03/13/2012 previous next GM of Mexico Ramos Arizpe Complex June 2000 ME217 Design for Manufacturability Stanford University 1 Improved Oil Pump System for the 4L60-E Transmission Final Presentation - ME217B Paulino Rivera Carlos B. Ramirez Fernando J. Valdes The Pumpkins Tuesday, March 13, 2012
16

DFM Oil Pump Project Stanford

Jul 04, 2015

Download

Documents

cbramirez

Design for Manufacturing project applied to an Automatic Transmission Oil Pump System
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

1

Improved Oil Pump System for the 4L60-E Transmission

Final Presentation - ME217B

Paulino Rivera Carlos B. Ramirez Fernando J. Valdes

The Pumpkins

Tuesday, March 13, 2012

Page 2: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

2

Project Advertisement

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 3: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

3

Market & Competition

• GM’s transmissions have a rich tradition of excellence

• GM Powertrain dominates the Automatic Transmisison business, with 43% share, Ford 29%, DC 28%

• 4L60-E Automatic Transmission Produced in Ramos Arizpe since 1999

• Applications: Suburban, Tahoe, Yukon, C/K (domestic and export)

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 4: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

4

Problem Statement

• The oil pump system is critical for the performance of the transmission

• A large number of transmission failures are associated with the oil pump

• Goal of this project:

Improve the Reliability of the 4L60-E Oil Pump System, while reducing its cost

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 5: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

5

Product Definition - ME217A

• Edith Wilson’s Checklist Improved• 4L60-E Pump Benchmarked vs. Ford and DaimlerChrysler Transmissions

• CVCA showed multiple customers

Background

Product Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

35 4 2

Tuesday, March 13, 2012

Page 6: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

6

Key Relationships• Value Graph: showed importance of two key internal components: Rotor and Slide

• QFD Phase I: showed DPTV’s and End Clearance as highest relative E.M.’s

• QFD Phase II: Rotor, Pump Body & Slide most important

• Cost-Worth identified candidates for:• Cost Reduction: Cover & Shaft, Pump

Body• Enhancement: Rotor, Slide, Slide

Springs

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 7: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

7

Function-Structure Tree• Revealed Product Complexity: functions

not related to the Pump Oil main function

1. Displace fluid 2. Regulate fluid 3. Provide structure

• Seal• Support

• Most Important Discovery in ME217A

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 8: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

8

Pareto was right...

• Fishbone Diagram and DFA showed redundancy in Rotor/Slide selection process

• FMEA revealed Rotor/Slide Stucked as main cause of oil

pump failure

• SMA: easier to replace entire oil pump than to service

0

125

250

375

500

Rot

or/S

lide

Stu

cked

Def

ectiv

e P

arts

Pum

p B

ody

Dis

torti

on

No

Acc

esib

ility

Ext

erna

l Lea

ks

Mis

sing

Par

ts

Impr

oper

Ass

embl

y

Pum

p C

over

Con

vex

Hig

h Te

mpe

ratu

re

Eng

ine

Inpu

t Spe

ed H

igh

0

0.250

0.500

0.750

1.000

CAUSE

70%

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 9: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

9

Concept Development

• Design Criteria expanded from QFD:

• Morphological Analysis generated 3 concepts: Single Slide/Rotor, Pump-in-a Box and Three-in-One Pump

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 10: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

10

Three-In-One Pump• Pugh Analysis revealed as better concept

• Improved: Reliability, FTY, DPTV, Robust Design, Performance

• Use of a Single Slide/Rotor (5 to 1)

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

COVER & SHAFT

PUMPSUPPORT

CASE COVER

SUPPORT COMPONENTS

PUMP OIL

SEAL TRANSMISSION

Tuesday, March 13, 2012

Page 11: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

11

Current vs Proposed

CURRENT

COVER & SHAFT

PUMP BODY

3 in 1 Concept

COVER & SHAFT

PUMPSUPPORT

CASE COVER

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 12: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

12

Product Specification• Same size than current oil pump• Weight assumed unchanged • Case Cover error proofed for alignment• Case Cover made of Aluminum SAE 390

Process Specification• Sub-Assembly: one machine less (Rotor/Slide),

one worker reduced, fixtures error proofed• Machining: Pump Support line from existing

PumpBody cell, addition of Case Cover cell, lean manufacturing, error proofing devices, no impact in labor

Design Recommendation

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 13: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

13

Competitive Analysis

• Business Case• Payback: 1 Year• ROI: 94.6%• Investment: $ 2.12 MUSD• NPV: $ 2.22 MUDS

• Development Time• 18 months from project approval

• Risks• Envisioning: limited product life• Design: packaging within envelope, same weight• Execution: material cost increase, validation fails

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 14: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

14

Quality Scorecarding

• Project Objective (Biggest Y)Improve the Net Present Value (NPV)

• Objective Measures (Y)Improve the Reliability measured in Defects per Thousand Vehicles (DPTV’s) and First Time Yield (FTY) in the assembly line.

• Control Factors (vital X’s)End clearance between the Rotor/Slide and Pump Support face, Pump Main Line Pressure.

• Noise Factors (V’s)Oil Pump Support distortion, manufacturing variation of Slide/Rotor/Pump Face.

• Transfer FunctionCashflow Analysis Spreadsheet

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 15: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

15

Conclusions and Recommendations

Conclusions • Robust Product Definition• Strong Business Case• Higher Risk: limited product life• Still profitable! (trucks)

Recommendations• Obtain management commitment• Form project team• Enhance communication• Keep focus on customer• Revisit dfM tools to measure results

BackgroundProduct Definition

Design Recommendation

Competitive Analysis

Concept Development

Introduction

Tuesday, March 13, 2012

Page 16: DFM Oil Pump Project   Stanford

03/13/2012previous next

GM of MexicoRamos Arizpe Complex

June 2000

ME217 Design for Manufacturability

Stanford University

16

QUESTIONS&

ANSWERS

Paulino Rivera Carlos B. Ramirez Fernando J. Valdes

The Pumpkins

Tuesday, March 13, 2012