200SpectrumCenter.com CONSTRUCTION TIME FRAME: Complete. LOCATION: Adjacent to the Irvine Spectrum Center ® on Irvine Center Drive and Spectrum Center Drive. SUPERIOR VISIBILITY: Prominent building-top signage provides branding opportunities to more than 526,000 cars per day. SUSTAINABILITY: • Pre-certified LEED ® Gold • Received the Designed to Earn the Energy Star recognition from the US Environmental Protection Agency - the only commercial office project in California, and one of four projects nationwide, to receive this 2015 recognition EFFICIENT BUILDING ACCESS: Three ingress/egress points via Pacifica, Spectrum Center Drive and Quasar with quick access to the I-405, I-5 and minutes to Highways 133 and 241. BUILDING EXTERIOR: Clad in modern, linen-finish stainless steel and high- performance floor-to-ceiling Viracon Glass for energy efficiency and maximum daylighting. BUILDING ARRIVAL: Dramatic Mediterranean Palm-lined entry. PARKING: 1,459 parking stalls within on-site 6-level parking structure – includes one level of subterranean parking. ON-SITE CUSTOMER CONVENIENCES: • Outdoor workspace with plush soft seating, shade structures and complimentary WiFi • Parking Structure features: - Showers and lockers - Bicycle storage lockers - Electric vehicle charging stations DEVELOPMENT OVERVIEW