Distribution List - ER:
1. Sh. Aditya Pyasi Head Regulatory Vedanta Limited (erstwhile Sterlite Energy Ltd.) 3
rd Floor, Core 6,
Scope Complex, Lodhi Road, Delhi Distt : Jharsuguda (Odisha)-768202 Email: [email protected]
Ph: 9999313479
2. Principal Chief Engineer cum Secretary Power Department Government of Sikkim Kazi Road, Gangtok, Sikkim
Email: [email protected] Mob: 9733032266
3. Sh. Subhash Thakur, AGM (PE-Electrical) NTPC(Darlipalli, North KaranPura, Nabinagar-II) EOC Complex, A-8A, Sec-24, Noida, UP-201301 Email: [email protected] [email protected] Ph: 9650991067
4. Shri M. S. Pal Addl. Chief Engineer & In-charge of PTR WBSEDCL Bidyut Bhawan, 7
th Floor,
B Block, DJ Block, Sector II, Salt Lake City, Kolkata – 700 091 Email : [email protected]
5. Sh Neeraj Jain General Manager Monnet Ispat & Energy Limited 11, Monnet House, Masjid Moth, Grater Kailash, Part-II, New Delhi – 110 048 Email : [email protected]
Mobile : +91 9560509283
6. Shri Harish Sharan Executive Director PTC India Limited, 2
nd Floor; NBCC Tower,
15 Bhikaji Cama Place New Delhi – 110 066 Phone : 011-41659136, Email : [email protected]
7. Shri Sudheer Kothapalli Director & SPV Head Lanco Babandh Power Pvt. Ltd. Plot No. 397, Phase-III Udyog Vihar, Gurgaon-122 016 Phone : 0124-4691101 Mobile : 8800090621 Email : [email protected]
8. Shri M. K. Sharma Chief Executive Officer Jal Power Corporation Limited A-102, Sector-65 Noida – 201 307 Phone : 0120-4397444 Email : [email protected]
9. Shri J. Mohapatra Director-Technical Ind-Bharat Energy (Utkal) Limited Plot No. 30-A. Road No:1, Film Nagar Jubilee Hills, Hyderabad-500 033 Mobile: 9717212999 Email : [email protected]
10. Shri P.S. Dutta Gupta Whole Time Director, Madhya Bharat Power Corporation Ltd 1
st Floor, Vanijya Bhawan,
Devendra Nagar Square, Jail Road, Raipur-492001 Mobile: 9810432623
Phone : 0771- 2214210 Email : [email protected]; [email protected]
11. Shri Deepesh Roy Essar Power (Jharkhand) Ltd. 2
nd Floor, Essar House Mahalaxmi
Mumbai-400034 Email: [email protected];
12. Shri Sanjeev Upadhyay President, Hydro Gati Infrastructure Limited 14/19/2 Old Delhi Gurgaon Road, Opp. Heera Public School, Samalkha, New Delhi - 110037. Email: [email protected]
13. Shri Madan Gopal Gupta CEO Essar Power (Jharkhand) Ltd. 2
nd Floor, Essar House,
Mahalaxmi, Mumbai - 400034 Email : [email protected]
14. Shri Sanjeev Upadhyay President, Hydro Gati Bhasmey Power Pvt. Ltd. 14/19/2 Old Delhi Gurgaon Road, Opp. Heera Public School, Samalkha, New Delhi - 110037. Email: [email protected]
15. Shri K. C. Samantray Sr. Manager (Electrical)
16. Sh. Hemant Chandil Director,
Orissa Power Generation Corporation Ltd. (OPGC) Zone-A, 7th Floor, Fortune Towers Chandrasekharpur, Bhubaneswar – 751023 Odisha Ph : 0674-2303765- 66, 09338715428 Fax : 0674-2303755-56 Email : [email protected]; [email protected]
Sikkim Hydro Power Ventures Ltd, 5th Floor, Orbit Plaza, New Prabhadevi Road, Prabhadevi, Mumbai- 400025 Email: [email protected] Mob: 7709042956
17. Shri Ajay Kumar Nathani Head, Transmission GMR Kamalanga Energy Ltd. Building no. 302, First Floor, New Shakti Bhawan, New Udaan Bhawan Complex, IGI Airport, Delhi-110037 Email: [email protected]
18. Shri Yogendra Kumar, Teesta Urja Limited, 2
nd Floor, Vijaya Building,
17, Barakhambha Road, Cannaught Place, New Delhi – 110001 Phone : 011-46529744 Email: [email protected]
Mob: 9910413388, Ph: 01146529749
19. Sh. Chandrasekhar Bobade Vice President Jindal India Thermal Power Limited Plot No: 12, Local Shopping Complex, Sector B-1, Vasant Kunj, New Delhi – 110070 Mob: 8130613563 Email:[email protected]; [email protected]
20. Shri Jatinder Singh, SPV Head, LANCO Teesta Ltd. Plot No. 397, Udyog Vihar – Phase III, Gurgaon – 122016 Email : [email protected] Phone : 0124-4741475 Mobile : 9599934386
21. Shri T. Nagendra Rao Managing Director, Shiga Energy Pvt. Ltd. 5
th Floor, DLF Building No. 8
Tower-C, DLF Cyber City, Phase-II Gurgaon – 122002 Phone : 0124-4696300, 4100393, Email : [email protected]
22. Shri T. Nagendra Rao Managing Director Dans Energy Pvt. Ltd 5th Floor, DLF Building No. 8 Tower-C, DLF Cyber City, Phase-II Gurgaon – 122002 Phone : 0124-4696300/9873574939 Email : [email protected],
23. Shri Vijay Kumar Atluri CEO Sneha Kinetic Power Projects Pvt. Ltd. Sonam Complex, Jeevan Theng Marg Development Area, Near Little Pixel International School, Gangtok, Sikkim-737 101 Email : [email protected]
Mob: 9958355966
24. Shri Sunder Prasad, KVK Energy & Infrastructure Pvt. Ltd. Plot No. 484/A, Road No 36, Jubilee Hills, Hyderabad – 500033 Email : [email protected] Phone: 9810257484
25. Sh. S K Bhowmick Sr. Vice President Teestavalley Power Transmission Ltd 2nd Floor, Vijaya Building 17, Barakhamba Road, New Delhi-110001 Email: [email protected] Mob: 9958008265
26. Shri P.K. Ghosh Head, T&D Planning and Power Purchase, India Power Corporation Ltd (Formerly DPSC Ltd) Plot no. X-1,2 & 3 Block-EP, Sector-V, Salt Lake Kolkata-700091 Ph: 033-23574309, 09836376548 Email: [email protected]
27. Shri K. Anil, Business Head M. Sunder Prasad, Chief Operating Officer KVK Nilachal Power Pvt Limited 6-3-1109/3, 3
rd Floor, Navabharath Chambers,
Raj Bhavan Road, Somajiguda Hyderabad: 500 082 Contact No: 040 66225111 Email:[email protected]; [email protected] Mob: 8790944466
28. Shri Sanjeev K. Bharati Sr. Manager Nabinagar Power Generation Co. 1
st Floor, Vidyut Bhavan-II,
Bailey Road, Patna-800021 Email: [email protected] Mob: 0612- 2504010
29. Director (Commercial) Grid Corporation of Orissa Ltd, (GRIDCO) Jan path, Bhubaneshwar-751022
Email: [email protected]; Mob: 9433035435
30. Shri Subhash Garg AVP (Electrical) Jindal Stainless Ltd OP Jindal Marg, Hisar (Haryana) Email: [email protected] Mob: 09896095182
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 1 of 27
Minutes of 11th Joint Co-ordination Committee meeting of Generation Projects granted Connectivity/LTA in Eastern Region (ER) held on 27.12.2016 at POWERGRID, Gurgaon
1. The 11th Joint Co-ordination Committee meeting of generation projects in Eastern Region was held at POWERGRID Office,
Gurgaon on 27th December, 2016. The list of participants of the meeting is enclosed at Annexure-I.
2. After welcoming the participants, it was informed that Minutes of the 10th Meeting of the Joint Co-ordination Committee of generation projects which were granted LTA in Eastern Region held on 30.09.2016, were issued vide letter ref. no. C/CTU/ER/OA/10JCC dated 24.10.2016. As no observations/comments were received on the minutes, the minutes were confirmed as circulated.
3. It was clarified that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with the
associated transmission system and accordingly, the information given by generation developers/applicants is being taken into
cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic
schedule & other status of generation project /dedicated line. However, for any substantial issue, it may be kindly submitted
through official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory
framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not
clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions
(Regulation 18) specifically regarding notice, mentioning the relinquishment quantum, date of relinquishment and consent for
payment of applicable relinquishment charges.
4. CTU emphasized that generation developers should ensure completion of their dedicated transmission lines to match with the
commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements
through LILO of existing lines were provided only as a contingency measure and the generation developers need to implement
the final dedicated transmission system as the matter has been very seriously looked into by Hon’ble CERC in Petition no.
112/TT/2013.
5. All the LTA customers were advised to clear the consultancy payment liabilities at the earliest towards implementation of bays for termination of dedicated/connectivity lines for timely implementation of the same. In case of failure, the generation developers/applicants shall alone be responsible towards any delay in implementation of the bays.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 2 of 27
6. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and
Detailed procedure made therein.
7. It is noted that some of the generation developers/ applicants have been repetitively not attending the JCC Meetings. All such
generation developers/ applicants were requested to attend the future meetings so as to have a better co-ordination.
8. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been
commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being
called for further JCC meetings (Details of all such generation projects as per Table T1 (i) & T1 (ii)).
9. As per the 9th JCC meeting, a no. of LTA customers were requested to sign the Transmission Service Agreement (TSA) at the earliest in accordance with CERC Sharing Regulations. However, none of them have signed TSA till date. It is once again advised that the LTA customers shall sign the TSA at the earliest. List of the generation developers who are yet to sign the TSA is enclosed herewith at Annexure- II.
10. The LTA Customers were requested to update the progress of their generation projects and the discussions are summarised below:
Status of the Generation Projects ����
HIGH CAPACITY TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule
(as per 11th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
1. Sterlite Energy
Ltd (4x600 MW)
400 0
200 0
200 0
0 0
U1, U2, U3 & U4-
Commissioned
progressively by Apr’12
U1, U2, U3 & U4-
Commissioned progressively
by Apr’12
400kV Sterlite-Jharsuguda Pool
D/c line: completion expected by Feb’17
Petition filed in CERC for relinquishment of entire LTA quantum.
The generation developer was once again advised to
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 3 of 27
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule
(as per 11th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
implement the dedicated line and remove the interim arrangement at the earliest.
2. Monnet Power Company Ltd (2x525 MW)
900 300 225 225 150 400MW-
West Bengal
Not attended (project in abeyance)
Not attended 400kV Monet TPS-
Angul Pool D/c line- Dec’16
LTA Customer is yet to open LC and sign TSA.
It was advised to submit fresh application for change in Region to supply power to West Bengal.
3.
Lanco Babandh
Power Pvt Ltd (2x660 MW)
800 325 650
475 150
0 0
UP: 424MW Rajasthan: 350 MW
(total-774MW)
Uncertain Not attended
U1&2: March’18
400kV Lanco TPS-Angul Pool D/c line + 3x500MVA ICT at
Angul Pool: Commissioning matching with
generation project.
Status submitted through letter dated 22.12.2016.
LTA Customer is yet to open LC. Dedicated transmission line has not yet been awarded.
Consultancy for terminal bays at Angul Substation (POWERGRID) has not been awarded as yet.
Generation developer has filed Petition No. 38/MP/2016 in Hon’ble CERC for keeping its LTA on abeyance on account of alleged force majeure condition.
Applicant to apply for change in region through a fresh application, if it desires to supply additional 124MW
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 4 of 27
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule
(as per 11th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
to NR (774MW-650MW) and shall be liable for payment of applicable relinquishment charges as decided by CERC in the petition no. 92/MP/2015.
4.
Ind Barath Energy(Utkal)
Ltd (2x350 MW)
616 266
116
350
0 0
0 500
Tamil Nadu : 500 MW GRIDCO :
81 MW
U1: COD (20.07.16)
(through LILO) U2: March’17 (Synchronization)
U1: COD (20.07.16)
(through LILO)
U2: March’17 (Synchronization)
400kV Ind barath-Jharsuguda Pool D/c line: Completed on 28.09.16 (Construction completed, line charging expected by 21.01.17)
Fresh application required for GRIDCO share on account of change in region. Applicant informed that they have approached Odisha for issuance of NOC from STU for supply of 81 MW to GRIDCO.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 5 of 27
HIGH CAPACITY TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th JCC)
Dedicated / Connectivity line & Status
Remarks NR WR ER
1.
Essar Power (Jharkhand) Ltd. (2x600 MW)
1100 400 400 300
Bihar: 750 MW
Jharkhand: 12% (127
MW)
U-1 : Nov’18
U-2 : Jan’19
U-1 : Nov’18
U-2 : Jan’19
400kV Essar TPS - Jharkhand Pooling Station D/c line (Quad) : Commissioning matching with generation projects
Representative informed that they are withdrawing their earlier petitions for relinquishment and abeyance of LTA and are proposing to file a fresh petition for relinquishment of entire 1100 MW.
Also informed that they have made a request for relinquishment of entire 1100 MW towards which CTU informed that the request has been made subject to various conditions which are not in line with the CERC Regulations. Applicant was advised to submit unconditional acceptance to pay the relinquishment charges.
2. WBSEDCL (1000 MW State surplus)
1000 600 400 0 Not attended Not attended -
Representative consistently not attending JCC meeting; status of progress not submitted since 5
th JCC;
CTU informed that recently WBSEDCL has expressed
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 6 of 27
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th JCC)
Dedicated / Connectivity line & Status
Remarks NR WR ER
their intention to exit from the LTA and applicant has been informed to give proper notice & acceptance to pay applicable relinquishment charges in terms of CERC Regulations (18). The same is yet to be received from WBSEDCL.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 7 of 27
HIGH CAPACITY TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER
1
PTC /Teesta Urja Ltd.
(Teesta-III) (6x200 MW)
1200 840 0 144
Punjab: 340 MW
Haryana: 200 MW
UP: 200 MW Rajasthan: 100 MW
Sikkim: 144 MW
U1: Dec’16 U2: Jan’17 U3:Jan’17 U4: Feb’17 U5 & U6: Mar’17
U1: Jan’17 U2: Jan’17 U3:Jan’17 U4: Feb’17 U5 & U6: Mar’17
400kV Teesta III - Kishanganj D/c (Quad) line (being implemented by TPTL): ISTS line upto Rangpo commissioned in Nov’16 and balance portion upto Kishanganj expected to be commissioned by 31.03.17.
Teesta-III HEP representative informed that SPS scheme at their switchyard has been implemented. Teesta-III HEP representative confirmed that no action may be taken on letter dated 22.12.2016 regarding operationalization till receipt of request from the LTA applicant, i.e. PTC.
2
Lanco Teesta Hydro Power
Ltd, (Teesta-VI) (4x125 MW)
500 0 500 0 MSEDCL-500 MW
Not attended Not attended
220 kV Teesta VI- Rangpo D/c Twin Moose Conductor line : Dec’17; bay work yet to be awarded
Applicant had earlier been advised to sign TSA at the earliest.
3
DANS Energy Pvt.
Ltd. (Jorethang)
(2x48)
96 48 48 0 Commissioned Commissioned
220kV Jorethang - New Melli D/c line- commissioned in Nov’16;
Applicant was advised to implement the SPS scheme at the earliest.
4
JAL Power Corporation (Rangit-IV) (3x40 MW)
120 16 16 88 WBSEDCL-
72MW
Not attended U1: Nov’18
U2&3: Dec’18
U1: Sep’19
U2&3: Oct’19
220kV Rangit IV - New Melli D/c line: expected by Dec’17
For implementation of bay (at New Melli) on deposit works basis, applicant informed that they shall approach POWERGRID after getting funds from Sikkim Govt.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 8 of 27
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER
which is likely by Mar’17.
5
Madhya Bharat Power
Corpn Ltd. (Rongnichu) (2x48 MW)
96 56 40 0 Nil Not attended U1: Nov’18
U2: Dec’18
220kV Rongnichu-Rangpo D/c Zebra conductor line: Jul’18
(award expected by Feb’17)
80% of the excavation works has been completed. Notice to Proceed (NTP) for main plant is yet to be issued.
Applicant was advised to sign TSA at the earliest.
Applicant to confirm firm timeline for completion of bays at Rangpo S/S & submit status of NIT/Award.
6
Gati Infrastructure
Ltd (Chuzachen) (2x49.5 MW)
99 99 0 0 Commissioned Commissioned
132kV Chuzachen-Rangpo D/c Zebra Conductor line – Expected by Dec’17
Generation Developer informed that Re-tendering for bays at Rangpo by Govt of Sikkim is underway.
Interim arrangement made through connection of 132 kV Rangpo - Gangtok S/c line at Chuzachen;
The generation developer was advised once again to implement the dedicated line and remove the interim arrangement at the earliest.
7
Gati Infrastructure
Bhasmey Power Pvt.
Ltd. (Bhasmey)
(2x25.5 MW)
51 36 15 0 West Bengal
: 30 MW U1: Mar’18 U2: Mar’18
U1: Apr’18 U2: May’18
132 kV Bhasmey- Rangpo D/c line – matching with generation project
Applicant was once again advised to submit fresh application for change in Region to supply power to West Bengal.
Supplementary BPTA and
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 9 of 27
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER
TSA to be signed at the earliest.
A meeting is to be convened among CTU, CEA, Govt of Sikkim & Generation Developer at Gangtok for resolution of all the matters in Jan’17. Representative of Bhasmey assured for coordinating the same in the month of Jan’17.
Regarding immediate evacuation, CTU clarified that LILO of Chuzachen – Rangpo line at Bhasmey earlier intimated is no more valid and the final dedicated system is 132 kV Bhasmey-Rangpo D/c line.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 10 of 27
(Phase-II IPPs in Odisha)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
1.
GMR Kamalanga Energy Ltd
(1x350 MW)
220 0 220 0 0 Uncertain Not attended
400kV GMR TPS-Angul Pool D/c (Quad) line with
bays at both ends: Commissioned
Applicant had earlier confirmed that Petition has been filed before CERC for relinquishment of entire quantum.
2. NTPC Ltd. (Darlipalli)
(2x800 MW) 793.5 0 0 793.5 0 Nil
U1:
Jun’18 U2:
Dec’18
U1: Jun’18 U2: Dec’18
765 kV Darlipalli-Jharsuguda two D/c
line- 1st line
expected by Sep’17
2nd
line: Expected by Sep’19
Best efforts shall be made by POWERGRID for early commissioning as per the indemnification agreement by POWERGRID for early commissioning.
3.
Orissa Power Generation Company
Ltd. (2x660 MW)
600 200 200 0 200 Nil
Not attended:
U1: July’17
U2: Nov’17
Not attended
400 kV OPGC-Jharsuguda D/c line with Triple snowbird conductor : Under
TBCB, scheduled by Jul’17
Applicant had been advised to sign TSA at the earliest
4.
K V K Nilachal
Power Pvt. Ltd
(3x350 MW)
560 140 140 140 140 Odisha:
25% (263 MW app)
Uncertain Not attended
LILO of one ckt of 400kV Baripada-
Mendhasal D/c line – matching with
Gen. Proj
Applicant had earlier informed that PIL has been disposed of in favor of Generation developer. However, work could not be taken up on account of tying up of finances.
Applicant to sign TSA at the earliest.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 11 of 27
5. Sterlite
Energy Ltd (4x600 MW)
1000 400 400 200 0 Commissi
oned Commissioned
400kV Sterlite-Jharsuguda Pool
2nd
D/c line: Requirement to be
reviewed in the next ER Connectivity /LTA meeting.
Petition filed in CERC for relinquishment of entire LTA quantum
The generation developer was advised to implement the 1
st 400 kV D/C
dedicated line and remove the interim arrangement at the earliest.
Applicant informed that feasibility report for 2
nd line
has been received from the consultant and the report would be shared with CEA/CTU.
6. GRIDCO Ltd
(Darlipali) 748 0 0 748 0
Odisha: 748 MW
Not attended
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 12 of 27
(Phase-II IPPs in Sikkim)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule
(as per 10th
JCC)
Comm. schedule (as per 11
th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
1.
Shiga Energy Pvt. Ltd.
(Tashiding) 2x48.5 MW
97 48.5 48.5 0 0 NIL U-1 & 2: Dec’16
U1: Dry commissioning
completed U2: expected
by Dec’16
220kV Tashiding -Legship D/c line –
expected by Dec’16
Legship- New Melli and bays at New Melli (under scope of Govt. of Sikkim) to be expedited.
2.
Sneha Kinetic Power Projects Ltd
(Dikchu) (2x48 MW)
96 0
48 0
48 0
0 0
0 0
Nil U1&2: Nov’16
U1&2: Jan’17
132 kV Dikchu- Dikchu Pool D/c
Moose conductor/ HTLS line :
400kV Interim arrangement
through LILO of one ckt of Teesta-III to Rangpo D/c line at
Dikchu (being implemented by M/s
Sneha Kinetic) –Jan’17
132 kV Dikchu- Dikchu Pool D/c line (under scope of Govt. of Sikkim) to be expedited.
Granted LTA was withdrawn/ revoked as the applicant failed to sign LTAA.
3.
Sikkim Hydro Power
Ventures Ltd- 2x33 MW
66 40 26 0 0 NIL
Not attended: Dec’18
Not attended
132 kV Rangit II – Legship Pool D/c line (along with 2
nos. of 132 kV line bays at legship
pool): Matching with generation project
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 13 of 27
Other Generation Projects – Granted LTA
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm
beneficiary
Comm. schedule (as per 10
th
JCC)
Comm. schedule (as per 11
th
JCC)
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
1 Nabinagar-II 1866.15 0 0 1726.19
0
Bihar: 1463.23 MW Jharkhand: 56.55 MW
Sikkim: 9.43 MW
UP: 196.98 MW
- U1: Jun’17 U2: Dec’17 U3: Jun’18
400 kV Nabinagar II-Gaya D/c line:
Apr’19 400 kV Nabinagar II-Patna D/c line:
Apr’19
Best efforts shall be made by POWERGRID for early commissioning of 400 kV Nabinagar-II-Gaya D/c line in 3rd quarter of FY-17-18.
2 NTPC Ltd
(North Karanpura)
1856.25 0 0 1856.
25 0
SBPDCL: 374.1 MW NBPDCL: 270.9 MW
JUVNL: 468.75 MW GRIDCO:
371.25 WBSEDCL: 92.81 MW
- U1: Feb’19 U2: Aug’19 U3: Feb’20
400 kV NTPC North Karanpura STPP
Generation Switchyard
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 14 of 27
Applicant granted Connectivity
Sl No
Generation Developer/ Open Access Applicant
Connectivity Quantum (MW)
Comm. Schedule
(TA/Intimation)
Comm. schedule
(as per 10th
JCC)
Comm. schedule (as per 11
th JCC)
Dedicated / Connectivity line &
Status Remarks
1 India Power Corporation Ltd (Bulk consumer) (Erstwhile
DPSC Ltd.) 500 Jul'14
Applicant requested for change in point of connectivit
y from 400/220 kV Chabalpur substation to 220 kV Debipur
substation
Not attended
LILO of 400kV Mejia-Maithon line at Chalbalpur 400kV S/s of DPSC:
Applicant was advised to submit fresh application for change in location of point
of connectivity.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 15 of 27
List of Generation Projects for which coordination not required in view of commissioning of projects along with the dedicated lines, or relinquishment of LTA
HIGH CAPACITY TRANSMISSION CORRIDOR – I
(Phase-I IPPs in Odisha & associated Transmission System) Table T 1 (i)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum (MW)
Target Beneficiaries Firm beneficiary
Last updated schedule
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
1.
GMR Kamalanga Energy Ltd (3x350 MW)
800
647
600
540
387
0
0
260
200 0
300-Haryana 260 - Bihar
8th JCC:
Project and dedicated line commissioned
400kV GMR TPS-Angul Pool D/c (Quad) line-commissioned in Dec’14;
GMR TPS- Meramundali 400 kV S/c - commissioned in Mar’15
Petition for relinquishment filed before CERC & the matter is under adjudication.
Meanwhile, GMR had applied for fresh LTA for change in region of 260 MW, which has been granted subject to payment of relinquishment charges for change in region.
LTA quantum reduced from 800 MW to 647 MW on account of relinquishment by GMR as per letter dated 21.06.2016 with consent for payment of relinquishment charges as per CERC decision in Petition No. 92/MP/2015.
2.
Navabharat Power Pvt.
Ltd
(3x350 MW)
720 465 255 0 0 8
th JCC:
Project Abandoned
400kV Navbharat
TPS-Angul Pool D/c line: Abandoned
Developer has applied for relinquishment and the case is pending in CERC. Order is reserved.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 16 of 27
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum (MW)
Target Beneficiaries Firm beneficiary
Last updated schedule
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
Applicant was advised to sign TSA at the earliest
3.
Jindal India Thermal
Power Ltd (2x600 MW)
1044
0
834
0
210 0
0 0 Commissioned
400kV Jindal TPS-Angul Pool D/c line
1st Ckt)- Commissioned
Gen. developer vide letter dated 26.12.2016 confirmed that Section-68 has been applied to CEA & four parties for survey work have been finalized for the 2
nd dedicated line.
Petition filed in CERC for relinquishment of entire LTA quantum. Order is reserved.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 17 of 27
HIGH CAPACITY TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)
Table T 1 (ii)
Sl. No.
LTOA / LTA Applicant
LTOA/LTA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Last updated schedule
Dedicated / Connectivity line &
Status Remarks
NR WR ER SR
1.
Adhunik Power & Natural
Resources Limited
(2x270 MW)
450
200
50 200
100
0
100
Tamil Nadu: 100 MW &
West Bengal: 100 MW;
(Operational)
8th JCC:
Project and dedicated line commissioned
400kV Adhunik TPS-Jamshedpur D/c line-
Commissioned
Applicant has filed a petition before CERC for relinquishment for 250 MW (NR: 200 MW, WR: 50 MW) of LTA and return of BG for 450 MW. LTA for 100 MW to Tamil Nadu & 100 MW to West Bengal operational
2.
Corporate Power Limited
Ph-I (2x270 MW)
480 240 240 0 0 Special JCC: Project
uncertain
400kV Corporate TPS-Jharkhand Pooling Station D/c line: Not taken up
Developer had earlier confirmed in the Special JCCthat project is uncertain due to de-allocation of Coal Blocks and requested for relinquishment of LTA.
Matter is sub-judice.
3.
Corporate Power Limited
Ph-II (2x270 MW)
480 240 240 0
0
Special JCC: Project
uncertain
400kV Corporate TPS -Ranchi D/c line: Not taken up
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 18 of 27
Status of the Associated Transmission System ����
HIGH CAPACITY TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)
Transmission System under the Scope of POWERGRID:
• Transmission System for Phase-1 generation projects in Odisha - Part-A
Sl. No.
Scope of Transmission System Status (as per 10
th JCC)
Status (as per 11
th JCC)
Remarks
1 765kV Angul Pooling Station – Jharsuguda Pooling Station 2xS/c line
Commissioned
Commissioned
2 LILO of 400kV Rourkela – Raigarh D/c at Jharsuguda Pooling station Commissioned Commissioned
3 LILO of 400kV Meramundali – Jeypore S/c line at Angul pooling station Commissioned Commissioned
4 LILO of 400kV one ckt of Talcher - Meramundali D/c line at Angul pooling station
Commissioned Commissioned
5 Establishment of 2x1500 MVA, 765/400kV Pooling Station at Jharsuguda Commissioned Commissioned
6 Establishment of 4x1500MVA, 765/400kV Pooling Station at Angul Commissioned Commissioned
• Transmission System for Phase-1 generation projects in Odisha - Part-B
Sl. No.
Scope of Transmission System Status (as per 10
th JCC)
Status (as per 11
th JCC)
Remarks
1 Establishment of 765kV switching station at Dharamjaygarh / near Korba Commissioned Commissioned
2 LILO of 765kV Ranchi – WR Pooling near Sipat S/c line at Dharamjaygarh / near Korba
Commissioned Commissioned
3 765kV Jharsuguda Pooling Station – Dharamjaygarh / near Korba (WR) D/c Commissioned Commissioned
4 Establishment of 765/400kV Pooling Station at Jabalpur Commissioned Commissioned
5 765kV Dharamjaygarh / near Korba – Jabalpur Pooling Station D/c line Commissioned Commissioned
6 400 kV Jabalpur Pooling Station – Jabalpur D/c (high capacity) line Commissioned Commissioned
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 19 of 27
• Transmission System for Phase-1 generation projects in Odisha - Part-C
Sl. No.
Scope of Transmission System Status (as per 10
th JCC)
Status (as per 11
th JCC)
Remarks
1 765kV Jabalpur Pooling Station – Bina D/c line Commissioned Commissioned
2 765kV Bina – Gwalior S/c (3rd circuit) Commissioned Commissioned
3 765kV Gwalior - Jaipur S/c line (2nd circuit) Commissioned Commissioned
4 765kV Jaipur - Bhiwani S/c line (1st circuit) Commissioned Commissioned
Transmission System under the Scope of Private Sector:
Sl. No.
Scope of Transmission System Status (as per 10th JCC)
Status (as per 11
th JCC)
Remarks
1 Establishment of 2x1500MVA, 765/400kV Bhopal Pooling Station Commissioned Commissioned
2 765kV Jabalpur Pool – Bhopal – Indore S/c Commissioned Commissioned
3 400kV Bhopal New substation – Bhopal (M.P.) D/c (high capacity) Commissioned Commissioned
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 20 of 27
HIGH CAPACITY TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)
Transmission System under the Scope of POWERGRID:
• Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-1
Sl. No.
Scope of Transmission System Status (as per 10th JCC)
Status (as per 11
th JCC)
Remarks
1 Establishment of 400kV GIS Pooling Station (Jharkhand Pool) near Essar and Corporate generation projects.
Commissioned Commissioned
2 400 kV Ranchi - Gaya D/c (Quad) line via pooling station proposed near Essar / Corporate generation projects
Commissioned Commissioned
• Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-2
Sl. No.
Scope of Transmission System Status (as per 10th JCC)
Status (as per 11
th JCC)
Remarks
1 Ranchi New (765/400kV S/s) - Dharamjaygarh / near Korba 765kV S/c Commissioned Commissioned
2 2x1500 MVA, 765/400 kV New GIS substation at Varanasi Commissioned Commissioned
3 Gaya - Varanasi 765kV S/c Commissioned Commissioned
4 Varanasi - Balia 765 kV S/c line Commissioned Commissioned
• Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-B
Sl. No.
Scope of Transmission System Status (as per 10th JCC)
Status (as per 11
th JCC)
Remarks
1 New 2x1500 MVA, 765/400 kV substation at Kanpur Commissioned Commissioned
2 Varanasi – Kanpur 765 kV D/c Commissioned Commissioned
3 Kanpur – Jhatikra 765 kV S/c Commissioned Commissioned
4 Kanpur (765/400kV) – Kanpur (Existing) 400kV D/C (Quad) Commissioned Commissioned
5
400kV connectivity for new 765/400kV S/s at Varanasi
• Varanasi – Sarnath (UPPCL) 400kV D/c (quad)
• LILO of Sasaram – Allahabad 400kV line at Varanasi
• Opening of LILO of one ckt of Sasaram – Allahabad 400kV D/c line at Sarnath
Oct’16
Commissioned
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 21 of 27
• Transmission System under the Scope of Private Sector:
Sl. No.
Scope of Transmission System Status (as per 10th JCC)
Status (as per 11
th JCC)
Remarks
1 Dharamjaygarh – Jabalpur 765kV D/C line (2nd
line) Commissioned Commissioned
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 22 of 27
HIGH CAPACITY TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)
Transmission System under the Scope of POWERGRID:
• Transfer of power from generation projects in Sikkim to NR/WR
Sl No
Scope of Transmission System Status
(as per 10th JCC) Status
(as per 11th JCC) Remarks
1 Establishment of New 2x500 MVA, 400/220 kV sub-station at Kishanganj Commissioned Commissioned
2 LILO of New Siliguri – New Purnea 400kV D/c line (quad) at Kishanganj Commissioned Commissioned
3 LILO of Siliguri – Dalkhola 220kV D/c line at Kishanganj Commissioned Commissioned
4 Establishment of 16x105MVA, 1 ph, 400/220kV and 3x100MVA 220/132kV, Gas Insulated Substation at Rangpo
Commissioned Commissioned
5 Establishment of 220kV Gas Insulated switching station at New Melli Commissioned Commissioned
6 LILO of Teesta III – Kishanganj 400kV D/c line (quad, Teesta III – Kishanganj 400kV D/c line under JV route) at Rangpo (with Twin HTLS)
Oct’16 (1st LILO) 1st LILO
commissioned in Nov’16.
One ckt. LILO completed and commissioned in Nov’16. 2nd LILO is being taken up as a separate project under part B1 of the scheme.
7 Rangpo – New Melli 220kV D/c line (with Single HTLS conductor) Commissioned Commissioned
8 LILO of Gangtok – Rangit 132 kV S/c line & Gangtok- Melli 132 kV S/c line at Rangpo
Commissioned Commissioned
9 LILO of Teesta V – Siliguri 400kV D/c line at Rangpo Commissioned Commissioned
10 Kishanganj – Patna 400kV D/c (quad) line Commissioned Commissioned
Transmission System under the Scope of TPTL (ISTS licensee):
Sl. No.
Scope of Transmission System Status (as per 10th JCC)
Status (as per 11
th JCC)
Remarks
1 Teesta III – Kishanganj 400kV D/c (Quad) line
Line upto Rangpo S/S – Oct ‘16 Balance portion upto Kishanganj S/S- Mar’17
Line upto Rangpo S/S Commissioned in Nov’16.
Balance portion upto Kishanganj S/S- Mar’17
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 23 of 27
Status of other Associated Transmission System ����
(GRIDCO) Phase-II IPPs in Odisha & associated Transmission System
Transmission System under the Scope of POWERGRID:
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Remarks
1 Angul-Jharsuguda (Sundargarh)-Dharamjaygarh 765 kV D/c (2nd
) line Jun’17
2 Addition of 2x1500MVA, 765/400 kV ICTs at Jharsuguda (Sundargarh) Apr’19
4 Split bus arrangement at 400 kV and 765 kV bus at Jharsuguda (Sundargarh) substations.
Apr’19
5 LILO of both circuits of Rourkela-Raigarh 400 kV D/c (2
nd) at Jharsuguda
(Sundergarh) substation Apr’19
Transmission System under the Scope of TBCB:
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Remarks
1 Jharsuguda (Sundargarh) – Raipur Pool 765 kV D/c
Aug’19 (As per SPV
transfer)
TBCB line is being monitored by CEA. However, POWERGRID will make the best effort to prepone the commissioning of bays and reactors.
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 24 of 27
Status of other Associated Transmission System ����
(North Karanpura)
Transmission System under the Scope of TBCB:
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Remarks
1 400 kV North Karanpura – Gaya D/c line with quad moose conductor Sep’19
(As per SPV transfer)
TBCB line is being monitored by CEA.
2 400 kV North Karanpura – Chandwa (Jharkhand) Pooling Station D/c line with quad moose conductor
Sep’17 (As per SPV
transfer)
TBCB line is being monitored by CEA.
Transmission System under the Scope of POWERGRID:
Sl. No.
Scope of Transmission System Status (as per 11th JCC)
Remarks
1 2 no 400 kV D/c line bays at Gaya for termination of North Karanpura-Gaya 400 kV D/c line
Sep’19
Completion of bays extension work matching with completion of TBCB line.
2 2 nos of 400 kV D/c line bays at under construction Chandwa (Jharkhand) Pooling Station for termination of North Karanpura – Chandwa 400 kV D/c line
Sep’17
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 25 of 27
Annexure-I List of Participants in the 11th Joint Co-ordination committee Meeting of IPPs granted LTA in ER held on 27.12.2016
Sl. No.
Name Designation Organization Email
1 Ajay Kumar Asst. Director Central Electricity Authority [email protected]
2 Shivani Sharma Deputy Director Central Electricity Authority [email protected]
3 Subir Sen COO (CTU-Plg & SG) POWERGRID [email protected]
4 Avinash M Pavgi GM (Commercial) POWERGRID [email protected]
5 D N Rozekar AGM (CTU-Plg) POWERGRID [email protected]
6 A K Dixit DGM (BDD) POWERGRID [email protected]
7 Jyoti Prasad DGM (CTU-Plg-Law) POWERGRID [email protected]
8 Ramchandra DGM (CTU-Plg) POWERGRID [email protected]
9 D Nikhandia Asst GM POWERGRID [email protected]
10 Anil K Meena CM (CTU-Plg) POWERGRID [email protected]
11 Rajesh Verma CM (CTU-Plg) POWERGRID [email protected]
12 Laxmikant Manager (CTU-Plg) POWERGRID [email protected]
13 Manish Pareta Sr.Engineer (CTU-Plg) POWERGRID [email protected]
14 Ankush Patel Engineer (CTU-Plg) POWERGRID [email protected]
15 Dwaipayan Sen Engineer (CTU-Plg) POWERGRID [email protected]
16 Narendra Sathvik Engineer (Smart Grid) POWERGRID [email protected]
17 Kumar Sanjeev Engineer (CMG) POWERGRID [email protected]
18 Ajay Kumar Sr Manager (Commercial) Essar Power Ltd [email protected]
19 A N Agrawal/ Prabhat suyal
GM (Transmission) Madhya Bharat Hydro Power Corporation [email protected]
20 R S Chadha Sr VP (T) Jal Power Corporation Limited [email protected]
21 P C Sharma President Shiga Energy Pvt Ltd [email protected]
22 Nukala Kishore Manager Shiga Energy Pvt Ltd [email protected]
23 Sanjeev Kumar Bhamli Sr Manager Nabinagar Power Generation Co. [email protected]
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 26 of 27
Sl. No.
Name Designation Organization Email
24 Jaideep Lakhtakiya GM Teesta Urja Limited [email protected]
25 Aman Sr Engineer Teesta Urja Limited [email protected]
26 Ravi Shankar Manager PTC India Limited [email protected]
27 S Naresh Kumar Sr Manager Teestavalley Power Transmission Limited [email protected]
28 R C Mahapatra Adviser (Power) Ind-Bharat Energy (Utkal) Limited [email protected]
29 Anshuman Gothwal Manager Gati Infrastructure Pvt Ltd [email protected]
30 Rajesh Sharma AGM Gati Infrastructure Pvt Ltd [email protected]
31 Aditya Pyasi AGM & Head Regulatory Vedanta Ltd [email protected]
Minutes of 11th
JCC of Eastern Region held on 27.12.2016
Page 27 of 27
Annexure-II
The following applicants are requested to sign the Transmission Service Agreement
Sl. No. LTOA / LTA Applicant
LTOA/ LTA Quantum
(MW)
Target Beneficiaries
NR WR ER SR
1. Essar Power (Jharkhand) Ltd.
(2x600 MW) 1100 400 400 300 0
2. Lanco Teesta Hydro Power Ltd,
(Teesta-VI) (4x125 MW) 500 0 500 0 0
3. Madhya Bharat Power Corpn Ltd.
(Rongnichu) (2x48 MW) 96 56 40 0 0
4. Orissa Power Generation Company
Ltd. 600 200 200 0 200
5. Monnet Power Company Ltd 900 300 225 225 150
6. KVK Nilachal Power Pvt. Ltd 560 140 140 140 140
7. Navbharat Power Pvt. Ltd 720 465 255 0 0
8. Sterlite Energy Ltd 400 200 200 0 0
9. Gati Infrastructure Ltd (Bhasmey) 51 36 15 0 0