Sr. No. Name fo District Name of Taluka Name of Substation Tentative RE integration (in MW) Name of EHV Source S/S Remark 1 Bharuch Valiya 66KV Daheli 2 Bharuch Valiya 132KV Valiya 3 Bharuch Netrang 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Mauza (Chasvad) 6 Narmada Dediapada 66KV Dediapada 7 Narmada Dediapada 66KV Saddapani 8 Narmada Dediapada 66KV Chikda 9 Narmada Dediapada 66KV Bal (Mozda) 10 Bharuch Ankleshwar 66KV A'war GIDC -A 50-70 11 Bharuch Ankleshwar 66KV Ankleshwar GIDC 50-70 12 Bharuch Ankleshwar 66KV Ankleshwar (Urban) 13 Bharuch Hansot 66KV Hansot 14 Bharuch Ankleshwar 66KV Panoli GIDC 15 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 16 Surat Palsana 66KV Niyol (Kadodara-2) 30-40 17 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 18 Surat Choryasi 66KV Bhagwati 19 Surat Choryasi 66KV Bhestan(Eklera) 20 Valsad Dharampur 66KV Dharampur 21 Valsad Dharampur 66KV Nani Vahiyal 22 Valsad Valsad 66KV Atak Pardi (Valsad) 23 Valsad Dharampur 66KV Piprol 24 Valsad Valsad 66KV Valandi (Navera) 25 Valsad Valsad 66KV Gundalav GIDC 26 Valsad Pardi 66KV Khadki Dungri 27 Valsad Pardi 66KV Kolak 28 Valsad Valsad 66KV Valsad City 30-40 29 Valsad Umargam 66KV Umargam 30 Valsad Umargam 66KV Sarigam GIDC 31 Valsad Umargam 66KV Sanjan 32 Valsad Umargam 66KV Vangam(Umargam-II) 33 Valsad Umargam 66KV Palgam 34 Valsad Umargam 66KV Bhilad 30-40 35 Dang Vaghai 66KV Waghai 36 Dang Ahwa 66KV Ahwa 37 Dang Ahwa 66KV Saputara 38 Navsari Chikhli 66KV Tankal 39 Navsari Vansda 66KV Vansda 40 Navsari Vansda 66KV Ankalachh 41 Navsari Vansda 66 KV Mahuwas (Kevadi) 42 Navsari Chikhli 66KV Chikhli 43 Navsari Khergam 66KV Khergam 44 Navsari Chikhli 66KV Fadvel (Matwad) 45 Navsari Chikhli 66KV Rankuwa (Manekpor) 46 Navsari Chikhli 66KV Rumla (Amadhra) 47 Navsari Vansda 66KV Bhinar 48 Valsad Valsad 66KV Dungri (Valsad) 49 Valsad Valsad 66KV Untadi(Malvan Bigri) 50 Navsari Chikhli 66KV Balwada (Wagaldhara) 30-40 220 KV Chikhli -- 30-40 30-40 30-40 220 KV Atul -- 30-40 30-40 220 KV Bhilad -- 132 KV Ankleshwar -- 50-70 132 KV Bhestan -- 30-40 Details of district wise substations for RE integration as on March-2018 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder. South Gujarat 50-70 132 KV Valia -- 30-40
21
Embed
Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Sr. No. Name fo District Name of Taluka Name of Substation
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
South Gujarat
50-70
132 KV Valia --
30-40
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
51 Surat Olpad 66KV Veluk52 Surat Olpad 66KV Olpad53 Surat Choryasi 66KV Pala54 Surat Choryasi 66KV SVNIT55 Surat Choryasi 66KV Gujarat Hira Bourse56 Surat Choryasi 66KV Pal57 Surat Choryasi 66KV Bhatha ( Pal-2)58 Surat Choryasi 66KV Variav59 Surat Choryasi 66KV Kosad (Amroli)60 Surat Choryasi 66KV Mora61 Surat Choryasi 66KV Ichhapore 30-4062 Surat Kamrej 66KV Kamrej63 Surat Kamrej 66KV Velanja64 Surat Kamrej 66KV Karjan 50-7065 Surat Mandvi 66KV Karanj66 Surat Mandvi 66KV Areth (Nogama)67 Surat Mandvi 66KV Umarkhadi (Maldha)68 Surat Mangrol 66KV Vankal69 Surat Mangrol 66KV Zankhvav70 Surat Mangrol 66KV Mosali (Mangrol)71 Surat Mangrol 66KV Palod (Kim)72 Surat Olpad 66KV Vadoli 73 Surat Olpad 66KV Mindhi74 Surat Mangrol 66KV Fair deal Text Park 30-4075 Surat Mangrol 66KV Palod-2 30-4076 Surat Bardoli 66KV Bardoli77 Surat Bardoli 66KV Sarbhon (Bardoli)78 Surat Bardoli 66KV Afva(Dungar) 79 Surat Mahuva 66KV Bamaniya80 Surat Mahuva 66KV Singod81 Surat Mahuva 66KV Mahuva82 Surat Bardoli 66KV Kadod83 Surat Bardoli 66KV Madhi84 Surat Mandvi 66KV Mandvi85 Surat Bardoli 66KV Mota 30-4086 Surat Kamrej 66KV Sampura 30-4087 Surat Kamrej 66KV Parab (Mankna) 50-7088 Tapi Vyara 66KV Vyara89 Tapi Vyara 66KV Borakhadi90 Tapi Vyara 66KV Rupwada91 Tapi Vyara 66KV Vyara-292 Tapi Valod 66KV Bhimpor (Kanjod)93 Tapi Valod 66KV Valod94 Tapi Valod 66KV Virpor (Pathakwadi)95 Tapi Valod 66KV Karanjkhed96 Tapi Vyara 66KV Dolvan97 Tapi Vyara 66KV Mangaliya (Chimer)98 Tapi Vyara 66KV Kalakva
30-40
220 KV Mota
(Bardoli)--
30-40
30-40
30-40
30-40
220 KV Kim --
30-40
15-20
30-40
30-40
220 KV Icchapore --
30-40
30-40
30-40
South Gujarat
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
99 Navsari Gandevi 66KV Billimora100 Navsari Gandevi 66KV Gandevi101 Navsari Gandevi 66KV Amalsad102 Navsari Jalalpore 66KV Sultanpur(Dandi)103 Navsari Gandevi 66 KV Chhapar (Kotha)104 Navsari Jalalpore 66KV Eroo105 Navsari Navsari 66KV Chhapra (Navsari -B)106 Navsari Navsari 66KV Navsari city107 Navsari Jalalpore 66KV Maroli 30-40108 Navsari Navsari 66KV Vesma 30-40109 Surat Choryasi 66KV SUSM-1110 Surat Choryasi 66KV Bhatia111 Surat Choryasi 66KV Sachin -B112 Surat Choryasi 66KV Vanz (Susml)113 Surat Palsana 66KV Erthan (Lingad) 114 Surat Palsana 66KV GETP115 Navsari Jalalpore 66KV Mangrol 30-40116 Surat Choryasi 66KV Khajod (Magadalla)117 Surat Choryasi 66KV Jiyav (Bamroli)118 Surat Choryasi 66KV Vadod119 Surat Choryasi 66KV Vesu120 Surat Choryasi 66KV Veshu-2 (Magdalla)121 Surat Choryasi 66KV Pandesara122 Surat Choryasi 66KV Jiav (Pandesara-II)123 Surat Choryasi 66KV Sachin -A124 Surat Choryasi 66KV Sachin-D125 Surat Choryasi 66KV Sachin ‘C126 Valsad Dharampur 66KV Motaponda (Kakadkopar)
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
148 Surat Kamrej 66KV Kosmada149 Surat Choryasi 66KV Godadara150 Surat Palsana 66KV Kadodara151 Surat Palsana 66KV Palsana152 Surat Palsana 66KV Tatithaiya153 Surat Palsana 66KV Jolva154 Surat Choryasi 66KV Punakumbharia155 Surat Kamrej 66KV Laskan156 Surat Kamrej 66KV Laskana -2157 Surat Kamrej 66KV Vav 30-40158 Surat Olpad 66KV Sivan (Sayan west)159 Surat Olpad 66KV Delad160 Surat Choryasi 66KV Sarthana 30-40161 Bharuch Wagra 66KV Vilayat162 Bharuch Bharuch 66KV Kukarwada163 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70164 Surat Mangrol 66KV Kosamba165 Surat Mangrol 66KV Kharach (Tarsali)166 Tapi Nizar 66KV Nizar167 Tapi Nizar 66KV Kelani (Kukarmunda)168 Tapi Nizar 66KV Balda/Nimbhora169 Tapi Uchchhal 66KV Rumkitalav170 Tapi Uchchhal 66KV Uchchhal171 Tapi Uchchhal 66KV Vadpada(Naranpur) 172 Tapi Songadh 66KV Borda173 Tapi Songadh 66KV Sagbara
174 Tapi Songadh 66KV Chikhali Bheshrot (Khodtalav)
175 Tapi Songadh 66KV Vadi Bhesrot176 Tapi Songadh 66KV Sisor (Panchpipla)177 Tapi Songadh 66KV Ukai178 Tapi Songadh 66KV Songadh179 Tapi Songadh 66KV Kavla180 Tapi Songadh 66KV Jamkhadi (Hindala)181 Dang Subir 66KV Subir
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
280 Vadodara Waghodiya 66KV Asoj (Paldi)281 Vadodara Waghodiya 66KV Vyankatpura282 Vadodara Waghodiya 66KV Jarod283 Vadodara Vadodara 66KV Amaliyara 284 Vadodara Vadodara City 66KV Chhani-A285 Vadodara Vadodara City 66KV Chhani -B 286 Vadodara Vadodara City 66KV Sama
30-40 220 KV Waghodia --
400 KV Asoj --30-40
30-40
220 KV Viramgam --
220 KV Vyankatpur
a--30-40
Central Gujarat
30-40
220 KV Salejada --
30-40
30-40
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
42 Gir Somnath Girgadhada 66KV Dhokadva43 Gir Somnath Girgadhada 66KV Gir Gadhada44 Gir Somnath Girgadhada 66KV Rabarika45 Gir Somnath Girgadhada 66 KV Navaugla46 Gir Somnath Una 66KV Samter (Una-II) 30-4047 Gir Somnath Una 66 KV Dandi 25-3048 Gir Somnath Girgadhada 66KV Bodidar49 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz50 Gir Somnath Una 66KV Vajadi 30-4051 Rajkot Gondal 66KV Vasavad52 Rajkot Gondal 66KV Moviya53 Rajkot Gondal 66KV Shrinathgadh54 Rajkot Jasdan 66KV Sanathali55 Jamnagar Jamnagar 66KV Aliabada56 Jamnagar Jamnagar 66KV Jam Wanthali57 Jamnagar Jamnagar 66KV Jamnagar-B58 Jamnagar Jamnagar 66KV Morkanda 59 Jamnagar Lalpur 66KV GIDC ph-III 60 Jamnagar Lalpur 66KV Lalpur61 Jamnagar Lalpur 66KV Pipli62 Jamnagar Lalpur 66 KV Haripar63 Jamnagar Lalpur 66 KV Mota Kadba (Vavdi)
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
107 Rajkot Rajkot city 66KV University Rd.108 Rajkot Rajkot 66KV Raiyadher109 Junagadh Bhesan 66KV Mendpara110 Junagadh Junagadh City 66KV Junagadh (GIDC)111 Junagadh Junagadh City 66KV Zanzarda (JU. City)112 Junagadh Junagadh 66KV Choki113 Junagadh Junagadh 66KV Majevadi114 Junagadh Mendarda 66KV Arniyana 115 Junagadh Vanthali 66KV Mahobatpur (Navagam)116 Junagadh Vanthali 66KV Vadala117 Junagadh Manavadar 66KV Katakpara 30-40118 Junagadh Vanthali 66KV Shapur 30-40119 Junagadh Vanthali 66KV Kanza 30-40120 Gir Somnath Sutrapada 66KV Moradiya 30-50121 Gir Somnath Sutrapada 66KV Lodhwa (Singsar)122 Gir Somnath Sutrapada 66 KV Gorakhmadi123 Gir Somnath Kodinar 66KV Sindhaj124 Gir Somnath Sutrapada 66KV Kanjotar(Barda)125 Gir Somnath Sutrapada 66KV Singasar 30-40126 Gir Somnath Sutrapada 66KV Sutrapada127 Gir Somnath Veraval 66KV Veraval (GIDC)128 Gir Somnath Veraval 66KV Bhalka(GIS)129 Gir Somnath Veraval 66KV Prabhas Patan130 Gir Somnath Kodinar 66 KV Devli131 Gir Somnath Kodinar 66 KV Kodinar132 Gir Somnath Kodinar 66 KV Jantrakhadi133 Gir Somnath Kodinar 66 KV Advi134 Gir Somnath Veraval 66KV Bhetali 30-40135 Gir Somnath Talala 66KV Ankolwadi136 Gir Somnath Talala 66KV Jasadhar137 Gir Somnath Sutrapada 66KV Pranchi138 Gir Somnath Kodinar 66KV Ghantwad139 Gir Somnath Kodinar 66KV Alidar
Saurashtra
30-40
30-40
220 KV Shapur
Maximum 50-70 MW RE injection
feasible30-40
220 KV Timbdi
Maximum 50-70 MW RE injection
feasible
50-70
50-70
30-50
50-70
50-70
220 KV Nyara
Maximum 50-100 MW RE injection
feasible30-40
50-70
20-30
220 KV Limbdi --
15-20
30-40
30-40
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.
Sr. No. Name fo District Name of Taluka Name of Substation
Tentative RE integration (in
MW)
Name of EHV Source S/S Remark
Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.