ASHLEY VILLAGE PWS OH2100011 2021 DISTRIBUTION SCHEDULE Community System Type: Operating Period: to 1/1 12/31 01/01/2021 Effective Date: THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Also, monitoring schedules may be revised during the year based on sampling results. For water emergencies that occur after hours, please call 800-282-9378 DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements Sampling Location SMP ID: Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1 DS000 Sample(s) Required between 1/31/2021 2 TOTAL COLIFORM (TCR) - 3100 1/1/2021 and Sample(s) Required between 2/28/2021 2 2/1/2021 and Sample(s) Required between 3/31/2021 2 3/1/2021 and Sample(s) Required between 4/30/2021 2 4/1/2021 and Sample(s) Required between 5/31/2021 2 5/1/2021 and Sample(s) Required between 6/30/2021 2 6/1/2021 and Sample(s) Required between 7/31/2021 2 7/1/2021 and Sample(s) Required between 8/31/2021 2 8/1/2021 and Sample(s) Required between 9/30/2021 2 9/1/2021 and Sample(s) Required between 10/31/2021 2 10/1/2021 and Sample(s) Required between 11/30/2021 2 11/1/2021 and Sample(s) Required between 12/31/2021 2 12/1/2021 and Sample(s) Required between 1/31/2021 2 TOTAL CHLORINE - 1000 1/1/2021 and Sample(s) Required between 2/28/2021 2 2/1/2021 and Sample(s) Required between 3/31/2021 2 3/1/2021 and Sample(s) Required between 4/30/2021 2 4/1/2021 and Sample(s) Required between 5/31/2021 2 5/1/2021 and Sample(s) Required between 6/30/2021 2 6/1/2021 and Sample(s) Required between 7/31/2021 2 7/1/2021 and Sample(s) Required between 8/31/2021 2 8/1/2021 and Sample(s) Required between 9/30/2021 2 9/1/2021 and Sample(s) Required between 10/31/2021 2 10/1/2021 and Sample(s) Required between 11/30/2021 2 11/1/2021 and Sample(s) Required between 12/31/2021 2 12/1/2021 and Samples should be collected at the same time and place as the Total Coliform samples. Chemicals Monitoring Requirements Sampling Location SMP ID: Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1 DS201 DELAWARE CO. EMS - 245 W. HIGH ST Dual Sample Required between 9/30/2021 at: DS201 DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below: 1) TOTAL HALOACETIC ACIDS (HAA5) – 2456 2) TTHM - 2950
32
Embed
DISTRIBUTION MONITORING SCHEDULE...Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1 LC### Refer to your Lead and Copper plan for SMP IDs LEAD -
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20212TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and
Sample(s) Required between 1/31/20212TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 DELAWARE CO. EMS - 245 W. HIGH ST
Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 DELAWARE MANOR APTS - 200 CENTER ST.
Dual Sample Required between 9/30/2021at: DS202DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ASHLEY, VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202110LEAD - 1030 AND COPPER - 1022 6/1/2021 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenINORGANICS 1 1/1/2021 and 5/31/2021 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2021 and 3/31/2021
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2021 and 1/31/2021Paired Sample Set Required between1 2/1/2021 and 2/28/2021Paired Sample Set Required between1 3/1/2021 and 3/31/2021Paired Sample Set Required between1 4/1/2021 and 4/30/2021Paired Sample Set Required between1 5/1/2021 and 5/31/2021Paired Sample Set Required between1 6/1/2021 and 6/30/2021Paired Sample Set Required between1 7/1/2021 and 7/31/2021Paired Sample Set Required between1 8/1/2021 and 8/31/2021Paired Sample Set Required between1 9/1/2021 and 9/30/2021Paired Sample Set Required between1 10/1/2021 and 10/31/2021Paired Sample Set Required between1 11/1/2021 and 11/30/2021Paired Sample Set Required between1 12/1/2021 and 12/31/2021
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/27/2020 and 1/2/2021Sample(s) Required between1 1/10/2021 and 1/16/2021Sample(s) Required between1 1/24/2021 and 1/30/2021Sample(s) Required between1 2/7/2021 and 2/13/2021Sample(s) Required between1 2/21/2021 and 2/27/2021Sample(s) Required between1 3/7/2021 and 3/13/2021Sample(s) Required between1 3/21/2021 and 3/27/2021Sample(s) Required between1 4/4/2021 and 4/10/2021Sample(s) Required between1 4/18/2021 and 4/24/2021Sample(s) Required between1 5/2/2021 and 5/8/2021Sample(s) Required between1 5/16/2021 and 5/22/2021Sample(s) Required between1 5/30/2021 and 6/5/2021Sample(s) Required between1 6/13/2021 and 6/19/2021Sample(s) Required between1 6/27/2021 and 7/3/2021Sample(s) Required between1 7/11/2021 and 7/17/2021Sample(s) Required between1 7/25/2021 and 7/31/2021Sample(s) Required between1 8/8/2021 and 8/14/2021Sample(s) Required between1 8/22/2021 and 8/28/2021Sample(s) Required between1 9/5/2021 and 9/11/2021Sample(s) Required between1 9/19/2021 and 9/25/2021Sample(s) Required between1 10/3/2021 and 10/9/2021Sample(s) Required between1 10/17/2021 and 10/23/2021Sample(s) Required between1 10/31/2021 and 11/6/2021Sample(s) Required between1 11/14/2021 and 11/20/2021Sample(s) Required between1 11/28/2021 and 12/4/2021Sample(s) Required between1 12/12/2021 and 12/18/2021
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DELAWARE, CITY DISTRIBUTION Facility Class: CLASS 2DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/202150TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/202150 2/1/2021 andSample(s) Required between 3/31/202150 3/1/2021 andSample(s) Required between 4/30/202150 4/1/2021 andSample(s) Required between 5/31/202150 5/1/2021 andSample(s) Required between 6/30/202150 6/1/2021 andSample(s) Required between 7/31/202150 7/1/2021 andSample(s) Required between 8/31/202150 8/1/2021 andSample(s) Required between 9/30/202150 9/1/2021 andSample(s) Required between 10/31/202150 10/1/2021 andSample(s) Required between 11/30/202150 11/1/2021 andSample(s) Required between 12/31/202150 12/1/2021 and
Sample(s) Required between 1/31/202150TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/202150 2/1/2021 andSample(s) Required between 3/31/202150 3/1/2021 andSample(s) Required between 4/30/202150 4/1/2021 andSample(s) Required between 5/31/202150 5/1/2021 andSample(s) Required between 6/30/202150 6/1/2021 andSample(s) Required between 7/31/202150 7/1/2021 andSample(s) Required between 8/31/202150 8/1/2021 andSample(s) Required between 9/30/202150 9/1/2021 andSample(s) Required between 10/31/202150 10/1/2021 andSample(s) Required between 11/30/202150 11/1/2021 andSample(s) Required between 12/31/202150 12/1/2021 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DELAWARE, CITY DISTRIBUTION Facility Class: CLASS 2DS201 200 TARA GLEN DR
Dual Sample Required between 1/14/2021at: DS201DISINFECTION BYPRODUCTS 1/8/2021 andDual Sample Required between 4/14/2021at: DS2014/8/2021 andDual Sample Required between 7/14/2021at: DS2017/8/2021 and
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DELAWARE, CITY DISTRIBUTION Facility Class: CLASS 2DS201 200 TARA GLEN DR
Dual Sample Required between 10/14/2021at: DS201DISINFECTION BYPRODUCTS 10/8/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DELAWARE, CITY DISTRIBUTION Facility Class: CLASS 2DS202 1840 COLUMBUS PIKE
Dual Sample Required between 1/14/2021at: DS202DISINFECTION BYPRODUCTS 1/8/2021 andDual Sample Required between 4/14/2021at: DS2024/8/2021 andDual Sample Required between 7/14/2021at: DS2027/8/2021 andDual Sample Required between 10/14/2021at: DS20210/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DELAWARE, CITY DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202130LEAD - 1030 AND COPPER - 1022 6/1/2021 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WESTERVILLE ESTATES MHP DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20211TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and
Sample(s) Required between 1/31/20211TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WESTERVILLE ESTATES MHP DISTRIBUTION Facility Class: CLASS 1DS201 11050 FANCHER RD. LOT 114
Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 andDual Sample Required between 11/14/2021at: DS20111/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WESTERVILLE ESTATES MHP DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WESTERVILLE ESTATES MHP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WORTHINGTON ARMS MHC DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20211TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and
Sample(s) Required between 1/31/20211TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WORTHINGTON ARMS MHC DISTRIBUTION Facility Class: CLASS 1DS201 5277 COLUMBUS PIKE
Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WORTHINGTON ARMS MHC DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenINORGANICS 1 1/1/2021 and 5/31/2021 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2021 and 5/31/2021
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2021 and 1/31/2021Paired Sample Set Required between1 2/1/2021 and 2/28/2021Paired Sample Set Required between1 3/1/2021 and 3/31/2021Paired Sample Set Required between1 4/1/2021 and 4/30/2021Paired Sample Set Required between1 5/1/2021 and 5/31/2021Paired Sample Set Required between1 6/1/2021 and 6/30/2021Paired Sample Set Required between1 7/1/2021 and 7/31/2021Paired Sample Set Required between1 8/1/2021 and 8/31/2021Paired Sample Set Required between1 9/1/2021 and 9/30/2021Paired Sample Set Required between1 10/1/2021 and 10/31/2021Paired Sample Set Required between1 11/1/2021 and 11/30/2021Paired Sample Set Required between1 12/1/2021 and 12/31/2021
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/27/2020 and 1/2/2021Sample(s) Required between1 1/10/2021 and 1/16/2021Sample(s) Required between1 1/24/2021 and 1/30/2021Sample(s) Required between1 2/7/2021 and 2/13/2021Sample(s) Required between1 2/21/2021 and 2/27/2021Sample(s) Required between1 3/7/2021 and 3/13/2021Sample(s) Required between1 3/21/2021 and 3/27/2021Sample(s) Required between1 4/4/2021 and 4/10/2021Sample(s) Required between1 4/18/2021 and 4/24/2021Sample(s) Required between1 5/2/2021 and 5/8/2021Sample(s) Required between1 5/16/2021 and 5/22/2021Sample(s) Required between1 5/30/2021 and 6/5/2021Sample(s) Required between1 6/13/2021 and 6/19/2021Sample(s) Required between1 6/27/2021 and 7/3/2021Sample(s) Required between1 7/11/2021 and 7/17/2021Sample(s) Required between1 7/25/2021 and 7/31/2021Sample(s) Required between1 8/8/2021 and 8/14/2021Sample(s) Required between1 8/22/2021 and 8/28/2021Sample(s) Required between1 9/5/2021 and 9/11/2021Sample(s) Required between1 9/19/2021 and 9/25/2021Sample(s) Required between1 10/3/2021 and 10/9/2021Sample(s) Required between1 10/17/2021 and 10/23/2021Sample(s) Required between1 10/31/2021 and 11/6/2021Sample(s) Required between1 11/14/2021 and 11/20/2021Sample(s) Required between1 11/28/2021 and 12/4/2021Sample(s) Required between1 12/12/2021 and 12/18/2021
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP002
EP002
Sample(s) Required betweenINORGANICS 1 1/1/2021 and 5/31/2021 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2021 and 5/31/2021
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2021 and 1/31/2021Paired Sample Set Required between1 2/1/2021 and 2/28/2021Paired Sample Set Required between1 3/1/2021 and 3/31/2021Paired Sample Set Required between1 4/1/2021 and 4/30/2021Paired Sample Set Required between1 5/1/2021 and 5/31/2021Paired Sample Set Required between1 6/1/2021 and 6/30/2021Paired Sample Set Required between1 7/1/2021 and 7/31/2021Paired Sample Set Required between1 8/1/2021 and 8/31/2021Paired Sample Set Required between1 9/1/2021 and 9/30/2021Paired Sample Set Required between1 10/1/2021 and 10/31/2021Paired Sample Set Required between1 11/1/2021 and 11/30/2021Paired Sample Set Required between1 12/1/2021 and 12/31/2021
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
EP002
LT2002
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2002 and one finished water sample at EP002. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 4Facility Source: Surface Water
LT200
LT2002
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/27/2020 and 1/2/2021Sample(s) Required between1 1/10/2021 and 1/16/2021Sample(s) Required between1 1/24/2021 and 1/30/2021Sample(s) Required between1 2/7/2021 and 2/13/2021Sample(s) Required between1 2/21/2021 and 2/27/2021Sample(s) Required between1 3/7/2021 and 3/13/2021Sample(s) Required between1 3/21/2021 and 3/27/2021Sample(s) Required between1 4/4/2021 and 4/10/2021Sample(s) Required between1 4/18/2021 and 4/24/2021Sample(s) Required between1 5/2/2021 and 5/8/2021Sample(s) Required between1 5/16/2021 and 5/22/2021Sample(s) Required between1 5/30/2021 and 6/5/2021Sample(s) Required between1 6/13/2021 and 6/19/2021Sample(s) Required between1 6/27/2021 and 7/3/2021Sample(s) Required between1 7/11/2021 and 7/17/2021Sample(s) Required between1 7/25/2021 and 7/31/2021Sample(s) Required between1 8/8/2021 and 8/14/2021Sample(s) Required between1 8/22/2021 and 8/28/2021Sample(s) Required between1 9/5/2021 and 9/11/2021Sample(s) Required between1 9/19/2021 and 9/25/2021Sample(s) Required between1 10/3/2021 and 10/9/2021Sample(s) Required between1 10/17/2021 and 10/23/2021Sample(s) Required between1 10/31/2021 and 11/6/2021Sample(s) Required between1 11/14/2021 and 11/20/2021Sample(s) Required between1 11/28/2021 and 12/4/2021Sample(s) Required between1 12/12/2021 and 12/18/2021
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP004
EP004
Sample(s) Required betweenINORGANICS 1 6/1/2021 and 10/31/2021 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2021 and 10/31/2021
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 6/1/2021 and 6/30/2021Paired Sample Set Required between1 7/1/2021 and 7/31/2021Paired Sample Set Required between1 8/1/2021 and 8/31/2021
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP004
LT2004
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2004 and one finished water sample at EP004. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
LT200
LT2004
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/27/2020 and 1/2/2021Sample(s) Required between1 1/10/2021 and 1/16/2021Sample(s) Required between1 1/24/2021 and 1/30/2021Sample(s) Required between1 2/7/2021 and 2/13/2021Sample(s) Required between1 2/21/2021 and 2/27/2021Sample(s) Required between1 3/7/2021 and 3/13/2021Sample(s) Required between1 3/21/2021 and 3/27/2021Sample(s) Required between1 4/4/2021 and 4/10/2021Sample(s) Required between1 4/18/2021 and 4/24/2021Sample(s) Required between1 5/2/2021 and 5/8/2021Sample(s) Required between1 5/16/2021 and 5/22/2021Sample(s) Required between1 5/30/2021 and 6/5/2021Sample(s) Required between1 6/13/2021 and 6/19/2021Sample(s) Required between1 6/27/2021 and 7/3/2021Sample(s) Required between1 7/11/2021 and 7/17/2021Sample(s) Required between1 7/25/2021 and 7/31/2021Sample(s) Required between1 8/8/2021 and 8/14/2021Sample(s) Required between1 8/22/2021 and 8/28/2021Sample(s) Required between1 9/5/2021 and 9/11/2021Sample(s) Required between1 9/19/2021 and 9/25/2021Sample(s) Required between1 10/3/2021 and 10/9/2021Sample(s) Required between1 10/17/2021 and 10/23/2021Sample(s) Required between1 10/31/2021 and 11/6/2021Sample(s) Required between1 11/14/2021 and 11/20/2021Sample(s) Required between1 11/28/2021 and 12/4/2021Sample(s) Required between1 12/12/2021 and 12/18/2021
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Ground Water
EP003
EP003
Sample(s) Required betweenINORGANICS 1 1/1/2021 and 5/31/2021 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/2021120TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/2021120 2/1/2021 andSample(s) Required between 3/31/2021120 3/1/2021 andSample(s) Required between 4/30/2021120 4/1/2021 andSample(s) Required between 5/31/2021120 5/1/2021 andSample(s) Required between 6/30/2021120 6/1/2021 andSample(s) Required between 7/31/2021120 7/1/2021 andSample(s) Required between 8/31/2021120 8/1/2021 andSample(s) Required between 9/30/2021120 9/1/2021 andSample(s) Required between 10/31/2021120 10/1/2021 andSample(s) Required between 11/30/2021120 11/1/2021 andSample(s) Required between 12/31/2021120 12/1/2021 and
Sample(s) Required between 1/31/2021120TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/2021120 2/1/2021 andSample(s) Required between 3/31/2021120 3/1/2021 andSample(s) Required between 4/30/2021120 4/1/2021 andSample(s) Required between 5/31/2021120 5/1/2021 andSample(s) Required between 6/30/2021120 6/1/2021 andSample(s) Required between 7/31/2021120 7/1/2021 andSample(s) Required between 8/31/2021120 8/1/2021 andSample(s) Required between 9/30/2021120 9/1/2021 andSample(s) Required between 10/31/2021120 10/1/2021 andSample(s) Required between 11/30/2021120 11/1/2021 andSample(s) Required between 12/31/2021120 12/1/2021 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS201 8500 N. HIGH ST.
Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS201 8500 N. HIGH ST.
Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS202 8208 MARYSVILLE RD
Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS203 1263 CAMERON AVE DONATOS
Dual Sample Required between 2/14/2021at: DS203DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2035/8/2021 andDual Sample Required between 8/14/2021at: DS2038/8/2021 andDual Sample Required between 11/14/2021at: DS20311/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS204 7307 SOUTH OLD STATE RD ORANGE TWP FIRE
Dual Sample Required between 2/14/2021at: DS204DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2045/8/2021 andDual Sample Required between 8/14/2021at: DS2048/8/2021 and
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS204 7307 SOUTH OLD STATE RD ORANGE TWP FIRE
Dual Sample Required between 11/14/2021at: DS204DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS205 6658 OLENTANGY RIVER RD.
Dual Sample Required between 2/14/2021at: DS205DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2055/8/2021 andDual Sample Required between 8/14/2021at: DS2058/8/2021 andDual Sample Required between 11/14/2021at: DS20511/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS206 7259 PENN RD.
Dual Sample Required between 2/14/2021at: DS206DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2065/8/2021 andDual Sample Required between 8/14/2021at: DS2068/8/2021 andDual Sample Required between 11/14/2021at: DS20611/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS207 7080 OLENTANGY RIVER RD.
Dual Sample Required between 2/14/2021at: DS207DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2075/8/2021 andDual Sample Required between 8/14/2021at: DS2078/8/2021 and
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS207 7080 OLENTANGY RIVER RD.
Dual Sample Required between 11/14/2021at: DS207DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2DS208 6195 GLICK RD.
Dual Sample Required between 2/14/2021at: DS208DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2085/8/2021 andDual Sample Required between 8/14/2021at: DS2088/8/2021 andDual Sample Required between 11/14/2021at: DS20811/8/2021 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DEL-CO DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202150LEAD - 1030 AND COPPER - 1022 6/1/2021 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
HOLMES LUMBER OFFICEOH2131612
2021 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2021Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Sample(s) Required between 3/31/20211TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 6/30/20211 4/1/2021 andSample(s) Required between 9/30/20211 7/1/2021 andSample(s) Required between 12/31/20211 10/1/2021 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: HOLMES LUMBER OFFICE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
WHITE SANDS
2021 MONITORING SCHEDULE
OH2133712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2021Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: WHITE SANDS DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WHITE SANDS
2021 MONITORING SCHEDULE
OH2133712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2021Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WHITE SANDS DISTRIBUTIONGround Water
Sample(s) Required between1 2/1/2021 and 2/28/2021
Sample(s) Required between1 3/1/2021 and 3/31/2021
Sample(s) Required between1 4/1/2021 and 4/30/2021
Sample(s) Required between1 5/1/2021 and 5/31/2021
Sample(s) Required between1 6/1/2021 and 6/30/2021
Sample(s) Required between1 7/1/2021 and 7/31/2021
Sample(s) Required between1 8/1/2021 and 8/31/2021
Sample(s) Required between1 9/1/2021 and 9/30/2021
Sample(s) Required between1 10/1/2021 and 10/31/2021
Sample(s) Required between1 11/1/2021 and 11/30/2021
Sample(s) Required between1 12/1/2021 and 12/31/2021
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WHITE SANDS
2021 MONITORING SCHEDULE
OH2133712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2021Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WHITE SANDSGround Water
2153900
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVER COMMUNITY CHURCH PWS
2021 MONITORING SCHEDULE
OH2134512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2021Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RIVER COMMUNITY CHURCH DISTRIBUTIONGround Water
Sample(s) Required between1 4/1/2021 and 6/30/2021
Sample(s) Required between1 7/1/2021 and 9/30/2021
Sample(s) Required between1 10/1/2021 and 12/31/2021
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVER COMMUNITY CHURCH PWS
2021 MONITORING SCHEDULE
OH2134512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2021Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RIVER COMMUNITY CHURCHGround Water
2160823
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.