Top Banner
1 Light Rail Day Bergen COLOURS USED IN LEVEL CROSSINGS 15.11.2016 Dipl. Ing. Christof Neumann, CEO 2 GMUNDNER FERTIGTEILE medium-sized private company Staff < 50 Persons Plant: reinforced-concrete parts polymer-concrete special-concrete parts Turnover: ~ 10 Mio EURO Export: represented in 20 countries GMUNDNER FERTIGTEILE Company
11

Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

May 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

1

Light Rail DayBergen

COLOURS USED IN LEVEL CROSSINGS

15.11.2016

Dipl. Ing. Christof Neumann, CEO

2

GMUNDNER FERTIGTEILEmedium-sized private company

• Staff < 50 Persons• Plant: reinforced-concrete parts

polymer-concretespecial-concrete parts

• Turnover: ~ 10 Mio EURO• Export: represented in 20 countries

GMUNDNER FERTIGTEILECompany

Page 2: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

3

Products:• BODAN – level crossing system (produced in polymer

concrete)• BO-TRACK – slab track system (produced in cement

concrete)• Technical buildings for railway installations• Bus and tram stops• Platforms (prefabricated)• Specialites• Tactile Paving

GMUNDNER FERTIGTEILECompany

4

Railway`s view:• Safety through tried and tested system• Track quality is the same everywhere

(track line and LC area)• Low expenditure for installation and

dismantling• Low expenditure required for routine

maintenance• High electrical resistance with track

insulation• Good rating for life cycle costs (LCC)

Level CrossingsRequirements

Page 3: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

5

Road Operator`s view:• Safety through tried and tested system• Continuously road space• High skid resistance due to grain-rough

surface• High level of durability with heavy duty

truck & lorry traffic• New developments to get even higher

performance in safety aspects on thelevel crossing

Level CrossingsRequirements

6

• BODAN comes up to all requirements-> track- and street-side

• BODAN – bridge structure; the loads of road trafficweighing on the panels are elastically transferredthrough rubber profile wedges to the rail foot. The elasticity of the rail is maintained also in the levelcrossing area.

BODANLevel Crossing

Page 4: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

7

BODANSystem

Designed with standard elements

8

BODANSpecial requests

Page 5: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

9

BODANReferences

- 300 to 400 BODAN level crossings every year- BODAN installations in 29 countries on five

continents- Germany > 3.000 BODAN level crossings- Austria > 1.800 BODAN level crossings- Japan 500 BODAN level crossings

10

Why to use colours in Level crossings

- Raise attention of car drivers- Raise attention of persons crossing- Marking areas where „not to stop“- Slow down car speed- Seperate areas of car and pedestrian traffic- Architectural aspects- Indicate, that there is a track crossing

(additional to other signs)

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

Page 6: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

11

NORWAY

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

12

Czech Republic

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

Page 7: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

13

Austria

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

14

Switzerland

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

Page 8: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

15

Japan

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

16

Australia

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

Page 9: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

17

Japan

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

18

Railway Exhibition

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

Page 10: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

19

Austria

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

20

Irleland

Light Rail Day, BergenCOLOURS USED IN LEVEL CROSSINGS

Page 11: Dipl. Ing. Christof Neumann, CEO Light Rail Day · • BO-TRACK – slab track system (produced in cement ... Company 4 Railway`s view: • Safety through tried and tested system

21

Thank you for yourattention!