leliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Distribution Reliability Cost & Funding Task Force

– Distribution Reliability Working Group–

January 15, 2013

1

Page 2: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Agenda

• Introductions, DRCF task force objective and progress to date (5 minutes)

• Ameren Missouri reliability investment metrics study (5 minutes)

• A risk-based approach to predicting reliability and managing substation assets (15 minutes)

• Open Discussion (15 minutes)

2

Page 3: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Task Force Objective

The Distribution Reliability Cost and Funding Task Force will provide utility industry guidance for evaluating the economics of distribution reliability, including:

– Evaluating total utility costs of outages

– Determining utility cost of improving reliability

– Assessing sources/methods of reliability funding

– Determining cost/benefit relationships

– Defining processes to determine cost of maintaining reliability

– Defining processes to determine cost of improving reliability

– Assessing the impact of regulatory agencies

The guidance will be documented and made available in order to promulgate common practices for assessing reliability costs and gaining approval for funding reliability initiatives. We anticipate this document would be an appendix to P1782.

3

Page 4: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

RELIABILITY INVESTMENT METRICS STUDY

4

Mark J. Konya, P.E.

Ameren Missouri

Page 5: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Reliability Investment Metrics Study

• Ameren Missouri Reliability Investment Metrics Study Conducted in 2009

– Objective - develop cost/benefit metrics for reliability expenditures

– Team-based approached utilizing various methods and resources to calculate $ per avoided customer interruption (ACI) for different programs

– Centered on evaluating reliability improvement programs

5

Page 6: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Reliability Investment Metrics Study

6

Reliability Improvement Programs

Page 7: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Reliability Investment Metrics Study

7

RESULTS

RANK

PROGRAM

1 Multiple Device

Interruptions

2 Tap Fusing

3 Circuit Performance

Improvement

4 Customers with Four or

More Outages

5 Vegetation Management

Initiatives

6 Circuit Inspections

7 Power On

N/A Device Inspections

Some programs are in the maintenance phase; significant reliability improvement will no

longer result from their execution. However reliability performance will decrease if the

programs are substantially scaled back.

Page 8: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Reliability Investment Metrics Study

Selected recommendations • Recognize a distinction between reliability maintenance and reliability

improvement, which have different objectives and require separate strategies

• Execute these strategies within a comprehensive framework of documented policies, programs, processes and procedures

• Prioritize improvement opportunities by ranking the relative contribution of individual circuits to system SAIFI and CAIDI

• Develop and execute a sound strategy for ensuring long-term funding of reliability improvement activities required to reach the goal.

• Use IEEE 1366-compliant measures for internal scorecards in order to reflect the requirements of 4CSR240-23.020.

8

Page 9: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Reliability Investment Metrics Study

Selected recommendations • Employ a Customer Interruption Cost Factor - CICF ($ / ACI) to help

assess and communicate the value of reliability improvement activities.

9

Page 10: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

A RISK-BASED APPROACH TO PREDICTING RELIABILITY & MANAGING SUBSTATION ASSETS

10

Mark J. Konya, P.E. Rao Palakodeti, P.E.

Ameren Missouri Alstom

Page 11: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Aging Energy Infrastructure

A Key Challenge for Everyone!

Page 12: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Overview & Objectives

• Key challenge – aging energy infrastructure

• Replacement cost of substation assets over 40 years old in the $billions$!

• Need to understand impact of aging on performance in order to ensure high levels of customer service – optimize system investments

– justify funding

• Generate a risk-based plan to manage substation assets

Page 13: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Overview & Objectives • Important elements of a substation asset management plan

– A forecast of the number and duration of failures for important substation components in the next 10 years

– A forecast of the number and duration of failures each substation will experience in the next 10 years

– The number of customer interruptions and customer minutes of interruption resulting from equipment failures

– A prioritized list of substation projects, the total cost of the projects and the project benefits

Page 14: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

PROJECT SCOPE, METHOD & RESULTS

Rao Palakodeti, P.E.

Page 15: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Project Scope • Evaluate historical performance of equipment and identify

failures as a function of service life

• Develop Hazard Curves to represent the time-dependent failure rates of important equipment

• Link hazard curves together in reliability block diagrams (RBDs) for each type of substation

• Perform Monte Carlo simulations to determine substation reliability for the next 10 years

• Calculate risk-adjusted consequences of equipment failure and add up the CMI by substation

• Rank substation projects based on descending CMI

Page 16: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Develop Hazard Curves

Page 17: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Create Reliability Block Diagram (RBD)

Page 18: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Link Hazard Curves With RBD

Page 19: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Perform Repeated Calculations

RESULTS

REPEAT CALCULATION

Page 20: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Results

• Substation and equipment identification

• Customers served for each substation and component

• Component criticality

• Total number of component failures

• Total number of substation failures

• Total downtime for each component

• Total downtime for each substation

• Total customer interruptions (CI) and customer minutes of interruption (CMI) for each component and substation

• Labor cost to repair each component failure

Page 21: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Results

• A list of substation improvement projects ranked by descending CMI

• Cost per CMI and cost per CI

• A list of substation improvement projects to be performed in each of the next 10 years

Page 22: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

What We Learned

Substation Revised In-

Service Date Original In-

Service Date

A 2014 2021

B 2014 2020

C 2014 2021

D 2014 2021

E 2014 2019

F 2014 2021

G 2014 2017

H 2014 (>=2017)

J 2014 2018

K 2014 2019

• Results generally pass the

“reasonability” test and make

sense

• In-service dates for substation

projects significantly revised

• Costs per avoided CI generally

consistent with previous studies

• Single unit, radial feed

substations have a higher risk of

outage than dual supply, multi-

unit substations

• Some equipment performs

worse/better than experience

suggests

• Total substation CI for 10 year

period seems high – investigating

further

Page 23: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Highlights of the Project

Model Input:

• Substation Types Created 16

• Substation Models Created 120

• Equipment Types Created 43

• Transformer Types Created 16

• Motor Operator Types Created 19

Data Collection and Cleaning:

• Total Substations Considered 780

• Total No. of Equipment considered 6,288

• Total Equipment Models 188

• Total Job Records Reviewed >60,000

Page 24: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Aging Energy Infrastructure

Page 25: Distribution Reliability Cost & Funding Task Force - IEEEgrouper.ieee.org/groups/td/dist/sd/minutes/meeting-notes... · Distribution Reliability Cost & Funding Task Force ... Circuit

Open Discussion