Top Banner
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ITEA 2 - 1 of 8 DICOMA 4 & 5 December 2013 Co-summit 2013-11-08, Stockholm DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden Eloy González Ortega
9

DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

Jan 08, 2016

Download

Documents

Oren

DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden Eloy González Ortega. Project Objectives. Development of Data Abstraction tools for decision makers. Assembly of Simulation and Modelling tools to model natural phenomena. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

DICOMA

DIsaster COntrol

MAnagement

Co-summit 2013

4 & 5 December, Stockholm – Sweden

Eloy González Ortega

Page 2: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 2 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, StockholmProject Objectives

• Development of Data Abstraction tools for decision makers.• Assembly of Simulation and Modelling tools to model natural

phenomena.• Decision Support & Training tools to provide fast and clear

information and propose alternative actions.

Page 3: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 3 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, StockholmProject Consortium

January 2012 – May 2014

FINLAND

SPAIN

TURKEY

ISRAEL

Page 4: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 4 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, StockholmTechnical Challenges

• Decision Support: event modelling, sharing physical resources and information across national and language borders.

• Control Systems: rule based knowledge discovery, Geographic Interface System platform, Data Mining, Human Computer Interaction.

• Real Time Data Processing: inter-agency data and resource sharing, Complex Event Processing, Event prediction and Modelling.

Page 5: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 5 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, StockholmTechnical Solutions

Information sources Communications

Analyze political, social and cultural implications of decisions

Effect on human lives and life quality

Analyze alternatives Generate options for decision makers

Generate options Generate a Common

Operation Picture

Interoperatibility Language and cultural

barriers

Control & DecisionControl & Decision

SimulationSimulation

Data Processing

Data Processing

Data &

Sensors

Data &

Sensors

RE

AL

TM

E

&N

ON

RE

AL

T

IME

RE

AL

TM

E

&N

ON

RE

AL

T

IME

Page 6: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 6 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, Stockholm

AIRCRAFT CRASH

Scenarios

FOREST FIRE

EARTHQUAKE

CHEMICAL GOOD CRASH

HEAVY WINTER STORM

Page 7: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 7 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, StockholmResults so FarGlobal Architecture

Page 8: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

ITEA 2 - 8 of 8

DICOMA4 & 5 December 2013

Co-summit 2013-11-08, StockholmResults so Far Conceptual Overview

Page 9: DICOMA DIsaster COntrol MAnagement Co-summit 2013 4 & 5 December, Stockholm – Sweden

Thank you for your attentionWe value your opinion and questions