DETOUR MAPS FOREST LN. BRIDGE WORK - PART 1 EB I-635 Mainlanes Below are maps showing the detours associated with Part 1 of the bridge work at Forest Lane at I-635 scheduled for Friday, Dec. 4 at 10 p.m. to Saturday, Dec. 5 at 8 a.m. Closures will include: • All lanes of eastbound I-635 at Forest Lane • All lanes of eastbound I-635 TEXpress Lanes prior to U.S. 75 • The entrance ramp to eastbound I-635 between Greenville Avenue and Abrams Road • The entrance ramp to eastbound I-635 at TI Boulevard • All lanes of Markville Drive at the eastbound I-635 frontage road • All lanes of Abrams Road at I-635 • All lanes of Forest Lane at I-635 Drivers who intend on traveling any of the listed routes above are advised to review these detours. EB I-635 Entrance Ramp at TI Boulevard EB I-635 Entrance Ramp between Greenville Avenue and Abrams Road