21 April, 2015 LOCATION? Diavik Wind Farm Chris Bertoli Superintendent Electrical & Instrumentation
15

Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

May 19, 2018

Download

Documents

truongnhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

21 April, 2015

LOCATION?

Diavik Wind Farm

Chris Bertoli

Superintendent Electrical & Instrumentation

Page 2: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

2

The Diavik Joint Venture

40% Owner

60% Owner and

operator

Page 3: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Construction 2000-2002 and production

in 2003

• Fully underground mine

• Mining three kimberlite pipes

• Fourth kimberlite pipe is currently being

developed

− US $350 million project

− 2018 production

• Average workforce: 945

• Formal agreements with five Aboriginal

groups

3

Diavik Diamond Mine at a glance

Page 4: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Located on an island in Lac de Gras

• 300km north-east of Yellowknife

• 100km north of the Tree Line

• 350km south of Arctic Ocean

• Accessible by seasonal winter road two

months of the year

4

Diavik Diamond Mine at a glance

Page 5: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Transmission project – Capex was ROI

prohibitive

• Solar – NPV negative with low penetration

• Geothermal – low temperature differentials

• Wind – largest penetration and NPV positive

• Diesel will continue to account for the

majority of Diavik’s energy

5

Energy options

Page 6: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• On-site storage capacity for 80 million

litres of diesel fuel

• Ice road only open for eight weeks of year

• Risks – climate change, fuel price

• Arctic temperatures: minus 30 degrees

Celsius

• Power security critical safety priority

6

Conditions and energy scenario

Page 7: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Four E-70 Enercon 2.3 megawatt turbines

• Will reduce diesel consumption by 10%

• Will reduce carbon footprint by 6% (12,000

tonnes CO2 equivalent offset)

• Blade de-icing system

• Projected to provide 17 gigawatt hours of

renewable energy per year

• Reliability – direct drive, gearless

generator

• Canada’s most northern wind farm

• Award winning project

7

Conditions and energy scenario

Page 8: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Wind-following: operator buy-in was

positive

• Wind forecasting

• Direct overhead line connection to grid

• Enercon SCADA – Delta V control system

integration is the first time Enercon has

allowed data transfer outside their

proprietary controls system

8

Start-up: Winter 2012-2013

Page 9: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

9

2013 year one energy production

2013 Forecast WF generation

Months

Kw

hr

Page 10: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• One of the coldest winters in the last 30

years

• Blade heating was supplied incorrectly

• Anemometer failures causing shutdown of

towers

• Electronic failures on inverters

• Support from Enercon without SCADA

connection was difficult

10

2013 first winter production

Page 11: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Installed 600 volt heaters in turbine for

electronics and troubleshooting

• Placed portable diesel generators outside

to provide power to heaters

• Replaced electronics (anemometers and

inverters)

• Support from Enercon without SCADA

connection was difficult

11

2013 mitigation for wind farm

Page 12: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Enercon replaced all blade heating

components (cable, heaters and breakers)

• Lubricants replaced for cold weather

operation

• New programing for turbines from

Germany was installed

• Enercon SCADA – Delta V control was

connected and support was improved

12

2013 wind farm alterations

Page 13: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Projected to produce 17 gigawatt hours for 2013 and 2014 and have an average

penetration of 10%

• Finished 2013 with 15.9 gigawatt hours and an average penetration of 9.2%.

• Finished 2014 with 19.9 gigawatt hours;17% above forecast and an average penetration

ratio of 10.5%

13

2013 and 2014 review

Page 14: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

• Demonstrate wind power as a viable

option for the North

• Provide support for future wind initiatives

and develop northern capacity

• Donated weather tower to Det’on Cho

Earth Energy Giant Mine wind study

• Developing local expertise and northern

contractors

• Diavik will share knowledge with

communities and government

14

Benefits beyond Diavik

Page 15: Diavik Wind Farm - sencanada.ca · Diavik Wind Farm Chris Bertoli ... •Enercon SCADA – Delta V control system integration is the first time Enercon has allowed data transfer outside

©2013, Rio Tinto, All Rights Reserved

Thank you 15