Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th , 2008
31

Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Developing Wind Energy in Indiana:

A Case Study of Benton County

Ian Van LieuApril 25th, 2008

Page 2: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Presentation Overview

• National Wind Energy Overview• Indiana Wind Energy Activity• Wind Energy Basics• Development of Benefit Cost Model• Results• Conclusions

Page 3: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

National Wind Energy

• Wind Energy is currently the fast growing technology in electricity generation

• Current installed capacity is 16,819 MW• Capacity under construction 3,627 MW

Page 4: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Source: American Wind Energy Association

Page 5: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Installed Capacity

Page 6: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Drivers of Wind Energy

•Declining Wind Costs•Fuel Price Uncertainty•Federal and State Policies •Economic Development•Green Power Marketing•Cap and Trade Program

Page 7: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Presentation Overview

• National Wind Energy Overview• Indiana Wind Energy Activity• Wind Energy Basics• Development of Benefit Cost Model• Results• Conclusions

Page 8: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Benton County Projects

• Indiana Winds Project– 130 MW facility by Earl Park

• Fowler Ridge Project– 750 MW in 2 phases

Page 9: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.
Page 10: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Indiana Development

• Adams• Boone• Jay• Randolph• Wayne • White

Page 11: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Presentation Overview

• National Wind Energy Overview• Indiana Wind Energy Activity• Wind Energy Basics• Development of Benefit Cost Model• Results• Conclusions

Page 12: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Wind Speed

• Wind speeds increase with height above the ground• It is not only about wind speeds

– Wind Power is the amount of energy produced by the wind

• Wind Power=(Wind Speed)3

• Wind Speeds are often best described using a Weibull Distribution

Page 13: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Wind Speed Distribution

Page 14: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Wind Turbine Power Equation

• ρ: The density of the air measure in kg/m3

• A : The area swept by the turbine

• CP: Turbine power coefficient

• VWind : The wind speed in meters per second

Turbine Power = 35.0 WindPVAC

Wind

TurbineP P

PC

Page 15: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.
Page 16: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Presentation Overview

• National Wind Energy Overview• Indiana Wind Energy Activity• Wind Energy Basics• Development of Benefit Cost Model• Results• Conclusions

Page 17: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Benefit Cost Model AssumptionsFactor Baseline Value

Project Life 25 Years

Nominal Interest Rate 7.00%

Inflation Rate 2.5%

Project Debt Percentage 60%

Loan Repayment Period 10 Years

Price Per kW Installed $1127.00

Number of Wind Turbines 67

Page 18: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Project Cost

Factor Baseline Value

Total Project Cost $113,263,500.00

Project Equity $45,305,400.00

Debt Payments $9,675,704.57

Page 19: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Benefit Cost Model AssumptionsFactor Baseline Value

Operation & Maintenance Cost $24.08 per kW

Power Purchase Agreement $0.045 per kW

Production Tax Credit $0.019 per kW

Annual Turbine Lease Payment $5,000.00

Page 20: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Property Tax AbatementYear Abatement Factor

1100%

290%

380%

470%

560%

650%

740%

830%

920%

1010%

Page 21: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

County Property Tax RevenueYear Property Taxes

1 -$7,434

2 $142,424

3 $177,226

4 $258,431

5 $344,574

6 $430,718

7 $516,862

8 $603,005

9 $689,149

10 $775,293

11 through 25 $861,436

Page 22: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Depreciation SchedulesMACRS 15 Year Schedule

Year 1 0.2 0.1

Year 2 0.32 0.1

Year 3 0.19 0.1

Year4 0.1152 0.1

Year 5 0.1152 0.05

Year 6 0.0576 0.05

Year 7 through 16 0 0.05

Page 23: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Presentation Overview

• National Wind Energy Overview• Indiana Wind Energy Activity• Wind Energy Basics• Development of Benefit Cost Model• Results• Conclusions

Page 24: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Baseline Scenarios Net Present Value Without Tax Abatement With Tax Abatement

Minimum $20,250,880 $23,208,780

Mean $25,366, 640 $28,256,650

Maximum $30,309,370 $18,849,450

Standard Deviation $1,383,383 $1, 383,383

Coefficient of Variation 5.49% 4.91%

P(NPV≤0) 0.00% 0.00%

Return on Equity 14.63% 15.78%

Page 25: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Cost Overrun Sensitivity

Scenario 1:

102%

Scenario 2:

106%

Scenario 3:

110%

Scenario 4:

115%

Minimum $ 21,566,900 $ 18,455,330 $15,343,770 $11,454,310

Mean $ 26,682,660 $ 23,571,090 $ 20,459,530 $ 16,570,070

Maximum $ 31,625,390 $28,513,830 $25,402,260 $ 21,512,800

Std. Dev. $ 1,383,383 $ 1,383,383 $ 1,383,383 $ 1,383,383

C. V. 5.18% 5.87% 6.76% 8.35%

P(NPV≤0) 0.00% 0.00% 0.00% 0.00%

IRR 15.13% 13.92% 12.79% 11.48%

Page 26: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Interest Rate SensitivityScenario 1 Scenario 2 Scenario 3

Interest Rate 9.00% 11.00% 13.00%

Minimum $10,646,290 $1,006,838 $6,557,295

Mean $14,974,010 $4,722,915 $3,342,950

Maximum $19,155,350 $8,313,308 $201,928

Standard Deviation $1,269,838 $1,004,887 $874,078

Coefficient of

Variation 7.82% 21.28% -

P(NPV≤0) 0.00% 0.00% 100.00%

Return on Equity 15.07% 12.20% 11.48%

Page 27: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Alternate Cost Overrun IRR

BaselineBefore Financing

After Taxes

Before Financing

Before Taxes

Before Financing

Before Taxes

Scenario 1: 102% 15.13% 11.11% 9.84% 7.73%

Scenario 3: 106% 13.92% 10.59% 9.23% 7.16%

Scenario 5: 110% 12.79% 10.04% 8.65% 6.62%

Scenario 6: 115% 11.48% 9.40% 7.98% 6.00%

Page 28: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Presentation Overview

• National Wind Energy Overview• Indiana Wind Energy Activity• Wind Energy Basics• Development of Benefit Cost Model• Results• Conclusions

Page 29: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Conclusions

• Wind farms in Benton county will be able to operate profitably under many of the scenarios studied.

• The results of the model are dependent on the wind speed estimates and the initial values of the model assumptions.

• The project is sensitive to both the debt interest rate and total project cost.

Page 30: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Conclusions

• A 10 percent increase in total cost still allows the project to operate with a positive average net present value.

• A 10 percent decrease in the wind speeds will decrease the quantity of electricity generated by 33 percent and also decrease the production tax credit by that amount.

Page 31: Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.

Questions