UNCTAD 17th Africa OILGASMINE, Khartoum, 23-26 November 2015 Extractive Industries and Sustainable Job Creation Developing local skills in Sudan's extractive industry By Osama Abdel Karim Aloub, Technical Adviser (Metallurgy), Rida Mining Group, Sudan The views expressed are those of the author and do not necessarily reflect the views of UNCTAD.
25

Developing local skills in Sudan's extractive industry...Reserve estimation & Mine Optimization . Metallurgy & processing technique to extract gold. Engineering, design parameters

Jan 25, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • UNCTAD

    17th Africa OILGASMINE, Khartoum, 23-26 November 2015

    Extractive Industries and Sustainable Job Creation

    Developing local skills in Sudan's extractive industry

    By

    Osama Abdel Karim Aloub, Technical Adviser (Metallurgy), Rida Mining Group, Sudan

    The views expressed are those of the author and do not necessarily reflect the views of UNCTAD.

  • 1 of 35

    By

    Osama A. Aloub

    Republic of Sudan

    Ministry of Minerals

    Rida Mining Company

  • 2 of 35

    CONTENTS

    • GENERAL OVERVIEW

    • MINE INITIATION HISTORY

    • RIDA PROJECT LIFE CYCLE

    • DEVELOPPING SKILL OF INDIVIDUALS

    • ELEMENTS OF TRAINING PLAN

    • HEALTH & SAFETY SUBJECTS

    • ARTISANAL TAILING REPROCESSING PLANTS

    • CREATED JOBS & STATISTICS

  • 3 of 35

    GENERAL OVERVIEW

    Rida Mining, a private national company pioneer in mining and mineral extractive industry and currently operating three plants:

    Assalam Proper Mine (Abidiya Area) , to extract gold from auriferous deposit.

    Chromite ore production, Ingassena, Blue Nile State.

    6 Gold Extractive Plants from Artisanal Tailings within 4 states of Sudan.

    The company employs > 2000 person to operate these activities.

  • 4 of 35

    RIDA MINING CONCESSION – BLOCK 23

    منجم

    السالم

  • 5 of 35

    MINE INITIATION HISTORY

    Rida Mining, financing & performing the whole project life cycle

    depending only on experienced and technically skilled Sudanese staff to

    carry out the followings:

    Geological and exploration.

    Reserve estimation & Mine Optimization .

    Metallurgy & processing technique to extract gold.

    Engineering, design parameters and process flowchart.

    Feasibility Study, equipment procurement.

    Construction and gold production November 2009.

    All these studies were carried by Sudanese expert except the

    Engineering phase which was performed in cooperation with ( Time

    Mining SA).

  • 6 of 35

    21%

    26%

    6%

    4%

    2%

    12%

    12%

    18%

    0 0.5 1 1.5 2 2.5

    Geological and exploration, works

    Detailed geological studies & drilling program.

    Calculating Ore Reserve and Block model

    Performing metallurgical test on the ore,

    Selection of Process method

    Develop the basic Engineering concept

    Issuing of Definitive Feasibility Study.

    Commissioning and Start up

    Number of Years

    P

    e

    r

    f

    o

    r

    m

    e

    d

    T

    a

    s

    k

    s

    RIDA PROJECT LIFE CYCLE 2000 - 2009

  • 7 of 35

    Mining Project Initiation Cycle

    Open Pit Ore

    mining

    Crushing

    Open Pit

    Model

    Heap

    Stacking

    ADR

    Bullion

    Bar

  • 8 of 35

    DEVELOPPING SKILL OF INDIVIDUALS

    Rida is devoted to have highly skilled personnel to

    meet the company`s current and future manpower

    needs cycled as:

    Pre-employment training programs for newly

    hired university graduates and inexperienced.

    On the Job training, teaching individual how to

    perform his job

    Rotation Assignment, rotate an employee within

    his department or in different location.

    Individual Skill analysis to retain the position

  • 9 of 35

    RIDA MINING SKILL DEVELOPMENT CYCLE

    Inexperienced

    Employees

    Pre-employment

    Training

    Apprentice Experienced

    Employees

    On the Job Training

    Rotation Assignment

    Performance Appraisal

    Skilled Employee

  • 10 of 35

    Class Room Training Site Visit Training

    Lecture with aid of PowerPoint

    presentation

    Guided Visit to the designated plant

    Explanation of the operation manuals

    Visits to one or two operating plants

    Familiarization with the process

    flowchart & layout drawings.

    Visit of the respective section of the

    plant where person is assigned to

    work

    Familiarization with particular

    equipments through documents

    Workshop hands with particular

    equipments disassembled

    ELEMENTS OF TRAINING PLAN

  • 11 of 35

    HEALTH & SAFETY SUBJECTS

    General Health & Safety training

    Technical equipment training

    Protective Personal Equipment (PPE)

    Handling dangerous substances

    Good housekeeping

    Recycling water monitoring

    Cover a range of issues identified through

    consultation

    Targeted and tailored courses to suit needs

  • 12 of 35

    UM DORMANMINING COMPANY

    ( BLOCK 23 CONCESSION) ASSALAM HEAP LEACH OPERATION

  • 13 of 35

    27

    104 137

    434

    702

    0

    100

    200

    300

    400

    500

    600

    700

    800

    Trainee Graduates Technicians Operators Total

    N

    o

    .

    o

    f

    E

    m

    p

    l

    o

    y

    e

    e

    s

    Employees Category

    RIDA MINING - UM DORMAN COMPANY

    ASSALAM MINE JOB CREATION RATE

  • 14 of 35

    BLOCK 23 MINE GOLD EXTRACTIVE PLANT

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    2009 2010 2011 2012 2013 2014 Total

    G

    o

    l

    d

    I

    n

    K

    g

    PRODUCTION YEAR

    ASSALAM MINE GOLD ANNUAL PRODUCTION

  • 15 of 35

    ARTISANAL MINER TAILINGS DUMPS

    • Rida Mining is commissioned to develop

    suitable Extractive Processing techniques

    • It has successfully developped reprocessing

    plants mostly using Carbon-In- Leach (CIL)

    & Heap Leaching methods to extract gold.

  • 16 of 35

    ARTISANAL TAILING REPROCESSING PLANTS OWNED BY RIDA MINING

    Northern State

    Al Hsour Company

    Kodorma CIL -

    1500

    Khanag HL - 1000

    River Nile State

    Exseer H L -4000t/d

    Exseer CIL- 3000t/d

    Red Sea State

    Wedian CIL –

    250 t/d

    River Nile

    State

    Rida CIL - 1500

    Um Durman

    Al Gadarif State

    Abu Regia CIL

    1500 t/d

    River NileState

    Sedon CIL

    300 t/d

  • 17 of 35

    Um Dorman

    Exseer

    Al Hasoor

    Al Hamdeen

    Abu Regia

    0

    100

    200

    300

    400

    500

    600

    700

    800

    Trainee Graduates Technicians Operators Total Employees

    27

    104

    137

    434

    702

    26

    86

    176

    219

    507

    29

    117

    58

    273

    477

    10

    99

    31

    177

    317

    16

    62

    25

    134

    237

    C

    o

    m

    p

    a

    n

    y

    N

    a

    m

    e

    E

    m

    p

    l

    o

    y

    e

    e

    s

    N

    u

    m

    b

    e

    r

    Categories of Employees

    RIDA GROUP DIFFERENT COMPANIES JOB CREATION RATE

  • 18 of 35

    GOLD PRODUCTION STATISTIC

    Um Durman HL Exseer HL Sedon HL Abu Regia CIL Al Hsour CIL Al Hsour HL

    Gold In Feed 3560 2750 1440 505 260 320

    Gold Produced in Kg 1700 1446 650 450 235 158

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    G

    o

    l

    d

    I

    n

    K

    g

    Company Name

    RIDA COMPANIES PRODUCTION STATISTICS

    January to August 2015

  • 19 of 35

    Material Handling & Milling Circuit

  • 20 of 35

    1500 t/d Carbon-In-Leach Plant to Retreat the Artisanal

    tailing at Kodorma , northern State, Sudan

  • 21 of 35

    GOLD REFINING EQUIPMENT

  • 22 of 35

    PRODUCED GOLD BAR

  • 23 of 35

    Exseer Mining Company – River Nile state

    Abu Hamad 4000 t/d Artisanl Heap Leach Plant

  • 24 of 35