Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Dec 15, 2015

Download

Documents

Arielle Elder
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.
Page 2: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Developers’ Workshop

Agenda:

1. Welcome & Introductions

2. Employment Practices

3. Draft 2015 QAP & Appendix B

4. Preliminary Application Changes

5. Carryover Loan Program

6. Questions

Page 3: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Employment Practices

Bryan Strickland

Director of Compliance and Fraud Investigations

North Carolina Industrial Commission

Page 4: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

2015 QAP

Page 5: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Disclaimers

•Not covering every topic

• Focusing on changes and what you need to know before submitting an application

• Participants are responsible for knowing the rules

• If questions are not covered, ask today or follow up with staff

Page 6: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

QAP Status

• First draft released on September 30

• Public Hearing is Oct. 16 at 2:00, Room 402

• Comments for 2nd Draft due by October 27

• Can submit more than once, on any topic

•As always, specificity is very helpful

•Will not be final until December due to official notice requirements

Page 7: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

QAP Changes

•Agency Basis Boost• County Income Designations•Amenities• Incompatible Uses• Rent and Income Targeting•Workforce Housing Loan Program•Developer Experience• Smoke-Free Housing•Appendix B: Design

Page 8: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Agency Basis Boost

• Two categories, each up to 15%–new construction projects earning rent and

income targeting points –all projects if the flat 9% tax credit rate is not

reinstated

• Projects in QCTs/DDAs may claim up to 30%

Page 9: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Agency Basis Boost

•New Construction if earn targeting points–floating rate: up to 30% boost–fixed 9% rate: up to 15% boost

• Rehabs–floating rate: up to 15% boost–fixed 9% rate: no boost

Page 10: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

County Income Designations

• Follows the 2014 County Tier Designations published by NC Dept. of Commerce

• Tier 3 High, Tier 2 Moderate, and Tier 1 Low

• Commerce considers four factors:–adjusted property tax base per capita–percentage population growth–median household income–average unemployment rate

Page 11: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

County Income Designations

• Commerce tiers are a consistent source for income designations

• Transition from STC to WHLP a good time to change

• 26 counties will change from 2014–20 up (e.g., Moderate to High), 6 down–less impact with WHLP than STC

Page 12: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Amenities

•Grocery point increments reduced to 3 per mile

• Sites can make up amenities points if:–the application has $250k in NAHASDA funds–a public bus/transit stop

is in service at time of prelim application date has a covered waiting area has hourly service, seven days a week is within ¼ mile walking distance using existing

sidewalks/crosswalks

Page 13: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Incompatible Uses

•Distance reduced for:–frequently used railroad tracks–high traffic corridor–power transmission lines and tower

• Lose points if within 250 feet of a building

Page 14: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Rent & Income Targeting

•Number of units to earn points reduced to 20% for all counties:–High Income, 30% AMI–Moderate, 40% AMI–Low, 50% AMI

•Affordable to (rent) and occupied by (income)

•Generates 15% Agency basis boost

• RPP: 40% of units at 50% AMI in any county

Page 15: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Workforce Housing Loan Program

• $10 million appropriation, non-recurring

• Statute requires projects meet the Agency’s loan criteria and we consider other sources of funding

• 0% interest, 30 year balloon (no payments)

• Requesting WHLP may result in an application being ineligible due to inadequate funds

Page 16: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Workforce Housing Loan Program

• Percent of eligible basis will be the initial limit and cannot exceed statutory maximums

• The 20 ineligible counties receive the most federal funds which can be used for housing

County Income Designation

Percent of Eligible Basis

Statutory Maximum

High 2% $250,000 Moderate 6% $750,000 Low 10% $1,000,000

Page 17: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Developer Experience

• Can no longer qualify using waiver

•Must have one NC project PIS between Jan. 1, 2008 and Jan. 1, 2014

•Agency may disqualify an owner who has sold a TC project or requested a qualified contract–intended for transactions which may result in the loss

of affordable housing units–for example, selling to a market rate company

Page 18: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Smoke-Free Housing

• Projects awarded in 2015 (not retroactive) must prohibit smoking in–all indoor common areas,–individual living areas (patios & balconies), and–25’ of building entries or ventilation intakes

•A non-smoking clause must be included in the lease for each household

Page 19: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Appendix B: Design

•One elevator per 60 units in a building

•Dishwashers in elderly projects

•Water/ice dispenser rough-in box in every unit with cold water supply line in the wall

•Multi-purpose room required in family projects

•One parking space per unit in elderly projects

Page 20: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Preliminary Application

Page 21: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Carryover Loan Program

• Eight among 2013 awards, available for 2014

•Only covering up to 95% of land (max of $1M)

•Not paying for any other costs

•Will have first priority deed of trust on the land

• Paid off with the construction loan; otherwise the term is 12 months

Page 22: Developers’ Workshop Agenda: 1.Welcome & Introductions 2.Employment Practices 3.Draft 2015 QAP & Appendix B 4.Preliminary Application Changes 5.Carryover.

Questions?

Draft 2015 QAP Public HearingOctober 16, 2014 at 2:00 PM Room 402 Raleigh Convention Center