DISASTER RISK MANAGEMENT AND FOOD SECURITY SECTOR MINISTRY OF AGRICULTURE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA DECEMBER 2011 THE STATE OF AFFAIRS OF OPERATIONALIZING THE NEW DRM APPROACH IN ETHIOPIA EARLY WARNING AND RESPONSE DIRECTORATE 1
Dec 11, 2015
DISASTER RISK MANAGEMENT AND FOOD SECURITY SECTOR
MINISTRY OF AGRICULTUREFEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
DECEMBER 2011
THE STATE OF AFFAIRS OF OPERATIONALIZING THE NEW DRM APPROACH IN
ETHIOPIA
EARLY WARNING AND RESPONSE DIRECTORATE
1
Outline
Disaster risks in the context of EthiopiaHistorical Background to Disaster
Management SystemCurrent State of Affairs of DRM
implementation Overview of the Ethiopia’s Early Warning and
Response SystemOngoing and planned activities towards full
operationalization of DRM approachStrengths and challenges Role of MPs in operationalizing the DRM
approach
2
Disaster risks: Context of Ethiopia
• Ethiopia has achieved a double digit economic growth over the last eight years and plans to increase it further (to the level of 14 percent) by the end of the GTP period.
• Despite such a tremendous achievement Ethiopia is still highly vulnerable to a wide range of CC induced natural as well as man-made disasters
• Drought remains the country’s leading major hazard while flood is the second major hazard next to drought
• Recent experience shows an apparent marked increase in area coverage and frequency of such disasters
• Climate Change and associated risks are and will continue to affect the economy in general and agriculture and FS in particular
3
…Background to Disaster Management System
Pre BPR period: crisis management focused Pre-1973: no organized DM system, ad-hoc response to
crises 1973: Relief & Rehabilitation Commission (RRC) 1995: Disaster Prevention and Preparedness Commission
(DPPC) 2004: Disaster Prevention and Preparedness Agency (DPPA)
PSNP opened a new chapter in the history of DM in Ethiopia by shifting the focus from crisis management to risk management
2006-07: Business Process Reengineering (BPR)Post BPR period: Risk management focused 2008: Disaster Risk Management and Food Security Sector
(DRMFSS)
7
…Policy
National Policy on Disaster Prevention & Management (NPDPM) – 1993 Focus on response largely to droughts Actions not backed by risk assessments
National Policy and Strategy on Disaster Risk Management – pending approval (by 3rd quarter of EFY04) Full DRM cycle – prevention, mitigation, preparedness, response,
recovery and rehabilitation Focus on proactive risk management Aligned with the Hyogo Framework for Action Multi-hazard and multi-sector approach Informed decision making based on strong risk assessments and
early warning system Legal backing with proper institutional structure
8
…Current state of Affairs: Early Warning and Response
System
Preparedness
Assessment
The system is multi-hazard and multi-sectoral
Ground & remotely
sensed data
Coordination mechanisms
NDPPCNDPPC
9
… Current state of Affairs• Risk reduction measures • DM:• High level Committees
• At each level of Government (at the Federal level led by the DPM)• Government led coordination mechanisms:
– Disaster Risk Management Technical Working Group (which brings together all actors involved in EWR)
– Sectoral Task Forces (led by respective ministries)– Multi-Agency Coordination Group ( at the technical and strategic levels)– Command post (on the scene)– RED&FS platform (DRMFS Task Force)
Preparedness Food and non-food stockpiles (government and partners) Disaster Response Fund (government and partners)
• Response– Response triggered based an early warning info and assessment findings and
beneficiaries identified through transparent and participatory geographic and community targeting
10
… Current state of Affairs• Partnerships:
– With US government to strengthen our response capability– With Global Food Monitoring System and ITC to improve access to remotely
sensed data and enhance application capability– With IGAD for capacity development – South-South Cooperation
Operational zed baselines, risk management tools, and innovative approaches Livelihood baselines EW baselines LEAP (EW, contingent financing, contingency plan, capacity) LEAP-LIAS Market analysis tools Risk financing mechanism (EW, contingent financing, contingency
plan, capacity) Insurance schemes
Professionalization of the DRM workforce and initiating applied researches and studies
Annual events: for documenting and sharing lessons learnt, best practices and experiences
11
MoA
FSCD EWRD
Logistics manageme
nt Case Team
Safety net and
household asset building
case team
Resettlement coordination Case Team
Aid agencies Coordination Case Worker
Finance & Procurement Case Team
EWRIMCase Worker
DRMFSS
Emergency Logistics
management Case Team
Emergency Finance &
Procurement Case Team
…State of Affairs: Organizational structure of the DRMFSS
EFSRA
NDPPFO NDPPFO
NDPPCNDPPC
DRMEWR Case Team
12
Ongoing and planned undertakings
Moving away from seasonal assessment based upon response to a continuous monitoring system
EW info and post event rapid assessment findings will lead to the response
Automation of information flow and report sharing:WoredaNET-based data and report sharing (vertical and horizontal)
Infrastructure and application development Trainings
Enhancing the response capacity: Integration of relevant components of US-NIMS
(MAC, EOS, and ICS)
13
Ongoing and planned undertakings: Strategic Programme & Investment
Framework
Translating the new DRM approach into action Designed to achieve the goals and targets of the Growth &
Transformation PlanWill help harmonize DRM initiatives and create synergies
for a more effective implementation and maximize the available resource efficiency of utilization
Main features– Aligned with the new BP, revised DRM Policy, HFA, PIF, GTP,
CAADP, African Regional Strategy for DRR– Presents all DRM programme components along the
different phases of DRM and their interrelationships– Substantively defines and costs (in detail) the various
DRM components/programmes– Provides a mechanism for assessing progress and
evaluating results on DRM
14
Ongoing and planned undertakings: Disaster Risk Profiling
An information system being developed (building upon existing livelihoods baselines) to implement the new DRM approach
Disaster Risk Profile for every wereda in country based on information collected from communities, households and DRM actors
It provides comprehensive information on: hazards and associated risks, vulnerabilities, underlying and associated causes of disaster risks and vulnerabilities, copying capacities, and current and proposed mitigation measures
Aims at informing: DRR plans in weredas, Comprehensive contingency plans The kind of location-specific early warning and response system
that need to be in place Appropriate context-specific risk transfer mechanisms and tools
15
Ongoing and planned undertakings: Productive Safety Net Programme
Aims at providing transfers to the food insecure households in chronically food insecure weredas in a way that prevents asset depletion at the household level and creates asset at the community level providing appropriate, timely and predictable transfers to
chronically food insecure households – basis of effective risk transfer establishing new community assets and maintaining the existing
ones with operational management mechanisms – enhancing community resilience
addressing transitory needs effectively in PSNP weredas up to the limit of risk financing resources – preventing impending disasters
Mitigates the risk of disaster occurrence by saving livelihoods of vulnerable people
Coverage: 8 regions, 318 weredas, 7.6 million people
16
Ongoing and planned undertakings: Risk Transfers: Going from Micro to Macro
Bottoms-up approach adopted for overall risk management framework
All programmes based on ground information (community-based risk profiles)
Best practices and lessons learned: Horn of Africa Risk Transfer for Adaptation (HARITA) Multiple Crop Insurance (MPCI) & Weather Index Crop
Insurance (WICI), supported by Nyala Insurance
Complements macro-level risk transfer effortsAll efforts directed towards strengthening the
resilience of vulnerable populations
17
Ongoing and planned undertakings: Early Warning: The Basis for RT
Major issue observed in existing micro-level risk transfer experiments – reliability of “triggers”
The new EWS focuses on a system based upon continuous monitoring as the basis for triggering the response
Regular multi-hazard monitoring and early warning (utilizing ground and remotely sensed information)
Analysis tool like: LEAP and LIAS LEAP is an important risk management tool that analyses
satellite and ground data and generates EW to facilitate timely and appropriate responses
It also provides triggers to activate the Risk Financing mechanism
LIAS is being used for analysing livelihood dynamics
18
Ongoing and planned undertakings: RT Practice-
Risk Financing Mechanism
Initiated in 2006 and evolved to the level now being seen as an integral part of PSNP
It is a mechanism to address additional caseloads in PSNP weredas in the event of disasters
Preventing non-PSNP beneficiaries from adopting destructive coping strategies and falling into chronic food insecurity
Early response to disasters through scaling up of the PSNP prevents them from becoming emergency.
A total of US$ 160 million has been pooled in the Contingent Financing
In 2011 US $134 has been triggered to mitigating impacts of drought in PSNP areas
19
…Risk Financing Mechanism - Pillars
Plans in place so that early response to impeding droughts can be made
Early warning to trigger early response
Ready resources to execute contingency plans and avoid delays in appeals
Adequate capacity to allow the pre-prepared plans to be effectively implemented
20
Ongoing and planned undertakings: Integrating DRR, CCA & SP
DRM, CCA and SP: basically all these addressing poverty, vulnerability, and disaster risk related issues and are interrelated and inseparable
CC increased disaster risks increased poverty and vulnerability
Mainstreaming is crucial, but may not bring about lasting solution unless there is a strong linkage between these three initiatives
The October 2007 Stockholm Plan of Action for Integrating DRR and CCA calls for common strategies (DRR, CCA, poverty reduction).
There is always a natural overlap between DRM, CCA, and SP – the integration facilitates effective risk transfer
Adaptive Social Protection: has a greater role to build the resilience of the poorest and most vulnerable people to climate change
21
Strengths and Challenges
Strengths: Government ownership and leadership; Proper institutional arrangement at all levels of
government; Alignment of DRM programmes to the HFA, revised policy,
PIF, GTP etc; Revising of the DRM policy doc; The EWRS helped prevent the 2011 drought induced crisis
from changing into famine (as life saving and livelihood protection measures were initiated in a timely manner);
Preparedness (in kind food and non-food stockpiles and disaster response fund) allowed timely response and also bridged resource gaps;
Integration of MAC and ICS into the DM system increased effectiveness of response
22
Strengths and Challenges
Disaster risk reduction measures like PSNP improved resilience; The Risk Financing Mechanism, component of PSNP, has been
playing a crucial role in avoiding asset depletion and protecting the hard-won gains achieved by beneficiaries by providing timely response in the event of shocks;
Partnership programmes with International and regional organizations helped improve capacity and increase access to information;
Risk Transfer Mechanisms contributed to reduce disaster risks and vulnerability to shocks and mitigate potential impacts;
DRM workforce professionalization and South-South Cooperation helped improve capacity;
Organizing an international DRM event annually contributed towards increased harmonization and synergy: Working jointly to achieving common goals.
Disaster risk profiling
23
Strengths and Challenges
Challenges: The Draft DRM policy is not yet approved; Reliance on external resources for DM; DMS is not yet fully decentralized; Limited Capacities for full operationalization of the new
DRM approach; Limited attitudinal change on the part of donors to
allocate resources for DRM; Lack of full integration and alignment of local level
projects/programmes with DRM policy, strategy, and plans;
Limited or no focus on capacity building of government institutions as part of exit strategy of programmes run by international organizations
24