Determining operational need Asset Management of civil infrastructural works

Feb 06, 2016

Download

Documents

Dino

Determining operational need Asset Management of civil infrastructural works. Melchert Rijks. Introduction. „Determining operational need for long term Asset Management policy of civil infrastructural works” Asset Management Control International Masters School Supervisors: Michel Kuijer - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Determining operational need Asset Management of civil infrastructural works

103 april 2012

Determining operational need Asset Management of civil infrastructural works

Melchert Rijks

Page 2: Determining operational need Asset Management of civil infrastructural works

203 april 2012

Introduction• „Determining operational need for long term

Asset Management policy of civil infrastructural works”

• Asset Management Control

• International Masters School

• Supervisors: Michel KuijerGerard Schouten

Page 3: Determining operational need Asset Management of civil infrastructural works

AgendaDissertation Presentation

Public Defense Assessment by the Examining Panel Presentation of Results and Diploma Reception Closing

303 april 2012

Page 4: Determining operational need Asset Management of civil infrastructural works

Research

403 april 2012

Page 5: Determining operational need Asset Management of civil infrastructural works

Research• How can operational need be determined so that

a long term asset management policy for a civil infrastructural work can be developed with the aim of achieving cost effectiveness during its life cycle?

• asset management policy• operational need• cost effectiveness • influence on organisation

503 april 2012

Page 6: Determining operational need Asset Management of civil infrastructural works

Policy on civil infrastructure

603 april 2012

Page 7: Determining operational need Asset Management of civil infrastructural works

Operational need

703 april 2012

Page 8: Determining operational need Asset Management of civil infrastructural works

Operational need

• Operational need is a statement of required capability, reliability and availability.

803 april 2012

Page 9: Determining operational need Asset Management of civil infrastructural works

Operational need• formulation of the problem• formulation of a concept policy• evaluation of the concept policy from the point of

view from the stakeholders• iteration• repeat evaluation

903 april 2012

Page 10: Determining operational need Asset Management of civil infrastructural works

Operational need• Determination of requirements

1003 april 2012

Page 11: Determining operational need Asset Management of civil infrastructural works

Cost effectiveness

1103 april 2012

Page 12: Determining operational need Asset Management of civil infrastructural works

Cost effectivenessExpert Analysis Markov analysis

Failure mode, effect and criticality analysis

Parts Count Analysis Hazard and operability study

Reliability Block Diagram Human Reliability Analysis

Fault tree analysis Event Tree Analysis

Task Oriented Probability of Abnormalities Analysis for Software

LCC-analysis

1203 april 2012

Page 13: Determining operational need Asset Management of civil infrastructural works

Cost effectiveness

1303 april 2012

System functionality

Operational (sub) functions

Technical (sub)functions

Basic functions

Page 14: Determining operational need Asset Management of civil infrastructural works

Cost effectiveness

1403 april 2012

Page 15: Determining operational need Asset Management of civil infrastructural works

Influence of operational needOrganization Sober performance High performance

Size (no. of

employees)

Decreases, expected is that in this

scenario intervals of certain tasks will be

larger. This will put a smaller strain on

the organization (less tasks per shift).

The organization can do with less

employees.

Decreases, the organization will be

smaller, because a high level of skills is

necessary for tasks. Outsourcing is

therefore unavoidable

No. of tasks Decreases, because of the lower

ambitions, certain tasks (cleaning,

replacement of lamps, non mandatory

checks) will have a lower frequency.

Equal, the number of tasks is expected

to be equally. Improvement in scheduling

of tasks (clustering), in efficiency of

tasks (for example by better tools and

methods) is necessary to increase

performance (more reliability and

availability)

Education Equal, although the number of tasks

decreases due to larger intervals, the

type of tasks will be the same.

Employees with the same type of skills

(mostly technical) will be necessary.

Shift in education, there will be a shift

from technical orientated employees to

management orientated employees,

because outsourcing and better

scheduling demands good management

skills.

1503 april 2012

Page 16: Determining operational need Asset Management of civil infrastructural works

Conclusion & recommendations• Literature

• what is expected from the policy executing organisation;

• the ability of the organisation to execute the policy;

• willingness of the organisation to execute the policy.

1603 april 2012

Page 17: Determining operational need Asset Management of civil infrastructural works

Conclusion & recommendations• Current practice

• ambiguous goals

• no functional requirements

1703 april 2012

Page 18: Determining operational need Asset Management of civil infrastructural works

Conclusion & recommendations• Operational need

• Iteration

• Systems Engineering

• NEN 2767-4

1803 april 2012

Page 19: Determining operational need Asset Management of civil infrastructural works

Conclusion & recommendations• Cost effectiveness

• LCM-model

• Change in operational need leads to change in asset managing organisations

1903 april 2012

tcyclelifeeperformancesseffectiventcos

cos

Page 20: Determining operational need Asset Management of civil infrastructural works

Conclusion & recommendations

2003 april 2012

Page 21: Determining operational need Asset Management of civil infrastructural works

2103 april 2012tel 0570 69 79 11fax 0570 69 73 44www.witteveenbos.nl

Deventer Den HaagAlmere Heerenveen Amsterdam MaastrichtBreda Rotterdam

België (Antwerpen) Indonesië (Jakarta)Kazachstan (Aktau, Almaty, Atyrau)Letland (Riga)Rusland (St. Petersburg)Vietnam (Ho Chi Minh City)