DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS). TECHNICAL PHILOSOPHY. A technical form of transportation planning Plangineering? Transportation Engineering? Traffic Planning? Large emphasis on field observations Elements of modeling Traffic engineering. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

DETERMINING THE RIGHT TOOLS FOR THE JOB

ERIC LUSHER, AICP (URS)

Page 2: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

TECHNICAL PHILOSOPHY• A technical form of transportation

planning – Plangineering?– Transportation Engineering?– Traffic Planning?

• Large emphasis on field observations• Elements of modeling• Traffic engineering

Page 3: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

BACKGROUND• Holly Springs

– 2000 US Census Population = 4,195– 2010 US Census Population = 9,189

• Halfway between Canton and Woodstock

• Mostly suburban or transitioning• Access to I-575

Page 4: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

BACKGROUND

2002Transportatio

n Study

2004LCI Study

2006Parking & Traffic

Circulation

2009Trail

Masterplan

2009 Implementation

/ Action Plan

2010-2011Transportatio

n Plan

Page 5: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

BACKGROUND

Page 6: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

BACKGROUND

Page 7: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

BACKGROUNDSTUDY GOALS• Develop transportation

improvements to facilitate LCI progress

• Develop grid network• Plan for transportation impacts once town

center is implemented• Develop alternatives to address

transportation impacts• Funding?

Page 8: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

ANALYSIS

RAILROADXING

DDA PROPERTY

TROUBLE INTERSECTON

COMMUNITY AMENITIES

TROUBLE INTERSECTONS DAILY BACKUPS

CUT THROUGHTRAFFIC

SAFETY PROBLEMS

INDUSTRIAL PARK

Page 9: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

ANALYSIS - PREVIOUSLY PLANNED PROJECTS

Page 10: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

ANALYSIS - PROJECT DAILY TRAFFIC VOLUMES

Page 11: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

ANALYSIS – STAKEHOLDER ENGAGEMENT

• Industrial connector important but understood to be a challenge

• Palm Street appears to be a priority• Jackson Street less of a priority• Concern about phasing – does

development or transportation come first?• Concerns about economy’s impact on LCI

development• Thoughts about widening Holly Springs

Parkway

Page 12: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

TECHNICAL ANALYSIS• Traffic Counts

– Turning Movement Counts– Vehicle Classification Counts

• Modeling and Projections– Continued E-W demand through study area on

Hickory Street– Substantial anticipated development east of

town center• Traffic Analysis

– Future widespread congestion predicted

Page 13: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

RECOMMENDATIONS

Project ID Project Title

Implementation Timeframe Estimated Project Costs

Potential Funding Responsibilities Short-

Term Mid-Term

Long-Term

1 Palm Street Extension $1,960,000 ARC (LCI funds) City of Holly Springs

2 J ackson Street Closure and P. Rickman Industrial Access $4,115,000 ARC (LCI funds)

City of Holly Springs 3 Town Center Grid Network N/A City of Holly Springs

Site Developer 4 /

CH-218 Town Center Multimodal

Improvements $648,081 ARC (LCI funds) City of Holly Springs Federal/GDOT

5 Town Center Access Improvements N/A City of Holly Springs

Site Developer 6 /

CH-215 Industrial Connector $8,089,200

City of Holly Springs Cherokee County

7 Hickory Street Corridor Widening $87,694,000 City of Holly Springs Cherokee County Federal/GDOT

8 Holly Springs Parkway Widening $45,711,000 City of Holly Springs Cherokee County Federal/GDOT

9 P. Rickman Industrial – Pinecrest Connections N/A City of Holly Springs

Site Developer N/A = Cost of project contingent on actual development plans and therefore cannot be estimated at this time Source: ARC Planning Level Cost Estimate Tool and ARC Envision 6 Regional Transportation Plan

Page 14: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

BACKGROUND

Page 15: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

RECOMMENDATIONSFIGURE 5.2Palm Street Planning Concept

FIGURE 5.3P. Rickman Industrial Access Planning Concept

CLOSE INTERSECTION

ALIGN WITH TOWN CENTER

Page 16: DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC LUSHER, AICP (URS)

Holly Springs Town Center Transportation Study & PlanStakeholder Meeting # 2 3.31.11GPA FALL 20129.26.12

QUESTIONS?Eric Lusher, AICPURS Corporation