Die Ingenieurwerkstatt Die Ingenieurwerkstatt programme “Silent Rail Freight Traffic “ (Silent Rhine) Pilot project and innovation programme “Silent Rail Freight Traffic “(Silent Rhine) Status of the pilot project: noise reduction by retrofitting freight traffic Dipl.-Ing. Thomas Quernheim Die Ingenieurwerkstatt GmbH Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 1
12
Embed
Die Ingenieurwerkstatt Pilot project and innovation programme “Silent Rail Freight Traffic “ (Silent Rhine) Status of the pilot project: noise reduction.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Pilot project and innovation programme “Silent Rail Freight Traffic “(Silent Rhine)
Status of the pilot project: noise reduction by retrofitting freight traffic
Dipl.-Ing. Thomas QuernheimDie Ingenieurwerkstatt GmbH
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 1
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 5
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Retrofitting of up to 5.000 freight wagons
Request for notification of directive for subsidies submitted to Brussels in May 2009
Approval of notification received inNovember 2009
Evaluation of technical options for vehicle detection and verification in the pilot project is completed:
RFID system Operational data
Project status (1)
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 6
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Homologation of composite brake blocks
Intensive coordination with EBA concerning approval of retrofitted wagons and with UIC-experts concerning restrictions in application guideline V-BKS (LL)
Limit value for equivalent conicity Inspection intervals therefore Measurement procedure therefore
Project status (2)
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 7
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Project status (3)
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 8
Status with reference to NDTAC
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Status with reference to NDTAC (2)
Subjects to be analysed in NDTAC study
Cost for public authority Cost for private sector Efficiency Effectivity Inter modal effects Compatibility to Europe Time line for implementation
Project status (4)
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 9
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Status with reference to NDTAC (3)
Study to verify cost for setting-up and maintaining NDTAC system in Germany will start soon
Results of study within 4 month until August / September
Preparation of governmental decision based on study and findings of the project
Possible implementation of NDTAC system untilDecember 2012
Project status (5)
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 10
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Preconditions for this time-line are
Cooperation of stakeholders
Financial feasibility (public & private sector)
Legal permissibility (state aid issues)
Practicability
Compatibility with European approach
Summary
Workshop NDTAC – 27.04.2010 – Pilot project and innovation programme “Silent Rhine" 11
Die IngenieurwerkstattDie Ingenieurwerkstatt
Pilot project and innovation programme“Silent Rail Freight Traffic “ (Silent
Rhine)
Thank you for your attention!
Die IngenieurwerkstattGesellschaft für Lifecycle-Engineering mbH