1 16 May 2012 Holger Witte Brookhaven National Laboratory Advanced Accelerator Group Dipole for Fast Ramping Synchrotron
18

Dipole for Fast Ramping Synchrotron

Jan 29, 2016

Download

Documents

dunne

Dipole for Fast Ramping Synchrotron. Geometry. Required good field region: 62x10 mm 2 Magnet aperture: 100x13 mm 2 Magnet dimension: > 500x500 mm 2. 6.5%SiFe. FeCo. Magnetization. 1 T. 2 T. Maximum Field. 2T?. Epstein Frame Test. FeCo - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dipole  for  Fast Ramping Synchrotron

116 May 2012

Holger WitteBrookhaven National Laboratory

Advanced Accelerator Group

Dipole for

Fast Ramping Synchrotron

Page 2: Dipole  for  Fast Ramping Synchrotron

216 May 2012

Geometry

Required good field region: 62x10 mm2

Magnet aperture: 100x13 mm2

Magnet dimension: > 500x500 mm2

FeCo

6.5%SiFe

Page 3: Dipole  for  Fast Ramping Synchrotron

316 May 2012

Magnetization

1 T

2 T

Page 4: Dipole  for  Fast Ramping Synchrotron

416 May 2012

Maximum Field

2T?

Page 5: Dipole  for  Fast Ramping Synchrotron

516 May 2012

• FeCo– enough material purchased for 9 test strips (24

planned)• 6.5SiFe

– 100 strips shipped (thanks to Mr. Ninomiya at JFE)

• Epstein frame test at Fermilab– thanks to Robert W Riley and John Zweibohmer

Epstein Frame Test

Page 6: Dipole  for  Fast Ramping Synchrotron

616 May 2012

• Measurements– C-direction– L-direction– L/C direction

6.5 Si Steel

Page 7: Dipole  for  Fast Ramping Synchrotron

716 May 2012

Results 6.5% Si Steel

Page 8: Dipole  for  Fast Ramping Synchrotron

816 May 2012

Results 6.5% Si Steel

Page 9: Dipole  for  Fast Ramping Synchrotron

916 May 2012

Results 6.5% Si Steel

Page 10: Dipole  for  Fast Ramping Synchrotron

1016 May 2012

Results 6.5% Si Steel

Page 11: Dipole  for  Fast Ramping Synchrotron

1116 May 2012

Results 6.5% Si Steel

Page 12: Dipole  for  Fast Ramping Synchrotron

1216 May 2012

FeCo - Hiperco

• Purchased from Ed Fagan– Hiperco 50 (A)

• Cut to size on site

• Annealed at IFW in Dresden, Germany– 871 deg C, 2h in

vacuum

Page 13: Dipole  for  Fast Ramping Synchrotron

1316 May 2012

FeCo – Hiperco 50A

Page 14: Dipole  for  Fast Ramping Synchrotron

1416 May 2012

FeCo – Hiperco 50A

Page 15: Dipole  for  Fast Ramping Synchrotron

1516 May 2012

FeCo – Comparison GO Steel

Page 16: Dipole  for  Fast Ramping Synchrotron

1616 May 2012

Fe Co Results

• about 0.1T short• reason is unknown

– wrong material– bad batch– not enough material– wrong annealing

• Vacuumschmelze GmbH & Co. KG– Hanau, Germany

Page 17: Dipole  for  Fast Ramping Synchrotron

1716 May 2012

Vacoflux 48

Page 18: Dipole  for  Fast Ramping Synchrotron

1816 May 2012

• 6.5% Si steel– confirmed values from datasheet– almost isotropic– good match of hysteresis loop– losses?

• FeCo– discrepancy between datasheet and

measurement– Vacuumschmelze

Summary