) Distribution CentralZone, PDB, Mymensingh.
1) Techinal Oritentation onPerformed Termination fordifferent size of Conductors. 07 Days, January/06 India. 2) Inspection against CentralZone Distribution Project,Mymensingh from 12.05.2012 to21.05.2012 for 7 days in India 3) Manufacturer Factory TestWitness & Inspection againstShahjibazar 330 MW CCPP projectfrom 25.07.15 to 31.07.15 inGermany. .
(O & M Circle, Mymensingh)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0684 12.01.60 Mr. Shahadat Hossain KhanEusufzai, Mymensing, B.Sc.Engr.(Mech.),
SE O & M Circle, PDB,Mymensingh. & PD (Addl. Charge) Shirajganj 300-400 MWPower PlantConstruction Project
1) 7 transmission Project inFrance for 06 weeks,1994 2) Purchasing Double tariff non-programmable energy meterfrom 30.10.12 to 09.11.12 inIndia. 3) Witnessing of manufacturingprocess against Chandpur 150MW CCPP from 21.04.15 to27.04.15 in China.
Sales & Distribution Division-1 (North), Mymensingh
Page 18
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-01319 14.08.73 Mr. A.K.M. Jasim Uddin, Shariatpur, B.Sc.Engr.(Mech.),
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical Orientation andQuality Test Witness against 05-set Oil Centrifuging Machine &08 Nos. Current Injection setform January/11 for 07 days inChina & Malyasia. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam. 3) Visit of distributiontransformer burnt out protectionsystem from 12.07.14 to 22.07.14in Malaysia. 4)Tehnical orientation & Qualitytest witness from 26.09.15 to01.10.15 in China.
2 11-0231 02.03.58 Mr. A.S.M Abdul Awal Mymensingh Diploma (Elect.) 27.06.80 (SAE) 04.11.13 (AE)
AE S & D-2, PDB,Mymensingh.
Page 19
3 1-01844 04.07.86 Mr. Md. Abul Kalam Azad Gazipur B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01672244741 [email protected]
SDE, Incharge S & D-2, PDB,Mymensingh.
Training on Operation &Maintenance from 01.05.16 to15.05.16
India 1) Technical orientation &quality test witness on 10 Nos.-10/13.33 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China.
4 Mr. Biplab Kumar Gosshami
B.Sc. Engg. 25.06.15 (AE)
AE S & D-2, PDB,Mymensingh.
S & D Division, Gafargaon, Mymensingh.1 1-01463 12.12.72 Mr. Abu Zahid Mohammad
XEN (Incharge) S & D Division,Gafargaon,Mymensingh.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical orientation &quality test witness Bheramarapower station Jan/2016 in India.
1) Training on Battery &Battery Charger fromSeptember/06 for 07 days 2) Training on ElectricitySector Advisor TQM Promotionfrom 17.02.07 to 03.03.07 for 15days 3) Training on InnovativeTechnologies inTransmission & Distributionsystems, central Institute forrural Electrification/ Indiafrom 19.10.2009 to 11.12.2009
India
Japan
India
Bhaluka Electric Supply, Mymensingh1 11-0367 01.01.62 Mr.Md.Shaha Alam Sekh
1) Factory Training for PowerTransformer and ControlProtection Panel From03.09.01 to 23.11.01 2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 3)Training on Operation &Maintenance from 01.05.16 to15.06.16
South Korea,
NewZealand
India
2 1-02092 Mr. Sumon Kumar Kundu Norail B.Sc.Engr.(Elect.) 13.04.14 (AE)
Operation & Maintenance ofMARK Vie DCS from 01.07.13 to10.07.13 in USA.
Sales & Distribution Division, Sherpur
Page 22
1 1-01419 01.12.70 Mr. Indrajit Debnath, Kishorgonj, B.Sc.Engr.(Mech.),
05.03.2000(AE) 08.12.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN)
XEN Sales & DistributionDivision, PDB, Sherpur.
1) Acceptance for the projecton StrengtheningManagement andPerformance Standards inPower Sector of Bangladeshthrough promotion of TQM (J-08-22662) from 22.02.09 to07.03.09 for 14 days. 2) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13
i) Training against GreaterChittagong Power DistributionProject on 33KV CapacitorBank & 33KV Gas InsulatorSwitchgear against FactoryTest Witness & Orientation ofGas Insulated Switchgearfrom 25.08.07 for 10 (days)
Germany 1) "Witness of factory test of sub-station gantry & hardware" from10.05.14 to 16.05.14 in India. 2) Witnessing of manufacturingprocess against Barapukuria P/Sfrom 20.05.15 to 28.05.15 inChina.
A proposal sent toministry dated10.05.16 forConstructiondrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
2 1-01420 05.06.74 Mr. Mohammad AnowarulIslam, Tangail, B.Sc.Engr.(Metallurgi.),
XEN (In charge), Sales and DistributionDiv., Bhuapur, PDB,Tangai
Factory Training againstBaghabari 50MW PeakingPower Plant ConstructionProject '' from 30.05.2011 to30.06.2011 for 30(Thirty) days(Bond for 5 years)
China 1) "Training for Technical Know-How & Technology Transfer"against Supply of Self CleaningAir Filter from 19.12.08 to24.12.08 for 05 days in Malaysia.
2) “Witnessing ofmanufacturing process & testsof the equipment atmanufacturer's works includingtransfer of technical know-howon Blade Kit, Turbine RotorStage-3 with Hardware kits GesShroud Assembly of TurbineNozzle Stage-3 with hard warekits Complete Set” from 10.01.11to 17.01.11 in USA. 4) Basic Engineering ReviewMeeting against BHOLA 225 mwccpp Project from 16 - 27August/2013 in China. (Departfrom China due to misconductactivity)
2 11-0218 30.08.57 Mr. Jibon Kishnu Debonath Mymensingh, Diploma(Mech.)
19.06.80.(SAE),
17.09.09(AE) 25.06.15 (SDE)
XEN (In charge), Sales and DistributionDiv., Bhuapur, PDB,Tangai
3 Mr. Sajjadul Islam Rana B.Sc. Engg. 25.06.15(AE)
AE Sales and DistributionDiv., Bhuapur, PDB,Tangai
Sales and Distribution Div., Ghatail, PDB, Tangail.
Page 25
1 1-01204 30.12.69 Mr. Shuresh Chandra Pal, Gajipur, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN Sales and DistributionDiv., Ghatail, PDB,Tangail.
1) Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari 50MWPeaking Power ConstructionProject from 09.08.10 to 18.08.10for 10 days in China. 2) Material witness Inspection(Engine and Generator) againstBagabari 50MW Peaking PowerPlant for 07 days in Finland. 3) international trainingprogram on Solar EnergyTechnology & Applications from10.11.14 to 28.11.14 in India.
S & D Division, Sakhipur, PDB, Tangail.1 1-01385 23.11.69 Mr. Md. Shahdat Ali,
1) Training on StrengtheningManagement andPerformance Standard inPower Sector throughpromotion of TQM (PI Solving)from 23.02.08 to 09.03.08 for 16days(by JICA).
Japan 1) "Technical Orientation &Quality Test Witness" of 150 KmGuy-Wire from 08.05.13 to14.05.13 in China.
1) On Job Training onInstallation of V.H.F.Equipment From 03.07.03 for01 Month 2) Training on Gater1132/33KV Sub-Station PowerTransformer, 33KV 11KV GasInsulated Switchgear, 33/11KVSub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33KV GasInsulated Switchgear'' from10.07.07 to 24.08.07 for 42days. 3) “Factory Training" aganistDohazari 100 MW PeakingPower Plant ConstructionProject for 30 (Thirty) daysfrom15.06.2011 to 14.07.2011. (Bond for 5 years)
Newzeland
China
China
A proposal sent toministry dated04.05.16 for Factoryacceptance test ofenergy meter from20.05.16 to 25.05.16in India.
Central Store, Tongi1 1-02080 10.07.85 Moushumi Begam,
PabnaB.Sc. Engg. (Elect.) 17.12.13
AE
Central Store
PDB, Tongi, Gazipur.
Page 27
2 1-0967 21.02.60 Mr. M. M. Siddique,Rajbari,AMIE(Elec.),29.9.88(SAE) 02.03.93(AE) 12.07.02(SDE) 21.07.11 (XEN)
XEN
ZRS,
PDB, Tongi, Gazipur.
1) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Against ChittagongPower Distribution Project''Design & Maintenance ofPower Transformer'' 10.07.07to 24.08.07 for 42 days.
China 1)Practical Demonstration(PPRP) From 25.07.04 to 7 Days InChina, 2) Training for Technical know-how and Technology Transfer of1.00 Lac Liter Transformer Oilfrom October./09 for 07 days inIndia. 3) Step-up TransformersInspection against Bera 70MWPeaking Power PlantConstruction Project (Materialswitness Inspection) fromOctober/10 for 07 days in SouthKorea. 4) To purchase Two Color Offsetmachine from 07.10.12 to14.10.12 in Germany. 5) "Technical Orientation &Quality test witness" of 11 KVSingle Phase PotentialTransformer from 01.10.13 to07.10.13 in China. 6) Witnessing of manufacturingagainst Shahjibazar PowerStation from 15.04.15 to 21.04.15in Netherlands 7) Witnessing of manufacturingagainst Shahjibazar PowerStation from 15.04.15 to 21.04.15in USA
Page 28
Distribution northern zone, PDB, Rajshahi.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
Addl. CE , Incharge Distribution northernzone, PDB, Rajshahi.
1) 132/33KV,SF-6 Breaker from01.04.2000 to 14.05.2000 for 45days
2)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004for 35 days
3) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33/33KV Sub-Station'' from 10.07.07 to24.08.07 for 45 days
India,
Japan,
China
1) "Technical Orientation &Quality Test Witness" of 150 KmGuy-Wire from 08.05.13 to14.05.13 in China.
A proposal sent toministry dated04.05.2015 againstShikalbaha 225MW Dual FuelCCPP Project from25.05.15 to 31.05.15in Germany.
Astt. CE office of the CE,Distribution northernzone, PDB, Rajshahi.
1) Training for Technical Know-how & Technology Transfer from29.06.06 to 06.06.06 in India. 2) Inspection against ChittagongPC Pole Construction Plant from16.04.2012 to 26.04.2012 in China.
3 1-01428 10.11.71 Mr. Md. Rafiqul Islam, Rajshahi, B.Sc.Engr.(Elec.),
Astt. CE Attach to CE,Distribution northernzone, PDB, Rajshahi.
1) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13
Thailand 1) 132KV Current Transformer &Voltage Transformer againstDawadkandi 50MW PeakingPower Plant from October/10 for07 days in China. 2) "Technical orientation &Quality test witness " from01.10.13 to 07.10.13 in China.
SDE (incharge) CE Office, Distributionnorthern zone, PDB,Rajshahi.
(O & M Circle, Rajshahi)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0855 08.01.64 Mr. Mohammad AbdurRashid, Natore,B.Sc.Engr.(Elec.)13.12.88(AE) 21.11.99(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
SE (Incharge) O & M Circle-1, PDB,Rajshahi.
1)Shahijebazar 60MW GasTurbine P/St.Operation andMaintenance. From 18.04.97to 29.04.97 2) Gas Turbine P/St.Operationand Maintenance. From10.04.00 to 09.04.00, 01(Month) 3) Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 to 07.08.04 (Bond for03 Years from 01.07.04 to 14days)
WestGermany
France
China
1) "Technical orientation andquality test witness" against400V, 3X10(60)Amps Three Phase4-Wire, D-Element, Outdoor TypeDouble Tariff ElectronicConsumer Energy Meter fromOctober/10 for 10 days in China. 2) Factory test witness of 3phase x-former againstChapainawabganj Power plantcons. Project from 23.04.16 to01.05.16 in China.
1)Operation andMaintenance of GTPS. From06.05.90 to 30.06.90 for08(Weeks)2)Training on Baghabari100MW P/St. From 17.09.01 to15.12.01 for 03 Months 3) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26days. 4) Training on Power StationRehbilatation Projec (Phase-2) Bheramara Gas TurbinePower Station Rehbilatation''Lube Oil Cooler, AVR, FireFighting System '' for 07 days.
France,
India
Bahrain
China.
1) "Practical Demonstration toImport Technical know how"against PPRP on Gas Turbine in2006 for 07 days in America 2) Witnessing of manufacturingprocess against ChittagongPower Station from 02.10.15 to08.10.15 in China.
S & D Division-1, Rajshahi1 1-01804 18.06.84 Mr. Md. Modasser Hossain
1) "Technical Orientation &Quality Test Witness" from15.08.13 to 22.08.13 in China &South Korea.
2 11-0451 17.12.59 Mr. Md. Abdul Hannan Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE S & D-1, PDB, Rajshahi.
3 11-0459 16.11.62 Mr. Md. Abul HossainMondol Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE S & D-1, PDB, Rajshahi.
Page 31
S & D Division-2, Rajshahi1 1-01184 21.03.70 Mr. Md. Moklesur Rahman,
Rajshahi, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE) . 31.07.12 (XEN)
XEN Sales & DistributionDivision-2 PDB, Rajshahi.
11/10/1999 To 20/10/199910(Ten) Daya On ProcessControl Operation andManagement(PCOM)
China 1) "Technical Orientation &Quality Test Witness" from15.08.13 to 22.08.13 in China &South Korea. 2) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
S & D Division-3, Rajshahi1 1-01403 16.04.73 Mrs. Sherin Yasmin,
1)Factory Test witness,Orientation & TechnicalTraining on 11 KV Singlephase Potential Transformerand 11KV Single phasecurrent transformer from25.07.04 to 29.07.04
China, 1) "Quality acceptance Test" of11 KV LA, 33 KV LA from 01.05.13to 07.05.13 in India.
Page 32
2 11-0267 11.10.55 Mr. A. H.M Maynul Kabir Jypurhat, Diploma (Power.)
1) Katakhalir 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12
China 1) Technical know-how andTechnology Transfer on 1.00 LacLiter Transformer Oil againstfrom Sept./09 for 07 days inIndia. 2) Inspection of 11 KV switchgearagainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inMarch/2012 for 7 days (excludingtravel time) in China.
1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program for 11KV DropOut Fuse Link, 11KV LightningArrester, 200 Amps MCCB, 100Amps MCCB & Transformer Oil atJune/2011 for 07 days in China.
Chapainawabganj Electric Supply1 1-01020 08.09.66 Mr. Md. Zakir Hossain,
RE (XEN), Chapainababgonj E/S,PDB, Chapainababgonj
1) Training On Operation &Maintenance of 100 MW GTUnit, Baghabari,Sirajgonj.From 16.10.01 To13.12.01(3 Month) 2) 'Wind Turbine Technology& Applications from 22.02.06to 03.03.06 for 12 days
India
India
Pre-Shipment Inspection. From15.06.97 to 29.06.97 in Germany.
1) Shantahar 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12 for1 month
China 1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China 2) "Engine Inspection" againstSantahar 50 MW and Katakhali50 MW Peaking Power PlantConstruction Project at July/2011for 07 days in Germany.
Page 34
Sales & Distribution Division, Natore1 1-01673 27.09.77 Mr.Md.Mahbubul Alam
1) Central Zone PowerDistribution Project, a "TechnicalOrientation and Quality TestWitness" Program named of11KV Capacitor Bank atApril/2011 for 07(Seven) days inChina.
3 11-0458 02.11.59 Mr. Md. Abdul Auwal Natore Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE, Natore Electric Supply, PDB, Natore.
(O & M Circle, Bogra)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0791 23.02.58 Mr. Md. Abul Hossain,Khustia,B.Sc.Engr.(Elec.),
30.08.86(AE) 21.11.99 (SDE) 17.09.09 (XEN)
SE (Incharge) O & M Circle, PDB, Bogra
1) Orientation & TechnicalTraining on PowerTransformer from 14.03.05 for07 days. 2) Orientation & TechnicalTraining on 33 KV XLPE Cables13.03.2005 for 07 days.
India
India.
1) Inspectionagainst Sikalbahapower Station on ''Witnessingof Manufacturing Process andTest of the equipment atmanufacture's works includingTransfer of Technical-KnowHow” in August/2011 for 07(Seven) days from the date ofactual journey(Excluding traveltime) in Czech Republic.
Page 35
S & D Division-1, Bogra1 1-01439 01.11.74 Mr. Dewan Md. Abu Hena
1) Training on Single Phase &Three Phase Pre-paymentMeters From 08.11.07 to15.11.07 for 07 days.
South Africa. 1) "Technical Orientation &Quality Test Witness" on 05 Nos.20/26 MVA 33/11 KV PowerTransformer from 20.12.2013 to26.12.13 in China. 2) Factory test witness of 3phase x-former againstChapainawabganj Power plantcons. Project from 23.04.16 to01.05.16 in China.
S & D Division-2, Bogra.1 1-01185 21.11.66 Mr. Md. Tofazzal Hossain
Pramanik, Bogra, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE) . 31.10.13 (XEN)
XEN Sales & DistributionDivision-2 PDB, Bogra.
1) Orientation & TechnicalTraining on Currency TransferSystem From 14.03.05 for 7 daysin India & Malaysia. 2) Inspection against CentralZone Power Distribution Project,Mymensingh from 06.06.12 to12.06.12 in UK. 3) Witness of factory test ofconductor (Pkg-18) from 20.04.14to 26.04.14 in China.
1) 11 KV Metering CT. From 24.01.05 to 30.01.05 for07days in China. 2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
China.
NewZealand
1) Workshop test Witness ofstep-up X-former againstGhorasal 365 MW CCPP projectfrom 13.04.16 to 22.04.16 inChina.
Sales & Distribution Division, Sherpur 1 1-01261 11.03.70 Mr. Shaikh Firoj Kabir
1) PSCDP Training program on"Performance Management(Batch-1) " from 26.08.13 to06.09.13
Thailand 1)Orientation & Training againstturbine pump spares for Khulnapower station in Czech Republicfor 07 days,Dec/06 2) Inspection against CentralZone Power Distribution Project,Mymensingh from 14.06.2012 to24.06.2012 for 7 daysin China 3) witnessing of manufacturingprocess from 30.01.15 to 06.02.15in France.
Sales & Distribution Division, Dupchachia, PDB, Bogra1 1-01695 01.03.81 Mr.Md. Jahangir Alam
1)Training against Daudkandi(Titas)50MW Peaking PowerPlant Construction Project for30(Thirty) days from30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years) 2) Training against Chitg."Jan/2016 in China for 7 days
China 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina. 2) "Technical Orientation &Quality Test Witness for Meter &Meter Enclosure"Aug/2015 inChina for 7 days pur -170
Sales & Distribution Division, PDB, Santahar1 11-0261 11.08.59 Mr. Md. Zillur Rahman
RE, XEN (Incharge) Jaypurhat ElectricSupply PDB, Bogra.
1) "Pre-shipment Inspection" ofCoal Pulverizer HP 703 Bowl Millagainst from 16.09.09 to 21.09.09for 07 days in China. 2) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MW CCPPproject from 20.10.15 to 29.10.15in China.
ZRS, Bogra.1 1-01197 30.10.70 Mr. Md. Mizanur Rahman,
Naoga, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN , ZRS, PDB, Bogra..
1) Safe, Reliable & efficientOperation and maintenanceof I & C System, ProtectionCircuits/Loops, Test adjustand setting of I & Cequipment system from21.03.2004 for 06 Months.(Bond for 03 Years)
China 1) “Witnessing of ManufacturingProcess and Tests of theEquipment at Manufacturer'sworks including transfer ofTechnical Know-how” from30.08.10 to 05.09.10 for 07 days inChina. 2) “Witnessing of ManufacturingProcess and Tests of theEquipment at Manufacturer'sworks including transfer ofTechnical Know-how” againstBarapukuria Coal Fired PowerPlant in August/2011 for 03(three) days in China (excludingtravell time). 2)"Coal Power Genaration" from10.06.13 to 14.06.13 in Thailand.
2 11-0442 06.03.61 Mr. Md. Abdul Hannan Bagura Diploma (Civil) 03-1-84 (AE) 27-12-11 (AE)
AE ZRS, PDB, Bogra..
Page 38
S & D Division, PDB, Naogan 1 1-01275 31.12.68 Mr. Shankar Kumer Dev
1) Attending the CounterpartTraining Program of JICA inpower Sector from 28.11.12 to22.12.12. 2) Operation & Maintenanceof Distribution Substationtraining program from11.02.13 to 22.02.13 3) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13
Japan
Thailand
Thailand
1) Contract No.pur-163/6-project/lot-1/2010/304 Dt.27/10/2010 and Contract No.pur-163/6-project/lot-2/2010/305 Dt.27/10/2010 against DOFC withfuse link, 11 KV Lighting Arrester& 200 Amps MCCB, 100AmpsMCCB, 95 rm Copper Lug & 70 rmCopper Lug against Renovation& Augmentation of DistributionLines & 11/0.4 KV Sub-Stationunder 6(six) Distribution zonefrom December/10 for 07 (seven)days in China2) TechnicalOrientation & Quality TestWitness of 33/11 KV PowerTransformer from 01.02.2015 to07.02.2015 in China.
1)Power Transformerfrom 08.10.03 to 08.01.04 for 90days 2) Operation & Maintenanceof Protection System & RelayCoordination trainingprogram from 14.01.13 to25.01.13
China
Thailand
1) Power Plant Inspection July/10for 04 days in China.
S & D Division-1, Pabna1 1-01287 29.09.73 Mr. Ziaul Islam
Training On Factory Test onXLPE Concentric Copper Cablefrom January/06 for 03 days.
South Africa 1) Inspection of LightningArrester from 02.10.12 to 11.10.12in China. 2) Factory test witness of Pin for11 KV Pin Insulator & Fittings for33 KV Disc Insulator from26.06.14 to 30.06.14 in China.
2 1-01813 27.12.83 Mr. Md. Sana Ullah Pabna B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01712937996 [email protected]
SDE, Incharge S & D-1, PDB, Pabna.
G.O. issued dated12.07.15 forTechnicalOrientation &Quality testWitness from22.07.15 to 28.07.15in China.
S & D Division-2, Pabna1 1-01449 19.10.73 Mr. Mohammad Giasuddin,
1) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project from24.02.11 to 02.03.11 for 07(Seven)days in China. 2) "Milling System Performance& Combustion Optimization"against "NTPC Limited" from14.12.10 to 16.12.10 in India.
1) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from October/10 for 10days in China. 2) Technical orientation &Quality test witness of 11 KVswitchgear Cubicles Set from21.07.14 to 27.07.14 in China.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of DiscInsulator againstRajshahi zonepower dist. Dev.Project from15.05.16 to 21.05.16in India & China
Sales & Distribution Division, Ishwardi, PDB, Pabna1 1-01805 13.04.83 Mr. Md. Hasibur Rahman
CE (Addl. Charge) Distribution Zone, PDB,Comilla & SE O & M Circle, PDB,Comilla.
1) Sub-Station Orientation &Technical Training FromFebruary /01 3 Months. 2) Orientation & TechnicalTraining From August /05 for 7days. 3) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13 4) Technology TransferTraining against 10- townproject from 13.04.15 to19.04.15
China.
China.
Thailand
Germany
1) 33 KV. Pin Insulator, 33 KV.Disk Insulator & 33 KV.Suspension Disk Fitting fromJuly/05 8 days in China.
SDE, Incharge Office of CE ,Distribution Zone, PDB,Comilla
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
1)Training on Technical know-how in 400 Sets 11KV Load BreakSwitch from 28.09.06 to 05.10.06for 07 days in China. 2) Modernisation of PowerDestribution Sector from 15.12.09to 11.01.2010 in India.
2 1-01892 15.05.87 Mr. Pervaz Ahmed Tangail B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 0174-8777948 [email protected]
1) "Technical Orientation &Quality Test Witness" on 05 Nos.20/26 MVA 33/11 KV PowerTransformer from 20.12.2013 to26.12.13 in China. 2) Tarif energy Meter FactoryAcceptance Test from 15.09.14 to19.09.14 for 5 days in Singapore. 3) Energy meter testing andsealing program from 8-10March/2016 in India.
'Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) daysfrom 30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years)
China 1) Technical Orientation andQuality Test Witness for 07 daysin India (G.O. Issued dt.09.11.10).
A proposal sent toministry Ref. No.BPDB/Training/TF-3/2016/399 Date-31.03.2016 formanagementmeeting withmanufacturersrepresentativeand witnessing ofmanufacturingprocess againstBheramara PowerStation from24.06.16 to 30.06.16in USA.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical Orientation andQuality Test Witness (a)Hydraulic Hand Trolley (3-TonCapacity)-06 Nos & (b) Fork Lift (5-Ton Capacity)-04 Nos. for 07 daysin China
2 11-0179 31.12.58 Mr. Md. Syed Mannan Jamalpur, Diploma(Elec.)
1) “Technical Orientation andQuality test witness'' Supply ofTransformer Accessories (CopperCables)" against Central zonepower distribution Project, PDB,Mymensingh at May/2011 for 07(Seven) days from the date ofactual journey(Excluding traveltime) in China. 2) A proposal sent to ministry on04.08.2011 on DecentralizedDistributed Generation in India.
S & D Division, Chandpur1 1-01450 09.11.72 Mr. Abdul Fattah Md.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Training. 33KV Pin Insulator with Pin,33KV Disc Insulator, etc.September/05 for 07 days India& China.
O & M Circle, Noakhali
Page 47
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0851 31.12.62 Mr. Mohammad MofazzalHossain, Chandpur, B.Sc.Engr.(Elec.),
18.2.88(AE) 21.11.99(SDE) 11.10.10 (XEN)
SE, Incharge O & M Circle, Noakhali
1)Training on Megar test withthe required test Equipment18.10.01 to 18.11.01
2) "Foreign Training" onEnegry Meter from 15.10.09 to29.10.09 for 15 days.
UK
Singapore.
1)Training on 132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-Station& Control Panel & ProtectionEquipment Against ChittagongPower Distribution Project''Design & Maintenance ofControl Panel & ProtectionEquipment'' from 10.07.07 to24.08.07 to 45 days in China. 2) Technical orientation &quality test witness againstSCADA Project from 23.03.15 to31.03.15 in China.
S & D Division, Laxmipur 1 11-0202 31.12.57 Mr. Shiekh Md. Dildar
Islam Feni B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 21.01.14 (XEN, Incharge)
XEN (InCharge) Distribution Division,PDB, Feni.
1) "Step up Transformer" againstSylhet 150MW Combined CyclePower Station ConstructionProject from 15.01. 2011 to 22.01.2011 for 07(Seven) days in China.
SE O & M Circle, Sylhet & CE (Add. Charge) Distribution Zone, PDB,Sylhet
Training on 'PowerDistribution' throughpromotion of TQM from23.01.05 to 19.02.05 in Japan.
Japan 1)Pre-Payment Metaring from17.02.07 to 22.02.07 for 07 days inSouth Africa. 2) "Developments in RenewableEnergy Technologies" against"NTPC Limited" from 07.03.11 to09.03.11in India. 3) Witnessing of manufacturingprocess against Tongi PowerPlant from 22.10.14 to 28.10.14 inChina.
Page 50
Distribution Division, Sylhet1 1-01806 06.01.79 Mr. Engr. Shyamal Chandra
1) Supply of 11KV LightingArrester & 11KV DOFC theProgram titled “TechnicalOrientation and Quality TestWitness” for 07 (seven) days inChina at March/11
2 1-02017 15.08.88 Mr. Gias Ibne Alam Chittagong B.Sc. Engg. (Mech.) 16-10-11 (AE) 01813881455 [email protected]
AE, Sales & DistributionDivision-2 PDB, Sylhet.
3 1-02026 10.11.85 Mr. Nawaz Ahmed Khan Bagerhat B.Sc. Engg. (Elect.) 16-10-11 (AE) 01768974728 [email protected]
AE, Sales & DistributionDivision-2 PDB, Sylhet.
S & D Division-3, Sylhet1 1-01318 31.12.68 Mr. Ujwal Kumar Mohanta,
1) Training AutomationSystem from 22.10.07 to11.11.07 for 03(Weeks).
Russia Inspection of Emergency DieselGenerators against Santahar 50MW and Katakhali 50 MWPeaking Power PlantConstruction Project from13.03.12 to 20.03.12 for 7 days(excluding travel time) from thedate of actual journey in China.
A proposal sent toministry dated13.03.14 fortechnicalorientation &quality testwitness of Battery& battery Chargerfrom 30.04.14 to06.05.14 in India.
2 1-02081 22.08.90 Mr. Aniruddho Chakraborty Cox'sBazar B.Sc.Engr.(Elec.),
17.12.13(AE)
AE Sales & DistributionDivision-3 PDB, Sylhet.
Page 52
S & D Division-4, Sylhet1 11-0284 18.04.59 Mr. Md. Zinnath Ali
1) Inspection against CentralZone Distribution Project,Mymensingh from 12.05.2012 to21.05.2012 for 7 days in India. 2) Pre shipment inspectionagainst renewable based powerplant construction project athaor area from 09.03.14 to15.03.14 in China.
O & M Circle, MoulobhibazarSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
CE (Addl. Charge) Distribution Zone, PDB,Rangpur. & SE O & M Circle, PDB,Rangpur.
1)33 KV outdoor C.B &11 KVSwitchgear From 04.04.2000 to20.05.2000
2) Trouble shootingprograming energy meterfrom 21.08.04 to 10.09.04
3) "Supply and Installation ofPower System MeteringEquipment on Turnkey Basis"Section-6 from 02.01.09 to22.01.09 for 02(weeks)
India,
U.S.A
USA
1) FAT on Pre-Payment Metering.05 days in South Africa.Jan/07 2) Inspection June/08 for 06days in India. 3) Energy Meter on “TechnicalOrientation & Quality TestWitness” 16.11.09 for 10 days inSingapore. 4) See N.B.
4) N.B. 4) Inspection on Power Plant against IEL Consortium & Associates & Dutch Bangla Power Ltd. from 16.06.10 to 19.06.10 for 04 days in Finland. 5) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 6) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3-Element, Double Tariff Programmable Energy Meterfor from May/11 for 10 (Ten) days or from the date of actual journey (excluding journey time) in Singapore. 7) Inspection of Programmable AMR Meter from 30.09.2012 to 11.10.2012 in Switzerland. 8) "Technical Orientation & Quality Test Witness for Meter & Meter Enclosure" from 16.03.14 to 25.03.14 in China. 9) Witnessing of manufacturing process against Barishal gas Turbine Power Plant from 01.02.15 to 15.02.15in USA. 10) Factory Test Witness of Gas Turbine against Shahjibazar 330 MW CCPP Project from 08.12.14 to 17.12.14 in Austria. 11)Construction Drawing Review Meeting against Barapukuria 275 MW Coal Based Power Plant from 15.01.16 to 21.01.16 in China. 12)Basic design engineering review meeting against Bibiana-3 CCPP project from 27.01.16 to 05.02.16 in India.
2 Mr. Abu Md. Majedul BariBhuiyan
AE Distribution Zone, PDB,Rangpur.
Page 56
O & M Circle, RangpurSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1) Inspection against CentralZone Power Distribution Project,Mymensingh to inpect 33 KV XLPECable from 19.02.13 to 27.02.13 inIndia. 2) Quality acceptance testagainst Chittagong Hill TrackElectrification Project from07.04.15 to 13.04.15 in SouthKorea & China.
S & D Division, Lalmonirhat1 1-01712 12.09.79 Mr.Md.Hasnath Zaman
1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina. 2) Quality Test witness from 21-27 feb/2016 in China .
2 11-0336 11.11.57 Mr.S. M. Masudul Alam Lalmonirhat, B.Sc.Eng(Elec.) 09.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE (Incharge) S & D Division,Lalmonirhat
Page 57
Sales & Distribution Division,Nilphamari1 1-01784 01.01.84 Mr. Md. Abu Sayed Sarkar
1) “Technical Orientation andQuality test witness'' Supply ofTransformer Accessories (CopperCables)" against Central zonepower distribution Project, PDB,Mymensingh in June/2011 for 07(Seven) days from the date ofactual journey(Excluding traveltime) in China. 2) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
2 1-01416 11.09.68 Mr. Md. Rezaul Karim, Nator, B.Sc.Engr.(Mech.),
1) Training on Rehabilitationof GT of Shahijibazar PowerStation from 29.11.07 to 05.12.07 for 07 Days 2) Training on Shikhalbaha 60MW Generator ExcitationSystem "Demonstration onEquipment and Spares toimpart Technical Know-how"from 04.01.08 to 10.01.08, 07days. 3) 'Factory Training" againstSylhet 150 MW CombinedCycle Power PlantConstruction Project, BPDBfrom 10.07.2011 to 09.08.2011for 30 (thirty) days (Excludingtravel time).
Abu Dhabi.
CzechRepublic
China
1) Materials witness Inspectionagainst “Generator & ExciterInspection from October/10 for07 days in South Korea.
1) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSept/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand. 2) Factory Acceptance Test from28.06.14 to 04.07.14 in Bangalore,India.
Training on InnovativeTechnologies inTransmission & Distributionsystems, central Institute forrural Electrification/ Indiafrom 19.10.2009 to 11.12.2009
India 1) Technical Orientation andQuality test witness of GasFilling Instrument from 11.02.07to 13.02.07 for 03 Days in China. 2) Materials witness Inspectionagainst “Generator & ExciterInspection from October/10 for07 days in South Koria. 3) Material Witness Inspectionon 11 KV Switchgear againstBaghabari 50 MW Peaking PowerPlant Construction Project from14.12.10 to 23.12.10 in Germany. 4) Technical orientation &quality test witness of 11 KVLightning Arrester from 21.06.14to 27.06.14 in China.
Distribution Division, Kurigram,1 1-01642 29.09.75 Mr.Md.Ashraful Islam
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, Operation Division)from August/10 for 15 days
China
Page 62
O & M Circle, DinajpurSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0784 01.10.62 Mr. Md. Shahadat HossainSarker, Rangpur, B.Sc.Engr.(Mech.),
1) Pre-shipment Inspectionagainst 33KV ACSR Grossbeak-452.40Km & 33KV ACSR Merlin-346.80Km. And 33KV ACSR DOGConductor-2675.60Km form05.01.09 to 14.01.09 for 10 days inChina. 2) the Government of thepeople's republic of Bangladeshin respect of the composition ofBangladesh aganist PowerPlants and machnieries ofRental Power Company UnitedEnterprises & Co. Ltd formaximum 04 (four) days(excluding Journey period) From09.12.10 or from the starting dateof journey in Germany. 3) Inspection on PlantEquipment from 11.1.11 to18.1.11 in Germany. 3) Technical orientation &Quality test witness from30.03.14 to 05.04.14 in Germany. 4) Technology Transfer Trainingagainst 10- town project from01.04.15 to 14.04.15 in India.
Dinajpur Electric Supply1 11-0391 08.09.57 Mr. Md. Mahbubul Alam
Newzealand 1) Factory test witness ofdifferent type of insulator withfittings from 10.05.14 to 16.05.14in china. 2)1) Factory test against chit.Power dis project Oct/2016 inchina.
Sales & Distribution Division, PDB, Panchagar.1 1-01222 20.04.66 Mr. Md. Ahsanul Kabir,
1) Training on 33/11KV 2x10MVA sub station from 19.03.06to 30.03.06 for 08 Days.
Thiland. 1) “Alternator Inspection”against Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inJuly/2011 for 07 days inSouthKorea. 2) "Technical Orientation andQuality Test Witness" on 100Nos. Hydraulic Wire Cutter & 100Nos. Hydraulic Compressor from
07.12.2013 to 15.12.2013 in China 3) Quality test witness againstChitt. zone power dist. dev.project from 18-24 March/2016 inIndia & China2 11-0435 31.01.62 Mr. A.K.M Mohiuddin
XEN (Incharge) S & D Division-1,Dinajpur, PDB, Dinajpur
1) "Generator Circuit BreakerInspection" for Sylhet 150MWCombined Cycle Power PlantConstruction Project from04.02.11 to 11.02.11 for07(Seven) days in Switzerland 2) Factory acceptance test of 11KV pin insulator against Chitt.Zone power dist. System dev.Project from 08.11.15 to 14.11.15in India & China.
S & D Division-2, Dinajpur
Page 64
1 1-01800 01.01.81 Mr. Ahsan Mahmud Elahy Netrokhona B.Sc.Engr(Elec.) 31.05.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN (Incharge) S & D Division-2,Dinajpur, PDB, Dinajpur
1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program named of 11KVCapacitor Bank in May/2011 for07(Seven) days in India.
2 1-01434 27.07.72 Mr. Md. Shafiqul Islam, Kishorgonj, B.Sc.Engr.(Elec.),
XEN (Incharge) S & D Division-2,Dinajpur, PDB, Dinajpur
1) Technology TransferTraining against 10- townproject from 01.04.15 to14.04.15
India 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina.
(CE, Distribution Project)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0397 01.01.58 Mr. Abu Musa Masud AlFaruque, Nowgaon,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 08.02.11 (SE) 15.12.14 (Addl. CE) 26.05.15 (CE)
CE Distribution Project,PDB, Dhaka.
I) Electric Power Engineering18.08.86 to 30.06.87
Norway (Post
Graduate)
04.10.02 to 10.10.02 In Indonesia,
2) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project fromJanuary/11 for 07(Seven) days inChina. 3) "Technical Orientation &Quality Test Witness" onPortable Meter Testing Set from25.05.13 to 31.05.13 in Bulgeria. 4) Factory test witness againstShahjibazar 330 MW project from25.08.15 to 31.08.15 in France.
2 1-0627 12.11.60 Mr. A.B.M. Anowarul Azim, Dinajpur, B.Sc.Engr.(Civil.),
26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN)
Asstt. CE (XEN) Distribution Project,PDB, Dhaka.
1)Hydro Power and theEnviournment From26.8.02to12.9.02
Norway 1)Training on 60 Nos.-11KV AutoCerceuit Recloser (ACR) in SouthKorea in 2006 for 07 Days.
On Lien
Central Zone Power Distribution Project, Mymensingh/Sylhet
Page 65
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
SE (PD), Central Zone PowerDistribution Project,PDB, Mymensingh.
1) Training on 33/11KV CircuitBreaker (9 Town) 07days, 2006 inIndia. 2) Inspection on SubstationEquipment & Mateerial againstCentral Zone Power DistributionProject, Mymensingh to from16.07.13 to 22.07.13 in Germany. 3) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland.
2 1-01722 12.04.77 Mr.Md.Rabiul Hasan Takurgaon B.Sc.Eng(Elec) 07.06.2006(AE) 16.06.14 (SDE)
XEN (Incharge) Office of PD, CentralZone DistributionProject PDB,Dhaka.
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, Operation Division)from August/10 for 15 days 2) Operation & maintenanceof gas turbine from 30.09.13 to11.10.13
China
Thailand
3 1-01360 05.07.72 Mr. Abul Bashar Md. FarukHossain, Narsingdi, B.Sc.Engr.(Elec.),
XEN Central Zone powerDistribution ProjectDivision, PDB,Mymensingh.
1) Training Course in "TheImprovement for ElectricPower Distribution Grid" byJICA, Japan throughpromotion of TQM (PI Solving)from 21.08.07 to 29.09.07 for 40Days,
Japan 1) 11KV Switchgear againstDudkhandi 50MW Peaking PowerPlant Construction ProjectNovember/10 for 07 days inGermany. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.
Page 66
4 1-01400 02.04.73 Mr. Md. Sana Ullaha, Naugaon, B.Sc.Engr.(Elec.),
XEN (Incharge), Central Zone powerDistribution ProjectDivision-2, PDB, Sylhet.
1) Training on "Improvementfor Electric Power DistributionGrid" from 01.09.09 to 10.10.09
2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
Japan
NewZealand
1) Training on ConsultancyServices for Grid System Study toIdentify Reactive Powerrequirement from 02.11.04 for 07days in Canada. 2)Witness of factory test of 33 &11 KV POwer Cable from 15.04.14to 21.04.14 in China.
5 1-01426 27.01.71 Mr. Chowdhury Md. AbuObayed, Shunamgonj, B.Sc.Engr.(Metallurgi.),
XEN Central ZoneDistribution Project-3 PDB,Sylhet.
1) Training on Operation &Maintenance from 01.05.16 to15.06.16
India 1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program named of 11KVCapacitor Bank in May/2011 for07(Seven) days in India.
6 11-0279 30.10.57 Mr. Md. Abul Kalam Jhalakathi, Diploma Engr.(Mech), 24.07.81 (SAE) 04.11.2013(AE) 24.12.14 (SDE)
XEN (Incharge), Central Zone powerDistribution Project-1Division, PDB,Mymensingh
XEN Division-2 (Khagrasori) ,Office of PD, Hill TrackElectrification Project
PDB, Rangamiti.
1) Training on Gater1132/33KV Sub-Station PowerTransformer, 33KV 11KV GasInsulated Switchgear, 33/11KVSub-station & Control Panel &Protection Against ChittagongPower Distribution Project''Design & Maintenance ofPower Transformer'' 10.07.07to 24.08.07 for 42 days. 2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 3) A training againstChittagong Hill tractsJan/2016 in India for 7 days
China
NewZealand
1) Factory aceptance test of discinsulator against Chitt.zonepower dist. System dev. Projectfrom 03.11.15 to 09.11.15 inChina.
A proposal sent toministry dated21.04.16 forTraining ofTechnologytransfer againstChitt. Hill tracksproject from20.05.16 to 26.05.16in India.
1) 132/33KV,SF-6 Breaker from01.04.2000 to 14.05.2000 for 45days
2)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004for 35 days
3) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33/33KV Sub-Station'' from 10.07.07 to24.08.07 for 45 days
India,
Japan,
China
1) "Technical Orientation &Quality Test Witness" of 150 KmGuy-Wire from 08.05.13 to14.05.13 in China.
A proposal sent toministry dated04.05.2015 againstShikalbaha 225MW Dual FuelCCPP Project from15.05.15 to 21.05.15in Germany.
1)Orientation & TechnicalTraining With Factory testwitness from 01.05.04 to 07.05.04for 07 days in India. 2) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07 (seven)days in China.
1) Inspection on 12 Meter SteelPole (350 daN-265 Nos. & 450daN-135 Nos. from 07 daysMarch/08 in China. 2) Inspection on Generator for 7(seven) days in 2008 in India. 3) Inspection r for 7 (seven) daysin 2009 in India. 4) Inspection on 11 KVswitchgear against Santahar 50MW and Katakhali 50 MWPeaking Power PlantConstruction Project from13.03.2012 to 20.03.2012 for 7days (excluding travel time) inChina.
O&M Training on EngineGeneration Unit (HFO fired)at manufacturers' factory”against Gopalganj 100 MWPeaking P/S ConstructionProject from 12/09/2011 to11/10/2011 for 30 days. (Bond for 5 years)
Norway. 1) Factory witness test(Engineering Inspection) StemTurbine & Generator for SteamTurbine aganist Chandpur150MW Combined Cycle PowerStation Construction Project for10 days in China & Hangzhou,China.
4 1-01889 12.01.87 Mr. Nazmul Hasan Bhuiyan Dhaka B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01911059193 [email protected]
1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 to01 (one) Month 2) Training on "EfficientEnergy Management andRenewable Energy" from21.04.08 to 25.04.08, 05 days. 3) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Russia,
India.
Singapore
1) Inspection against “132KVTransformer from October/10 for07 days in China. 2) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSep/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand. 3) Inspection on SubstationEquipment & Mateerial againstCentral Zone Power DistributionProject, Mymensingh to from16.07.13 to 22.07.13 in Germany.
2 11-0279 30.10.57 Mr. Md. Abul Kalam Jhalokathi Diploma Engr.(Elec.),
24.07.81 (SAE) 04.11.13 (AE)
AE Consumer Affair's, PDB,Dhaka.
Greater Chittagong Project, SCADASL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0712 30.06.58 Mr. Muhammad JoynalAbedin Feni, B.Sc.Engr.(Elec.),
1) Power Distribution throughpromotion of TQM from18.3.02 to 18.4.022) MV Switchgear,VD4 and VBF11 days in India(Sept./2003) 3) 33KV Capacitor Bank Gi Dci"Design & Maintenance of33KV Capacitor Bank of GISfrom 20.04.07 to 05.05.07 for 14days.
Japan,
India, Nasic
Germany.
1) "Technical Orientation &Quality Test Witness" of 20 Nos.-Battery Charger from 15.01.14 to21.01.14 in India. 2) Technical orientation &quality test witness againstSCADA Project from 18.01.15 for10 days in NewZealand,Australia & Singapore. 3)Technical orientation &quality test witness againstSCADA project from 24.08.15 to02.09.15 in Singapore &Malaysia.
Page 74
2 1-01384 02.03.71 Mr. Md. Abdul Mannan,Chittagong,B.Sc.Engr.(Elec.),05.03.2000(AE)
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 2) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
NewZealand
Singapore
1) Orientation and TechnicalTraining on Kwh Meter TestingSet at HENAN STAR HI-TECH CO.LTD. from 23.02.06 to 01.03.06 for07 days in Zhenzhou, China,
2) Technical orientation &quality test witness of hardware& software of data centre from08.05.14 to 09.06.14 in Singapore& New Zealand.
Project Coordinator (CE) Solar Street LightingProgram in CityCorporation Project,PDB, Dhaka.
I) Greater Dhaka Power Dist.Project. 07.01.87 to 16 Weeks.
2) PSCDP training program on"Contract Management (Batch-1)" from 02.09.13 to 13.09.13
U.K.
Thailand
1) Power Transformer FactoryTest Witness From 05.02.2004 to11.02.2004 in China, 2) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina 3)Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
1) VCB Lightening Arrester March/05, 7 dyas India. 2) "Factory Test Witness" onMetering & Backup meteringSystem and Current Transformer(CT) from 28.07.09 to 03.08.09 inIndia. 3) Inspection on 33 KV pininsulator, 33 KV disc insulatorand so on from 04.02.13 to07.02.13 in India & from 25.01.13to 31.01.13 in China. 4) Technical orientation &quality test witness from10.04.14 to 14.04.14 in China &.From 27.05.14 to 28.05.14 in India
5) Quality acceptance testagainst Chittagong Hill TrackElectrification Project from07.04.15 to 13.04.15 in SouthKorea & China. 6) Factory acceptance test of 33KV disc insulator against Chitt.zone power dist. system dev.project from 25.10.15 to 31.10.15in India & China.
1)Operation andMaintenance of X-former andCkt.Breaker From 09.1.91 to8.4.91 2) Transmission Line DesignFrom 02.8.99 to 2.11.99
China,
Germany& Switzerland
1) Technical Orientation &Quality Test Witness from25.04.14 to 01.05.14 in China. 2) Factory acceptance test of 11KV pin insulator against Chitt.Zone power dist. System dev.Project from 08.11.15 to 14.11.15in India & China.
Page 77
3 1-01424 01.01.71 Mr. Sumanta KumarDebnath, Noakhali, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN)
1) Supplying of 6mm dia 1000Quintal, 7mm dia 1000 Quintal,8mm dia 600 Quintal & 9mm Dia1400 Quintal High TensileSteel(HTS) Wire, "Pre-shipmentinspection (Foreign)” againstChittagong PC Pole ConstructionPlant, BPDB, Halishahar,Chittagong in June/2011 for 10(Ten) working days from thedate of actual journey in China.
2) Technical orientation &quality test witness 14.04.14 inChina &. From 27.05.14 to28.05.14 in India 3) Factory acceptance test of 33KV post insulator againstChitt.zone power dist. system dev.project from 06.11.15 to 12.11.15in China.4 1-01268 12.04.71 Mr. Md. Shahidul Islam,
1) Seinar on Bently NevadaVibration monitoring Systemrom 27.08.01 to 31.08.01 fro 05days
2) Workshop Of ControlSystem Up-Gradation Contractfrom 16.05.04 to 28.05.04 for12 Days
3) Training on Control SystemUpgradation of GT Unit-2, GtUnit-3 for 23.02.07 to 08.04.07for 45
Singapore
Japan,
Japan
1)Orientation & TechnicalTraining With Factory TestWitness From 03.05.2004 for 07Days in China, 2) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
1) Power Generation &Distribution from 07.10.89-30.12.90
2)Traning on Gas TurbineAgainst Tongi 80 MW From08.08.04 to 07.10.04 TwoMonth (Bond for 03 Yearsfrom 24.07.04 to 22.08.04) 3) Factory Training againstBheramara Power Stationfrom 01.02.15 to 14.02.15
Germany,
France,
USA
G.O. issued dated25.04.16 for Factoryacceptance test of11 KV Pin Insulatoragainst RajshahiZone power dist.Dev. Project from12.05.16 to 18.05.16in China..
2 1-0920 01.01.62 Mr. Md. Abdul Aziz,Jhinedha,B.Sc.Engr.(Mech.),07.04.86(AE) 11.11.01(SDE) 19.03.98(SDE) 23.04.09(XEN) 25.01.16 (SE)
1) ontract No.pur-163/6-project/lot-1/2010/304 Dt.27/10/2010 and Contract No.pur-163/6-project/lot-2/2010/305 Dt.27/10/2010 against DOFC withfuse link, 11 KV Lighting Arrester& 200 Amps MCCB, 100AmpsMCCB, 95 rm Copper Lug & 70 rmCopper Lug against Renovation& Augmentation of DistributionLines & 11/0.4 KV Sub-Stationunder 6(six) Distribution zonefrom December/10 for 07 (seven)days in China 3) “Alternator Inspection”against Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inJuly/2011 for 07 days in SouthKorea. 4) "Quality acceptance Test" of11 KV Auto Circuit Reclosure from03.06.13 to 12.06.13 in Australia.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of 11KV Pin insulatoragainst RajshahiZone ElectricityDistributionSystemDevelopmentProject from24.05.16 to 04.06.16in India.
4 1-01289 29.09.71 Mr. Nizamul Haque Sarker Rajshahi, B.Sc.Engr.(Elec.),
Japan 1) Workshop on NumericalRelays in MV/LT Systems from27.09.10 to 29.09.10 in India. 2) Technical orientation &quality test witness on 30 Nos.-oil Centrifuging Machine from29.11.13 to 07.12.13 in China.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of DiscInsulator againstRajshahi zonepower dist. Dev.Project from15.05.16 to 21.05.16in India & China
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of 11KV Pin insulatoragainst RajshahiZone ElectricityDistributionSystemDevelopmentProject from24.05.16 to 04.06.16in India.
G.O. issued dated25.04.16 for Factoryacceptance test of11 KV Pin Insulatoragainst RajshahiZone power dist.Dev. Project from12.05.16 to 18.05.16in China..
Rangpur Zone Electricity Distribution System Development Project, PDB, Rangpur.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0626 03.05.59 Mr. Md. Moazzam HossainDewan, Naogaon, B.Sc.Engr.(Elec.),
1) 230 KV Grid Sub-stationOperation and MaintenanceFrom April/1993 toSeptember/1993 +F554
South Korea& Germany
India
1) Pre-shipment Inspectionagainst 33KV ACSR Grossbeak-452.40Km & 33KV ACSR Merlin-346.80Km. And 33KV ACSR DOGConductor-2675.60Km form01.09.08 to 10.09.08 for 10 days inChina. 2)Training against hill Tracts for7 days
A proposal sent toministry dated21.04.16 forTraining ofTechnologytransfer againstChitt. Hill tracksproject from20.05.16 to 26.05.16in India.
Page 81
2 1-01216 01.01.70 Mr. Md. Lutful HaiderChowdhury, Dinajpur, B.Sc.Engr.(Mech.),
1)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From07.08.04 for Two Month 2) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
France
Singapore
1) "Technical Orientation andQuality test Witness" inAugust/2011 for 10 (Ten) days inChina.