Heather Fisher, P.Eng, PMP Dillon’s Project Manager October 14, 2015
34

Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

Dec 01, 2018

Download

Documents

phamminh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

Heather Fisher, P.Eng, PMP

Dillon’s Project Manager

October 14, 2015

Page 2: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 2

• Semi-remote, northern location

• 3 year Remediation Program

– construction of two LTUs

– excavation of hydrocarbon-impacted soil from the apron and FTA

– placement into the constructed LTUs

• PFC Considerations

• Unexpected Challenges

• Sustainable Solutions

Page 3: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 3

Page 4: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 4

Page 5: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 5

• Remediation of former tank farm near

apron

• Three ASTs were decommissioned in

1992 and relocated 30 m east

• PHC, napthalene and metals were

identified at the former tank farm area

Page 6: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 6

• FTA was historically as a firefighting training facility

• Aqueous film forming foam (AFFF) was applied to lit aircraft

crash mock-ups;

• Unburned fuel, water and AFFF were used in the unlined FTA

facility within a 40 cm berm;

• Fuel was provided by an AST farm and pipe system formerly

located west of the bermed FTA area;

• FTA used for a brief period in the early ‘90s; and decommissioned

shortly thereafter (tanks and associated piping removed);

• AFFF contains fluoroalkyl surfactants (PFAS) and low levels of

perfluoroalkyl sulfonate salts (e.g., PFOS)

Page 7: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 7

Page 8: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 8

Activity 2013 2014 2015

Remove and Dispose Fuel Transfer Building X

Construct LTU for Petroleum Hydrocarbon Impacts Soils from Apron Area X

Excavate and Transport Petroleum Hydrocarbon Impacted Soils X

Excavate and Remove Concrete Debris from Excavation* X

Monitoring Well Installations (9) around Apron and LTU X

Construct LTU for Petroleum Hydrocarbon Impacts Soils from FTA X X

PFC Investigation X

Address Crushed Drums and Metal Cylinders* X

Dewater FTA LTU* X

Excavate PHC Impacted Soils and Transport to FTA LTU X

Monitoring Well Installations (11) around FTA and FTA LTU X

Post-Excavation Confirmation Sampling X X X

Quality Control (e.g., geomembrane testing) X X

Page 9: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 9

Page 10: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 10

Page 11: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 11

Page 12: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 12

Page 13: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 13

INSERT PHOTOs – Use more

than one slide

Page 14: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 14

Page 15: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 15

Page 16: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 16

Page 17: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 17

Page 18: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 18

Page 19: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 19

Items Numbers

LTUs Constructed 2

Volume of Petroleum Hydrocarbon Impacts Soils Excavated from Apron Area 3500 m3

Volume of PHC Impacted Soils Excavated from FTA 4260 m3

Volume of Concrete Debris Removed from Excavation 165 m3

Volume of Unexpected Aggregate Placement for Base/Ballast Layer 9,350 m3

Horizontal Delineation Achieved Yes

Vertical Delineation Achieved By permafrost

Tonnes of Crushed Drums and Metal Cylinders* Removed 20

Volume of Excavation Water requiring Off-site Treatment 400 liters

Number of Monitoring Wells Installed around FTA and FTA LTU 20

Number of Post-Excavation Confirmation Samples 117

Page 20: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 20

• 14 TPs were completed

• Sampling Procedures were per Transport Canada Protocol,

adopted from Dillon:

– cotton coveralls with no water resistant coatings,

– no Gore-TexTM

gear,

– no snacks or meals on-site,

– no use of shampoo, conditioner, body gel, or cosmetics, and

– no markers

• Equipment was decontaminated after each TP

• Rinse water samples were collected and analysed for

PFASs

• MWs sampled without the use of Teflon tubing or fittings

Page 21: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 21

Page 22: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 22

• Meteorological Conditions

• Soil Conditions

• Drums and Canisters

• Concrete

Page 23: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 23

Page 24: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 24

mm Rain Snow Total

Jul-13 48.6 0.0 48.6

Aug-13 10.6 3.4 14.0

Sep-13 27.0 2.8 29.8

Jul-14 85.6 0.0 85.6

Aug-14 15.8 0.0 15.8

Sep-14 15.2 11.0 26.2

Jul-15 59.4 0.0 59.4

Aug-15 11.8 0.0 11.8

NORMAL July - - 24.1

NORMAL August - - 25.7

NORMAL Sept. - - 19.1Source: Environment Canada Weather Data

http://climate.weather.gc.ca/prods_servs/cdn_climate_summary_e.html

Page 25: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 25

Page 26: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 26

Page 27: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 27

Page 28: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 28

Page 29: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 29

Page 30: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 30

Page 31: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 31

Page 32: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 32

• Local pitrun material (non-traditional) used as backfill material

• LTU base and berms used grubbed material from footprint (no hauling)

• Consolidated waste liquids recovered from drum disposal area excavation;

pure product was separated and used in the Hamlet’s pilot gasification plant

• Excavation surface water applied to apron LTU soils (in lieu of off-site removal)

• LTU accumulated water was analysed prior to discharge and discharged locally

(no transport)

Page 33: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

CBA Remediat ion Program 33

• Delays associated with unexpected site

conditions further resulted in weather related

delays;

• Challenges associated with a short field

season, soil conditions, barge delivery and

unexpected subsurface discoveries;

• PHC impacted soils were successfully

remediated at the 2 airport locations;

• Northern location fostered sustainable

solutions: local borrow, water disposal.

Page 34: Dillon’s Project Manager - esaa.org · CBA Remediation Program 5 •Remediation of former tank farm near apron •Three ASTs were decommissioned in 1992 and relocated 30 m east

Heather Fisher, P.Eng., PMP

1558 Willson Place

Winnipeg, Manitoba, R3T 0Y4

204.453.2301 ext. 4077

[email protected]