Page 1: DEVIKULUM

DEVIKULUM

Community Hall ProjectProgress to Date

2-May-2011

Page 2: DEVIKULUM

INTRODUCTIONOur project is to build a Community Hall with rain water capture.We chose this undertaking because:

We can create an integrated design that provides a solution to more than one problem.

There is future scope to include more if the initial design is well received.

The needs of the Devikulum villagers.

Page 3: DEVIKULUM

Needs of the Devikulum Community

Poor rural based community. Low levels of education with low literacy rates (98%). Cultural differences between the classes or “castes”, and

their segregation requires change. Substandard existing facilities, requiring maintenance. Access to water for daily chores is a burden, it takes time

away from education and wealth creation. Poor sanitation practices and understanding. Routinely intermittent electricity supply requiring backup.

Page 4: DEVIKULUM

What will our project achieve?

CULTURAL IMPROVEMENT

• Provide a common meeting place irrespective of religion or class differences.

• Local decisions can be made through the airing of ideas, concerns and perspectives.

• Strengthening of the local social cohesion and morale and improve their quality of life.

• Allow the villagers to take ownership of their future.• Liaison with external groups, other cultures.

Page 5: DEVIKULUM

What will our project achieve?

ENGINEERING IMPROVEMENT

• Provide a suitable facility for meeting purposes.• Provide an alternate source of water supply.• Provide a working model of water with scope for refinement

with education.• Provide possible additions for other design solutions to

issues on a viable scale.

Page 6: DEVIKULUM

Proposed Construction Site

Page 7: DEVIKULUM

PRELIMINARY DESIGNIDEAS AND CRITERIA: Barn type structure, simple design, two gutters. Rammed earth wall construction. Wall not to roof height, low eaves. Elevated slab or foundation filled as all existing structures. Wood-truss or ‘Hi-span’ laminated beams for roof A-frame. Concrete stabilised RHS upright posts independent from rammed earth walls.

Western style ‘colour-bond’ steel roof as per communication facility in nearby village (pictured).

Above-ground rainwater tank of earth brick concrete lined or reinforced concrete dependent on size.

Leaf trap with removable filter-basket for debris removal.

Page 8: DEVIKULUM

Rammed Earth Wall Construction

Page 9: DEVIKULUM

Leaf Trap

Page 10: DEVIKULUM

FINAL DESISNWHAT WE NEED TO DO:• Size of tank and final material selection.• Lighting and other ancillaries• Research ‘Blackout’ 4-cyl diesel generator types, dB rating

and future maintenance & costs.• Calculations to determine final dimensions from concept

including stresses for span requirements (15 metres!). We do not want a centre column!!

• Final selection of materials for structural members and water tank.

Page 11: DEVIKULUM

Community Hall

Page 12: DEVIKULUM

Water Tank

Page 13: DEVIKULUM

Gutter

Page 14: DEVIKULUM

Generator

Page 15: DEVIKULUM

Our Tasks AheadSign up to EWB to post forum questions

regarding finer detail and ask if our ideas sound feasible.

Speak with Uniting Church contact about their experience building houses in India.

Examine possible sources of revenue, sponsorship for our project.

Developing our Gant Chart to assign tasks ahead and assist in group management.

Page 16: DEVIKULUM

RESOURCE ALLOCATION'SCANT' GANT WK 8 WK9 WK10 WK11 WK12 WK13DESIGN CONCEPT END PRELIMINARY PRESENTATION DUE FIRST PEER ASSESSMENT DUE FINAL REPORT DUERESEARCH DETAIL DESIGN FINAL PEER ASSESSMENT DUEFINAL PRESENTATION DUE INDIVIDUAL TASK, WK8 INDIVIDUAL TASK, WK9 INDIVIDUAL TASK, WK10 INDIVIDUAL TASK, WK11 INDIVIDUAL TASK, WK12

Page 17: DEVIKULUM

Conclusion• Devikulum people have a diverse culture and a positive

outlook and are motivated to creating a brighter future for their community.

• Our design stems from the needs and wishes of this poor and remote rural community.

• With the help of the EWB organisation we hope to deliver plans for a Community Hall to assist the Devikulum people:Provide a place where they can further control their

planning and development.Meet and discuss issues as a coherent body regardless of

social status or religion.

Page 18: DEVIKULUM

References

• EWB organisation website• 2011 Challenge Introduction Presentation

Page 19: DEVIKULUM

Thank You