SCOPING MISSION REPORT DISASTER RISK MANAGEMENT REQUIREMENTS OF METRO MANILA December 2009 Photo taken along Ortigas Avenue in Pasig City Philippines a day after Tropical Storm Ketsana hit Metro Manila on 26 September 2009 (Photo courtesy of Nonie Reyes). This report was prepared by the Scoping Mission Team: John Schneider and Greg Scott, Geoscience Australia; and Anne Orquiza, AusAID
29

Disaster Risk Management Needs of Metro Manila: A Scoping Report

Nov 01, 2014

Download

Education

anne.orquiza

A scoping mission was conducted by AusAID and Geoscience Australia in October 2009 right after Tropical Storm Ketsana flooded Metro Manila. The report recommends critical intervention for Metro Manila (i.e., disaster preparedness, prevention and mitigation) that can be supported by the Australian Government.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Disaster Risk Management Needs of Metro Manila: A Scoping Report

 

 

 

 

 

  

SCOPING MISSION REPORT 

DISASTER RISK MANAGEMENT REQUIREMENTS OF METRO MANILA December 2009 

  

Photo taken along Ortigas Avenue in Pasig City Philippines a day after Tropical Storm Ketsana hit Metro Manila on 26 September 2009 (Photo courtesy of Nonie Reyes).

  This report was prepared by the Scoping Mission Team:  John Schneider and Greg Scott, Geoscience Australia; and Anne Orquiza, AusAID

Page 2: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 2 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

Abbreviations and Acronyms  

AusAID   Australian Agency for International Development 

BOM    Bureau of Meteorology 

CCA    Climate Change Adaptation 

CLUP    Comprehensive Land Use Plan 

CSCAND  Collective Strengthening of Community Awareness for Natural Disasters 

DEM    Digital Elevation Map 

DPWH    Department of Public Works and Highways 

DRM    Disaster Risk Management 

DRR    Disaster Risk Reduction 

GA    Geoscience Australia 

GOP    Government of the Philippines 

LDCC    Local Disaster Coordinating Council 

LGU    Local Government Unit 

LIDAR    Light Detection and Ranging 

MGB    Mines and Geosciences Bureau 

MMDA   Metro Manila Development Authority 

MMEIRS  Metro Manila Earthquake Impact Reduction Study 

NAMRIA  National Mapping and Resource Information Agency 

NDCC    National Disaster Coordinating Council 

NEDA    National Economic Development Authority 

NEXIS    National Exposure Information System 

OCD    Office of Civil Defense 

PAGASA  Philippine Atmospheric, Geophysical and Astronomical Services  

PHIVOLCS  Philippine Institute of Volcanology and Seismology  

PNRC  Philippine National Red Cross 

PROJECT 143  Strengthening the Disaster Management Capacities of Communities 

READY Project Hazard Mapping and Assessment for Effective Community and Disaster Risk Management 

REDAS    Rapid Earthquake Damage Assessment System 

SDI    Spatial Data Infrastructure 

UNDP    United Nations Development Bank 

UP    University of the Philippines 

WB    World Bank 

Page 3: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 3 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

Table of Contents  

Contents  Page 

  Acronyms and Abbreviations…………………………………………………………………………….  2 

  Table of Contents………………………………………………………………………………………………  3 

  Summary……………….………………………………………………………………………………………….  4 

     

I  Background……………………………………………………………………………………………………….  6 

II  The Scoping Mission………………………………………………………………………………………….  9 

III  Potential Opportunities for Engagement…………………………………………………………..  11 

IV  Recommendations and Next Steps……………………………………………………………………  16 

     

  Annexes   

1  Scoping Mission Summary of Program…………..………………………………………………….  20 

2  Highlights of Discussions with Agencies…………………………………………………………….  21 

3  List of People Consulted.…………………………………………………………………………………..  27 

 

Page 4: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 4 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

SUMMARY  Tropical Storm Ketsana hit the Philippines on 26 September 2009 and flooded Metro Manila and  neighboring  provinces.    In  response,  the  Australian Government  provided  a  total  of AUD3.10 million for emergency assistance to communities and families in Metro Manila and Southern Tagalog.   AusAID and Geoscience Australia also undertook a  scoping mission  to understand  the  context  of  the  flooding  and  scope  out  the  disaster  risk  reduction  and management requirements of Metro Manila.  Since  the  flooding  affected  Metro  Manila  and  the  provinces  of  Laguna  and  Rizal,  the National Disaster Coordinating Council ‐ Collective Strengthening of Community Awareness for  Natural  Disaster  agencies were  in  consensus  that  this  conurbation,  referred  here  as Greater Manila Area, should be the coverage of future risk reduction initiatives.  The following disaster risk reduction and management needs and options were identified.  1. Collect  inundation and damage data  from Ketsana  to  improve understanding of  flood 

forecasting and risk. 2. Undertake  hazard mapping  for  all  relevant  natural  hazards  (e.g.  flood,  storm  surge, 

severe wind, earthquake, tsunami, landslide, liquefaction and volcanic eruption). 3. Develop an urban flood modeling capability to capture the combined effects of riverine 

and flash flooding in the urban environment. 4. Assess earthquake and flood risk to Greater Manila Area through a robust understanding 

of  the  hazard  and  the  potential  impacts  (damage,  loss  of  life,  social  disruption  and economic cost). 

5. Develop  a  national  exposure  information  system  which  is  an  essential  information platform for extending natural hazard mapping to risk assessment. 

6. Improve flood monitoring through better monitoring of rainfall and stream flow. 7. Improve early warning to better prepare people and communities to disasters and avoid 

or minimize losses. 8. Integrate disaster risk management into the Metro Manila Physical Framework Plan and 

Comprehensive Land Use Plans of local government units. 9. Prepare contingency plans focusing on search and rescue, evacuation, and relief at the 

community or barangay level. 10. Formulate disaster risk management plan for the metropolitan area to tackle disasters of 

huge magnitude and better coordinate efforts of local governments.  Given these risk reduction and management needs and options, a comprehensive program of hazard and risk assessment to improve the scientific and technical foundations of disaster risk management is recommended.  1.  Immediate to short‐term (3‐6 months) 

a. Provide inputs to Post‐Disaster Needs Assessment. b. Build  data  and  analytical  tool  through  lessons  learned  and  high  resolution 

topographic information. c. Design Metro Manila recovery and reconstruction program and prepare action plan 

for Metro Manila urban planning. 

Page 5: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 5 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

 2.  Medium to long‐term (1‐4 years) 

a. Undertake  low  resolution mapping  of  relevant  natural  hazards  in  Greater Manila Area (1st to 12th month). 

b. Gather and develop datasets and tools required for higher resolution natural hazard impact analysis (12th to 18th month). 

c.  Undertake  natural  hazard  impact  analyses,  including  climate  change  scenarios,  in high priority areas (1st to 24th month). 

d.  Formulate the Metro Manila Physical Framework Plan (25th to 30th month). e.  Mainstream  disaster  risk  management  and  climate  change  adaptation  into 

development planning (31st to 42nd month). f.  Strengthen early warning system capacity of technical agencies on impact modeling 

and forecasting (12th to 24th month). g.  Strengthen the capacity of communities to prepare for and manage disasters (12th to 

30th month). 

Page 6: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 6 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

I.  BACKGROUND  PHILIPPINES IN THE RING OF FIRE 

The  7101  islands  of  the  Philippines  archipelago  is  situated  in  the  Pacific  ring  of  fire, earthquake belt and typhoon path placing the country second in Asia1 most at risk to natural hazards  such volcanic eruptions, earthquakes and  typhoons  including associated  risks.    In Southeast  Asia,  the  Philippines  accounts  for  30  percent  of  disasters  that  occurred  from 1990‐2009.    At  least  60  percent  of  the  total  land  area  of  the  Philippines  is  exposed  to multiple  hazards, with  74  percent  of  its  population  vulnerable  to  disasters,  ranking  the country  eighth most  vulnerable worldwide  to natural disasters2.    In  economic  terms,  the country  ranks ninth with 80 percent of  its GDP at  risk  to natural hazards.  It  is even more disturbing  in human terms  ‐ mortality risk  is high with the country’s 92 million population vulnerable to natural hazards.    If the same typhoon were to hit Japan and the Philippines, mortality  is  estimated  to  be  17  times  higher  in  the  Philippines.3  More  alarmingly,  this disaster  profile  of  the  Philippines  is  also  strongly  influenced  by  the  pressures  of  climate change, population growth and urbanization making  the country more vulnerable  to both current and future risks.  METROPOLITAN MANILA 

Metropolitan Manila or Metro Manila corresponds to the National Capital Region.    It has a  land area of  636  square  kilometers  or  0.21  percent  of  the Philippines’  aggregate  land  area  which  is connected by an isthmus that is bound on the east by  Laguna  Lake  and  on  the west  by Manila  Bay.  Metro Manila  lies along the flat fluvial and deltaic lands  in  the  west;  and  the  rugged  lands  of Marikina Valley and the Sierra Madre mountains in the east; by the Manila Bay in the west, the larger and fertile plains of Central Luzon in the north, and Laguna  de  Bay  in  the  south.   Metro Manila  is  a member  of  the  Central  Luzon  Basin  composed mainly of recent alluvial deposits. The slope of the land descends generally to the west, southwest or south  direction. A  network  of  natural waterways and  rivers  of  various  sizes  and  importance traverses  the  landscape  to  Laguna  Lake  to  the south and Manila Bay to the west.  Metro Manila is regarded as the Philippines premier urban center, the seat of government and power, and considered as the 18th largest

                                                            1 United Nations International Strategy for Disaster Reduction. 2009. Global Report on Disaster Risk Reduction. 2 World Bank. 2005. Natural Disaster Hot Spots: A Global Risk Analysis. 3 United Nations International Strategy for Disaster Reduction. 2009. 2009 Global Assessment Report on Disaster Risk Reduction: Risk and poverty in a changing climate. 

Page 7: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 7 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

metropolitan area in the world. It  has  a  population  of  11.55 million  (National  Statistics Office, 2007) making  it highly dense  at  almost 18,100 people per  square  kilometer.    The mega city’s contiguous area is composed of 16 cities, one municipality and 1,695 barangays each  independently managed;  is host to 90 percent of the country’s business and financial activities;  cultural,  medical,  educational  and  research  institutions;  as  well  international organizations.  Local government units like cities and municipalities have the responsibility to provide basic social services to their constituency and the authority to manage their natural resources and generate additional revenues.   The administrative management of Metro Manila however  is undertaken by the Metro Manila Development Authority (MMDA).   The services under the jurisdiction of MMDA are those services which have metro-wide impact and transcend legal political boundaries or entail huge expenditures such that it would not be viable for said services to be provided by the individual local government units (LGUs) comprising Metro Manila. These services include: (1) development planning: (2) transportation and traffic management: (3) solid waste disposal and management: (4) flood control and sewerage management: (5) urban renewal, zoning, land use planning and shelter services; and (6) health sanitation, urban protection and pollution control and public safety. Despite the mandate of MMDA, the development  of  LGUs  in  Metro  Manila however  has  been  undertaken  in  isolation  of  the  bigger Metro Manila wide  perspective, reflected  by  the  desire  of  each  local  government  to  implement  its  own  rules  and regulations,  i.e.,  traffic management.    Often, Metro Manila  administration  is  also made more complicated by political affiliations of local chief executives making it hard for MMDA to implement inter‐local government initiatives and regulations.  A MEGA‐CITY AT RISK 

Metro Manila is built on and around active faults, and thus has a very high potential for damaging earthquakes.  In the Asia Pacific region, Metro Manila  is the megacity most at risk  to  earthquakes  with  the  active  West  Valley  fault system  that  cuts  through  the  northeastern  part  of  the metropolis. 4    Studies  indicate  that  magnitude  6 earthquakes  occur  every  37  years  and  magnitude  7 earthquakes every 200 to 400 years.  The high population density coupled with this active fault system could have a devastating  impact  on Metro Manila.   A  recent  study  of earthquake  risk  to  Metro  Manila  indicates  that  a magnitude 7.2 earthquake on the West Valley fault could result  in  33,000  deaths  and  38  percent  damage  to residential structures 5.   Tsunamis triggered from offshore earthquakes also pose a risk to Metro Manila.  The  Philippines  has  the  greatest  number  of  people exposed  to  very  high  volcanic  hazards  with  volcanic disasters affecting more  than 100,000 people once every 

                                                            4 Geoscience Australia. June 2008. AUSGEO News. Assessing natural disaster risk in the Asia Pacific region. 5 Metro Manila Earthquake Impact Study, MMDA, 2004? 

Page 8: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 8 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

few  decades.6  Metro Manila  in  particular  is  located  near  two  active  volcanoes,  namely Mount Pinatubo  to  the north and Taal Volcano  to  the  south, making  it highly exposed  to volcanic hazards.  As a low‐lying area, Metro Manila is highly vulnerable to riverine flooding, storm surge and severe  wind,  particularly  given  the  frequency  of  cyclonic  activity  –  an  average  of  20 typhoons hit the Philippines in a year, at least five of which are destructive.  Moreover, the eastern portion of Metro Manila  is  traversed by Marikina River, a major river system  that stretches from Rizal Province to eastern Metro Manila, connects to Laguna Lake and passes through  heavily  populated  residential  areas  and  important  commercial  and  industrial districts at  its middle and downstream portions.   Historically, approximately half of Metro Manila  is  subject  to  flooding at a  return period of 100 years or  less7.   The  river  regularly overflows  its  banks,  and  floods  the  surrounding  basin  during  periods  of  heavy  rains  as experienced on 26 September 2009 when Tropical Storm Ketsana (Ondoy) poured down on Metro Manila.   METRO MANILA IN THE EYE OF KETSANA 

Tropical Storm Ketsana caught Metro Manila and its surrounding environment (the Greater Manila Area, Laguna and Rizal in particular) by surprise and highlighted the vulnerability of the mega‐city  to disaster  risks.   Ketsana was not  strong  in  terms of wind  intensity but  it brought 420 millimeter (mm) of rainwater in a matter of 24 hours, submerging major parts of the metropolitan area totaling to 21,710 hectares.  Total damage to properties amounted to  PhP3  billion  and  total  deaths  of  241.    The  devastation  was  greatly  exacerbated  by uncontrolled  and  rapid  urbanization  –  poor  urban  planning,  insufficient  spillways  and floodways, drainage clogged with  solid wastes,  infrastructure and  settlement encroaching on natural water ways  and bodies,  and  informal  settlers on  riverbanks  and hazard‐prone areas.  Most significantly, Ketsana underscored the vulnerability of the metropolis to natural hazards  and  weak  contingency  planning  –  a  fatal  combination,  which  beckons  urgent measures to strengthen disaster preparedness and early warning systems in Metro Manila.  AUSTRALIA WORKING ON DISASTER RISK MANAGEMENT 

The Australian Government, through the Australian Agency  for  International Development (AusAID),  has  been  working  closely  with  the  Government  of  the  Philippines  (GOP)  on disaster risk management (DRM) initiatives since 2006.  It has been supporting government agencies  to map  27  provinces  vulnerable  to  natural  hazards,  establish  community‐based early  warning  systems,  organize  disaster  response  teams,  and  integrate  disaster  risk reduction (DRR) and climate change adaptation (CCA) strategies into local development and regulatory processes.   Australia has  also  commenced work with  government  agencies on enhancing the tropical cyclone early warning system, and assessing risks and  impacts from natural hazards.   All  these  initiatives have been  focused  in  rural areas, particularly  in  the eastern seaboard provinces of the Philippines.   

                                                            6 Geoscience Australia. June 2008. AUSGEO News. Assessing natural disaster risk in the Asia Pacific region. 7 Metro Manila Flood Susceptibility Map, Mines and Geosciences Bureau, 2009. 

Page 9: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 9 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

II.  THE SCOPING MISSION  OBJECTIVES 

The  aftermath  of  Tropical  Storm  Ketsana  provides  an  opportunity  for  the  Australian Government to expand its DRM initiatives to an urban area like Metro Manila.  To look into this, AusAID with Geoscience Australia (GA) conducted a scoping mission from 29 October to 06 November (Annex 1 – Scoping Mission Summary of Program).  The scoping mission was  three‐pronged.   Primarily,  it provided an opportunity  for AusAID and GA to understand the context of the recent flooding in Metro Manila and scope out the DRM needs of Metro Manila.  It also provided a venue for the team to validate the priorities identified under the Options Paper. And lastly, it allowed GA to follow‐up on activities under the project Strengthening Natural Hazard Risk Assessment Capacity  in the Philippines with NDCC‐CSCAND agencies.  The mission also provided an opportunity for the Australian Government to provide  inputs to the Post‐Ketsana Disaster Needs Assessment8, particularly to the chapter on Disaster Risk Management, and to the newly created Special Private‐Public Reconstruction Commission.9  THE TEAM 

The scoping mission team is composed of the following: • Dr  John  Schneider,  Assistant  Director‐General,  Risk  and  Impact  Analysis  Group, 

Geoscience Australia • Mr Greg Scott, Assistant Director‐General, National Mapping and Information Group, 

Geoscience Australia • Ms Anne Orquiza, Senior Program Officer, Disaster Management, AusAID 

 APPROACH 

The mission built on the DRM initiatives of AusAID in the Philippines implemented with the National Disaster Coordinating Council (NDCC), particularly the Technical Working Group on Collective Strengthening of Community Awareness on Natural Disasters (CSCAND) and other government  and  international  development  partners,  and  the Options  Paper  on Natural Hazard Risk Assessment prepared by GA, NDCC‐CSCAND agencies.  The mission involved individual discussions with the following agencies:  1. NDCC‐CSCAND agencies, namely: 

 

                                                            8 Led by the World Bank (with United Nations and European Commission) and Government of the Philippines after Tropical Storm Ketsana and before Typhoon Parma to help government undertake damage assessment and recommend long‐term reconstruction needs; complements the United Nations Disaster Assessment Committee which focused on rescue and relief. 9 Created by virtue of EO XXX to coordinate reconstruction projects to address impacts of Ketsana, and generate and manage (national and international) funds for these. 

Page 10: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 10 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

a. Mines  and  Geosciences  Bureau  (MGB):  Responsible  for  landslide  and  flood susceptibility maps  based  on  geologic  and  physiographic  data,  as well  as  historic information. 

b. National Mapping  and  Resource  Information Authority  (NAMRIA):  Responsible  for base maps and compilation of hazard/risk map layers from other CSCAND agencies. 

c. Office  of  Civil  Defense  (OCD):  Responsible  for  coordinating  disaster  risk management,  including emergency and humanitarian response, at the national and local levels. 

d. Philippine  Atmospheric,  Geophysical  and  Astronomical  Services  Administration (PAGASA): Responsible for weather forecasting and flood hazard mapping. 

e. Philippine  Institute  for  Volcanology  and  Seismology  (PHIVOLCS):  Responsible  for earthquake and volcano hazard monitoring and mapping and leadership of the Rapid Earthquake Detection and Simulation  (REDAS) project which  simulates damages  to earthquake scenarios. 

 2. City of Taguig: One of the 16 Metro Manila cities and one of the most heavily impacted 

by Ketsana flooding, particularly along its border with Lake Laguna.  

3. Department of Public Works and Highways (DPWH) ‐ Major Flood Control Project Office: Responsible for design implementation of major flood control measures.  

4. Metro Manila  Development  Authority  (MMDA):  Responsible  for  coordinating metro‐wide development policies and activities in Metro Manila, including flood management.  

5. National  Economic  and  Development  Authority  (NEDA):  Responsible  for  developing economic  and  land  use  policies  and  coordinating  national  and  regional  development planning  and  programming,  and  census  information  through  the  National  Statistical Office.  

6. University of the Philippines (UP):  Premier state university, the Department of Geodetic Engineering hosts  the Applied Geodesy and Applied Photogrammetric Training Center which  was  funded  by  the  Australian  International  Development  Assistance  Board (AIDAB), the predecessor of AusAID:  

7. United  Nations  Development  Programme  (UNDP):    Administrator  of  the  Partner  of NDCC‐CSCAND agencies  in the  implementation of the Hazard Mapping and Assessment for Effective Community and Disaster Risk Management  (READY Project) being  funded by AusAID.  

8. World Bank (WB):  Led with GOP the conduct of Post Disaster Needs Assessment to help the  government  undertake  damage  assessment  and  recommend  long‐term reconstruction needs 

 A meeting that brought together CSCAND agencies and NEDA was also organized to agree on priorities and next steps.  

Page 11: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 11 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

Annex 2 provides the Highlights of Discussions with Agencies, and Annex 3  lists the people met during the scoping mission.   III.  POTENTIAL OPPORTUNITIES FOR ENGAGEMENT  The  scoping mission  team  found  a wide  array  of  DRM  activities,  particularly  on  natural hazard  impact  analysis,  which  could  be  pursued  in  Metro  Manila.    The  timing  is  also opportune  given  that  the  impacts of  Tropical  Storm Ketsana have  generated huge public interest and placed DRM high  in the political agenda – a  long overdue attention given the high exposure of the Philippines to natural hazards and high vulnerability of  its population to disasters.  The flooding brought about by Tropical Storm Ketsana was not limited to Metro Manila but also affected neighboring provinces, particularly Laguna and Rizal.   As a result, the general consensus of  the NDCC‐CSCAND agencies  is  that  this  larger area  is  the more appropriate conurbation  for  future  risk  reduction  initiatives.    Thus,  this  report  will  refer  to  the conurbation of Metro Manila together with the neighboring Laguna and Rizal provinces as the Greater Manila Area.  The following summarizes possible areas for intervention.  11. COLLECT INUNDATION AND DAMAGE DATA FROM KETSANA.  Knowledge of the extent, timing and 

depth  of  flooding  in  Greater  Manila  Area,  together  with  a  spatial  distribution  of associated  damage  is  of  critical  importance  to  improving  understanding  of  flood forecasting  and  risk.  Data  collected  by  several  government  agencies  and  non‐government organizations (NGOs) need to be consolidated and integrated to generate a more accurate depiction of the impact of this event.  This information is vital in the short term for input to reconstruction planning and improved early warning, as well as in the longer  term  for  improved  risk  assessment  to  inform  disaster  risk  reduction  and management. 

 12. UNDERTAKE HAZARD MAPPING.   Natural hazard mapping  in  the Greater Manila Area should 

be  undertaken  for  all  relevant  natural  hazards  (eg.  flood,  storm  surge,  severe wind, earthquake,  tsunami,  landslide,  liquefaction  and  volcanic  eruption)  using  the  current READY Project10 mapping process. This study will also build on other metro‐scale studies undertaken  in Metro Manila  such  as  the Metro Manila  Earthquake  Impact Reduction Study  (MMEIRS) and Drainage Study  in Metro Manila. The  low resolution mapping will provide urgent information necessary for relief and recovery efforts (e.g. resettlement of displaced peoples). This process will also  identify high‐priority areas  for more detailed analysis, such as areas potentially and seriously affected by multiple hazards and areas that may be susceptible to climate change impacts.  

                                                            10  Hazard Mapping and Assessment for Effective Community and Disaster Risk Management Project, funded by AusAID and being implemented by UNDP and NDCC‐CSCAND agencies in 28 provinces along the eastern seaboard.  Components include hazard mapping, community‐based early warning system, and information and education campaign. 

Page 12: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 12 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

13. DEVELOP AN URBAN FLOOD MODELING CAPABILITY.   The magnitude and extent of flooding from Ketsana was not  foreseen by existing  flood  forecasting  tools or previous  flood hazard mapping.  Flood mapping to date has been based on historical information on previous floods and on limited riverine flood modeling.  There is a need to improve the modeling capability  to  fully  capture  the  combined  effects  of  riverine  and  flash  flooding  in  the urban environment.   This capability will need to  incorporate flow as defined by streets and urban drainage,  including various  flood control measures  such as dikes,  spillways, tunnels, pumping stations and tidal  influences.    It will also need to capture  issues with lack of maintenance  including drainage barriers  from  trash and other debris,  informal settlements, cemented storm drains,  fish pens, and water  lilies. This work will  require investment  in a detailed digital elevation model  (DEM)  for Greater Manila Area, which can  be  obtained  from  an  aerial  LIDAR  (Light  Detection  and  Ranging)  survey  or  an appropriate alternative technology.   This will also require  the customization of a  flood modeling tool to capture the specific attributes of the natural and man‐made water flow process in the Greater Manila Area.  Once developed, the model would provide the basis for  testing  different  flood  management  options  as  well  as  support  early  warning systems.  

14. ASSESS EARTHQUAKE AND FLOOD RISK TO GREATER MANILA AREA.   Flood and earthquake are the natural  hazards  that  present  the  biggest  risks  to  the  Greater  Manila  Area.    The assessment  of  risk  requires  a  robust  understanding  of  the  underlying  natural phenomena (i.e., the hazard), as well as the potential impact in terms of damage, loss of life,  social disruption  and  economic  cost.    The MMEIRS Project provided  an  excellent assessment  of  earthquake  risk  to Metro Manila, which  lies  to  the west  of  the West Valley fault.  This study needs to be updated and expanded to investigate the risk to the eastern  side  of  the  fault  (in  the  Rizal  and  Laguna  provinces)  which  is  also  heavily populated  and  equally  at  risk.    Similarly,  a  study  of  flood  risk  requires  additional information  on  the  vulnerability  of  population,  buildings  and  infrastructure,  but  can utilize  the  same exposure  information  that  is developed  for earthquake.   Therefore, a combined study of earthquake and flood risks could be undertaken.  

15. DEVELOP A NATIONAL EXPOSURE INFORMATION SYSTEM.  A national exposure information system (NEXIS) would provide  the essential  information platform  for extending natural hazard mapping  to  risk assessment.   The current REDAS program being developed and  rolled out by PHIVOLCS is an important contribution to this effort.  This effort however needs to be  significantly  expanded  to meet  the broader needs  for  input  to DRM  as well  as economic development planning.   NEDA has the mandate to develop and manage this data  as part of  its  role  in  collecting  and managing  census data,  through  the National Statistics  Office,  as  well  as  in  its  role  in  coordinating  socio‐economic  and  land  use planning at the national and regional levels.  It is currently in the process of developing geo‐referenced databases through its 15 regional offices which can be the starting point for a more comprehensive exposure data system. 

 Under  the  current  engagement  between  GA  and  PHIVOLCS,  the  development  of  an exposure  information  system  will  be  pilot‐tested  in  Iloilo  City  with  the  intention  of eventually  replicating  this  to  other  localities,  and  then  eventually  nationwide.    An 

Page 13: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 13 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

exposure system could also be developed  for  the Greater Manila Area building on  the Iloilo pilot testing and lessons learned.  NAMRIA has also identified the need for a national spatial data infrastructure (SDI).  The development of the SDI is a long‐term process which will need to be addressed at many levels of government.   NEDA  is also  interested  in  this  capability,  so  there  is a natural affinity  for  this  development  in  the  combined  interests  of  NAMRIA  from  a  spatial perspective and NEDA from a socio‐economic one.  

16. IMPROVE FLOOD MONITORING.   Improved monitoring of rainfall and stream flow  is essential to  improving  flood  forecasting and early warning.   A major  issue  for  flood  forecasting and  flood modeling  is  generally  the  lack  of  rainfall monitoring  and  stream  flow  data throughout  the water  catchment  for  the  Greater Manila  Area.    PAGASA  prepared  a framework  for  strengthening  early warning  system  capacity  in  this  area.   Under  this framework,  PAGASA  is  in  the  process  of  installing  rain,  water‐level  and  automated weather stations, with funding from the Korean Government, which will provide much‐needed input to model the flooding either in real time or for hazard mapping in the long term.   A specific need has been  identified for two additional Doppler radar  instrument for the Greater Manila Area which will greatly enhance the forecasting capability for this area.   Under the framework, PAGASA  identified AusAID and UNDP as potential sources of support for these.  Three  ground‐based  Doppler  radar  instruments  are  also  being  installed  in  Aparri (Cagayan),  Virac  (Catanduanes),  and  Guian  (Samar)  with  funding  from  the  Japanese Government.    These  are  expected  to  markedly  improve  the  forecasting  ability  of PAGASA in northern Luzon.  

17. IMPROVE  EARLY  WARNING.    It  is  a  challenge  to  disseminate  the  right  information  to communities exposed to disasters; multiple channels of communications are necessary but difficult to coordinate. The existing community‐based early warning system should be improved so that people and communities are better prepared to avoid or minimize their  losses.  Such  early  warning  systems  should  exist  for  well‐defined  geographical areas,  covering  all  significant  hazards  that  can  affect  the  communities,  follow  both scientific  and  indigenous  approaches  and  form  an  integral  part  of  community‐based contingency  planning  exercises.    Institutional  arrangements  could  be  strengthened through radio, television, and print media at the national and regional level to  improve the flow of information and early warnings to the people likely to be affected.  

18. INTEGRATE DISASTER RISK MANAGEMENT INTO PHYSICAL AND LAND USE PLANS.   Several  factors that converged  to produce  the shocking  impacts of Ketsana were man‐made:  impermeable concrete  surfaces  covered  the  soil  and  prevented  the  absorption  of  rainwater; indiscriminate garbage disposal clogged drainages; structures along waterways impeded the flow of water unto rivers and eventually to the sea; and buildings and entire villages were built along river beds and  flood plains.   These  impacts provide an opportunity to re‐examine how Metro Manila  and  its  fringes have been haphazardly developed,  and how effective land use and urban planning could significantly reduce the vulnerability of the Greater Manila Area to natural hazards. 

Page 14: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 14 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

 Land use planning provides a platform in mainstreaming DRM in the urban development process, and a framework within which risk mapping, building resilient communities and building back better may be undertaken. It can also address concerns brought about by climate change‐induced hazards by redesigning the spatial structure and functioning of urban areas.  As such, the preparation of comprehensive land use plans (CLUPs) of local government units  in Metro Manila  should  commence based on  a physical  framework plan  that builds on  the potentials and  limits of  the natural and physical environment, provides development options, describes  the  trajectory of metropolitan development, and defines the policy environment.  NEDA recently coordinated the updating of Regional Physical Framework Plans through the NEDA Regional Offices.   The Metro Manila Physical Framework Plan however was not  included  in  the  update  (note  that MMDA  is  not  part  of  the NEDA  organizational structure).  The document was last prepared in 1999 and MMDA plans to update this by June  2010  for  presentation  to  the  new  President  and  MMDA  administration.    The scoping mission team, however, advised MMDA that the formulation process would take at least two years if the document is to build on sound scientific and technical datasets and  tools  (i.e.,  hazard  risk  and  vulnerability  assessment)  as  bases  for  development options and policy environment.   Within  the six months  timeframe, an action plan  for the  formulation  of  the  Metro  Manila  Physical  Framework  Plan  could  be  prepared, including data generation, for presentation to the next administration.  

19. PREPARE CONTINGENCY PLANS.  In the Philippines, response to a disaster is organized largely through  local resources, with the national resources supplementing the  local response.  A number of LGUs have prepared contingency plans to respond to disasters. However, these plans have not been updated or tested for their operational value. There is a need to adopt a much stronger policy on contingency planning, one which focuses on search and rescue, evacuation, and relief to the people. It needs to be a broad‐based exercise, which  includes  local  government, NGOs,  the business  sector,  and other humanitarian organizations,  and  needs  to  be  updated  every  year.  These  plans  should  also  be supported with basic emergency facilities, training, and regular testing through the team of responders. 

 20. FORMULATE DISASTER RISK MANAGEMENT PLAN.  While contingency planning at the local level is 

important,  it  is also necessary  to have an  integrated and unified DRM action plan  for Metro Manila,  a  task  that  goes  beyond  the  territorial  boundaries  of  each  LGU which tackles  disasters  within  their  areas  of  jurisdictions  with  mixed  results.    Given  the magnitude of recent disasters brought about by Ketsana  (and aggravated by  typhoons Parma and Mirinae), very few  local governments with enough resources will be able to address the problem adequately, even among more progressive and developed LGUs in Metro  Manila.    There  is  therefore  a  need  to  coordinate  the  efforts  of  all  local governments, particularly within a metropolitan area.  To undertake this, MMDA should be  provided  with  sufficient  authority  to  coordinate  LGUs  within  the  metropolis  for disaster risk management. This authority should enable the MMDA to direct resources and actions without being over‐ridden by local governments’ autonomy.  

Page 15: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 15 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

As  part  of  DRM  and  contingency  planning,  provincial  and  metropolitan/regional databases  for  emergency  response  assets  should  be  developed  to  immediately determine  the  available  resources  and  how  these  could  be  shared  and  deployed  to respond  to  an  emergency.    A  national  stockpile  or  repository  for  rescue  equipment, relief  goods, medical  and  health  supplies  should  also  be  established  to  immediately supplement and re‐supply  local supplies of these  items  in the event of a major natural disaster.  This  stockpile  would  provide  for  the  request,  receipt,  staging,  storage, repackaging, distribution, dispensing,  retrieval and  return of any unused assets of  the stockpile or any pandemic countermeasures. 

 10. PROPOSED DISASTER RISK MANAGEMENT PROJECTS FOR METRO MANILA  

a.  Metro  Manila  reconstruction  and  rehabilitation  program.    During  the  scoping mission,  AusAID Manila  developed  a  concept  note  on  proposed  reconstruction  and rehabilitation  of Metro Manila.    The  concept  note  intends  to  expand  current  DRM support  of  AusAID  implemented  in  27  eastern‐seaboard  provinces  to Metro Manila.  Components  include  socialized  housing  and  livelihood  support with Gawad  Kalinga11; classroom rehabilitation with Department of Education; community‐based disaster risk management with  the Philippine National Red Cross  (PNRC) building on Project 14312; and urban planning with Taguig City.   The objective  is  to  implement a comprehensive recovery  and  reconstruction  package  of  assistance  based  on  a  “building  back  better” approach with a local government unit, and to showcase this as a model that other LGUs and donors could replicate in other localities.  Hazard risk and vulnerability mapping will also be undertaken with GA and NDCC‐CSCAND agencies for the whole of Metro Manila including its surrounding provinces (i.e., Laguna and Rizal).  The  leadership  of  Taguig  City  is  very  open  to working with  AusAID  on  the  proposal, particularly on in‐city relocation and resettlement of informal settlers, and integration of DRM  and  CCA  into  a  comprehensive  land  use  plan.    On  the  socialized  housing component, a major consideration that should be further looked into is the suitability of proposed  relocation and  resettlement  sites and  the  structural design of  the  socialized housing  units  to  be  constructed.    GA  could  provide  AusAID  with  technical evaluation/advice on  the appropriateness of  the relocation and resettlement sites and structural design.    It might also be worth exploring other resettlement models such as the  low‐equity socialized housing being  implemented by the Habitat for Humanity with the Housing and Urban Development Coordinating Council.  b.  Mainstreaming Disaster Risk Management and Strengthening Early Warning System Capacity in Metro Manila.  UNDP submitted to AusAID a concept note on strengthening DRM capacity in Metro Manila.  The concept note has the following components: hazard risk and vulnerability mapping,  integration of DRM  into development planning process, 

                                                            11 a Philippine‐based poverty reduction and nation‐building movement launched by Couples for Christ, a Catholic lay community, to care for worse‐off Filipinos and survivors of natural disasters.  Gawad Kalinga implements integrated, holistic and sustainable community development programs in depressed areas addressing shelter, livelihood, education and health issues. 12 Strengthening the Disaster Management Capacities of Communities Project, funded by AusAID and implemented by PNRC in 16 LGUs.  Focus is on establishing and capacitating barangay disaster response teams. 

Page 16: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 16 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

community‐based  early  warning  system,  contingency  planning,  and  strengthening  of disaster management agencies like OCD, PAGASA and PHIVOLCS.  The concept note is comprehensive in scope, builds on and brings together learning and experiences  from other AusAID‐supported DRM  initiatives13.   UNDP acknowledges  the technical  expertise  of  Australian  government  agencies  like  GA  and  the  Bureau  of Meteorology and their current engagement with CSCAND agencies.   Thus, the proposal provides opportunity  for GA  to  further engage and work with NDCC‐CSCAND agencies and share Australian expertise.  Building on hazard risk and vulnerability mapping for Greater Manila Area, the proposal could be a platform for the formulation of the Metro Manila Physical Framework Plan, and updating of the CLUPs for Metro Manila LGUs.   While targeting Metro Manila, the concept note did not  include MMDA as potential project partner but  instead  identified NEDA and OCD as project partners and  implementers.   This needs to be revisited given the  critical  role  that MMDA plays  in metropolitan and urban planning,  including DRM and  contingency  planning.    Per  consultation  with  NEDA,  MMDA  should  lead  this initiative with NEDA providing  technical advice, sharing  tools and sitting  in  the project board. 

  IV.  RECOMMENDATIONS AND NEXT STEPS  As articulated in the original Terms of Reference for this scoping mission, key datasets, tools and information are required to understand the impacts of natural hazards.  These datasets, tools and information include:  

• High resolution topographic information; • Information  on  the  characteristics,  frequency  and  potential  extent  of  different 

natural  hazards,  and  how  the  weather‐related  hazards  are  affected  by  climate change; 

• Exposure  information  includes  location and attributes of community elements exposed to  natural  hazards,  i.e.,  data  on  people,  residential  structures,  critical  facilities  and infrastructure (i.e., schools, hospitals, roads and bridges), and attributes associated with these elements (i.e., type of construction, number of residents, cost of construction); and 

• Vulnerability information includes physical, social, environmental or economic elements.  An improved understanding of the characteristics and impacts of natural hazards, including the effects of climate change, on Metro Manila will support a broad range of activities  to reduce  and  manage  risks  to  vulnerable  communities.    These  activities  could  include emergency drills, evacuation and contingency planning, early warning system, construction of resilient buildings, retrofitting of critical infrastructure, land use planning, and education and awareness.  

                                                            13 READY Project and Mainstreaming Disaster Risk Reduction and Climate Change Adaptation into Development Planning and Regulatory Processes implemented by UNDP and NEDA. 

Page 17: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 17 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

Given  the  abovementioned  risk  reduction  and  management  needs  and  options,  a comprehensive  program  of  hazard  and  risk  assessment  to  improve  the  scientific  and technical  foundations  of  disaster  risk management  is  recommended  by  the  team.    This approach should take into account “low hanging fruit” (i.e., identifying barriers, solving the flooding problem and undertaking LIDAR  survey, among others) with a view  to  improving the knowledge base for a reasonable timeframe of three (3) to four (4) years.  In the immediate and short term (3‐6 months), the following activities are recommended:  1.  IMMEDIATE TO SHORT‐TERM (3‐6 MONTHS)  

a. Provide inputs to Post‐Disaster Needs Assessment.  At the time of the scoping, a Post‐Disaster Needs Assessment  for Ketsana was being undertaken by  the World Bank and  GOP  with  the  European  Commission,  the  United  Nations  and  the  Asian Development  Bank.   World  Bank  requested  AusAID  and  GA  to  contribute  to  the process.   The  findings and  recommendations  from  this  scoping mission could  feed into the PDNA chapter on DRM. 

 b. Build data and analytical tool 

i. Develop  lessons  learned document  for  the Metro Manila  flooding.   This would involve  gathering  and  organizing  existing  data  and  lessons  learned  from  the Ketsana flooding. 

ii. Identify  options  (i.e.,  aerial  photography,  RADAR  or  LIDAR  survey)  for  the generation of high  resolution  topographic  information  (including assessment of Asiametrex  proposal  on  LIDAR  survey  in  Greater Manila  Area  (approximately AUD 600,000 to cover 2,000 square kilometers). 

 c.  Design the Metro Manila reconstruction and rehabilitation program and prepare an 

action plan for Metro Manila urban planning i. Design hazard risk and vulnerability assessment project for Greater Manila Area 

with NDCC‐CSCAND agencies and GA. ii. Design community‐based DRM project with Taguig City and PNRC. iii. Provide  inputs  to  socialized  housing  and  urban  planning  components  of  the 

Metro  Manila  reconstruction  and  recovery  program,  i.e.,  assess  physical (geological and hydrological) suitability of proposed relocation and resettlement sites, and structural design of proposed socialized housing. 

iv. Prepare  an  action  plan  for  the  formulation  of  the  Metro  Manila  Physical Framework Plan with MMDA, taking note of the need for the process to benefit from hazard and vulnerability assessment and mapping. 

v. Explore options on providing Metro Manila with Doppler  radar  instruments  to improve  flood  monitoring  and  forecasting  of  PAGASA  and  strengthen  early warning system in Metro Manila. 

vi. Discuss  with  UNDP  the  implementation  of  the  project  proposal  on Mainstreaming DRM and Strengthening Early Warning System Capacity in Metro Manila with the Metro Manila reconstruction and recovery program. 

 

Page 18: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 18 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

Most activities identified and designed would take at least one year to implement and some would be building blocks  that would provide  inputs  to succeeding activities.   Thus,  timing and phasing of activities would be important considerations.  2.  MEDIUM TO LONG‐TERM (1‐4 YEARS)  

a. Undertake  low  resolution mapping  of  relevant  natural  hazards  in  Greater Manila Area (1st to 12th month).  This activity will build on other studies undertaken in Metro Manila  and  provide  urgent  information  for  recovery  and  relief  efforts  (e.g. resettlement  of  displaced  peoples).  Furthermore,  this  process  will  identify  high‐priority  areas  for  more  detailed  analysis  (i.e.,  potentially  seriously  affected  by multiple hazards, and susceptible to climate change impacts). 

 b. Gather and develop datasets and tools required for higher resolution natural hazard 

impact  analysis  (12th  to  18th  month).  Datasets  fundamental  to  multiple  natural hazards include: i. Historical data (i.e., peak flood levels, streamflow, rainfall) i. High‐resolution DEM; ii. Moderate‐high resolution bathymetric data; iii. Climate change scenario data (i.e., sea level rise, rainfall and wind intensity); iv. Land use information; v. Exposure information; and vi. Vulnerability information. 

 c.  Undertake  natural  hazard  impact  analyses,  including  climate  change  scenarios,  in 

high priority areas  (1st  to 24th month).    Impact analysis will provide  information on which  communities  are  most  vulnerable  to  specific  natural  hazards;  how  many people would be left homeless, injured or killed by different probability events; and how much  economic  losses  and  damage  to  properties  the  hazards would  bring  if these would turn into disasters.  The following analytical work could be undertaken in order of priority, with the primary  focus on  flood and earthquake  in the  first 24 months of the study: i.  Flood hydrodynamic analysis; ii.  Earthquake impact analysis; iii.  Cyclone severe wind impact analysis; iv.  Tsunami impact analysis; v.  Volcanic ash impact analysis; and vi.  Landslide susceptibility. 

 d.  Formulate  the Metro Manila  Physical  Framework  Plan  (25th  to  30th month).    This 

indicative  physical  and  land  use  plan with  policy  recommendations will  cover  all cities and municipalities in Metro Manila, and will be prepared and led by MMDA in close  consultation with  LGUs.    It will  utilize  the  hazard maps  and  impact  analysis undertaken for Metro Manila and guided by the guidelines on the  formulation and updating of Regional Physical Framework Plans prepared by NEDA. 

 

Page 19: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 19 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

e.  Mainstream  disaster  risk  management  and  climate  change  adaptation  into development planning  in Metro Manila (31st to 42nd month).   This activity will guide the revision and updating of CLUPs of cities and municipality in Metro Manila.  It will take off  from  the Metro Manila Physical  Framework Plan, utilize  the hazard maps prepared and  impact analysis undertaken.   The preparation of CLUPs will be guided by  the  planning  guidelines  prepared  by NEDA  through  the  project Mainstreaming DRR  and  CCA  into  local  development  plans  and  decision‐making  processes  being supported  by AusAID.   A DRM  plan  for  the whole  of Metro Manila  could  also  be prepared through this activity. 

 f.  Strengthen early warning system capacity in Metro Manila (12th to 24th month).  This 

activity will capacitate technical agencies such as PAGASA and PHIVOLCS on  impact modeling and forecasting, and the National and Local Disaster Coordinating Councils and MMDA on contingency planning and response.  It will build on the hazard maps and  impact analysis, early warning equipment (i.e., Doppler radar  instruments, rain gauges, weather stations, etc) provided to Metro Manila. 

 g.  Strengthen the capacity of communities to prepare for and manage disasters (12th to 

30th  month).    This  activity  will  establish  barangay  disaster  response  teams  and capacitate these teams to set up and monitor  local early warning systems; produce information,  education  and  communication  materials;  develop  community evacuation  plans;  provide  voluntary  labor  for  physical  protection measures;  and form  skilled  community‐based  teams  to  support  rescue  and  recovery  operations.  This will build on the  lessons from Project 143 and the contingency planning of city and municipality  disaster  coordinating  councils,  and will  utilize  hazard maps  and vulnerability assessment.  Activities will be coordinated with and mainstreamed into the  local  disaster  coordinating  councils  and  local  government  units  to  facilitate ownership and sustainability of activities and project gains. 

Page 20: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 20 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

ANNEX 1 SCOPING MISSION SUMMARY OF PROGRAM 

  

29 October, Thursday Meeting in AusAID with Titon Mitra, Minister Counsellor Courtesy call with Ambassador Rod Smith Meeting with UNDP and World Bank  30 October, Friday Launch of PAGASA’s Enhanced Tropical Cyclone Early Warning System Meeting with Bureau of Meteorology  02 November, Monday Telecon with GA Meeting with ADB  03 November, Tuesday Meeting with NEDA Meeting with MGB Meeting with PAGASA Meeting with UP Department of Geodetic Engineering  04 November, Wednesday Meeting with NAMRIA Meeting with PHIVOLCS  05 November, Thursday Meeting with Taguig City Meeting with MMDA Debriefing with AusAID Meeting with DPWH  06 November, Friday Meeting with CSCAND Agencies and NEDA Meeting with UNDP 

Page 21: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 21 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

ANNEX 2 HIGHLIGHTS OF DISCUSSIONS WITH AGENCIES 

  1. UNITED NATIONS DEVELOPMENT PROGRAMME AND WORLD BANK  (29 October  2009,  Thursday, 

6:30‐8:30 pm, UNDP Office, Makati City; Mr. Sanny  Jegillos, Mr. Krishna Vatsa and Dr. Michael Ernst of UNDP; and Ms. Mukami Karauki, Dr. Hyoung Gun Wang and Ms. Kathy Vidar of World Bank)   Discussion.   PDNA damage and  loss assessment currently being undertaken with needs assessment  to commence  the  following week.   Sectoral  teams were created to undertake PDNA.  DRR is captured in building back better, e.g., different locations require different policies.  Draft PRNA report is due on 13 November, with final report by 27 November  for  recommendation  to  the Reconstruction Commission.   The current constraint of the PDNA is the lack of map on actual area flooded due to Ketsana.  LANDSAT data was not used because of noise  in the radar data.   Google Campaign can fly and cover 1000 km (at estimated cost of US$200,000).  Due to the high cost of data acquisition, there  is a need to prioritize areas to be covered (i.e., WB and UN agencies requested  information  for  different  areas).   WB  inquired  if AusAID would  be  able  to support/fund data acquisition.  Agreements. (1) GA can provide advisory services to the PDNA  in the short‐term  (i.e., next two weeks).    (2) AusAID and GA could contribute  in the  long‐term  through natural hazard  impact analysis,  for  further discussion.    (2) Will explore possibility for AusAID to support data acquisition. 

 2. AUSTRALIAN  BUREAU  OF METEOROLOGY  (30  October  2009,  Friday,  2:30‐3:30  pm,  AusAID 

Office, Makati City; Mr. Andrew Donaldson, Mr. Todd Smith)   Discussion.   This was an opportunity  to  share  information  about  interests  of  BOM  and  GA  in meteorological hazards.  Discussed was the complementary nature of the forecasting work of BOM with hazard  and  risk  assessment  work  of  GA.    BOM  identified  rainfall  associated  with monsoons as a big issue, bearing in mind that rainfall attributed to Ketsana was probably exacerbated  by  a  monsoon  system.    Agreements.    GA  and  BOM  to  look  into opportunities to collaborate  in work with PAGASA.   The main opportunity would be  in hazard modelling, particularly developing the historical catalogue of typhoon tracks, and in developing better forecasting of rainfall together with improved inundation modelling of the urban environment. 

 3. ASIA DEVELOPMENT BANK  (Friday, 4:00 PM‐6:30 PM, Renaissance Hotel, Makati City; Mr. 

Neil Britton, Regional Disaster Management Coordinator)  Discussion.  The focus of ADB in  the  Philippines  is  on  infrastructure  development,  while World  Bank  places  more emphasis  on  health  and  social  issues.    The ADB  has  contributed  about US$1B  to  the Government of the Philippines over the past 5 years, mainly for infrastructure programs.  ADB was  very  complimentary  of  the  AusAID  approach  to  capacity  building, which  is aimed  at  reducing  the  dependency  on  aid  in  the  long  term.    In  terms  of  regional initiatives, ADB  thinks  the Global Earthquake Model has potential, and noted  that any participation/funding  from ADB would need  to  come  from  the  regional offices, which would  be  the  South  East  Asia  and  South West  Pacific.    Agreements.    Given mutual interests  in  development  activities,  it  would  be  useful  to  explore  potential  for collaboration between AusAID and the ADB. 

Page 22: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 22 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

 4. NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY (03 November, Tuesday, 8:30‐10:00 am, 

NEDA  Office,  Pasig  City;  Director  Susan  Jose,  Ms.  Medy  Endencia  and  Ms.  Thelma Manuel)    Discussion.    NEDA  has  previous  experiences  on  PDNA  and  involvement  to corresponding  reconstruction  bodies  (i.e.,  1990  Luzon  earthquake  and  1991  Mount Pinatubo eruption) and should have initiated the assessment not the World Bank.  As an end‐user for policy and planning, NEDA is very interested on having a National Exposure System (NEXIS) in the Philippines and this is one reason why NEDA requested the study tour  to Australia.   The establishment of NEXIS  could be a  combination of a pilot  (i.e., Iloilo)  for  nationwide  coverage  later  on.   Within  the  context  of  the  inter‐agency  and multi‐sectoral National Land Use Committee, NEDA sees itself as the coordinating body for the establishment of a NEXIS.  It however needs to think about actually housing the system.  The national database could be housed in NEDA Central Office and the regional database at the NEDA Regional Officers.  The mechanism at the local government level is the question.    In  terms of using  the Reduced Earthquake Damage Assessment System (REDAS) as a platform for other hazards, NEDA was advised that REDAS has  limitations and would  not  be  able  to  perform  the  required  algorithm  and manipulation  if  other hazard  information  and  requirements  are  plugged  in.    Agreements.    NEDA  keen  on establishing a NEXIS and sees  itself as  the coordinating body. Needs however  to  think about actual housing the system. 

 5. Mines and Geosciences (03 November 2009, Tuesday, 11:00 am ‐ 1:00 pm, MGB Office, 

Quezon City; Director Horacio Ramos, Assistant Director Edwin Domingo, Dr. Bill David, Engr. Antonio Apostol, Engr. Evelyn Rollon)  Discussion.  MGB has a key role in assessing natural hazards  in the Philippines.   In general,  it provides geologic data to PAGASA and PHIVOLCS  who  have  the  prime  carriage  for  meteorological  and  geological  hazard assessment,  respectively,  at  the  national  scale.    However,  MGB  is  also  currently developing  landslide  and  flood  susceptibility  maps  throughout  the  Philippines  at 1:50,000 scale.   These maps are based on historic  information of past floods as well as physiographic and geologic mapping.  MGB expressed interest in developing a capability to do dynamic modeling of these hazards.  In the case of flood modeling, however, there appears to be overlap with PAGASA’s role  in flood hazard assessment.   With regard to landslides, the differentiation of roles between PHIVOLCS and MGB is clearer, with MGB generally  responsible  for  instability  mapping  and  failures  induced  by  rainfall,  while PHIVOLCS  is  responsible  for  mapping  earthquake‐induced  soil  failures  including landslides and liquefaction.  Discussed was GA’s landslide interoperability project which links disparate databases across Australia.  MGB is interested in this concept as there is no uniform database being developed by the regional offices.   Agreements.   Given the disparate nature of  landslide and flood mapping at the regional  level, the development of interoperable databases would be useful in the long term. 

 6. PAGASA  (03 November  2009,  Tuesday,  2:00  –  4:00  pm,  PAGASA Office, Quezon  City; 

Director Prisco Nilo, Dr. Cynthia Celebre, Ms. Susan Espinueva, Ms. Thelma Cinco, Ms. Charmie Monteverde, Ms. Lourdes Sulapat)  Discussion.  Initial discussion focused on the draft MOU  prepared  by GA  for  consideration  of  PAGASA  as  a  basis  for  developing  a detailed work program.  Several issues were noted, particularly with regard to roles and expectations from each party.  Inquiry on the operational budget was also made on the 

Page 23: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 23 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

sidelines.  Severe wind modeling is still a priority, particularly in regional areas.  PAGASA has been focusing on severe weather forecasting and collecting some flood  inundation information from Ketsana.   PAGASA states without reservation that  it has the mandate for flood hazard mapping at the national level.  However, its capability to model floods, particularly in an urban environment  is  limited.   PAGASA needs assistance to develop a capability  that would  incorporate  riverine  and  flash  flooding  in  an  urban  setting.    A major  issue  for  flood  forecasting  and  flood modeling  generally  is  the  lack  of  rainfall monitoring and stream flow data throughout the water catchment surrounding Manila.  Three ground‐based Doppler radar  instruments are being  installed  in Aparri  (Cagayan), Virac  (Catanduanes), and Guian  (Samar) with  funding  from  Japan, which will markedly improve the forecasting ability.  However, additional Doppler radars are greatly needed for Metro Manila.  PAGASA  is  also  in  the  process  of  installing  rain,  water‐level  and automated weather stations with funding from Korea, which will provide much‐needed input to model the flooding either  in real time or for hazard mapping  in the  long term.  PAGASA has also been working  to  capture  climate  change  information  into  long‐term weather forecasting.   This  issue was not explored at any  length  in the meeting.    It was understood, however, that PAGASA has been working with the Millennium Development Goal  Fund  Project  on  Strengthening  Institutional  Capacity  on  Climate  Change Adaptation, a grant from Spain, to develop an understanding of some of the broad‐scale climate implications for the Philippines in terms of rainfall and temperature in particular.  There  is a  longer‐term need  to better understand  the  implications  for  the distribution and frequency of severe storms, including wind, rainfall and storm surge.  Agreements.  General  agreement  on  the  nature  of  the  collaboration  was  reached,  but  some outstanding details, particularly on operational budget, need  to be discussed with GA (Alanna  Simpson).    The  lack  of  a  comprehensive  flood‐modeling  and  forecasting capability  is  the  outstanding  gap  which  needs  to  be  addressed  in  any  potential expansion of the program. 

 7. NAMRIA  (04 November 2009, Wednesday, 9:00 am – 12:00 nn, NAMRIA Office, Taguig 

City; Deputy Administrator Linda Papa and Director  Jose Galo  Isada)   Discussion.   The present  collaboration with GA  is exploring  the underlying data acquisition, processing and validation processes of NAMRIA’s mapping operations, which need to be updated as a matter of priority.   NAMRIA  is keen  to develop a national spatial data  infrastructure (SDI) but will need  to update  its  internal operational  systems before  it will be able  to move  in this direction.    In any case, an SDI will require  investment over the  long term and a commitment across government to make  it happen.   Meanwhile, the recognized need  for exposure data  to  support disaster  risk management  is a good vehicle  to get things going.   NAMRIA  is the only agency to have actually prepared a flood  inundation map from Ketsana.  They made it clear that this was not done as part of their mandate as a mapping agency, rather as an offer of assistance  in a crisis.   Some 700 data points were collected, which  focused on areas of heaviest  flooding along  the Marikina River.  This valuable dataset has been contributed to NDCC and the PDNA, but  it needs to be consolidated and integrated with the data collected by other agencies.  NAMRIA also has before  and  after  ALOS  satellite  imagery  from  Ketsana,  which  provides  a  reasonable overview of the extent of flooding, but no detail.  The existing base map of Metro Manila is outdated.  The current map was developed from aerial photography at 1:5,000 scale, which  provides  1‐2 meter  accuracy.    However,  this  is  insufficient  for  detailed  flood 

Page 24: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 24 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

modeling.  There is a priority need to conduct a LIDAR survey over Metro Manila plus as well  as  the Greater Manila  area  to  capture  both  ground‐level  and  building  footprint information.  Climate change is an emerging issue.  One of the issues regarding assessing coastal  impact  is  the  lack  of  a  detailed  map  of  the  Philippine  coastline.    This  is problematic given the 7100 islands that make up the archipelago.  Sources of funding to redress  this  include:  a  loan  of  $100M  loan  to  the  GOP  for  an  Integrated  National Resources and Environment Program; and a $5M grant  from  the World Bank’s Global Disaster Relief Fund.   These projects also complement  the  funding  from Spain  for  the Millennium Goal Development Framework, which  is  supporting down‐scaling of global climate models  (through PAGASA).   Agreements.   GA will continue  to provide support from the National Mapping and  Information Group to assist NAMRIA with updating  its map  production  processes.    The  development  of  a  detailed  LIDAR‐based  DEM  for Greater Manila is a priority, as is the development of a national digital elevation model to replace existing paper‐based maps. 

 8. PHIVOLCS  (04 November 2009, Wednesday, 2:30 – 6:30 pm, PHIVOLCS Office, Quezon 

City;  Director  Rene  Solidum,  Mr.  Ishmael  Narag,  Ms.  Mylene  Villegas)    Discussion.  Reviewed  the  current GA‐PHIVOLCS work  program, which  is  focusing  on  vulnerability modeling  and  a  case  study  risk  assessment  for  Iloilo.    Iloilo  has  a  well‐developed database of residential structures which will provide a good basis for extracting building types. A framework for this will be developed further at the GA‐PHIVOLCS workshop on 13‐14 November.   This workshop will focus on earthquakes, and will  include engineers from the University of Philippines and the private sector.   Vulnerability to volcano and wind  hazard will  be  incorporated  in  the  next  stage.    Reviewed  the  status  of  READY, which  incorporates  community‐preparedness  and  training  using  the  REDAS  program.  This  is  being  rolled  out  over  27  provinces,  11  of which  have  been  completed.    The program  covers  earthquake  (rupture,  ground  shaking,  liquefaction,  tsunami),  flood, landslide and volcanic hazards at 1:50,000 scale.  The program provides hazard scenarios and  local  governments  generate exposure  information  as  an overlay.   The workshops target disaster and land managers for local government capacity building.  It was noted that PHIVOLCS  is waiting  for national household survey data  from  the NSO  to provide additional  information  for  REDAS  at  the  barangay  level.    For  the  current  program, PHIVOLCS  is happy to continue to  incorporate exposure  information  into REDAS, but  in the  longer  term  it  is  recognized  that  this  is  not  its  role.   Meanwhile,  REDAS  is  an excellent tool  for community‐level education and data  input, but  it does not presently capture vulnerability information and therefore is limited in its ability to model risk.  The MMEIRS  study was  a  detailed  earthquake  scenario  risk  study  of Metro Manila.    The study, covering 14 cities and 3 municipalities in an area of 636 square km, was funded by JICA and was completed in 2004.  The study developed earthquake scenarios, the most salient of which was a 7.2 magnitude event on the West Valley Fault  in eastern Metro Manila.    This  event was  assessed  to  have  a  return  period  of  200‐400  years, with  an estimated 33,000 deaths and 38 percent damage to residential structures.  The MMEIRS study represents a reasonably comprehensive study of earthquake risk of Metro Manila.  The main  limitations are  in  the  focus on residential structures only and on a scenario‐based approach rather than a fully probabilistic one.  The biggest limitation, however, is that the study did not address the risk to the eastern side of the fault, which comprises Greater Manila outside Metro Manila proper.  Since this area is heavily populated and is 

Page 25: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 25 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

part of the water catchment for the Marikina River,  it would be appropriate to extend the  earthquake  risk  study  at  the  same  time  as  a  broader  flood  risk  study  of Greater Manila.    Also  discussed  were  the  Global  Earthquake  Model  development  and  the potential  benefits  to  the  Philippines.    PHIVOLCS  acknowledged  that  the  international collaboration and development of models and tools could be useful.  On the other hand, the REDAS approach to community preparedness and bottom‐up approach to assessing vulnerability  should  be  considered  by GEM  as  an  exemplar  in  the  developing world.  PHIVOLCS has not had a specific role in the study of Ketsana.  However, they did access remotely  sensed  satellite  data  for  post‐disaster  impact  assessment  through  their participation  in  Sentinel Asia.   PHIVOLCS  requested post‐event  flood data  for Ketsana which was provided to NAMRIA and PAGASA.  PHIVOLCS also noted that Glen Tabios of the National Hydraulics Training Center at the University of Philippines had done some flood modeling of Ketsana.  Agreements.  The current work program on risk assessment and the case study for Iloilo is on track.  The MMEIRS study should be expanded to the Greater Manila Area as a matter of priority. 

 9. TAGUIG CITY  (05 November 2009, Thursday, 8:30 – 11:00 am, Taguig City Hall, Taguig 

City;  Administrator  Wilfredo    Villar,  Architect  Joey  Mastrili,  Mr.  George  Sumabat)  Discussion.  Taguig City had big plans to develop the lakeshore into a major tourism area like Darling Harbor  in  Sydney.   The  recent  flooding however provided a  reality  check.  The  road  dike  traversing  Bicutan  to  Tatay was  built  based  on  a  100‐year  flood  level.  Although  it saved Taguig City from major flooding,  its  integrity  is still  in question given the possible increased likelihood of another flood of this magnitude.  It was not only the informal  settlers who were  vulnerable  to  the  flooding.   An executive  village was  also submerged since it is situated on a natural wetland outside the dike.  Suggested was the possibility of using the pipe constructed by the National  Irrigation Administration  from Laguna Lake to irrigate farmlands in Bacoor Cavite.  This is not being utilized now given the  subdivision boom  in Cavite.    There  are 30,000  informal  settlers‐families  in Taguig City.    Thus,  the  city  has  partnered  with  NGOs  on  resettlement,  using  the  following models,  namely:  (a)  Gawad  Kalinga  –  sweat  equity  using  conventional  method, PhP120000 for 17 square meters under a usufruct agreement; (b) Habitat for Humanity – with equity using smart masonry blocks, PhP250000 for 26 square meters at PhP900 per month for 25 years, target to build 70 buildings, with 8 buildings completed to date; (c) New Zealand – prefabricated steel.  The city is due to update its CLUP with the vision of surpassing Makati  in 10 years.   The city has an established an early warning system and designated evacuation centers.   The team conducted an ocular survey of the road dike and potential relocation site for AusAID.  The area seems to be still part of a natural floodplain.  While the road dike protected the area from flooding, there might be a need to re‐think the safety of the relocation site.   The team also visited a sample relocation site of Habitat for Humanity community in FTI Taguig City. 

 10. MMDA  (05 November  2009,  Thursday,  11:30  –  1:00  pm, MMDA Office, Makati  City; 

Assistant General Manager Corazon Bautista‐Cruz, Director Josefina Faulan, Mr. Michael Gison, Mr. Reynaldo  Lunas)   Discussion.   MMDA presented  their  internally developed damage  and  needs  assessment  for Metro Manila  as  a  result  of  Ketsana.   Damage  to flood  control  amounted  to  PhP32.62M.  Total  number  of  informal  settlers  in Metro Manila  is about 544,609 households/families.   The current government policy  is  in‐city 

Page 26: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 26 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

resettlement.   MMDA mentioned  that AusAID  is  the  first donor agency  that  talked  to them  about  disaster  risk management  for Metro Manila,  and  articulated  their  keen interest to work with the agency.  MMDA requested assistance in the preparation of the Metro Manila  Physical  Framework  Plan.    They  initially  intend  to  have  the  document ready  for  the new President  after May  2010.    This however  is not possible  since  the document needs to be informed by impact modeling and risk assessment.  Agreements.  Recommend  to  AusAID  the  provision  of  assistance  to MMDA  on  the  formulation  of Metro Manila Physical Framework Plan.    Instead of handing over  the plan  to  the next President, an action agenda will be drawn up informing the President of the immediate actions and next steps. 

 11. DPWH (05 November 2009, Thursday, 5:30 – 6:30 pm, DPWH Office, Manila; Engr. Sofia 

Santiago,  Engr.  Leonila  Mercado,  Engr.  Leonardo  Sanchez)    Discussion.    Provided historical perspective on eFCOS and plans of DPWH to improve flood control operations and monitoring.    Clarified  that  the  operation  and management  of  the  Efficient  Flood Control Operation  System  (eFCOS)  turned  over  to MMDA  in  2002  from DPWH.    The design and construction of this was managed by DPWH including initial operation. 

 12. CSCAND AGENCIES AND NEDA (06 November 2009, Friday, 9:10 am – 12:00 nn, PAGASA 

Office, Quezon City; Deputy Administrator Linda Papa, Director Prisco Nilo, Director Rene Solidum,  Assistant  Director  Edwin  Domingo,  Engr.  Tony  Apostol,  Ms.  Charmie Moneverde, Ms. Penny Abat, Ms. Kristine Villarino)  Discussions.   The meeting provided a venue for CSCAND agencies to  identify their priorities and confirm DRM priorities for Metro Manila.  The following are the key points:  b.  Identify  the entire watershed or  river basin  as  the  target  coverage of  a proposed 

project on hazard mapping and vulnerability assessment for Metro Manila.   Expand the  coverage  of  previous  studies  undertaken  for Metro Manila,  i.e., MMEIRS,  to cover neighboring provinces, particularly Laguna and Rizal. 

b.  Conduct an  inventory of existing  information  for Greater Manila Area, acquire new datasets and update elevation models. 

c.  Build exposure information on floods and earthquakes. d.  Include the impact of climate change on hazard and vulnerability assessment project. e.  Support  strengthening of early warning  system  for Metro Manila,  i.e., provision of 

Doppler radar instrument and capacity building. f.  Identify appropriate relocation sites for socialized housing projects. g.  Metro Manila as a case  study  to  improve  flood data and monitoring methodology 

and this can be expanded to other areas. h.  Develop  a  national  disaster  data  infrastructure  housed  in  OCD  based  initially  on 

READY Project/REDAS. i.  At  the  national  level,  improve  the  national mapping  program,  and,  in  particular, 

develop a national spatial data infrastructure. j.  Convene stakeholders and bring together lessons learned from the flooding. k.  Identify MMDA to lead a Metro Manila wide project given their mandate.  NEDA will 

share tools and guidelines and will support MMDA as part of the oversight body. 

Page 27: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 27 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

ANNEX 3 LIST OF PEOPLE CONSULTED 

  Asian Development Bank 1  Mr Neil Britton, Regional Disaster Management Coordinator Australian Agency for International Development 2  Mr Titon Mitra, Minister Counsellor 3  Mr Peter Jensen, Counsellor Australian Bureau of Meteorology 4  Mr Andrew Donaldson, Manager 5  Mr Todd Smith, Manager City of Taguig 6  Mr Wilfredo Villar, Administrator 7  Architect Joey Mastrili, OIC City Planning and Development Office 8  Mr George Sumabat, Socialized Housing Specialist Department of Public Works and Highways 9  Engr Sofia Santiago, Program Manager of Major Flood Control Project 10  Engr Leonila Mercado, Supervising Engineer 11  Engr Leonardo Sanchez, Engineer II Metro Manila Development Authority 12  Dr Corazon Bautista‐Cruz, Assistant General Manager 13  Ms Josefina Faulan, Director for Policy and Planning Services 14  Mr Michael Gison, Chief of Planning Division 15  Mr Reynaldo Lunas Mines and Geosciences Bureau 16  Mr Horacio Ramos, Director 17  Mr Edwin Domingo, Assistant Director 1  Dr Bill David, Chief of Planning Division 19  Engr Antonio Apostol, OIC Land Survey Division 20  Engr Evelyn Rollon, Supervising Engineer National Economic Development Authority ‐  Regional Development Coordination Staff 21  Engr Susan Jose, Director 22  Ms Medy Endencia, Assistant Director 23  Ms Thelma Manuel, Chief of Land Use and Physical Planning Coordination Division National Mapping and Resource Information Authority 24  Ms Linda Papa, Deputy Administrator 25  Mr Jose Galo Isada, Director of Mapping Philippine Atmospheric Geophysical and Astronomical Services Administration 26  Dr Prisco Nilo, Administrator 27  Dr Cynthia Celebre 28  Ms Susan Espinueva 29  Ms Thelma Cinco 30  Ms Charmie Monteverde 31  Ms Lourdes Sulapat 

Page 28: Disaster Risk Management Needs of Metro Manila: A Scoping Report

Page 28 | S c o p i n g   M i s s i o n   R e p o r t :   D R M   R e q u i r e m e n t s   o f   M e t r o   M a n i l a  

Philippine Institute of Volcanology and Seismology 32  Dr Rene Solidum, Director 33  Mr Ishmael Narag, OIC of Volcanology and Seismology Monitoring Division 34  Ms Mylene Villegas, OIC of Information and Education Division United Nations Development Programme 35  Mr Sanny Jegillos, Regional Programme Coordinator (Bangkok) 36  Mr Krishna Vatsa, Early Recovery Specialist 37  Dr Michael Ernst, Consultant for Early Recovery University of the Philippnes – Department of Geodetic Engineering 38  Dr Enrico Pariquit, Department Chairman World Bank 39  Ms Mukami Karauki, Senior Operations Officer 40  Dr Hyoung Gun Wang, Geographic Information System Specialist 41  Ms Cathy Vidar 

 

Page 29: Disaster Risk Management Needs of Metro Manila: A Scoping Report

                                       

For inquiries, contact:  

Australian Agency for International Development Ms Anne Orquiza, Phone +63 2 7578294, Email [email protected] 

Level 24 Australian Embassy Tower II RCBC Plaza 6819 Ayala Avenue Makati City 1200 Philippines  