Top Banner
Production excellence through real-time decision support D square: http://www.dsquare.be Friday 30 March 2012
18

Digitale fabriek - I2 - Dsquare

Jul 03, 2015

Download

Technology

Sirris

Inleiding op deel 6 van de seminariereeks Digitale fabriek. Digitale fabriek als een van de transformaties van Factories of the Future.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Digitale fabriek - I2 - Dsquare

Production excellence through real-time decision support

D square: http://www.dsquare.be

Friday 30 March 2012

Page 2: Digitale fabriek - I2 - Dsquare

Operational Excellence

!"#$%&

'()*+,(-$(%"./0,-1.*"(2$

3$.*"4*.*%&

5+,6%"4*.*%&

71$+"8,("./'92$..$(2$

718-*:$/1+,2$;;$;/#,+/-"9*-"./1+,6%

';;$(8"./#,+/.*2$(;$/%,/,1$+"%$

3$<=*+$>/#,+/.*2$(;$/%,/,1$+"%$/"(>/2,-1"(&/+$1=%"8,(

?11.*$;/%,/,1$+"8,("./1+,2$;;$;/";/@$../";/1$,1.$/A/*(#,+-"8,(

Friday 30 March 2012

Page 3: Digitale fabriek - I2 - Dsquare

From data sinks to information sources, from iT to IT

D square: http://www.dsquare.be

Friday 30 March 2012

Page 4: Digitale fabriek - I2 - Dsquare

From data sinks to information sources, from iT to IT

D square: http://www.dsquare.be

Friday 30 March 2012

Page 5: Digitale fabriek - I2 - Dsquare

Plant conditions

Shift logbook

Shift handover

Production meeting

ENTERPRISE RESOURCE PLANNING

From data sinks to information sources, from iT to IT

D square: http://www.dsquare.be

Friday 30 March 2012

Page 6: Digitale fabriek - I2 - Dsquare

Plant conditions

Shift logbook

Shift handover

Production meeting

ENTERPRISE RESOURCE PLANNING

SCADA - DCS

PROCESS CONTROL

PIMS LIMS ALARM EVENTS

PRODUCTION QUALITY EFFICIENCY MAINTENACE

From data sinks to information sources, from iT to IT

D square: http://www.dsquare.be

Friday 30 March 2012

Page 7: Digitale fabriek - I2 - Dsquare

From data sinks to information sources, from iT to ITFriday 30 March 2012

Page 8: Digitale fabriek - I2 - Dsquare

Real-time decision support

http://www.dsquare.be

Process watchdog

Process logbook

Process coach

Friday 30 March 2012

Page 9: Digitale fabriek - I2 - Dsquare

D square: http://www.dsquare.be

Friday 30 March 2012

Page 10: Digitale fabriek - I2 - Dsquare

Data mining: science, art or magic?

D square: http://www.dsquare.be

Friday 30 March 2012

Page 11: Digitale fabriek - I2 - Dsquare

Data mining flavors

Data mining: science, art or magic?

• Soft sensors

• Anomaly detection

• Adaptive control

• Defect classification / analysis / prediction

• Root-cause analysis

• Operator action advise

• KPI prediction

• Planning and scheduling

• ...

Friday 30 March 2012

Page 12: Digitale fabriek - I2 - Dsquare

Data mining: science, art or magic?

• What is the question?

• Is the answer in the data?

• Involvement & expectations?

• Where is the expert?

• Is there sufficient context?

Data mining success criteria

Friday 30 March 2012

Page 13: Digitale fabriek - I2 - Dsquare

Case study: Operator action advise

D square: http://www.dsquare.be

Friday 30 March 2012

Page 14: Digitale fabriek - I2 - Dsquare

Waste incinerationFriday 30 March 2012

Page 15: Digitale fabriek - I2 - Dsquare

Motivation

• Significant variation on the decisions taken by panel operators

• Variations in operator behavior are believed to have significant effects on important process KPIs such as steam flow

• Expertise of senior operators may not be fully exploited to assist more junior operators when difficult decisions need to be made

• Data of operator actions and their effects is readily available in todays data historians.

• There is a gap between the operational and managerial level that makes it difficult to implement performance optimal plant operation. It is hard for managers to relate operator behavior to process performance.

• A feasibility study has indicated that potential ROI of a decision support system is signficant

Friday 30 March 2012

Page 16: Digitale fabriek - I2 - Dsquare

Differential operator team analysisFriday 30 March 2012

Page 17: Digitale fabriek - I2 - Dsquare

Results

• Determined influence factors for steam loss

• Differential operator analysis

! Across teams

! Problems due to inefficient shift handover

• Implementation of an operator advisory system (process GPS)

! Action advise

! Action insight

Friday 30 March 2012

Page 18: Digitale fabriek - I2 - Dsquare

Production excellence through real-time decision support

http://www.dsquare.be

D square: http://www.dsquare.be

Friday 30 March 2012