LOSE DESIGN | 2809 FOSTER AVENUE NASHVILLE, TN 37210 | 615.242.0040 www.lose.design Page 1 of 3 Dickson Downtown Revitalization Project - Phase V State Project No: 22LPLM-F3-033 Federal Project No: TAP-9303(18) PIN: 125187.01 ADDENDUM NO. 2 October 15, 2021 This addendum supersedes and supplements all portions of the bidding documents and becomes part of the Contract Documents for the above referenced project. Failure to acknowledge this addendum in the Bid Form may result in Bid being deemed non- responsive. Where any original item is amended, voided or superseded hereby, the provision of such item not so specifically amended, voided or superseded shall remain in effect. ADDENDUM N0. 2 Narrative: Attachments: 1. Revised Sheet 1A 2. Revised Bid From Bidder Questions: 1. RE: Bidder Question: Are the Handicap symbols thermoplastic or paint? If they are thermoplastic, are they included in the spray plastic quantities? If they are painted there is no item # set up for them. Response: Themoplastic. Include in item 716-13.01 2. RE: Bidder Question: Please provide plastic pipe specification. Response: See TDOT Spec Section 914 – Non-Metallic Pipe. 3. RE: Bidder Question: Please provide Area Drain details/specification. Please provide storm cleanout details/ specification. Response: See ADS website for cleanout details and specifications. 4. RE: Bidder Question: How does aggregate under the sidewalk, curbs, sidewalk and concrete paving get paid? Response: Aggregate under sidewalk is not required but can be utilized on an as needed basis. Stone for curbs will need to be included in the 303-10.01. This quantity has been adjusted to include the light duty asphalt stone and stone base for curbs.
6
Embed
Dickson Downtown Revitalization Project - Phase V State ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Dickson Downtown Revitalization Project - Phase V State Project No: 22LPLM-F3-033 Federal Project No: TAP-9303(18)
PIN: 125187.01
ADDENDUM NO. 2
October 15, 2021
This addendum supersedes and supplements all portions of the bidding documents and becomes part of the Contract Documents for the above referenced project. Failure to acknowledge this addendum in the Bid Form may result in Bid being deemed non-responsive. Where any original item is amended, voided or superseded hereby, the provision of such item not so specifically amended, voided or superseded shall remain in effect.
ADDENDUM N0. 2 Narrative: Attachments:
1. Revised Sheet 1A 2. Revised Bid From
Bidder Questions:
1. RE: Bidder Question: Are the Handicap symbols thermoplastic or paint? If they are thermoplastic, are they included in the spray plastic quantities? If they are painted there is no item # set up for them. Response: Themoplastic. Include in item 716-13.01
2. RE: Bidder Question: Please provide plastic pipe specification. Response: See TDOT Spec Section 914 – Non-Metallic Pipe.
3. RE: Bidder Question: Please provide Area Drain details/specification. Please provide storm cleanout details/ specification. Response: See ADS website for cleanout details and specifications.
4. RE: Bidder Question: How does aggregate under the sidewalk, curbs, sidewalk and concrete paving get paid? Response: Aggregate under sidewalk is not required but can be utilized on an as needed basis. Stone for curbs will need to be included in the 303-10.01. This quantity has been adjusted to include the light duty asphalt stone and stone base for curbs.
5. RE: Bidder Question: What size and how thick is the aggregate under sidewalk? Response: Per the TDOT standard detail MM-SW-1, aggregate is not required under sidewalk. If needed, the stone size will be #57.
6. RE: Bidder Question: How long is the no. 5 rebar in the heavy duty paving? Response: 18”
7. RE: Bidder Question: Where will the no. 5 be required? Response: Along any joints between successive pours.
8. RE: Bidder Question: Where will the ½ x 2’ dowels be required? Response: Anywhere where new concrete is poured adjacent to existing concrete.
9. RE: Bidder Question: What is the coating/finish on the dowels and rebar? Response: Rebar and dowels shall conform to TDOT spec Section 907 – Concrete Reinforcement
10. RE: Bidder Question: Please clarify on the detail where the filter fabric will be required for the ribbon curb? Response: There is a typo in the detail. It should say “pervious” instead of previous. We do not have any pervious paving therefore there will not be any filter fabric on this job.
11. RE: Bidder Question: Are only the expansion joints required to have joint sealing? Is TDOT approved Silicone acceptable? Response: Yes, only expansion joints are required to have joint sealant and yes, TDOT approved silicone is acceptable.
12. RE: Bidder Question: Is the asphalt for the stamped pattern paid for by the ton in the asphalt pay item? Response: No, the intent is to stamp the existing asphalt.
13. RE: Bidder Question: How will milling be paid? Response: Milling has been removed from the project.
14. RE: Bidder Question: How will detectable warnings be paid? Response: Detectable warnings will be paid in the curb ramp line item per the TDOT standard detail.
15. RE: Bidder Question: How will time be handled for TDOT planting season? Response: Planting restrictions: plant during one of the following periods. Coordinate planting periods with maintenance periods to provide required maintenance from date of substantial completion. Spring planting: January – March 15 Fall Planting: October 15 – December 31 Weather limitations: proceed with planting only when existing and forecasted weather conditions permit.
16. RE: Bidder Question: CXS Questions: Lose will issue Addendum 3 with CSX responses when they arrive.