Top Banner
1 DETAIL PROJECT REPORT (D.P.R.) (I.W.M.P.-BIJNOR 1 ST ) INTEGRATED WATERSHED MANAGEMENT PROGRAMME WATERSHED- MALIN RIVER, BLOCK-NAJIBABAD, DISTRICT- BIJNOR (U. P.) Submitted to:- Prepared By Department of Land Resources Bhoomi Sanrakshan Adhikari Ministry of Rural Development, Department of Land Development Government of India and Water Resources, Bijnor DEPARTMENT OF LAND DEVLOPMENT AND WATER RESOURCES LUCKNOW (U.P.)
175

DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

May 26, 2018

Download

Documents

vophuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

1

DETAIL PROJECT REPORT (D.P.R.)

(I.W.M.P.-BIJNOR 1ST

)

INTEGRATED WATERSHED MANAGEMENT PROGRAMME

WATERSHED- MALIN RIVER, BLOCK-NAJIBABAD, DISTRICT- BIJNOR (U. P.)

Submitted to:- Prepared By

Department of Land Resources Bhoomi Sanrakshan Adhikari

Ministry of Rural Development, Department of Land Development

Government of India and Water Resources, Bijnor

DEPARTMENT OF LAND DEVLOPMENT AND WATER RESOURCES LUCKNOW (U.P.)

Page 2: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

2

Contents S.N Particulars Page Nos. 1.

EXCUTIVE SUMMARY 5

1.1 Excutive Summary 6 1.2 Project At Glance 1.3 Introduction and Background 9 1.4 Status of Previous 10 1.5 Need and Scope for watershed development Programme 11 1.6 Weightage for the selection of the watershed 12 2. GENERAL DESCRIPTION OF PROJECT AREA 15 2.1 Location 16 2.2 Physiography 18 2.3 Climate 19 3. BASELINE SURVEY AND PARTICIPATORY RURAL APPRAISAL 20 3.1 Detail of Population 21 3.2 Land holding pattern 22 3.3 Migration: Pre Project Status 23 3.4 Micro Watershed wise Detail of Crop their Productivity & Production 24 3.5 Livestock Population 3.6 Horticulture Status 33 3.7 Detail of Infrastructure 24 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status 65 3.11 Source wise Area Irrigrated in IWMP 1st 67 4. INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 69 4.1 Project Implementing Agency 70

4.2 Details of Staff at PIA 71 4.3 Details of WDT 72 4.4 Watershed committee Gram Panchayat wise 73 4.5 Details of Village wise (SHGs) 83 4.6 Details of SHGs Group wise Names 93 4.7 Details of Users Group 98 4.8 Activities wise formation of users Groups 98 4.9 Convergence 103

Page 3: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

3

5. CAPACITY BUILDING PLAN 104 6. EPA 108 6.1 Entry Point Activity (EPA) 109 6.2 Estimation of Run off 110 7. PHASING OF PROGRAMME AND BUDGETING 138 7.1 Details of Item wise Financial Position 139 7.2 Details of Physical and Financial Year wise Phasing 140 8. EXPECTED OUTCOMES/ BENEFITS: 141 9. Chapter-9 EPA Photos 142, 143

10. MAPS

( Watershed map, Micro watershed Map)

155,156

157

11. Design of Earthen bund 158

12. Design of Drop Spill Way 159

13. Estimate of Drop Spill Way 160

14. Design of Field Out let 161

15. Estimate of Field Out let 162

Page 4: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

4

CERTIFICATE This is to be certified that the proposed Project (IWMP-I) comprising Fifteen micro-watersheds of district Bijnor Uttar Pradesh has been selected for its sustainable development on watershed basis under Integrated Watershed Management Programme. The land is physically available for proposed interventions and is not overlapping with any other schemes. It will be developed as per Common Guidelines for Watershed Development Project-2008, GOI, New Delhi. The significant results will be achieved through proposed interventions on soil and water conservation, ground water recharge, availability of drinking and irrigation water, agricultural production systems, live stock, fodder availability, livelihoods of asset less, capacity building, etc. The proposed Detailed Project Report of IWMP-I, 2009-10 is approved for its implementation. Soil Conservation Officer IWMP-I Dept. of LDWR, Chandpur AT Bijnor UP Deputy Director LDWR, Moradabad UP Project Director DRDA, Bijnor UP

Chief Development Officer Distt.-Bijnor UP

Page 5: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

5

Chapter- 1

EXECUTIVE SUMMARY

Page 6: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

6

1.1 EXECUTIVE SUMMARY All the micro-watersheds of IWMP-I, 2009-10 are situated in Najibabad Block District Bijnor, Uttar Pradesh. The extent of latitude and longitude of the project is 29.39 to 29.70 N-S and 78.18 to 78.31 E-W. The project consists of Fifteen micro-watersheds namely Jaspur (2B5C1c3c), Bhaguwala (2B5C1c3d),Gudha 1st (2B5C1C3F), Gudha 2nd (2B5C1d2a), Prempur (2B5C1d1b), Moh Alampur (2B5C1e1a), vijaypur (2B5C1e1b) Gulalwali (2B5C1e1C) Veerpur 2nd (2B5C1e2a) Veerpur 1st (2B5C1e2b) Sahanpur N.P (2B5C1e3b) Pooranpur gadhi 1st (2B5C1e4a) Rampur mangal (2B5C1e4c) Bijori (2B5C1e4d) Rehmapur (2B5C1d1a)with total geographical area of 6148.00 ha, out of which 3812.00 ha is treatable with total outlay of Rs. 457.44 lakh under Integrated Watershed Management Programme. The Project Implementing Agency (PIA) is Bhumi Sanrakshan Adhikari, Department of Land Development and Water Resources, Chandpur At Bijnor , Uttar Pradesh. All micro-watershed falls in agro-climatic zone of Western resion representing a transitional zone of tropical sub-humid to semi-arid and comes under hot moist semi-arid ecological sub-region. The micro-watersheds of IWMP-I is situated at an elevation of some 201.10 to 249.17 m above mean sea level and has relief from 14 to 34 m. General topography of the watershed is mild to gentle.

Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3- 5,. Per cent areal extent of different slope classes in IWMP-I micro-watershed is shown in Page no .63 The dominant slope category in the micro-watershed is 1-3 per cent (85%) followed by 3-5 per cent (15%). On an average 26 per cent population is scheduled caste. The watershed is water scarce. Expected runoff is worked out as 40% per centannual rainfall. The watershed is dominated by cow and Buffalo . To achieve the sustainable development, all kinds of activities related to natural resource management, production systems and livelihood options for asset less people are described in Page no. 87 to 97 The total cost of the project is Rs. 457.44 lakh. All the activities of natural resource conservation are marked on the map of proposed plan. Major crops of the watershed were urd, mung, Sugarcane, during kharif and , wheat in.Rabi.

Page 7: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

7

1.2 PROJECT AT A GLANCE 1 Name of Project IWMP-I

2 Name of Block (s) Najibabad

3 Name of district Bijnor

4 Name of State U.P

5 Name of Watershed IWMP 1st

6 Name of Micro watershed/ code with Coordinate latitude Longitude Latitude

1 jaspur 2B5C1c3c 78.20 29.44

2 Bhaguwala 2B5C1c3a 78.31 29.70

3 Guda 1st

2B5C1c3f 78.18 29.42

4 Prempur 2B5C1d1b 78.18 29.40

5 Gurda 2nd

2B5C1d2a 78.20 29.43

6 mo Alampur 2B5C1e1a 78.30 29.60

7 Vijaypur 2B5C1e1b 78.30 29.60

8 GulalWali 2B5C1e1c 78.20 29.41

9 Veerpur 2nd

2B5C1e2a 78.21 29.41

10 veerpur 1st

2B5C1e2b 78.20 29.39

11 Sahanpur N.P 2B5C1e3b 78.31 29.70

12 Puranpur Gadi 1st

2B5C1e4a 78.25 29.60

13 Rampur Mangal 2B5C1e4c 78.22 29.39

14 Bijori 2B5C1e4d 78.31 29.70

15 Rehmapur 2B5C1d1a 78.30 29.40

Project Period 2009-10 to 2013-14

Name of gram Panchayats No.- 14

Names of concerned villages-(No.) 35

Total Geographical area of Project (ha) 6148

Treatable area (ha.) 3812

Forest Area 320

Land under Agriculture use 4316

Total Project cost (Lacs) 457.44

Cost to be met through convergence -

Project period 4 Years

Formation of Watershed committees 14

No. of WCs 14

No. of members 154

Formation of SHGs 45

Total SHG Nos 98

Female SHG Nos 17

Total No. of members 452

Formation of UGs 30

No. of Ugs 67

No. of members 332

Important Outcome indicators

(1) Rainfed area (ha.) 4243.00

(2) Area under irrigation (ha.) 1243.00

Page 8: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

8

(3) Area under crops (ha.) iKharif 2121.00 Rabi 2024.00

Productivity of important crops (Q/ha.) Urd 4.24

Moong 5.29

Jawar 800 kg

Bajara 800 kg

Wheat 1415kg/ha Pulse And Oil seed 800 kg/ha

Sugar Cane 400 k/ha

10) Mustard 5 kg/ha

(12) Ground water status (m) 4.35-15.55

(13) Milk Production (Liters) 2.00 litre

14) Average income per family (Rs.) 20000/year

(1) Land holding families 4540

(2) Land less/ poor families 710

18 Employment generation (1) During Project Period 68750/year

(2) After project 91500 Md/year

Page 9: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

9

1.3 INTRODUCTION AND BACKGROUND

Status of watershed programme and approved plan by Steering committee, Govt. of India and status of previous Detailed Project Reports for Bijnor district of Uttar Pradesh is given in following Tables 1.1, 1.2 and 1.3.

Status of watershed programme District- Bijnor

Details No. Area ( ha.) Total Micro watersheds in the district 410 456100 Workable Micro Watersheds 278 362774 Micro Watersheds already treated by LDWR & other Agencies Uttar Pradesh 101 100175

Micro Watersheds (MWS) available for treatment (At the time of start of IWMP in the district)

177 262599

Table 1.2: Approved plan (PPRs) by Steering Committee (SC)/Govt. of

Year Project MWS Area (Treatable) (ha)

Project Cost (Rs. Lakh)

Name of PIA

Date of Sanction by S.C. Got. Of India

2009-10 IWMP-I 15 3812 457.44 B.S.A LDWR, Bijnor-I, U.P.

30/04/10

Total

Page 10: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

10

1.4 Status of previous DPRs

Sl. No. Approved Project

Status of DPR under preparation/ prepared/approved by SLNA with date

Treatable Area ha

Project Area (Geographical) ha

Project cost Rs.(Lakh)

Project period (Fin. Year from.......q ......)

PIA

1 IWMP-I Prepared / under revision

3812 6148 457.44 2010/11to2013/14 B.S.A LDWR, Bijnor-I, UP

Total

1.1 Project Background

Integrated Watershed Management Programme-I comprises Fifteen micro-watershed namely Jaspur (2B5C1c3c), Bhaguwala (2B5C1c3d),Gudha 1st (2B5C1C3F), Gudha 2nd (2B5C1d2a), Prempur (2B5C1d1b), Moh Alampur (2B5C1e1a), vijaypur (2B5C1e1b) Gulalwali (2B5C1e1C) Veerpur 2nd (2B5C1e2a) Veerpur 1st (2B5C1e2b) Sahanpur N.P (2B5C1e3b) Pooranpur gadhi 1st (2B5C1e4a) Rampur mangal (2B5C1e4c) Bijori (2B5C1e4d) Rehmapur (2B5C1d1a)watershed project is situadated in Najibabad Block of District Bijnor and spread over in 51 villages of 14 gram Panchayat. The total geographical area of the IWMP-I 6148ha, out of which 3812 ha is treatableunder Integrated Watershed Management Programme (IWMP-I).

Page 11: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

11

1.5 Need and Scope for Watershed Development Watershed project

Micro Watersheds (MWS) detail

Micro watersheds code

Treatable Area (ha) Name of Watershed in which MWS is falling (River / Nala name)

IWMP-I jaspur 2B5C1c3c 214.70 Malan River IWMP-I Bhaguwala 2B5C1c3a 512.85 Malan River IWMP-I Gudha 1

st 2B5C1c3f 143.50 Malan River

IWMP-I Prempur 2B5C1d1b 259.24 Malan River IWMP-I Gudha 2

nd 2B5C1d2a 268.77 Malan River

IWMP-I Moh Alampur 2B5C1e1a 289.64 Malan River IWMP-I Vijaypur 2B5C1e1b 184.74 Malan River IWMP-I GulalWali 2B5C1e1c 145.74 Malan River IWMP-I Veerpur 2

nd 2B5C1e2a 194.43 Malan River

IWMP-I veerpur 1st

2B5C1e2b 301.87 Malan River IWMP-I Sahanpur N.P 2B5C1e3b 119.58 Malan River IWMP-I Puranpur Gadhi 1

st 2B5C1e4a 301.21 Malan River

IWMP-I Rampur Mangal 2B5C1e4c 154.08 Malan River IWMP-I Bijori 2B5C1e4d 159.31 Malan River IWMP-I Rehmapur 2B5C1d1a 562.33 Malan River Total 3812.00 Western U.P region was in a grip of severe drought continuously and rains from 2004 to 2009. Watershed project was selected with following objectives: Long Term Objectives:

� To optimize productivity of the land

� To restore ecological balance in degraded and fragile eco-system

� To narrow down the disparity between rainfed and irrigated areas

� To create sustained employment opportunities

Page 12: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

12

1.6 Crite Area of Weightage for selection of watershed

1 2 3 4 5 6 7 8

s.

n

o

distric

t

Name

of the

project

No of

micro-

Watersha

des

Proposed

to be

covered

Propose

d

Project

Area(ha

)

Type of

(hill/

desert/

other

Proposed

Cost(Rs.in

lakh)

I

Weightage under the criteria

II III IV V VI VII VIII IX X XI XII XIII Tota

l

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1 Bijnor IWMP i 15 3812 Other 457.44 7.5 10.0 5.0 10.0 0.0 0.0 10.0 5.0 10.0 10.0 10.0 15.0 0.0 92.5

Total 3812 457.44 - - - - - - - - - - - - -

1.7 Details of on going watershed programme:

Presently, no watershed development programme is going on in the watershed.

Page 13: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

13

# Criteria and weightge for selection of Watershed S.No criteria Maximum

Score

Rangs & Score

i powerty index (% of poor to

population)

10 Above 80% (10) 80 to 50%(7.5) 50 to (5) Below 20 % (2.5)

ii % of SC/ST population 10 Moer than 40% (10) 20 to 40%(5) lees than 20% (3)

iii Actual Wages 5 Actual Wages are

significances lower then

minimum Wages (5)

Actual Wages are

equal to or high

than minimum

Wages (5

iV % of Small and marginal

farmers

10 Moer than 80% (10) 50 to 80 % (5) lees than 50% (3)

V Groups Water Status 5 over exploid (5) critical (3) sub critical (2) Safe (0)

Vi Moisture

index/DPAP/DDP/DDp Block

15

-66.7&Below (15)DDP

Block

-33.3 to 66.6(10)

DPAP Block

0 to-33.3(0)Non

DPAP/DDP Block

VII Area under rain-faid agriculture 15 more then 90% (15) 80 to 90% (10) 70 to 80%(5) Abobe

.70%(reject)

Viii Drinking Water 10 No Source (10) Problometic

Villlege (7.5)

Partially covered

(5)

Fully covered (0)

ix Degarded La nd 15 High-above 20%(15) Medium -10 to

20% (10)

Low-less then 1%

off TGA (5)

x Productivity potential of the

land

15

Land with low

production &where

Productivity ca be

significantly enhanced

with reasonable efforts

(15)

Land with

Moderate

production

&where

Productivity ca be

enhanced with

reasonable

efforts (10)

Land with high

production

&where

Productivity ca be

Marginaly

enhanced with

reasonable

efforts (5)

Page 14: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

14

Xi contiguity to

another

watershed that

has already been

developed

/treated

10 contiguous to

previously trteated

watershed &

contiguity with in

the microwatershed

in the project (10)

contiguous with In

the watershed in

the project but non

contiguous to

previously treated

watershed (5)

Neighter contiguous

to previously

trteated watershed

nor contiguity with

in the

microwatershed in

the project (0)

Xii cluster approach

in the hills plaints

(more then

onecontiguous

microwatershed in

the project )

15 above 6 micro

watersheds in

cluster (15)

4 to 6 micro

watersheds in

cluster (10)

2 to 4 micro

watersheds in

cluster (0)

Xii cluster approach

in the hills plaints

(more then

onecontiguous

microwatershed in

the project

15 above 5 micro

watersheds in

cluster (15)

3 to 5 micro

watersheds in

cluster (10)

2 to 3 micro

watersheds in

cluster (5)

Total 150 150 90 41 2.5

Page 15: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

15

Chapter- 2

GENERAL DESCRIPTION OF PROJECT AREA

Page 16: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

16

GENERAL DESCRIPTION OF PROJECT AREA

2.1 Location: The micro-watersheds of IWMP-I is located in Najijabad block of Bijnor district. It is about 35 km. from Bijnor on Najibabad road. Location (lat/long), Gram Panchayat, villages and its geographical area for each micro-watershed are depicted in Total area of the project is 6148 ha, out of which 3812 ha is treatable.. : Micro-watershed wise details of location, Gram Panchayat, villages and geographical area of IWMP- I

Sl. No.

Name of micro watershed

with Code

Latitude / Longitude

Name of GP

Names of villages

Name of Block

Area of village

included in

MWS(Geographical

TreatableArea

Details of important

/approach road with distance km

1 jaspur 29.44 to 78.20

Gudha Jaspur Ramnagar Ramsahaywali Chahsaloono Jaspur Guda

Najibabad 4.79 15.09

257.37 53.03 20.72

214.70 Najibabad To JAspur 8 Km

2 Bhaguwala 29.70 to 78.31

Jaspur Guda Bhagowala Jaspur Guda Bhagoowala Kangarpur

Najibabad 45.21 28.11

101.95 486.25

512.85 Najibabd To Samipur Road 5 km

3 Gudha 1st

29.42 to 78.18

Gudha Gudha 1st Najibabad 231.50 143.50 Najibabd To Prempur

Road 3 km

4 Prempur 29.40 to 78.18

Gudha Prempur.Jatpura Moda .Vijaypur

Guda Prempur Niyamatpur Ahmadpur Majid Jatpura khas Rehmapur

Najibabad 186.68 111.84

0.08 56.75 12.41 47.47

259.24 Najibabd To Bijori Road 6km

5 Gudha 2nd

29.43 to 78.20

Gudha Chahsallono Guda

Najibabad 258.69 172.44

268.77 Najibabd To Pooranpur gadi

Road3 km

6 Moh

Alampur

29.60 to 78.30

Prempur.Vijaypur. Ranipur.Rahaatpur Khudra .Mo Alampur

Mo Alampur Prempur Rehmapur Jadopur Lalpur Bhikka Rehatpur Khurd Vijaypur Nangla Pithora

Najibabad 1.31 17.04 48.50 15.81 32.14 11.18

150.04 40.85

289.64 Najibabd To Pooranpur Road 3 km

Page 17: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

17

7 Vijaypur 29.40 to 78.30

Prempur Vijaypur.Ranipur. Gulalwali Verpur Prempur rehmapur Jadopur Lalpur bhikka

Najibabad 57.68 82.99 76.33 0.10

61.65 16.05

184.74 Najibabd To Jhakaki Road 9 km

8 GulalWali 29.41 to 78.20

.Prempur. gulalwali Veerpur PRempur

Najibabad 148.67 85.33 0.03

145.75 Najibabd To Gulalwali By Road10 km

9 Veerpur 1st 29.41 to 78.21

Gudha Prempur Ranipur Sahanpur Nanu Veerpur Sahanpur Santoki Jadopur Lalpur bhikka

Najibabad 0.08 263.05 17.64 3.19

30.68

194.43 Najibabd To Veerpur By Road7km

10 Veerpur 2nd 29.39 to 78.20

Gudha .Prempur. ShanpurNanu Veerpur

Najibabad 325.54 163.06

301.87 Najibabd To Veerpur By Road 8 km

11 Sahanpur N.P 29.70 to 78.31

Prempur.Ranipur Amanullahpur . Veerpur Sahanpur Santoki Lalpur Bhikka Sahanpur girdhaba Sahanpur Amanullahpur

Najibabad 45.71 136.87 36.04 56.64 17.76 7.66

119.58 Najibabd To Sahanpur By Road6 km

12 Puranpur Gadhi

1st

29.60 to 78.25

Ranipur.Vijaypur.Pooranpur Gadi.Amanullahpur

Sahanpur Santoki Rampur Mangal Ranipur Lalpur bhikka Vijaypur Sahanpur Girdhaba Pooranpur Gadi Amanullahpur Purushottampur

Najibabad 62.64 32.49 52.33 3.37 0.34

155.96 18.88 14.80

127.47 20.37

301.21 Najibabd To Pooranpur Gadhi By Road6km

13 Rampur Mangal 29.39 to 78.22

Guda.Bijori.Ranipur. Veeruwala.

Sahanpur Nanu Bijori Rampur Mangal Ranipur

Najibabad 107.32 125.96 16.42 0.71

154.08 Najibabd To Rampur MAngal By Road 6 km

14 Bijori 29.70 to 78.31

G Meduwala.Moh Amekhanpur ,Sahanpur Nanu Bijori

Najibad 3.52 1.37

55.83 193.63

159.31 Najibabd To Bijori By Road 7km

15 Rehmapur 29.40 to 78.30

Guda.Jatpura Bonda.Vijaypura .RAhatpur khurd.Muusepur.Sekhupura Alam.

Najibabad 830.00 562.33 Najibabd To Gulalwali By Road10 km

Total 6148.00 3812.00

Page 18: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

18

2.2 Physiography Slope: Spatial distribution of different slope classes was prepared using Arc GIS. Slope was divided into five classes’ viz. 0-0.5, 0.5-1.0, 1-3, 3-5.% and more than 5 per cent. Per cent areal extent of different slope classes in IWMP-I micro-watershed is shown in The dominant slope category in the micro-watershed were 1-3 per cent (85%) followed by 3-5 per cent 5, (15%). Areal extent of various slope classes in the micromicro-watershed of IWMP

Sl. No.

Name of MWS & code Slope range wise area (ha) Total ProjectArea (ha)

0-0.5% 0.5-1.0% 1-3% 3-5% >5% Undulating Terraced

1 jaspur 2B5C1c3c -- 105.45 74.90 34.35 34.35 -- 214.70

2 Bhaguwala 2B5C1c3a -- 255.85 180.00 77.00 77.00 -- 512.85

3 Gudha 1st

2B5C1c3f -- 74.50 47.00 22.00 22.00 -- 143.50

4 Prempur 2B5C1d1b -- 129.89 90.50 38.85 38.85 -- 259.24

5 Gudha 2nd

2B5C1d2a -- 134.77 93.80 40.20 40.20 -- 268.77

6 Moh Alampur 2B5C1e1a -- 153.64 92.50 43.50 43.50 -- 289.64

7 Vijaypur 2B5C1e1b -- 92.34 64.90 27.50 27.50 -- 184.74

8 GulalWali 2B5C1e1c -- 74.95 50.40 20.40 20.40 -- 145.75

9 Veerpur 2nd

2B5C1e2a -- 99.83 65.50 29.10 29.10 -- 194.43

10 veerpur 1st

2B5C1e2b -- 151.87 105.00 45.00 45.00 -- 301.87

11 Sahanpur N.P 2B5C1e3b -- 60.58 41.50 17.50 17.50 -- 119.58

12 Puranpur Gadhi

1st

2B5C1e4a -- 146.21 110.00 45.00 45.00 -- 301.21

13 Rampur Mangal 2B5C1e4c -- 77.08 54.00 23.00 23.00 -- 154.08

14 Bijori 2B5C1e4d -- 84.31 51.00 24.00 24.00 -- 159.31

15 Rehmapur 2B5C1d1a -- 284.33 197.00 81.00 81.00 -- 562.33

16 Total -- 1925.60 1378.00 568.40 550.90 -- 3812.00

Page 19: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

19

Climate The annual rainfall of the Western region varies from 759 to 1020 mm, about 90% of which is received during South-West monsoon period (Singh et al. 2002). The major part of the rainfall is received during the month of July and August. The length of growing season in Western ranges between 90 to 150 days depending upon rainfall and temperature regimes. The winter rains are erratic, occasional, meager and uncertain. The total rainy days/year vary from 30-45 in the region with an average of 37. The distribution of rainfall is very erratic. Low rainfall and drought are common features. Long dry spells during rainy season are also experienced often, which adversely affect the crops. It has been observed that in a cycle of 5 years, 2 are normal, 2 drought years and 1 is excessive rainfall year (Tiwari et al. 1998). The climate of Bijnor is characterized by a hot dry summer and cold winter and is marked for high variability of rainfall year to year. There are primarily four seasons: – Dry Summer season – from March to May i.e. before advent of monsoon, moist summer season – from June to September (Monsoon) transition period - in October and November, which is the post monsoon period, and winter season – from December toFebruary The coldest months in the year are December and January. Average monthly rainfall and temperature Average monthly rainfall and temperature at IWMP-I, Month Rainfall in mm. Temperature c 2011

2004 2005 2006 2007 2008 2009 2010 2011 Average Max. Min. January 11.1 4.8 0 0.70 0.00 4.00 10.6 9.6 8.86 17.3 5.80

February 0 0.4 0 31.40 0.00 26.20 140.00 32.20 66.13 22.30 10.00

March 0 13 30.10 17.50 0.00 7.60 --- 12.20 6.60 29.60 13.3

April 10.4 1.8 0 0.10 2.80 8.60 7.40 15.60 10.53 33.70 17.1

May 4.60 6.4 22.40 13.90 18.20 28.70 32.40 101.20 54.10 34.50 22.3

June 95.3 39.4 50.90 69.50 583.20 36.00 16.40 137.70 63.36 32.40 24.60

July 135.9 196.4 170.10 82.30 244.00 66.60 842.60 273.30 394.16 31.60 25.70

August 286.6 127.8 80.90 99.90 206.80 315.00 295.40 415.80 342.06 31.50 24.90

September 57 106.2 27.50 36.50 90.30 246.50 304.00 22.60 191.03 31.70 24.00

October 47.8 0 6.80 0 0.00 15.60 5.00 --- 6.86 30.40 16.20

November 0 0 0 0 24.30 4.20 --- -- 1.40 15.20 5.10

December 0 1.4 0.10 0.80 0.00 ---- 21.50 -- 7.16 16.10 5.20

Page 20: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

20

Chapter- 3

Baseline Survey

Page 21: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

21

3.1: Demographic Features in the project area (IWMP-I, Bijnor)

Sr. No

Name of Micro Watershed

Name of village

Total Population Population of SC/ST

Total Male Female Total Male Female 1 jaspur 1610 880 730 417 242 175 2 Bhaguwala 11277 6057 5220 1952 1030 922

3 Gudha 1st

1002 570 432 195 105 90

4 Prempur 4406 2280 2126 1300 695 605

5 Gudha 2nd

964 530 434 180 100 80

6 Moh Alampur 2178 1173 1005 546 296 250

7 Vijaypur 540 290 250 145 80 65

8 GulalWali 1420 740 680 365 200 165

9 Veerpur 2nd

250 145 105

10 veerpur 1st

3877 2025 1852 1048 548 500

11 Sahanpur N.P 25725 13725 12000 6943 3573 3370 12 Puranpur Gadhi 1

st 4856 2556 2300 1460 760 700

13 Rampur Mangal 916 500 416 230 135 95

14 Bijori 1570 820 750 790 440 350

15 Rehmapur 580 330 250 197 105 92

Total 61171 32621 28550 15768 8309 7459

Page 22: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

22

3.2 : Soil and Land Holding Pattern Majority of the land of the project is heavy textured soil. Category wise details of farmer and their irrigated area are described in : Details of Soil texture in IWMP-I Bijnor.

Sr. No. MWS Project Area in different Soil Group (ha) Total Light textured soil (sand, loamy sand)

Medium textured soil (Sandy loam, loam, silt loam)

Heavy textured soil (Clayey

1 jaspur 172.10 20.50 22.10 214.70

2 Bhaguwala 33.35 140.45 39.05 512.85

3 Gudha 1st

107.62 20.60 15.28 143.50

4 Prempur 181.46 62.30 15.48 259.24

5 Gudha 2nd

188.20 68.90 11.67 268.77

6 Moh Alampur 202.74 71.30 15.60 289.64

7 Vijaypur 133.50 40.48 10.76 184.74

8 GulalWali 99.40 35.30 11.05 145.75

9 Veerpur 2nd

136.20 35.40 22.83 194.43

10 veerpur 1st

210.80 76.60 14.47 301.87

11 Sahanpur N.P 84.50 28.30 6.78 119.58

12 Puranpur Gadhi 1st

225.80 65.40 10.01 301.21

13 Rampur Mangal 115.50 25.60 12.98 154.08

14 Bijori 114.70 30.10 14.51 159.31

15 Rehmapur 440.10 80.20 42.03 562.33

Page 23: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

23

3.3: Migration Pre Project Status

S.

No.

No. of Village No. of Persons Migrating No. of Days per year of

Migration

Major Reasons for migrating

1 2 3 4 5

1 54 214 170 Unemployment & Low wages

Page 24: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

24

3.4 : Micro-watershed wise details of Crops, their Productivity & Production Name of MWS: JASPUR

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Til. 22.00 72.00 10.00 5.00

B Rabi,

Wheat,Mator,Masoor 40.00 65.70 20.00 7.00

C Zaid

Moong,Urd 5.00 10.00 3.00 1.50

Total 67.00 147.70 33.00 13.50

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Bhaguwala

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 80.00 120.00 10.50 4.80

B Rabi,

Wheat,Mator,Masor 104.00 208.85 19.00 6.50

C Zaid

Moong,Urd - - - -

Total 184.00 328.85 29.50 11.30

Page 25: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

25

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Gudha 1st

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 30.00 38.50 10.00 5.00

B Rabi,

Wheat,Mator,Masor 40.00 35.00 21.00 6.00

C Zaid

Moong,Urd - - - -

Total 70.00 73.50 31.00 11.00

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Prempur

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 20.00 101.24 9.50 4.50

B Rabi,

Wheat,Mator,Masor 38.00 100.00 20.00 6.00

C Zaid

Moong,Urd - - - -

Total 58.00 201.24 29.50 10.50

Page 26: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

26

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Gudha 2nd

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 32.00 101.00 9.75 4.80

B Rabi,

Wheat,Mator,Masor 40.00 95.77 20.00 7.00

C Zaid

Moong,Urd - - - -

Total 72.00 196.77 29.75 11.80

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Moh Alampur

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 40.00 100.64 10.00 5.00

B Rabi,

Wheat,Mator,Masor 54.00 80.00 20.00 7.00

C Zaid

Moong,Urd 5.00 10.00 3.00 1.50

Total 99.00 190.64 23.00 13.50

Page 27: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

27

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Vijaypur

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 30.00 60.00 9.75 4.50

B Rabi,

Wheat,Mator,Masor 39.00 55.74 19.00 6.50

C Zaid

Moong,Urd - - - -

Total 69.00 115.74

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Gulalwali

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 20.00 77.70 10.50 4.50 B Rabi, Wheat,Mator,Masor 32.00 70.00 18.00 6.00

C Zaid

Moong,Urd Total 52.00 147.70

Page 28: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

28

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Veerpur 1st

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 40.00 117.87 10.00 4.90

B Rabi,

Wheat,Mator,Masor 45.00 100.00 19.50 6.25

C Zaid

Moong,Urd

Total 84.00 217.87

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Sahanpur N P

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 30.00 30.00 10.00 5.00 B Rabi, Wheat,Mator,Masor 30.00 29.58 20.00 6.50

C Zaid

Moong,Urd Total 60.00 59.58

Page 29: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

29

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Bijori

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 32.00 40.00 11.00 5.00

B Rabi,

Wheat,Mator,Masor 44.00 43.31 20.00 5.00

C Zaid

Moong,Urd

Total 76.00 83.31

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Rehmapur

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 50.00 250.00 10.50 5.00 B Rabi, Wheat,Mator,Masor 55.00 207.33 20.00 6.00

C Zaid

Moong,Urd Total 105.00 457.33

Page 30: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

30

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Veerpur 2nd

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 48.00 108.00 11.00 5.00

B Rabi,

Wheat,Mator,Masor 36.00 110.61 20.00 5.00

C Zaid

Moong,Urd

Total 84.00 218.61

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Pooranpur Gadhi

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 48.00 200.00 10.20 5.00 B Rabi, Wheat,Mator,Masor 40.00 187.32 20.00 6.00

C Zaid

Moong,Urd Total 88.00 387.32

Page 31: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

31

: Micro-watershed wise details of Crops, their Productivity Name of MWS: Rapur Mangal

Sino Crop. Area in (Ha

Productivity Q/Ha

Irrigated Rainfed. Irrigated Rainfed.

A Kharif,

Paddy,JAwar,Bajra ,Tie. 50.00 70.00 10.30 4.80

B Rabi,

Wheat,Mator,Masor 44.00 72.53 18.50 5.00

C Zaid

Moong,Urd

Total 94.00 142.53

Page 32: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

32

3.5 : LIVESTOCK POPULATION

The watershed I.W.M.P-1has 12040 cows, 18100 Buffaloes, 10804Bullocks, 12784 Goats, 1700 Pigs, 462 Sheep and

3872 Poulutry

Poultry. The majority of the peoples are depended on Buffaloes and Cows. The micro-watershed wise detail of the

Livestock is given below

Detail of Live Stock (I.W.M.P‐‐‐‐1) Bijnor

S.No. Watershed No. Name of the Watershed

Buffaloes Cows Bullocks Goat Pig Sheep Poultry Total

1 2B5C1c3c jaspur 1410 875 245 720 65 20 550 3885

2 2B5C1c3a Bhaguwala 850 546 1139 815 60 - 340 3750

3 2B5C1c3f Gudha 1st

2000 1325 371 1170 250 50 610 5776

4 2B5C1d1b Prempur 1300 838 1213 1018 180 122 520 5191

5 2B5C1d2a Gudha 2nd

1410 500 273 1060 65 120 412 3840

6 2B5C1e1a Moh Alampur 1250 1041 265 1080 80 - 390 4106

7 2B5C1e1b Vijaypur 730 252 1172 911 70 - 300 3435

8 2B5C1e1c GulalWali 1080 410 830 710 220 30 120 3400

9 2B5C1e2a Veerpur 2nd

1100 720 516 650 140 20 110 3256

10 2B5C1e2b veerpur 1st

1210 600 750 820 80 - 70 3530

11 2B5C1e3b Sahanpur N.P 930 1290 810 900 100 60 120 4210

12 2B5C1e4a Puranpur Gadhi

1st

1050 420 720 800 120 - 80 3190

13 2B5C1e4c Rampur Mangal 1080 400 890 720 90 40 100 3320

14 2B5C1e4d Bijori 1200 1310 1100 810 100 - 90 4610

15 2B5C1d1a Rehmapur 1500 1513 510 600 80 - 60 4263

Total 18100 12040 10804 12784 1700 462 3872 59762

Page 33: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

33

3.6 : Horticulture Status

S. N. Name of micro watershed with code

Name of village

Name of Important horticultural crop Orchand Scattered Fruit Crop

Name Area ha. Productivity qtl/ha

Production qtls

No Productivity qtl/No.

Production qtls

1 jaspur Mango 4.00 80 320 20 0.60 12.00

2 Bhaguwala Mango Guava

2.00 2.50

80 120

160 300

25 25

0.60 0.80

15.00 20.00

3 Gudha 1st

Mango 2.00 80 160 30 0.60 18.00

4 Prempur Mango 2.50 80 200 20 0.60 12.00

5 Gudha 2nd

Mango 4.00 80 320 20 0.60 12.00

6 Moh Alampur - - - - - - -

7 Vijaypur Vijaypur 3.00 80 240 20 60 12.00

8 GulalWali Mango 5.00 80 400 25 60 15.00

9 Veerpur 2nd

Mango 3.00 80 240 15 60 9.00

10 veerpur 1st

Mango 2.00 80 160 20 60 12.00

11 Sahanpur N.P Mango 3.00 80 240 20 60 12.00

12 Puranpur

Gadhi 1st

Mango 2.50 80 200 15 60 9.00

13 Rampur

Mangal

Mango 3.00 80 240 20 60 12.00

14 Bijori Mango 3.00 80 240

20 60 12.00

15 Rehmapur Mango 3.00 80 240 20 60 12.00

Page 34: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

34

3.7: Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

1 Jaspur i Name of villages connected to the main road by an all-weather road

Najibabad To Jaspur

ii Village's Name provided with electricity Ramnagar,Jaspur,Gudha iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 03

(S) 02

(HS) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

-----

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis N.A

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 03

xiii Name of villages with access to Anganwadi Centre

Jaspur

xiv Cummunity centre, Panchayat Ghar Available

Page 35: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

35

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

2 Bhaguwala i Name of villages connected to the main road by an all-weather road

Najibabad To Bhaguwala

ii Village's Name provided with electricity Bhaguwala,Jaspur,Gudha iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Available

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Bhaguwala

xiv Cummunity centre, Panchayat Ghar Available

Page 36: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

36

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

3 Gudha 1st i Name of villages connected to the main road by an all-weather road

Najibabad To Gudha

ii Village's Name provided with electricity Gudha iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

N/A

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Gudha

xiv Cummunity centre, Panchayat Ghar Available

Page 37: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

37

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

4 Prempur i Name of villages connected to the main road by an all-weather road

Najibabad To Prempur

ii Village's Name provided with electricity Prempur ,Niyamatpur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

-----

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Prempur

xiv Cummunity centre, Panchayat Ghar Available

Page 38: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

38

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

5 Gudha 2nd i Name of villages connected to the main road by an all-weather road

Najibabd To Gudha

ii Village's Name provided with electricity Gudha

iii No. of households without access to drinking water

-

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

-------

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Gudha

xiv Cummunity centre, Panchayat Ghar Available

Page 39: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

39

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

6 Moh Alampur i Name of villages connected to the main road by an all-weather road

Najibabd To Moh Alampur

ii Village's Name provided with electricity Rehmapur.Jadopur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

----------

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Rehmapur Jaspur

xiv Cummunity centre, Panchayat Ghar Available

Page 40: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

40

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

7 Vijaypur i Name of villages connected to the main road by an all-weather road

Najibabad To Vijaypur

ii Village's Name provided with electricity Prempur.veerpur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

---------

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Prempur Vijaypur

xiv Cummunity centre, Panchayat Ghar Available

Page 41: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

41

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

8 Gulalawali i Name of villages connected to the main road by an all-weather road

Najibabad To Gulalwali

ii Village's Name provided with electricity Gulalwali,Prempur,Veerpur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

---------

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Prempur

xiv Cummunity centre, Panchayat Ghar Available

Page 42: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

42

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

9 Veerpur 2nd i Name of villages connected to the main road by an all-weather road

Najibabad To Veerpur

ii Village's Name provided with electricity Sahanpur Nanu ,veerpur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Najibabad

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Sahanpur N.P

xiv Cummunity centre, Panchayat Ghar Available

Page 43: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

43

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

10 Veerpur 1st i Name of villages connected to the main road by an all-weather road

Najibabad To veerpur 1st

ii Village's Name provided with electricity Veerpur,Sahanpur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Najibabad

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Sahanpur N.P

xiv Cummunity centre, Panchayat Ghar Available

Page 44: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

44

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

11 Sahanpur N.P i Name of villages connected to the main road by an all-weather road

Najibabad To Shahanpur N.P

ii Village's Name provided with electricity Sahanpur,vijaypur,Amanullahpur iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) 01

(VI) 01

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Sahanpur

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks 01 ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries

N.A

xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Sahanpur

xiv Cummunity centre, Panchayat Ghar Available

Page 45: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

45

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

12 Pooranpur Gadhi 1st

i Name of villages connected to the main road by an all-weather road

Najibabad To Pooranpur Gadhi

ii Village's Name provided with electricity Rampur Mangal.Pooranpur Gadhi

iii No. of households without access to drinking water

-

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

-------

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Pooranpur Gadhi.Rampur Mangal

xiv Cummunity centre, Panchayat Ghar Available

Page 46: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

46

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

13 Rampur Mangal i Name of villages connected to the main road by an all-weather road

Najibabad To Rampur Mangal

ii Village's Name provided with electricity Bijori.Rampur Mangal iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 02

(H) -

(VI) -

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Najibabad

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Rampur Mangal .Bijori

xiv Cummunity centre, Panchayat Ghar Available

Page 47: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

47

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

14 Bijori i Name of villages connected to the main road by an all-weather road

Najibabad To Bijori

ii Village's Name provided with electricity Bijori,Meduwala iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 04

(S) 03

(H) -

(VI) 01

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Najibabad

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries N.A xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Bijori.Meduwala

xiv Cummunity centre, Panchayat Ghar Available

Page 48: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

48

Details of infrastructure in IWMP-I, Bijnor .

Sr. No

Name of Micro Watershed

Parameters Status

15 Rehmapur i Name of villages connected to the main road by an all-weather road

Najibabad ToRehmapur

ii Village's Name provided with electricity Rehmapur.Vijaypur,Jatpura iii No. of households without access to drinking

water -

iv No. of educational institutions : Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI)

(P) 03

(S) 02

(H) -

(VI) 01

v Names of villages with access to Primary Health Centre

Available -01

vi Names of villages with access to Veterinary Dispensary

Najibabad

vii Names of villages with access to Post Office 01 viii Names of villages with access to Banks N.A ix Names of villages with access to Markets/

mandis Available

x Names of villages with access to Agro-industries

N.A

xi Total quantity of surplus milk deficit NIL xii No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) -

(S) -

(PA) -

(O) 04

xiii Name of villages with access to Anganwadi Centre

Rehmapur.Jatpura

xiv Cummunity centre, Panchayat Ghar Available

Page 49: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

49

3.8: Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRIs Other Pvt. persons

Govt. (Specify dept

PRI Other

1

JASPUR

Wasteland/ degraded land 214.70 - - - 214.70 - - - Pastures - - - - - - - Orchards - - - - - - - Village Woodlot - - - - - - - Forest - - - - - - - Village Ponds/ Tanks - - 0.60 - - - 0.60 Community Buildings - - 1.30 - - - 1.30 Weekly Markets - - - - - Permanent markets - - - - - Temples/ Places of worship - - 0.60 - - - 0.60 Habitat, Chakmarg, Sector, Road etc

- 12.10 - - -

Total 214.70 12.10 2.50 - 214.70 - - 2.50

Page 50: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

50

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRIs Other Pvt. persons

Govt. (Specify dept

PRI Other

2

Bhaguwala

Wasteland/ degraded land 512.85 - - - 512.85 - - - Pastures - - 0.60 - - 0.60 - Orchards - - - - - - - Village Woodlot - - - - - - - Forest - - - - - - - Village Ponds/ Tanks - - 1.10 - - 1.10 - Community Buildings - - 1.70 - - 1.70 - Weekly Markets - - - - - Permanent markets - - - - - Temples/ Places of worship - - 0.60 - - 0.60 - Habitat, Chakmarg, Sector, Road etc

- 10.20 - - -

Total 512.85 10.20 4.00 - 512.85 - 4.00 -

Page 51: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

51

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRIs Other Pvt. persons

Govt. (Specify dept

PRI Other

3

Gudha 1st

Wasteland/ degraded land 143.50 - - - 143.50 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - - - Village Ponds/ Tanks - - 1.02 - - - 1.02 - Community Buildings - - 2.00 - - - 2.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - - 0.78 - - - 0.78 - Habitat, Chakmarg, Sector, Road etc

- 10.20 - - - -

Total 143.50 10.20 3.80 - 143.50 - 3.80 -

Page 52: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

52

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

4

Prempur

Wasteland/ degraded land 259.24 - - - 259.24 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.15 - - - 1.15 - Community Buildings - - 2.00 - - - 2.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 8.70 0.54 - - - 0.54 - Habitat, Chakmarg, Sector, Road etc

- - - - -

Total 259.24 8.70 3.69 - 259.24 - 3.69 -

Page 53: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

53

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

5

Gudha 2nd

Wasteland/ degraded land 268.77 - - - 268.77 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.10 - - - 1.10 - Community Buildings - - 3.00 - - - 3.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.50 - - - 0.50 - Habitat, Chakmarg, Sector, Road etc

- 10.50 - - - -

Total 268.77 10.50 4.60 - 268.77 - 4.60 -

Page 54: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

54

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

6

Moh Alampur

Wasteland/ degraded land 289.64 - - - 289.64 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.10 - - - 1.10 - Community Buildings - - 0.85 - - - 0.85 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 1.05 - - - 1.05 - Habitat, Chakmarg, Sector, Road etc

- 8.10 - - - -

Total 289.64 8.10 3.00 - 289.64 - 3.00 -

Page 55: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

55

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

7

Vijaypur

Wasteland/ degraded land 184.74 - - - 184.74 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 2.10 - - - 2.10 - Community Buildings - - 1.05 - - - 1.05 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.90 - - - 0.90 - Habitat, Chakmarg, Sector, Road etc

- 9.20 - - - -

Total 184.74 9.20 4.05 - 184.74 - 4.05 -

Page 56: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

56

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

8

Gulalwali

Wasteland/ degraded land 145.75 - - - 145.75 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.00 - - - 1.00 - Community Buildings - - 2.10 - - - 2.10 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 1.00 - - - 1.00 - Habitat, Chakmarg, Sector, Road etc

- 10.70 - - - -

Total 145.75 10.70 4.10 - 145.75 - 4.10 -

Page 57: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

57

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

9

Veerpur 2nd

Wasteland/ degraded land 194.43 - - - 194.43 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.60 - - - 0.60 - Community Buildings - - 1.50 - - - 1.50 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.60 - - - 0.60 - Habitat, Chakmarg, Sector, Road etc

- 7.60 - - - -

Total 194.43 7.60 2.70 - 194.43 - 2.70 -

Page 58: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

58

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

10

Rehmapur

Wasteland/ degraded land 562.33 - - - 562.33 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.80 - - - 0.80 - Community Buildings - - 1.60 - - - 1.60 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.80 - - 0.80 - Habitat, Chakmarg, Sector, Road etc

- 15.10 - - 15.10 -

Total 562.33 15.10 3.20 - 562.33 15.10 3.20 -

Page 59: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

59

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

11

Veerpur 1st

Wasteland/ degraded land 301.87 - - - 301.87 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 1.00 - - - 1.00 - Community Buildings - - 1.20 - - - 1.20 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.80 - - 0.80 - Habitat, Chakmarg, Sector, Road etc

- 10.20 - - 10.20 -

Total 301.87 10.20 3.00 - 301.87 10.20 3.00 -

Page 60: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

60

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

12

Sahanpur N.P

Wasteland/ degraded land 119.58 - - - 119.58 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.50 - - - 0.50 - Community Buildings - - 1.20 - - - 1.20 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.70 - - 0.70 - Habitat, Chakmarg, Sector, Road etc

- 8.80 - - 8.80 -

Total 119.58 8.80 2.40 - 119.58 8.80 2.40 -

Page 61: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

61

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

13

Pooranpur Gadhi

Wasteland/ degraded land 208.14 - - - 208.14 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.50 - - - 0.50 - Community Buildings - - 1.10 - - - 1.10 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.70 - - 0.70 - Habitat, Chakmarg, Sector, Road etc

- 10.20 - - 10.20 -

Total 208.14 10.20 2.30 - 208.14 10.20 2.30 -

Page 62: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

62

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

14

Rampur Mangal

Wasteland/ degraded land 154.08 - - - 154.08 - - - Pastures - - - - - - - - Orchards - - - - - - - - Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.60 - - - 0.60 - Community Buildings - - 1.20 - - - 1.20 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.80 - - 0.80 - Habitat, Chakmarg, Sector, Road etc

- 9.10 - - 9.10 -

Total 154.08 9.10 2.60 - 154.08 9.10 2.60 -

Page 63: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

63

Details of common property resources In IWMP-I, Bijnor ,

Sr. No

Names of MWS with code

CPR Particulars

Total Area (ha) Area owned/ In possession of

Area available for treatment (ha)

Pvt. persons

Govt. Revenue

PRI Other Pvt. persons

Govt. (Specify dept

PRI Other

15

Bijori

Wasteland/ degraded land 159.31 - - - 159.31 - - - Pastures - - - - - - - - Orchards - - - - - - - -

Village Woodlot - - - - - - - - Forest - - - - - - Village Ponds/ Tanks - - 0.40 - - - 0.40 - Community Buildings - - 1.00 - - - 1.00 - Weekly Markets - - - - - - Permanent markets - - - - - - Temples/ Places of worship - 0.60 - - 0.60 - Habitat, Chakmarg, Sector, Road etc

- 8.80 - - 8.80 -

Total 159.31 8.80 2.00 - 159.31 8.80 2.00 -

Page 64: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

64

3.9: Ground Water Status in IWMP-I, Bijnor

Sr. No.

Name & Code of Micro watershed

Name of Village

Depth of Ground Water Table (Below Ground in Meter

No. of Observation well

Remarks

Before monsoon

After monsoon

1 jaspur Ramnagar .Ramsahaywali .chahsaloono ,Jaspur,Gurda.

8.05 7.00 32

2 Bhaguwala Jaspur.gurda.Bhaguwala.gurda.Kamgarpur. 6.00 5.10 82

3 Gudha 1st Guda 1st

10.60 9.10 32 4 Prempur Guda.Prempur.Niyamqtpur Jatpura khas.Rehmapur. 8.80 7.60 22 5 Gudha 2nd chahsaluno.Guda. 10.60 9.10 36 6 Moh Alampur Prempur.Rehmapur.Jadopur.Lalpur

Bhikka.Rahatpur khurdh.Vijypur.Nangla pithora.Mo Alampur.

7.40 6.30 42

7 Vijaypur Gulalwali.Veerpur.Prempur.Rehmapur.Jadopur. Lalpur Bhikha.

9.50 8.30 34

8 GulalWali Gulalwali.Veerpur.Prempur. 9.50 8.30 24 9 Veerpur 2nd SahanpurNanu.Veerpur.Sahanpur

Santoki.Jadopur.Lalpur Bhikka 10.70 9.20 35

10 veerpur 1st Sahanpur Nanu.Veerpur 10.70 9.20 38 11 Sahanpur N.P Veerpur.Sahanpur SantokiLalpur Bhikka.Sahanpur

N.P.Girdhaba Sahanpur.Amanullahpur.Vijaypur 7.60 6.40 30

12 Puranpur Gadhi 1st

Sahanpur Santoki.Rampur Mangal.Ranipur.LaLpur Bikka.Vijaypur Purqnpur Gadi Villa Atmali.Amanullahpur.Purushottampur.

12.30 10.80 24

13 Rampur Mangal

Sahanpur Nanu.Bijori.Rampur Mangal.Ranipur. 9.50 8.50 40

14 Bijori Meduwala.Mo Amekhanpur Sahanpur Nanu.Bijori 7.90 6.70 29 15 Rehmapur Niyamatpur.Jatpurakhas.Ahmadpur Majeed Thapal

Jatpura Bhooda Rahatpur khurd Mahavatpur Dalpat 10.60 9.40 21

Page 65: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

65

3.10: Irrigation Status in IWMP-I,Bijnor

Sr

No

.

Name &

Micro

Watershed

with code

Name of Village

Gross Cultivated Area Net

cultivate

Area

Gross Irrigated Area Net

Erricgated

Area

RainFed

Area Kharif Rabi Zai Total Kharif Rabi Zai Total

1 jaspur Ramnagar .Ramsahaywali

.chahsaloono ,Jaspur,Gurda.

135.00 196.30 15.00 346.30 316.30 22.00 40.00 5.00 67.00 67.00 249.00

2 Bhaguwala Jaspur.gurda.Bhaguwala.gurda.K

amgarpur.

410.00 417.18 827.18 787.18 80.00 104.00 - 184.00 184.00 603.00

3 Gudha 1st

Guda 1st

102.00 129.46 231.46 216.48 30.00 40.00 - 70.00 70.00 146.48

4 Prempur Guda.Prempur.Niyamqtpur

Jatpura khas.Rehmapur.

180.10 238.03 418.13 398.13 20.00 38.00 - 58.00 58.00 340.13

5 Gudha 2nd

chahsaluno.Guda. 190.00 218.50 25.00 433.50 403.50 32.00 40.00 - 72.00 72.00 331.50

6 Moh

Alampur

Prempur.Rehmapur.Jadopur.Lal

pur Bhikka.Rahatpur

khurdh.Vijypur.Nangla

pithora.Mo Alampur.

160.00 175.40 17.00 362.40 342.40 40.00 54.00 - 99.00 99.00 243.40

7 Vijaypur Gulalwali.Veerpur.Prempur.Reh

mapur.Jadopur.

Lalpur Bhikha.

140.00 157.58 297.98 277.98 30.00 39.00 - 69.00 69.00 208.98

8 GulalWali Gulalwali.Veerpur.Prempur. 102.00 109.09 22.00 235.09 225.09 20.00 32.00 - 52.00 52.00 173.09

9 Veerpur 2nd

SahanpurNanu.Veerpur.Sahanp

ur Santoki.Jadopur.Lalpur Bhikka

142.00 171.61 313.61 302.61 40.00 44.00 - 84.00 84.00 218.61

10 veerpur 1st

Sahanpur Nanu.Veerpur 215.00 248.89 23.00 486.09 460.89 40.00 45.00 - 85.00 85.00 375.89

11 Sahanpur

N.P

Veerpur.Sahanpur SantokiLalpur

Bhikka.Sahanpur N.P.Girdhaba

Sahanpur.Amanullahpur.Vijaypu

r

140.00 152.66 5.00 297.66 277.66 30.00 30.00 - 60.00 60.00 217.66

12 Puranpur

Gadhi 1st

Sahanpur Santoki.Rampur

Mangal.Ranipur.LaLpur

Bikka.Vijaypur Purqnpur Gadi

Villa

Atmali.Amanullahpur.Purushott

ampur.

220.00 265.32 - 485.32 455.32 30.00 38.00 - 68.00 68.00 387.32

Page 66: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

66

13 Rampur

Mangal

Sahanpur Nanu.Bijori.Rampur

Mangal.Ranipur.

120.00 128.53 - 248.53 236.53 44.00 50.00 - 94.00 94.00 142.53

14 Bijori Meduwala.Mo Amekhanpur

Sahanpur Nanu.Bijori

125.00 131.96 - 256.96 236.98 32.00 44.00 - 76.00 76.00 160.96

15 Rehmapur Niyamatpur.Jatpurakhas.Ahmad

pur Majeed Thapal Jatpura

Bhooda Rahatpur khurd

Mahavatpur Dalpat

440.00 466.99 - 906.99 854.99 50.00 55.00 - 105.00 105.00 749.99

Page 67: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

67

3.11: Source wise Area Irrigated in IWMP-I,Bijnor (area in ha

Sr.

No

.

Name

&Micro

watershed

with

code

Name of Village Canala

rea

State Tube

wells

Tanks Open Well Bore wells Lift

Irrigation

Othres

(specify)

total

Irrigati

on

Remark

No Area No Area No Area No Area No Area

1 jaspur Ramnagar

.Ramsahaywali

.chahsaloono

,Jaspur,Gurda.

- - 3 5.00 29 62.00 - - - - 67.00

2 Bhaguwala Jaspur.gurda.Bhagu

wala.gurda.Kamgar

pur.

- 1 20. - 2 4.00 82 160.00 - - - - 204.00

3 Gudha 1st

Gudha 1st

- - - - 32 70.00 - - - - 85.00

4 Prempur Guda.Prempur.Niya

mqtpur Jatpura

khas.Rehmapur.

- - - 12.00 22 58.00 - - - - 80.00

5 Gudha 2nd

chahsaluno.Gudha. - - 1 2.00 35 70.00 - - - - 87.00

6 Moh

Alampur

Prempur.Rehmapur.

Jadopur.Lalpur

Bhikka.Rahatpur

khurdh.Vijypur.Nan

gla pithora.Mo

Alampur.

- 1 15 - 1 2.00 41 82.00 - - - - 99.00

7 Vijaypur Gulalwali.Veerpur.P

rempur.Rehmapur.J

adopur.

Lalpur Bhikha.

- - 2 4.00 32 65.00 - - - - 79.00

8 GulalWali Gulalwali.Veerpur.P

rempur. - - 11.00 24 52.00 - - - - 71.00

9 Veerpur 2nd

SahanpurNanu.Veer

pur.Sahanpur

Santoki.Jadopur.Lal

pur Bhikka

- 1 10 - 2 4.00 36 70.00 - - - - 96.00

Page 68: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

68

10 veerpur 1st

Sahanpur

Nanu.Veerpur - 1 15 - 4 - 35 70.00 - - - - 93.00

11 Sahanpur

N.P

Veerpur.Sahanpur

SantokiLalpur

Bhikka.Sahanpur

N.P.Girdhaba

Sahanpur.Amanulla

hpur.Vijaypur

28.00 - 4 8.00 30 60.00 - - - - 96.00

12 Puranpur

Gadhi 1st

Sahanpur

Santoki.Rampur

Mangal.Ranipur.LaL

pur Bikka.Vijaypur

Purqnpur Gadi Villa

Atmali.Amanullahpu

r.Purushottampur.

8.00 1 20 - 3 8.00 24 48.00 - - - - 82.00

13 Rampur

Mangal

Sahanpur

Nanu.Bijori.Rampur

Mangal.Ranipur.

10.00 1 15.00 - 3 6.00 40 82.00 - - - - 113.00

14 Bijori Meduwala.Mo

Amekhanpur

Sahanpur

Nanu.Bijori

8.00 1 15 - - - 29 61.00 - - - - 84.00

15 Rehmapur Niyamatpur.Jatpura

khas.Ahmadpur

Majeed Thapal

Jatpura Bhooda

Rahatpur khurd

Mahavatpur Dalpat

7.00 - - - 51 105.00 - - - - 112.00

Page 69: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

69

Chapter- 4

Institutional Building & Project Managment

Page 70: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

70

INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT Project Implementing Agency

The Project Implementing Agency (PIA) is Soil Conservation Officer, Department of Land Development and Water Resources, IWMP-I, Bijnor,

Uttar Pradesh. The PIA was given responsibility to develop the micro-watershed by District Watershed Development Unit (DWDU) and State Level Nodal

Agency (SLNA) considering its vast experiences in handling land and water management issues in the region. The PIA has well experienced trained and

sufficient staff to handle the watershed management programme efficiently. Most of the staff of PIA has exposure of several watershed projects. In

addition the PIA has access for technical backstopping from the ICAR viz. IGFRI and NRCAF, and KVK located at Bijnor . Details of PIA are presented in

subsequent section.

4.1 : Details of Project Implementing Agency (PIA), IWMP-I, Bijnor

Sr. No. Particulars of PIA

(i) Date of selection of PIA 16-03-2010

(ii) Type of organization State Govt. Agency

(iii) Name of organization Department of Land Development and Water Resources, Uttar Pradesh

(iv) Designation & Address

Unit Bijnor

Bhoomi Sanrakshan Adhikari, Land Development and Water Resources, Chandpur at

BIJNOR (U.P.)

(v) Telephone BSA- 07376757856

(vi) Fax 01342-260938

(vii) E-mail [email protected]

Page 71: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

71

Detail of staff at PIA, IWMP- Ist BIJNOR

Sr. No. Designation Name M/F Qualification Field of Experience & Period

Remarks

1 B.S.A. Er. R.K. Ram M Diploma in Ag Eng. 25 -

2 Junior Engineer Er. S.D Goel M Diploma in civil Eng. 31

3 Junior Engineer Er. V.P. Singh M Diploma in Ag Eng. 31

4 Accountant Sh. Prdeep kumar Agarwal M M.Com 31

5 Draftmen Ram Shankar M Graduate 32

6 Junier Clerk Sh.krishan kumar tiwari M High School

7 ASCI Jai Bhagwan M ” 33

8 ASCI R.K. Pathak M Inter Diploma 33

9 ASCI S.S. Punia M Graduate Diploma 32

10 ASCI Devendra Singh M Inter Diploma 31

11 ASCI Aman kumar M MSc (Ag) 8

12 ASCI Sanjay Kumar M BSc (Ag) & MA 3 Months

13 ASCI Shashi Kant Tyagi M BSc (Ag) 3 Months

14 Jiledar Sh.Mohan lal M Intermedeate (canal Law)

15 Seench Parcakshak Gore Lal M Intermediate 26

16 Seench Pal Shyam Bihari Yadav M B.A. 26

17 Seench Pal Chote lal M MSc. 8

18 Seench Pal Avdesh Prasad M M.A. 8

19 IV Class Brajpal Sharma M VIII 32

20 “” Brajmohan Gupta M ” 21

21 ,, Sh.Ramjilal M High SChool

Page 72: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

72

: Details of Watershed Development Team (WDT) in the project area Project- IWMP I PIA- BSA, LDWR, BIJNOR -II District – BIJNOR Sr. No.

Name of WDT member

M/F Age Qualification / Experience

Description of professional training

Role/ Function

Date of appointment of WDT member

1 Shri S.C. Garg M 62 Inter (Ag Diploma) Soil & Water

Conservation

Soil & Water

Conservation

23/12/2011

2 Shri Harpal

Singh

M 63 High school (Ag

Diploma)

Soil & Water

Conservation

Soil & Water

Conservation

06/08/2011

3 Shri Harvendra

Singh

M 30 MSc (Ag) Economics Ag Expert “

4 Shri Arun

Kumar

M 29 MSc.( Ag) Agronomy Ag Expert “

5 Smt.Mamta F 26 B.A Social Worker Social Worker 06/08/2011

Page 73: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

73

4.4: Water shed Committee , Gram Panchayat: Jaspur Name of Project: - IWMP-I

Sl. N o.

Name of watershe

d

Name of Gram

Sabha/ GP

Name Designation

M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SHG GP Educa-tional qualification

Function(s) assigned

1 Jaspur Jaspur Babita kaur President F √ √ √ 10TH

Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Gangaram Seceretary M √ √ √ 10TH

Shanty devi Member F √ √ √ 8TH

Subhash ‘’ M √ √ √ 5TH

Bhavani ‘’ M √ √ √ 8TH

Omprakash ‘’ M √ √ √ 10TH

Dharamal ‘’’’ M √ √ √ 8TH

Ramsharan ‘’ M √ √ √ 5TH

Dharampal 2 ‘’ M √ √ 8TH

Harnam ; M √ 5TH

Bala devi ‘’ F √ √ 5TH

Page 74: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

74

Water shed Committee , Gram Panchayat: gudha Name of Project: - IWMP-I

Sl. N o.

Name of watershed

Name of

Gram Sabha/

GP

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

2 Gudha1st Gudha JAiprakash President M √ √ √ B.A Implementation

of Watershed programme under the supervision of PIA (as per common guide

lines)

Yogendra

singh

Seceretary M √ √ √ 12TH

Harpal

singh

Member M √ √ √ 10TH

Rode singh ‘’ M √ √ √ √ 5TH

Jagdish

Prasad

‘’ M √ √ √ M.A

Dharma

singh

‘’ M √ √ √ √ 10TH

Dharampal

singh

‘’’’ M √ √ √ 10TH

Bhojraj

singh

‘’ M √ √ √ 10TH

Foolwati ‘’ F √ √ √ 5TH

Begraj

singh

; M √ √ 5TH

Saroj ‘’ F √ √ 5TH

Page 75: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

75

Water shed Committee , Gram Panchayat:Bhaguwala Name of Project: - IWMP-I

Sl.

N

o.

Name of

watershed

Name of

Gram

Sabha/ GP

Name Designation M

/F

S

C

ST OB

C/

Ge

n

SF M

F

LF Land

-less

UG SH

G

GP Educa-

tional

qualification

Function(s)

assigned

3 Bhaguwala Bhaguwala Mursat

jaha

President F √ √ √ 10 TH

Implementation

of Watershed

programme

under the

supervision of

PIA (as per

common guide

lines)

Sanjay Seceretary M √ √ √ 12TH

Liyakat Member F √ √ √ 8TH

Sahid ‘’ M √ √ √ √ 10TH

Suresh ‘’ M √ √ 10TH

Khatiba ‘’ M √ √ √ 8TH

Vinita ‘’’’ F √ √ √ 5TH

Najim ‘’ F √ √ √ 8TH

Kalva ‘’ M √ √ √ 8TH

Laxmi ; F √ 8TH

Sumer ‘’ M √ 5TH

Page 76: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

76

Water shed Committee , Gram Panchayat: Prempur Name of Project: - IWMP-I

Sl. N o.

Name of watershed

Name of Gram

Sabha/ GP

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

4 Prempur Prempur Jagvindra

singh

President M √ √ √ 10TH

Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Anil

kumar

Seceretary M √ √ √ 12TH ITI

Hukam

singh

Member M √ √ √ 8TH

Mahipal ‘’ M √ √ √ 5 TH

Khajan

singh

‘’ M √ √ √ 8TH

Dhyan

singh

‘’ M √ √ √ 5TH

Amar

singh

‘’’’ M √ √ √ 10TH

Gurmit

singh

‘’ M √ √ √ M.A

Soma ‘’ M √ √ √ 5TH

Geeta

devi

; F √ √ √ 8TH

Page 77: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

77

Water shed Committee , Gram Panchayat:Ranipur Name of Project: - IWMP-I

Sl. N o.

Name of watershed

Name of Gram

Sabha/ GP& date of constitution

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional qualification

Function(s) assigned

6 Rampur

Mangal

Ranipur Parul W/o

Manoj

President F √ √ 5TH

Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Jaipal S/o

Rampal

Seceretary M _ √ √ 10TH

Savita W/o

Veer singh

Member F _ √ √ √ -

Sureshna W/o

Raghuveer

‘’ F _ √ √ -

Neeta W/o

Ompal

‘’ F √ √ √ 5TH

Ayodhya W/o

Hetta

‘’ M √ √ √ 5TH

Manoj S/o Jai

Prakash

‘’’’ M √ √ √ 10TH

Ompal S/o

Sitaram

‘’ M √ √ √ 5TH

Vedram S/o

Ghasita

‘’ M √ √ √ 5TH

Rampal S/o

Lallu

; M √ √ √ 5TH

Ghanshyam

S/o Brahmpal

‘’ M _ √ √ √ 5TH

Parshuram S/o

RAmchandra

‘’ M √ 8th

WDT/ASCI

Page 78: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

78

Water shed Committee , Gram Panchayat: Rahatpur khurd Name of Project: - IWMP-I

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

7 Moh

Alampur

Rahatpur

Khurd

Munni President F √ √ √ 10TH

Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Vikash Seceretary M √ √ √ 12TH

Sitaram Member M √ √ √ 8TH

Omprakash ‘’ M √ √ √ 10TH

Hargovind ‘’ M √ √ √ 8TH

Sunita ‘’ F √ √ √ 10TH

Nootan

Kumar

‘’’’ M √ √ √ 8TH

Manju ‘’ M √ √ √ 5TH

Ratiram ‘’ M √ √ √ 10TH

Birmo ; M √ √ √ 8TH

Dharampal ‘’ M √ √ √ 8TH

Page 79: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

79

Water shed Committee , Gram Panchayat: Pooranpur Gadhi Name of Project: - IWMP-I

Sl. N o.

Name of watershed

Name of Gram

Sabha/ GP & Date

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

9 Pooranpur

Gadhi

Pooranpur

Gadhi

03-08-10

Parul W/o Manoj President F √ √ √ 5TH

Implementation of Watershed programme under the supervision of PIA (as per common guide lines)

Manoj S/I Jaiprakash Seceretary M √ √ √ √ 10TH

Yashpal S/o Raghuveer Member M √ √ √ 10th

Praveen S/o Gangoo ‘’ M √ √ √ 8TH

Vijaysingh S/o

Ramprakash

‘’ M √ √ -

Ramesh S/o Ramshanker ‘’ M √ √ √ -

Neela devi S/o Ompal ‘’’’ F √ √ √ 5TH

Baby S/o Jitendra ‘’ F √ √ √ 10TH

Vedram S/o Ghasita ‘’ M √ √ √ 5TH

Shemsher S/o Ghesita ; M √ √ √ 8TH

Ayodhya S/o Hetta ‘’ M √ √ √ 5TH

Savita W/o Veer sinsh ‘’ F √ 8th

WDT/ASCI

Page 80: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

80

Water shed Committee , Gram Panchayat: Bijori Name of Project: - IWMP-I

Sl. N o.

Name of Waershed

Name of Gram

Sabha/ GP & date

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

10 Bijori Bijori

05-08-10

Smt Veerbala W/o Dhara

singh

President M √ √ √ √ B.A Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Sh.Khajan singh S/o Jagdisg Seceretary M √ √ √ √ 10TH

Sh.Netram Singh S/o

Banbari

Member M √ √ √ 8TH

Param Singh S/o Bishan

singh

‘’ M √ √ √ 8TH

Santram S/o Lallu Singh ‘’ M √ √ 12TH

Rahtash S/o Ganga Ram ‘’ M √ √ √ 12th

Gopal S/o chulwa ‘’’’ F √ √ √ 5TH

Kranti Devi W/o Rampal ‘’ F √ √ √ -

Santosh Devi W/0 Diwan

Singh

‘’ F √ √ √ 11TH

Ramchandra S/o Baldev ; M √ √ √ 10TH

BAlkishanS/o Sukke ‘’ M √ √ √ 8TH

Rafiq S/o Shakoor ‘’ M √

Papensra S/o Chandan M √

Jagdish S/o Hemprakash M √

Page 81: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

81

Water shed Committee , Gram Panchayat:Mussepur Name of Project: - IWMP-I

Sl. N o.

Namo of Watershed

Name of Gram

Sabha/ GP

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

12 Rehmapur Mussepur Sitaram President M √ √ √ 10TH

Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Veersingh Seceretary M √ √ √ 12TH

MayaDevi Member F √ √ √ 8TH

Rajendra ‘’ M √ √ √ 10TH

Mahesh ‘’ M √ √ √ 8TH

Sunnu ‘’ M √ √ √ 10TH

Ramesh ‘’’’ M √ √ √ 8TH

Natthu ‘’ M √ √ √ 10TH

Harpal ‘’ M √ √ √ 10TH

Budhdhu ; M √ √ √ 8TH

Sudesh ‘’ M √ √ √ 8TH

Page 82: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

82

Water shed Committee , Gram Panchayat: Vijaypur Name of Project: - IWMP-I

Sl. N o.

Name of Watershed

Name of Gram

Sabha/ GP

Name Designation M /F

S C

ST OB C/ Ge n

SF M F

LF Land -less

UG SH G

GP Educa-tional

qualification

Function(s) assigned

14 VIJAYPUR VIJAYPUR Munni President F √ √ √ 10TH

Implementation of Watershed programme under the supervision of PIA (as per common guide

lines)

Neetu Seceretary F √ √ √ 12TH

Rohtash Member M √ √ √ 8TH

Kusum ‘’ F √ √ √ 8TH

Ravindra ‘’ M √ √ √ 12TH

Sanjeev ‘’ M √ √ √ 9TH

Naresh ‘’’’ M √ √ √ 8TH

Harisingh ‘’ M √ √ √ 10TH

Amar

singh

‘’ M √ √ √ 11TH

Gopal ; M √ √ √ 10TH

Maya

devi

‘’ F √ √ √ 8TH

Page 83: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

83

4.5: Village wise details of Self Help Groups (SHGs) in the project area IWMP- I

Project- IWMP I District – Bijnor

Sr.

No.

Name of

MWS

Names of

villages

Total no. of

Constituted/registered

SHGs

No. of members No. of SC/ST

in each

category

No. of OBC

in

each

categor

Date of

formation

of SHGs

With

only

Men

With

only

Women

With

both

Total Categories M F Total M F Total M F Total

1 Jaspur

2B5C1c3c

Jaspur 9 3 - 12 (i) Landless 6 2 8 2 2 4 7 1 8 06/09/11

- (ii) SF - - - - - - - - -

- (iii) MF 3 1 - -- - - - - --

- Total 9 3 12 2 2 4 7 1 8 -

Ramsahaywali 10 1 - 11 (i) Landless 4 1 5 5 1 6 5 - 5 10/05/11

- (ii) SF 2 - 2 - - - - - - -

- (iii) MF 4 - 4 - - - - - - -

- Total 10 1 11 5 1 6 5 - 5

Ramnagar 8 5 - 13 (i) Landless 4 2 6 5 3 8 3 2 5 11/08/11

Page 84: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

84

- (ii) SF 3 3 6 - - - - - - -

- (iii) MF 1 - 1 - - - - - - -

- Total 8 5 13 5 3 8 3 2 5 -

2 Bhaguwala

2B5C1c3e

Bhaguwala 2 9 - 11 (i) Landless 2 5 7 - - - - - - 18/09/11

- (ii) SF - 4 4 2 5 7 4 4 -

- (iii) MF - - -

- Total 2 9 11 2 5 7 4 4

Bhaguwala - 11 - 11 (i) Landless - 7 7 - 8 8 - 3 3 05/10/11

- (ii) SF - 4 4 - - - - - -

- (iii) MF - - -

- Total - 11 11 - 8 8 - 3 3

Kamgarpur 10 2 - 12 (i) Landless 8 2 10 5 1 6 5 1 6 05/08/11

- (ii) SF 1 - 1 - - - - - -

- (iii) MF 1 - 1 - -

- Total 10 2 12 5 1 6 5 1 6

3 Gudha 1st

2B5C1c3f

Gudha - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 06/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Gudha 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 12/11/11

- (ii) SF -- - - -- - - - - -

Page 85: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

85

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Gudha 8 4 - 12 (i) Landless 3 2 5 5 3 8 3 1 4 20/11/11

- (ii) SF 3 2 5 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 8 4 12 5 3 8 3 1 4

4 Prempur

2B5C1d1b

Prempur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 15/11/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Prempur 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 05/10/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Jatpura khas 9 4 - 13 (i) Landless 5 3 8 6 3 9 3 1 4 06/08/11

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 9 4 13 6 3 9 3 1 4

5 Gudha 2nd

2B5C1d2a

Gudha - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 07/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

Page 86: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

86

- Total - 11 11 - 11 11 - - -

Gudha 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 12/11/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Chahsaluno 10 2 - 12 (i) Landless 5 1 6 6 2 8 4 - 4 14/09/11

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 3 - 3 - - - - - -

- Total 10 2 12 6 2 8 4 - 4

6 Moh

Alampur

2B5C1e1a

Moh Alampur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 21/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Rahatpur khurd 12 - - 12 (i) Landless 6 - 6 7 - 7 5 - 5 17/09/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 12 - 12 7 - 7 5 - 5

Lalpur Bhikka 9 4 - 13 (i) Landless 4 2 6 5 3 8 4 1 5 12/10/11

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 3 1 4 - - - - - -

- Total 9 4 13 5 3 8 4 1 5

7 Vijaypur Vijaypur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 08/08/11

Page 87: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

87

2b5C1e1b

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Vijaypur 11 - - 11 (i) Landless 8 - 8 7 - 7 4 - 4 10/09/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 7 - 7 4 - 4

Jadopur 10 2 - 12 (i) Landless 6 2 8 9 2 11 1 - 1 25/09/11

- (ii) SF 2 - 2 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 10 2 12 9 2 11 1 - 1

8 Gulalwali

2B5C1e1c

Gulalwali - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 05/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Gulalwali 14 - - 14 (i) Landless 9 - 9 8 - 8 6 - 6 10/09/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 14 - 14 8 - 8 6 - 6

Gulalwali 11 - - 11 (i) Landless 6 - 6 8 - 8 3 - 3 25/09/11

- (ii) SF 3 - 3 - - - - - -

Page 88: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

88

- (iii) MF 2 - 2 - - - - - -

- Total 11 - 11 8 - 8 3 - 3

9 Veerpur 2nd

2B5C1e2a

Veerpur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 08/04/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Veerpur 11 - - 11 (i) Landless 8 - 8 7 - 7 4 - 4 10/06/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 7 - 7 4 - 4

Lalpur Bhikka - 14 - 14 (i) Landless - 14 14 8 - 8 6 - 6 15/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 14 14 8 - 8 6 - 6

10

Veerpur 1st

2B5C1e2b

Veerpur

-

11

-

11

(i) Landless

-

11

11

-

8

8

-

3

3

02/04/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 8 8 - 3 3

Veerpur 11 - - 11 (i) Landless 4 - 4 4 - 4 7 - 7 11/05/11

- (ii) SF 4 - 4 - - - - - -

Page 89: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

89

- (iii) MF 3 - 3 - - - - - -

- Total 11 - 11 4 - 4 7 - 7

Veerpur 8 4 - 12 (i) Landless 6 3 9 5 3 8 3 1 4 06/06/11

- (ii) SF 1 1 2 - - - - - -

- (iii) MF 1 - 1 - - - - - -

- Total 8 4 12 5 3 8 3 1 4

11 Sahampur

N.P

2B5C1e3b

Sahanpur N.P - 12 - 12 (i) Landless - 12 12 - 8 8 - 4 4 06/09/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 12 12 - 8 8 - 4 4

Sahanpur

Santoki

- 11 - 11 (i) Landless - 11 11 - 8 8 - 3 3 25/09/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 8 8 - 3 3

Sahanpur

Santoki

10 2 - 12 (i) Landless 4 2 6 4 2 6 6 - 6 11/10/11

- (ii) SF 4 - 4 - - - - - -

- (iii) MF 2 - 2 - - - - - -

- Total 10 2 12 4 2 6 6 - 6

12 Pooranpur

gadhi 1st

Pooranpur

Gadhi

5 7 - 12 (i) Landless 5 3 8 3 3 6 2 4 6 14/02/11

Page 90: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

90

2B5C1e4a

- (ii) SF - 4 4 - - - - - -

- (iii) MF - - - - - - - - -

- Total 5 7 12 3 3 6 2 4 6

Pooranpur

Gadhi

- 11 - 11 (i) Landless - 11 11 - 5 5 - 6 6 16/04/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 5 5 - 6 6

Amanullahpur 11 - - 11 (i) Landless 11 - 11 7 - 7 4 - 4 12/06/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 7 - 7 4 - 4

13 Rampur

Mangal

2b5C1e4c

Rampur

mangal

11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 09/02/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Rampur Mangal - 12 - 12 (i) Landless - 11 11 - 6 6 - 6 6 10/04/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 6 6 - 6 6

Rampur Mangal 8 4 - 12 (i) Landless 4 2 6 4 2 6 4 2 6 05/07/11

Page 91: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

91

- (ii) SF 2 1 3 - - - - - -

- (iii) MF 2 1 3 - - - - - -

- Total 8 4 12 4 2 6 4 2 6

14 Bijori

2B5C1e4d

Bijori 11 - - 11 (i) Landless 11 - 11 11 - 11 - - - 10/02/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total 11 - 11 11 - 11 - - -

Bijori - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 14/04/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Bijori 8 4 - 12 (i) Landless 6 4 10 7 4 11 1 - 1 17/07/11

- (ii) SF 2 - 2 - - - - - -

- (iii) MF - - - - - - - - -

- Total 8 4 12 7 4 11 1 - 1

15 Rehmapur

2B5C1d1a

Rehmapur - 11 - 11 (i) Landless - 11 11 - 11 11 - - - 14/08/11

- (ii) SF - - - - - - - - -

- (iii) MF - - - - - - - - -

- Total - 11 11 - 11 11 - - -

Rehmapur 12 - - 12 (i) Landless 6 - 6 7 - 7 5 - 5 08/09/11

- (ii) SF 4 - 4 - - - - - -

Page 92: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

92

- (iii) MF 2 - 2 - - - - - -

- Total 12 - 12 7 - 7 5 - 5

Rehmapur 10 2 - 12 (i) Landless 4 2 6 4 2 6 6 - 6 22/09/11

- (ii) SF 3 - 3 - - - - - -

- (iii) MF 3 - 3 - - - - - -

- Total 10 2 12 4 2 6 6 - 6

Page 93: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

93

4.6: Details of Self Help Groups (SHGs) in the project area

Project- IWMP I

Sr.

No

Name of

micro

watershed

Name of

village

Name of

group

SHG

Date of

constituti

on

Name of

Adhyaksh

Name of

Sachiv

Total No. of Members Name of

Bank and

Address

Account

No. &Date

Up to

date

Savin

g

Rs.

Group

activities

Women Sc/St Other Total

1 Jaspur

2B5C1c3c

Jaspur Maharani Laxmi

Bai

06/09/11 Sri Vijendra

Singh

Sri Mangal

Singh

3 4 5 12 Under

Process

- Goatary

Ramsahaywali Jai bajrang bali

10/05/11

Sri Gopal

Singh

Sri Prem Kumar 1 6 4 11 Under

Process

- Dairy

Ramnagar Krishna 11/08/11 Sri Kaliram Sri Vedprakash 5 5 3 13 Under

Process

- Dairy

2 Bhaguwala

2B5C1c3e

Bhaguwala Radha

18/09/11 Smt Kusum Smt Beena 9 1 1 11 Under

Process

- Tailring

Bhaguwala Gaytri 05/10/11 Smt kiran Smt

Mamta

11 - - 11 Under

Process

- Tailring

Kamgarpur Ravi 05/08/11 Sri jai singh Sri Ram singh 2 5 5 12 Under - poultry

Page 94: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

94

Process

3 Gudha 1st

2B5C1c3f

Gudha Santoshi 06/08/11 Smt Meena Smt Sema 11 - - 11 Under

Process

- Tailring

Gudha Om 12/11/11 Sri Vikram

singh

Sri Lakhan singh - 11 - 11 Under

Process

- Poultry

Gudha Shiv 20/11/11 Sri Shyam

singh

Sri Kallu Singh 4 5 3 12 Under

Process

- Dairy

4 Prempur

2B5C1d1b

Prempur Sarasvati 15/11/11 Smt Rekha Smt Meenu 11 - - 11 Under

Process

- Tailring

Prempur Vaibhav 05/10/11 Sri Vikash Sri Arun - 11 - 11 Under

Process

- Goatary

Jatpura khas Ashish 06/08/11 Sri Rahul Sri Anubhav 4 6 3 13 Under

Process

- Fishring

5 Gudha 2nd

2B5C1d2a

Gudha Maha laxmi 07/08/11 Smt Renu Smt Ritu 11 - - 11 Under

Process

- Tailring

Gudha Sri Ram 12/11/11 Sri Peetam Sri Anand - 11 - 11 Under

Process

- Dairy

Chahsaluno SriKrishana 14/09/11 Sri Rajat Sri komal 2 6 4 12 Under

Process

- Poultry

6 Moh

Alampur

2B5C1e1a

Moh Alampur Durga 21/08/11 Smt Babita Smt Mithless 11 - - 11 Under

Process

- Tailring

Rahatpur Khurd Peer 17/09/11 Mo Alam Mo Yunus - 7 5 12 Under

Process

- Poultry

Page 95: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

95

Lalpur bhikka Ravidas 12/10/11 Sri Prem

Kumar

Sri Rajesh Singh 4 5 4 13 Under

Process

- Fishing

7 Vijaypur

2b5C1e1b

Vijaypur Rama Bai 08/08/11 Smt Deepa Smt Suneeta 11 - - 11 Under

Process

- Tailring

Vijaypur Ambedkar 10/09/11 Sri Surendra Sri Harvendra - 7 4 11 Under

Process

- Goatry

Jadopur Yuva dal 25/09/11 Sri Bhopal Sri Suneel 2 9 1 11 Under

Process

- Dairy

8 Gulalwali

2B5C1e1c

Gulalwali Laxmi 05/08/11 Smt Servesh Smt

Sheela

11 - - 11 Under

Process

- Tailring

Gulalwali Mahadev 10/09/11 Sri Virendra Sri Manoj - 8 6 14 Under

Process

- Beekeeping

Gulalwali Bhoola 25/09/11 Sri Charat Sri Teekam - 8 3 11 Under

Process

- Dairy

9 Veerpur 2nd

2B5C1e2a

Veerpur Sangani 08/04/11 Smt Dulari Smt Mamta 11 - - 11 Under

Process

- Tailring

Veerpur Bhem 10/06/11 Sri Charan Sri Harpal - 7 4 11 Under

Process

- Poiltary

Lalpur Bhikka Pratigya 15/08/11 Smt Neelam Smt Ponam 14 - - 14 Under

Process

- Tailring

10 Veerpur 1st

2B5C1e2b

Veerpur Shanti 02/04/11 Smt Rashmi Smt Neha 11 - - 11 Under

Process

- Tailring

Veerpur Gandhi 11/05/11 Sri Ramnath Sri Lala - 4 7 11 Under

Process

- Bekiping

Veerpur Bosh 06/06/11 Sri Nihal Sri Aman 4 5 3 12 Under - Goatiary

Page 96: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

96

Process

11 Sahanpur

N.P

2B5C1e3b

Sahanpur N.P Shakuntala 06/09/11 Smt Reena Smt Hema 12 - - 12 Under

Process

- Tailring

Sahanpur

Santoki

Seeta 25/09/11 Smt Sangita Smt Kavita 11 - - 11 Under

Process

- Tailring

Sahanpur

Santoki

Jai Bharat 11/10/11 Sri Gore Lal Sri Avdesh 2 4 6 12 Under

Process

- Dairy

12 Pooranpur

Gadhi

2B5C1e4a

Pooranpur

Gadhi

Milan 14/02/11 Sri Parveen Sri Yashpal 7 4 1 12 P.N.B Bijnor

01-167688

- Dairy

Pooranpur

Gadhi

Parvayi 16/04/11 Smt Beena Smt Lata 11 - - 11 Under

Process

- Tailring

Amanullhpur Jai Hind 12/06/11 Sri Chote Lal Sri Shyam

Bihari

- 7 4 11 Under

Process

- Poiltary

13 Rampur

Mangal

2B5C1e4a

Rampur Mangal Parshuram 09/02/11 Sri lallu Lal Sri Vedu - 11

-

11 Under Process - Goatry

Rampur Mangal Deepika 10/04/11 Smt Kamla Smt Vimla 12 - - 12 Under Process Tailring

Rampur Mangal Ramjanki 05/07/11 Sri

Parshuram

Sri Vedram 4 6 2 12 P.N.B

Najibabad

18340001001

57703

- Poiltary

14 Bijori

2B5C1e4d

Bijori Shankar 10/02/11 Sri Fool

singh

Sri Sooraj Singh - 11 - 11 Under Process - Dairy

Page 97: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

97

Bijori Savitri 14/04/11 Smt

Veerbala

Smt Santosh 11 - - 11 Under Process - Tailring

Bijori Shikhar 17/07/11 Sri Nandu Sri Ghashita 4 7 - 11 Under Process - Bekiping

15 Rehmapur

2B5C1d1a

Rehmapur Suchitra 14/08/11 Smt Geeta Smt Reena 11 - - 11 Under Process - Tailring

Rehmapur Bheem rao

Ambedkar

08/09/11 Sri Chaman

singh

Sri magan Singh 7 5 12 Under Process - Dairy

Rehmapur Teg Bahadur 22/09/11 Sri

Raghuveer

Sri Hariom 2 4 6 12 Under Process - Dairy

Page 98: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

98

4.8 : Details of Formation of User Groups (UGs) User Groups were formed on the basis of beneficiaries of different natural resource conservation activities to be constructed in the

watershed. The location of the activities/group mentioned in Table 4.8 can be seen on the proposed plan available in the map section. Table :Activity wise formation of user groups

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

1. Jaspur Jaspur Ambedkar 12/09/11 lal singh Surendra - 5 6 11 Under

Process

Rs12/hr Irrigation done

Rampur Mangal

Jai bhem 25/09/11 Fattu

Singh

Ramnath 2 3 8 13 Under

Process

Rs12/hr CropProduction done

Total

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

2 Bhaguwala bhaguwala Yuva 22/08/11 Surendra Virendra - 5 6 11 Under

Process

Rs12/hr Irrigation done

Kamgarpur Bajrang 26/09/11 Bhopendra manoj 2 5 5 12 Under

Process

Rs12/hr CropProduction done

Total

Page 99: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

99

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

3 Gudha 1st

Gudha shiv 12/08/11 Veersingh Balvant - 5 6 11 Under

Process

Rs12/hr Irrigation done

Gudha Bhola 04/09/11 Rajesh Gajendra -* 4 8 12 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

4. Prempur Prempur Krishna 15/10/11 Kapil Rohtash - 7 4 11 Under

Process

Rs12/hr Irrigation done

Jatpura khas

Gopal 02/11/11 Balakram mohan - 5 6 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

5

Gudha 2nd

Gudha Mohan 08/10/11 Naresh Tejpal - 6 5 11 Under

Process

Rs12/hr Irrigation done

Chahsaluno Nand 02/11/11 Munesh Ramsingh 1 7 4 12 Under

Process

Rs12/hr CropProduction done

Page 100: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

100

. r. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

6. Mo

Alampur

Mo Alampur

Bheem 27/10/11 Ashoke Raju - 6 5 11 Under

Process

Rs12/hr Irrigation done

Lalpur bhikka

Arjun 01/11/11 Sumit Jaipal - 4 7 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

7. Vijaypur Vijaypur ganesh 16/10/11 sohan Rahul - 5 6 11 Under

Process

Rs12/hr Irrigation done

Jadopur Gandhi 02/11/11 Tapraj Dheeraj - 7 4 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

8 Gulalwali Gulalawali

Narayan

27/10/11 Ashoke Raju - 6 5 11 Under

Process

Rs12/hr Irrigation done

Gulalwali Arjun 01/11/11 Sumit Jaipal - 4 7 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro

Name of village

Name of

Date of constitution

Name of Adhyaksh

Name of Sachiv/

Total No. of Members Name of Bank

User Charges

Group Active

Status of Women Sc/ Other Total

Page 101: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

101

watershed group Treasurer St and Address

ties User Agree ment

9 Veerpur

2nd

Veerpur Shyam 28/10/11 Kalva Foolsingh - 6 5 11 Under

Process

Rs12/hr Irrigation done

Lalpur Bhikka

Sunder 12/11/11 Rajesh Kripal - 4 7 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

10 Veerpur

1st

Veerpur Kanhaiya 25/10/11 Avdesh Khemsingh - 4 7 11 Under

Process

Rs12/hr Irrigation done

Veerpur Sangam 15/11/11 Praveen Jaisingh - 5 6 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

11 Sahanpur

N.P

Sahanpur N.P

Ganga 24/10/11 Girdhari Omkar - 4 7 11 Under

Process

Rs12/hr Irrigation done

Sahanpur Santoki

Godavri 22/11/11 Manoj Asharam - 5 6 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women

Sc/ St

Other Total

12 Pooranpur Pooranpur Yamuna 12/09/11 Munesh Hetram - 6 5 11 Under Rs12/hr Irrigat done

Page 102: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

102

Gadhi Gadhi Process ion

Amanullahpur Brahamputra 21/10/11 Gangu

Singh

Ramprasad 2 5 4 11 Under

Process

Rs12/hr CropP

roduc

tion

done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

13 Rampur

Mangal

Rampur Mangal

Gaytrti 08/10/11 komal Buddhu - 5 6 11 Under

Process

Rs12/hr Irrigation done

Rampur Mangal

Gomti 14/11/11 Ashoke Mukandi - 4 8 12 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

14 Bijori Bijori Ravidas 18/10/11 Manoj Bhagbana - 6 5 11 Under

Process

Rs12/hr Irrigation done

Bijori Javahar 16/11/11 Balveer Perma - 7 5 11 Under

Process

Rs12/hr CropProduction done

Sr. No

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv/ Treasurer

Total No. of Members Name of Bank and Address

User Charges

Group Active ties

Status of User Agree ment

Women Sc/ St

Other Total

15 Rehmapur Rehmapur Surya 21/10/11 AShoke Mukesh - 4 7 11 Under

Process

Rs12/hr Irrigation done

Rehmapur Bhaga

t

Singh

08/11/11 Kalva Nepal - 5 6 11 Under

Process

Rs12/hr CropProduction done

Page 103: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

103

Total user Groups -67 Has been Formed -30 Remaining UGs in Process -37

4.9: Convergence in IWMP-I, Bijnor

Several programmes are running in the area which are sponsored by Central and State Govt. and could be converged with watershed programmes. Some of them are listed in Below The details of the activities to be carried out under convergence in the project are mentioned. List of Central/State sponsored schemes

S.No. Name of Programme Implementing Agency Objectives of the Programme

1 Seed Distribution Programme (Pulse Development & ISOPAM

U.P. Agriculture Deptt To increase seed replacement ratio for higher productivity

2 Pump set Distribution (Food Security Mission Agriculture Deptt Providing irrigation

3 Training Programme Agriculture Deptt., KVK District RolarDevelopment in instititute haldaur

Capacity building of the farmers

4 HDPE pipe Agriculture Deptt

5 National Horticulture Mission (NHM) Horticulture Deptt. Increasing the area under fruits and vegetables

6 Sanitation Programme Gram Vikash To make hygienic condition in the rural areas

7 MGNERGA (Bunding, Farm Pond, Adarsh Jalashay, Blast well, Chakroad, etc.)

Gram Panchayat To provide work to the all village personnel under the rojgar guarantee yojana

8 Dept. of Animal Husbandry U.P. Animal Husbandry To improve the productivity of livestock

9 Afforestation Deptt. of Forest U.P.

10 NABARD (Agriculture & SMC Deptt. Of Agriculture

Page 104: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

104

Chapter- 5

Capacity Building Plan

Page 105: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

105

CAPACITY BUILDING PLAN

The capacity building of various stake holders will be given very high priority as the watershed is to be developed in

participatory mode. Capacity building initiative plays very important role in human resource development of watershed.

List of identified training institutes for capacity building.

Sl.No.

Name of Training institute

Address Designation of the Head of institute

Type of Institute

Area(s) of specialization

No. of training

assigned

No. of persons to be trained

Allocation to be made to the institute

1 2 3 4 5 6 7 8 9 1 Pandit

Deendayal Upadhyay Gram vikas Sansthan

Bakshi ka Talab Lucknow

Director General/ Principal

State Level Soil & Watershed Management, Agriculture, Horticulture,

Production System, Livelihood for landless

person, Animal Husbandary etc.

01 02 Bakshi ka Talab

Lucknow

2 S.B.B.P. Agriculture Univercity

KVK Nagina Director PIA 02 200 At village Level

Training to stakeholders on participatory watershed management

Sl. No.

Client Group

Title of the programme / duration / time

Objectives Coverage / Topics

Training methedology

Training institutions

1 PIA 1- 1 to 5 days/ 10.00 am

to 5.00 pm

2- 1 to 2 days/ 10.00 am

to 5.00 pm

Training

Orientation,

Livelihood,

enterprises,

Waterhsed

Management etc.

Skill

Development

Pandit Deendayal Upadhyay

Gram vikas Sansthan, Bakshi

ka Talab Lucknow , S.B.B.P.

Agriculture Univercity Meerut

2 WDT

3 WC

Page 106: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

106

Table 5.3: Capacity Building Plan

Level of Stake Holder

2009-10 2010-11 2011-12 2012-13 2013-14

Total

Target

(no.)

Trainin

g/

Person

Achiev

ment

(no.)

Trainin

g/

Person

Target

(no.)

Training/

Person

Achiev

ment

(no.) Training/

Person

Target

(no.) Training

/Person

Achiev

ment

(no.)

Training

/Person

Target

(no.)

Training/Perso

n

Target

(no.)

Training/Pers

on

Target

(no.)

Training/

Person

Achiev

ment

(no.)

Training/

Person

SLNA Level - - - - - - - - - -

District Level - - - - - - - - - -

PIA Level - - 01/12 01/02 01/03 01/03 - -

WDT Level - - 01/05 - 02/05 02/05 - -

WC Level - - 8/910 02/200 5/520 - 05/542 -

Other - - 1/03 - 02/02 02/02 -

TOTAL - - 11/930 03/202 10/530 05/10 05/542

Page 107: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

107

Detail of Institution Capacity Building Annual Action Plan

First Yeat Second Year Third Year Fourth year G. Total

S.

No.

Level Total

No. of

Person

No of

Person

to be

Trained

No. of

Training

to be

conduct

e

Trainin

g days

Tota

l

cost

Rs in

Lakh

No of

Perso

n to

be

Traine

d

No. of

Training

to be

conduct

e

Traini

ng

days

Total

cost

Rs in

Lakh

No of

Person

to be

Traine

d

No. of

Training

to be

conduct

e

Trai

nin

g

day

s

Total

cost

Rs in

Lakh

No of

Perso

n to

be

Train

ed

No.

of

Train

ing

to be

cond

ucte

Train

ing

days

Total

cost

Rs in

Lakh

Per

son

Cost

Rs in

Lakh

1 SLNA - - - - 0.91 - - - - - - - 0.45 - - - - - 1.36

2 WCDC 15 15 1 3 0.45 15 1 2 0.30 15 1 2 0.30 - - - - 45 1.05

3 PIA 18 18 1 3 0.54 18 1 2 0.36 18 2 3 1.08 18 1 2 0.36 72 2.34

4 WDT 5 5 1 3 0.09 5 1 3 0.09 5 1 3 0.09 5 1 2 0.06 20 0.33

5 SHG'S 86 172 2 5 1.72 172 2 2 0.69 172 2 3 1.03 102 1 1 1.02 618 4.46

6 UG'S 77 154 2 1 0.92 154 2 1 0.92 154 2 3 2.77 100 1 1 0.30 562 4.91

7 WC 10 110 4 1 2.20 110 1 1 0.55 110 2 1 1.10 110 1 1 0.55 440 4.40

8 OTHER - 800 1 1 2.40 500 1 1 1.50 - - - - 40 1 1 0.12 134

0

4.02

9 TOTAL 1274 9.23 974 4.41 474 6.82 335 2.41 309

7

22.8

7

Page 108: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

108

Chapter- 6

Entry Point Activities

Page 109: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

109

6.1: Entry Point Activities (EPA) Entry point activities were executed with the consent of stake holders and it helped in winning the confidence of the villagers for moving ahead the other programmes of watershed. In total 18 EPA activities were executed in the project area which costed Rs. 2973120.00. Photographs of entry point activities done in the project are given below:

Name of PIA

Name of Project

Year Name of Block

Name of project/ Name of village

Code of project

E.P.A cost in lakh

Detail of Works

1 2 3 4 5 6 7 8

LDWR I Bijnor IWMP I 2009-10 Nijibabad jaspur 2B5C1c3c 1.05 Road and pulia mentinence

Bhaguwala 2B5C1c3a 2.48 mentinence of culvert Road mentinence soil filing in

Vetantery Hospital

Gudha 1st

2B5C1c3f 0.68 kharanja and pulia mentence

Prempur 2B5C1d1b 1.24 E.W in schoool

Gudha 2nd

2B5C1d2a 1.29 kharanja

Moh Alampur 2B5C1e1a 1.39 Road Mentinence

Vijaypur 2B5C1e1b 0.88 kharanja mentinence

GulalWali 2B5C1e1c 0.69 E.W in school

Veerpur 2nd

2B5C1e2a 0.96 Kharanja nirman

veerpur 1st

2B5C1e2b 1.49 Kharanja nirman filing in school

Sahanpur N.P 2B5C1e3b 0.58 EW filing in Barat Ghar And Floor

Puranpur Gadhi 1st

2B5C1e4a 1.45 E w filling in DharamshalaAnd school

Rampur Mangal 2B5C1e4c 0.73 E W filling in school and road

Bijori 2B5C1e4d 0.76 E W filling in school and Boundry and C C road

Rehmapur 2B5C1d1a 2.69 E W filling in school and Boundry and panchayat ghar

Total 18.30

6.2: Works Phase

Page 110: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

110

Following are the major problems of the watersheds

� Water scarcity both for drinking as well as irrigation

� Excess runoff and soil loss

� Low water holding capacity of the soil

� Low productivity of crops

� Low fertility of soil

� Low cropping intensity

� Lack of technical knowledge

� Anna Pratha (let loose system of cattle)

� Poor vegetative cover

� Poor/low productive breeds of miltch animals

� Lack of feed & fodder availability

� Non availability of wood/fuel

� Lack of proper market facilities

� Low income of the households

� Lack of employment opportunity.

Estimation of Runoff from the Watershed Runoff from the watershed is estimated by Curve Number method of the Soil Conservation Service of the USDA using 18 years data (1994-2009) with a gap of 2005 and 2006). It is estimated that runoff potential of the project area is 620 mm, equivalent to 21 per cent of average annual rainfall. Expected runoff and soil loss from the project area are depicted

Runoff and soil erosion in the project area (IWMP-I,Bijnor)

Sr. No. Name of Micro Watershed

Cause Type of erosion Area affected (ha) Run off (mm/ year)

Average Soil Loss (Tonnes/ ha/ year)

1 Jaspur

Water erosion

a Sheet 105.45 621 16.50 b Rill 74.90 c Gully 34.35 Total 214.70 2 Bhaguwala

Water erosion

a Sheet 255.85 621 16.50 b Rill 180.00

Page 111: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

111

c Gully 77.00 Total 512.85 3 Gudha 1st

Water erosion

a Sheet 74.50 621 16.50 b Rill 47.00 c Gully 22.00 Total 143.50 4 Prempur

Water erosion

a Sheet 129.89 621 16.50 b Rill 90.50 c Gully 38.85 Total 259.24 5 Gudha 2nd

Water erosion

a Sheet 134.77 621 16.50 b Rill 93.80 c Gully 40.20 Total 268.77 6 Moh Alampur

Water erosion

a Sheet 153.64 621 16.50 b Rill 92.50 c Gully 43.50 Total 289.64 7 Vijaypur

Water erosion

a Sheet 92.84 621 16.50 b Rill 64.40 c Gully 27.50 Total 184.74 8 Gulalwali Water erosion

Page 112: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

112

a Sheet 72.95 621 16.50 b Rill 52.40 c Gully 20.40 Total 145.75 9 Veerpur 2nd

Water erosion

a Sheet 99.83 621 16.50 b Rill 65.50 c Gully 29.10 Total 194.43 10 Veerpur 1st

Water erosion

a Sheet 151.87 621 16.50 b Rill 105.00 c Gully 45.00 Total 301.87 11 Sahanpur N.P

Water erosion

a Sheet 60.58 621 16.50 b Rill 41.50 c Gully 17.50 Total 119.58 12 Pooranpur Gadhi

Water erosion

a Sheet 146.21 621 16.50 b Rill 110.00 c Gully 45.00 Total 301.21 13 Rampur Mangal

Water erosion

a Sheet 77.08 621 16.50 b Rill 54.00 c Gully 23.00 Total 154.08

Page 113: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

113

14 Bijori

Water erosion

a Sheet 84.31 621 16.50 b Rill 51.00 c Gully 24.00 Total 159.31 15 Rehmapur

Water erosion

a Sheet 284.33 621 16.50 b Rill 197.00 c Gully 81.00 Total 562.33

Page 114: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

114

6.2 A : Watershed Development Activities Proposed : Micro-watershed wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of Measures/Activitie

Uni JASPUR BHAGUWALA GUDHA 1st PREMPUR GUDHA 2nd Total

No., Length/

ha, Volum

Qanty Cost Qanty Cost Qanty Cost Qanty

Cost Qanty

Cost

1 2 3 4 5 6 7 8 9 10 11 12 13 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - - - - - - 2. Contour Bund (with Sodding) cum. 10575 4.23 26250 10.50 5732 2.24 5502 2.15 5374 2.10 3.Marginal Bund/PB cum. 9075 3.63 22750 9.10 9724 3.80 2195

5 8.58 2367

0 9.25

B- Water Resource Development

1. Tank/Pond No 1 0.65 - - - - - - - - 1a - Water storing capacity cum. 1875.0

0 - - - - - - - - -

1b- Area proposed for irrigation ha 4.00 - - - - - - - - - 2- Water Harvesting Bundhi/GP cum. 1003 4.50 20800 9.36 5838 2.83 1041

7 5.05 9922 4.81

2a- Water storing capacity cum.

2b- Area proposed for irrigation ha - - - - - - - - - - 3. Check Dam / Drop Spill Way No. 8 1.00 17 2.50 6 0.60 14 1.32 10 1.08 3a- Water storing capacity cum. 2200 - 5800 - 1300 - 3200 - 4000 - 3b. Area proposed for irrigation ha 3.00 - 8.00 - 5.00 - 8 - 8.00 - Total 14.01 31.46 9.47 17.10 17.24 89.28

Page 115: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

115

F JASPUR BHAGUWALA GUDHA 1st

PREMPUR GUDHA 2nd

Total

Total 14.01 31.46 9.47 17.10 17.74 89.28

Agroforestry

Plants

Ukeliptis ha 8.00 0.41 15.00 0.75 1.40 0.07 2.00 0.10 2.00 0.11

Sheesham And Seeras ha - - 15.00 0.75 1.00 0.05 2.10 0.12 1.89 0.09

Horticulture

Mango ha - - 8.00 0.75 0.50 0.05 0.5 0.05 1.20 0.12

Guava ha - -- 7.50 0.75 - - 0.50 0.05 - -

Total 14.42 34.46 9.64 17.42 18.06 94.00

Livelihood for landless People No. of SHGs/ No. of beneficiaries

-- -- -- -- -- -- -- -- -- --

1. Goatary do -- -- 1/11 0.25

2. Back Yard Poultry do -- -- 1/12 0.25

3. Poultry (Broiler) do -- -- 1/11 0.25 1/12 0.25

4. BeeKeeping do -- --

5. Dairy do 2/24 0.50 2/22 0.50 1/12 0.25 1/11 0.25

6. Tailoring do 1/12 0.25 -- -- 1/11 0.25 1/11 0.25 1/11 0.25

7. Fishries do -- -- -- -- -- -- 1/13 0.25

8. Vermi composting do -- -- -- -- -- -- -- -- -- --

9. Fruit Processing do -- -- -- -- -- -- -- -- -- --

10. Mini Dal Mill do -- -- -- -- -- -- -- -- -- --

11. Mini flour Mill do -- -- -- -- -- -- -- -- -- --

12. Mini Oil Expeller do -- -- -- -- -- -- -- -- -- --

13. Carpentry do -- -- -- -- -- -- -- -- -- --

Total 3/36 0.75 3/34 0.75 3/34 0.75 3/35 0.75 3/34 0.75 3.75

Page 116: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

116

iii Agriculture Production and micro enterprises System

Jaspur BhagooWala Guda 1st Prempur Guda 2nd Total in lakh

A- Crop Demonstrations- (Crop Wise)

1.Wheet No. of farmers /Area (ha)

15/6.00 0.30 40/16.00 0.80 11/4.40 0.23 20/8.00 0.40 20/8.00 0.41

2.Paddy No. of farmers /Area (ha)

17/608 0.34 35/14.00 0.70 10/4.00 0.20 19/7.60 0.38 20/8.00 0.40

B.Seed Distribution

Ha/Rupees 20.00 0.78 45.00 1.80 13.00 0.52 23.25 0.93 24.20 0.97

C.Agroforestry - - -

Ha/Rupees 0.21 0.64 50.00 1.50 14.35 0.43 26.00 .078 26.90 0.81

D.Green manuring

Ha/Rupees 17.00 0.51 45.00 1.35 11.35 0.34 20.70 0.62 21.33 0.64

Total 2.57 6.15 1.72 3.11 3.23 16.78

Page 117: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

117

Micro-watershed wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of Measures/Activitie

Uni Veerpur 1st

Sahanpur Poranpur Gadhi Rampur Mangal Bijori Total in lakh No.,

Length/ ha, Volum Qanty Cos

t Qanty Cost Qanty Cost Qanty Cost Qanty Cost

1 2 3 4 5 6 7 8 9 10 11 12 13 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - 819 3.20 - - - - 2. Contour Bund (with

Sodding) cum. 14325 5.73 6175 2.47 12795 5.00 3900 1.52 7512 2.93

3.Marginal Bund/PB cum. 14850 5.94 5275 2.11 14359 5.61 8060 3.15 7572 2.96

B- Water Resource Development

1. Tank/Pond No

1a - Water storing capacity cum.

1b- Area proposed for irrigation

ha

2- Water Harvesting Bundhi/GP

cum. 17200 7.74 4800 2.16 13760 6.67 9695 4.70 7467 3.62

2a- Water storing capacity cum.

2b- Area proposed for irrigation

ha

3. Check Dam / Drop Spill Way

No. 9 0.90 6 0.58 24 2.17 12 1.00 12 1.00

3a- Water storing capacity cum. 1800 - 1200 - 6600 - 3600 - 3600 -

3b. Area proposed for irrigation

ha 2.00 - 1.50 - 8.50 - 5.50 - 4.20 -

Total 20.31

7.32 19.45 9.37 10.51 71.16

Page 118: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

118

B. F Veerpur 1st

Sahanpur np Poranpur Gadhi

Rampur Mangal

Bijori Total in lakh

Total 20.31 7.32 19.45 9.37 10.51 66.96

Agroforestry Plants Ukeliptis ha - - 3.00 0.16 3.00 0.15 1.50 0.07 1.00 0.05

Sheesham And Seeras ha - - 4.00 0.20 3.15 0.16 1.13 0.06 1.30 0.07

Horticulture

Mango ha - - 1.50 0.15 3.00 0.30 0.30 0.30 0.75 0.07

Guava ha - -- 2.08 0.21 1.70 0.17 3.50 0.35 - -

Total 20.31 8.04 20.23 10.35 10.70 69.51

Livelihood for landless People No. of SHGs/ No. of beneficiaries

1. Goatary do 1/12 0.25 1/11 0.25

2. Back Yard Poultry do

3. Poultry (Broiler) do 1/11 0.25 1/12 0.25

4. BeeKeeping do 1/11 0.25 1/11 0.25

5. Dairy do 1/12 0.25 1/12 0.25 1/11 0.25

6. Tailoring do 1/11 0.25 2/23 0.50 1/11 0.25 1/12 0.25 1/11 0.25

7. Fishries do

8. Vermi composting do

9. Fruit Processing do

10. Mini Dal Mill do

11. Mini flour Mill do

12. Mini Oil Expeller do

13. Carpentry do

Total 3/34 0.75 3/35 0.75 3/34 0.75 3/35 0.75 3/33 0.75 3.75

Page 119: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

119

III

Agriculture Production and micro enterprises System

Veerpur 1st

Sahanpur Poranpur Gadhi Rampur Mangal Bijori Total in lakh

A- Crop Demonstrations- (Crop Wise)

16.78

1.Wheet No. of farmers /Area (ha)

20/8.00 0.40 10/4.00 0.20 25/10.00 0.50 13/5.20 0.26 12/4.80 0.24

2.Paddy No. of farmers /Area (ha)

20/8.00 0.40 8/3.20 0.16 20/8.00 0.40 10/4.00 0.20 12/4.80 0.24

B.Seed Distribution Ha/Rupees 18.00 0.72 11.00 0.43 27.15 1.08 13.90 0.55 14.34 0.57 C.Agroforestry - - -

Ha/Rupees 30.00 0.90 12.00 0.36 30.00 0.90 14.41 0.46 15.94 0.47

D.Green manuring Ha/Rupees 40.00 1.20 10.00 0.28 24.10 0.72 12.33 0.36 12.75 0.38

Total 3.62 1.43 3.60 1.83 1.90 12.38

G. Total 29.16

Page 120: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

120

Micro-watershed wise details of Watershed Development Activities proposed in IWMP-I, Bijnor Sr.

N Particular of Measures/Activitie

Uni Moh Alampur Vijaypur Gulalwali Veerpur 2nd Rehmapur No., Length/ ha, Volum

Qanty Cost Qanty Cost Qanty Cost Qanty Cost Qanty

End Cost

1 2 3 4 5 6 7 8 9 10 11 12 13 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - - - - - - 2. Contour Bund (with Sodding) cum. 14080 5.63 9700 3.82 5630 2.20 10200 4.08 30125 12.05

3.Marginal Bund/PB cum. 14500 5.80 8260 3.30 10799 4.22 8250 3.30 23100 9.24

B- Water Resource Development

1. Tank/Pond No 1a - Water storing capacity cum. 1b- Area proposed for irrigation ha

2- Water Harvesting Bundhi/GP cum. 11200 5.04 7200 3.24 4745 2.30 7995 3.60 23200 10.44

2a- Water storing capacity cum. 2b- Area proposed for irrigation ha

3. Check Dam / Drop Spill Way No. 10 1.40 10 0.97 7 0.90 8 0.93 15 2.80

3a- Water storing capacity cum. 4000 2000 2600 2200 6000 3b. Area proposed for irrigation ha 5.10 2.00 3.20 4.10 10.40

Total 17.87 11.33 9.62 11.91 34.53

Page 121: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

121

B. F Moh Alampur Vijaypur Gulalwali Veerpur 2nd Rehmapur Total in lakh

Total 17.87 11.33 9.62 11.91 34.53 85.26 Agroforestry Plants Ukeliptis ha 8.00 0.40 5.70 0.30 2.00 0.10 5.30 0.28 15.00 0.81

Sheesham And Seeras ha 8.75 0.40 5.00 0.25 0.45 0.02 6.00 0.30 16.00 0.905

Horticulture

Mango ha 4.00 0.40 3.00 0.30 0.30 0.03 3.00 0.30 8.00 0.80

Guava ha 4.60 0.40 2.50 0.25 0.20 0.02 2.80 0.28 8.00 0.85

Total 19.47 12.43 9.79 13.07 37.895 92.655

Grand Total 256.165

Livelihood for landless People No. of SHGs/ No. of beneficiaries

1. Goatary do 1/11 0.25 -- -- -- -- -- -- 2. Back Yard Poultry do -- -- -- -- -- -- -- -- 3. Poultry (Broiler) do 1/12 0.25 -- -- -- -- 1/14 0.25 -- -- 4. BeeKeeping do 1/14 0.25 -- -- 5. Dairy do 1/11 0.25 1/11 0.25 2/24 0.50

6. Tailoring do 1/11 0.25 1/11 0.25 2/22 0.50 1/11 0.25

7. Fishries do 1/13 0.25 1/11 0.25

8. Vermi composting do -- -- -- -- -- -- -- -- -- -- 9. Fruit Processing do -- -- -- -- -- -- -- -- -- -- 10. Mini Dal Mill do -- -- -- -- -- -- -- -- -- -- 11. Mini flour Mill do -- -- -- -- -- -- -- -- -- -- 12. Mini Oil Expeller do -- -- -- -- -- -- -- -- -- -- 13. Carpentry do

Total 3/36 0.75 3/33 0.75 3/36 0.75 3/36 0.75 3/35 0.75 45- 11.25 HGs Formed in next year 41- 10.47 86- 21.72 77 UGs Formed in next year 77- 19.47 Gr. Total 163- 41.19

Page 122: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

122

Soil & water con. Acti Livelihood activities Agi. Production & Micro Enterprises

III Agriculture Production and micro enterprises System

Moh Alampur Vijaypur Gulalwali Veerpur 2nd Rehmapur Total in lakh

A- Crop Demonstrations- (Crop Wise)

29.16

1.Wheet No. of farmers /Area (ha)

23/9.20 0.46 15/6.00 0.30 11/4.40 0.22 15/6.00 0.30 45/18.00 0.90

2.Paddy No. of farmers /Area (ha)

20/8.00 0.40 13/5.20 0.25 11/4.40 0.22 14/5.60 0.28 40/16.00 0.80

B.Seed Distribution

Ha/Rupe 21.00 1.05 16.00 0.65 13.12 0.52 18.00 0.70 0.50 2.075

C.Agroforestry - - -

Ha/rupee 27.00 0.82 17.00 0.52 14.58 0.44 18.00 0.56 53.00 1.60

D.Green manuring

Ha/Rupe 24.00 0.73 16.00 0.48 11.66 0.35 16.00 0.49 48.00 1.45

Total 3.46 2.20 1.75 2.33 6.825 16.565

Grand Total 45.725

Summary Cost EW Structure 56% 256.16 520843.00 168 9% 41.19 - - 10% 45.73 - - Total 343.08

Page 123: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

123

6.3: Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Ranipur

No., Length/

ha, Volum

Rampur mangal Pooranpur garhi Sahanpur NP Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - 819.00 0.32 - - 819 0.32 2. Contour Bund (with Sodding) cum. 927.50 0.36 787.50 1.48 4350 1.74 9065 3.58 3.Marginal Bund/PB cum. 3371 1.32 11892 4.65 2600 1.06 17863 7.03 B- Water Resource

Development - - - - - - - -

1. Tank/Pond No - - - - - - - - 1a - Water storing capacity cum. - - - - - - - - 1b- Area proposed for irrigation ha - - - - - - - - 2- Water Harvesting Bundhi/GP cum. 3741.98 1.86 28610 11.99 4800 2.10 37151.98 15.95 2a- Water storing capacity cum. - - - -- - - - -

2b- Area proposed for irrigation ha - - - - - - - - 3. Check Dam / Drop Spill Way No. 6 0.40 13 1.47 6 0.58 25 2.45 3a- Water storing capacity cum. - - - - - - - 3b. Area proposed for irrigation ha - - - - - - - -

Total 3.94 19.91 5.48 29.33

Page 124: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

124

Sr. N

Particular of

Measures/Activitie

Uni Ranipur

No., Length/ ha,

Volum

Rampur mangal Pooranpur garhi Sahanpur NP Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost

2 2 3 4 5 6 7 8 9 10 11 B. F 3.94 19.91 5.48 29.33

Agroforestry - - - - - - - -

Plants Ha 2.63 0.13 6.15 0.32 - - 8.78 0.45

Horticulture Ha - - 1.50 0.15 - - 1.50 0.15

Total 2.63 0.13 7.65 0.47 - - 10.28 0.60

Gra. Total 4.07 20.38 5.48 29.93 Livelihood for landless

People

No. of SHGs/ No of Beneficiaries

1. Dairy - - - - - - - - -

2. Goitary - 1/14 0.30 3/33 0.75 - - 4/47 1.05

3. Pattal Making - 1/12 0.30 2/23 0.50 - - 3/35 0.80

4. Tailoring - - - - - 2/22 0.55 2/22 0.55

TOTAL - 2/26 0.60 5/56 1.25 2/22 0.55 9/104 2.40

User’s Group 1/11 0.25 5/57 1.25 1/11 0.25 7/79 1.75

G. TOTAL - 3/37 0.85 10/113 2.50 3/33 0.80 16/183 4.15

Page 125: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

125

iii Agriculture Production and micro enterprises System

Ranipur

Rampur mangal Pooranpur garhi Sahanpur NP Total

A- Crop Demonstrations-

13/5.20 0.26 45/18 0.90 11/440 0.22 69/27.60 1.38

B.Seed Distribution No. of farmers /Area (ha)

7.00 0.28 27.15 1.08 6.50 0.26 40.65 1.62

C.Agroforestry -

Ha/Rupees 7.41 0.24 30 0.90 7.00 0.22 44.41 1.36 D.Green manuring

Ha/Rupees 6.33 0.18 24.10 0.72 6.00 0.18 36.43 1.08 Total 0.96 3.60 0.88 5.44 Grand Total 5.88 27.23 7.16 39.52

Page 126: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

126

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Bijori

No., Length/

ha, Volum

Rampur mangal Bijori Total

Qty. Cost Qty. Cost Qty. Cost

1 2 3 4 5 6 7 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - 2. Contour Bund (with Sodding) cum. 648 0.25 921.50 0.36 1569.50 0.61 3.Marginal Bund/PB cum. 1701 0.66 5975 2.33 7676 2.99 B- Water Resource

Development - - - - - -

1. Tank/Pond No - - - - - - 1a - Water storing capacity cum. - - - - - - 1b- Area proposed for irrigation ha - - - - - - 2- Water Harvesting Bundhi/GP cum. 10238.02 4.92 14067 6.82 24305.02 11.74 2a- Water storing capacity cum. - - - - - -

2b- Area proposed for irrigation ha - - - - - - 3. Check Dam / Drop Spill Way No. 4 0.40 13 1.30 17 1.70 3a- Water storing capacity cum. - - - - - - 3b. Area proposed for irrigation ha - - - - - -

Total 6.23 10.81 17.04

Page 127: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

127

Sr. N

Particular of

Measures/Activitie

Uni Bijori

No., Length/ ha,

Volum

Rampur mangal Bijori Total

Qty. Cost Qty. Cost Qty. Cost

2 2 3 4 5 6 7 10 11 B. F 6.23 10.81 17.04

Agroforestry - - - - - -

Plants Ha - - 2.30 0.12 2.30 0.12

Horticulture Ha 0.50 0.05 0.75 0.075 1.25 0.125

Total 0.50 0.05 3.05 0.195 3.55 0.245

Gr.Total 6.28 10.705 16985

Livelihood for landless People

No. of SHGs/ No of Beneficiaries

1. Dairy - - - - - - -

2. Goitary - 1/12 0.30 2/22 0.50 3/34 0.80

3. Pattal Making - - - - - - -

4. Tailoring - - - - - - -

TOTAL - 1/12 0.30 2/22 0.50 3/34 0.80 User’s Group 2/23 0.60 2/24 0.47 4/47 1.07

G. TOTAL - 3/25 0.90 4/46 0.97 7/81 1.87

Page 128: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

128

iii Agriculture Production and micro enterprises System

Bijori Rampur mangal Bijori Total

A- Crop Demonstrations-

10/4 0.20 24/9.60 0.48 34/13.60 0.68

B.Seed Distribution No. of farmers /Area (ha)

6.90 0.27 14.34 0.57 21.24 0.84

C.Agroforestry -

Ha/Rupees 7.00 0.22 15.94 0.48 22.94 0.70 D.Green manuring

Ha/Rupees 6.00 0.18 12.75 0.38 18.75 0.56 Total 0.87 2.10 2.78 Grand Total 8.05 14.525 22.385

Page 129: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

129

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Pooranpur garhi

No., Length/ ha, Volum

Pooranpur garhi Total

Qty. Cost Qty. Cost

1 2 3 4 5 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - 2. Contour Bund (with Sodding) cum. - - - - 3.Marginal Bund/PB cum. 420 0.16 420 0.16 B- Water Resource

Development - - - -

1. Tank/Pond No - - - - 1a - Water storing capacity cum. - - - - 1b- Area proposed for irrigation ha - - - - 2- Water Harvesting Bundhi/GP cum. - - - - 2a- Water storing capacity cum. - - - -

2b- Area proposed for irrigation ha - - - - 3. Check Dam / Drop Spill Way No. - - - - 3a- Water storing capacity cum. - - - - 3b. Area proposed for irrigation ha - - - -

Total 420 0.16 420 0.16

Page 130: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

130

Sr. N

Particular of

Measures/Activitie

Uni Pooranpur garhi

No., Length/ ha, Volum

Pooranpur garhi Total

Qty. Cost Qty. Cost

2 2 3 4 5 6 7 B. F

Agroforestry - - - - -

Plants Ha - - - -

Horticulture Ha - - - -

Total - - - -

Livelihood for landless People

No. of SHGs/ No of Beneficiaries

- - - -

1. Dairy - - - - -

2. Goitary - - - - -

3. Pattal Making - - - - -

4. Tailoring - - - - -

TOTAL - - - - -

- - - -

User’s Group - - - -

G. TOTAL - - - - -

Page 131: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

131

iii Agriculture Production and micro enterprises System

Pooranpur garhi Total

A- Crop Demonstrations-

- - - -

B.Seed Distribution No. of farmers /Area (ha)

- - - -

C.Agroforestry

Ha/Rupees - - - - D.Green manuring

Ha/Rupees - - - - Total Grand Total 0.16

Page 132: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

132

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Gudha

No., Length

/ ha, Volum

Gudha 1st Guda 2nd Prempur Jaspur Veerpur 2nd Bhaguwala

Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost

Qty. Cost Qty.

Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - - - - - - - - -

2. Contour Bund (with Sodding)

cum. 5732 2.40 5374 2.10 3302 1.29 1900 0.76 9575 3.83 475 0.19 26358 10.57

3.Marginal Bund/PB cum. 9724 3.80 23670 9.25 13200 5.16 - - 74.50 3.00 - - 54044 21.21

B- Water Resource Development

- - - - - - - - - - - - - -

1. Tank/Pond No - - - - - - - - - - - - - -

1a - Water storing capacity cum. - - - - - - - - - - - - - -

1b- Area proposed for irrigation

ha - - - - - - - - - - - - - -

2- Water Harvesting Bundhi/GP

cum. 5838 2.83 9922 4.81 6560 3.20 - - 8700 3.84 - - 31020 14.68

2a- Water storing capacity cum. - - - - - - - - - - - - - -

2b- Area proposed for irrigation

ha - - - - - - - - - - - - - -

3. Check Dam / Drop Spill Way

No. 6 0.60 10 1.08 7 0.90 - - 1 0.30 - - 24 2.88

3a- Water storing capacity cum. - - - - - - - - - - - - - -

3b. Area proposed for irrigation

ha - - - - - - - - - - - - - -

Total 9.63 17.24 10.55 0.76 10.97 0.19 49.34

Page 133: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

133

Sr. N

Particular of

Measures/Activitie

Uni Gudha

No., Length

/ ha, Volum

Gudha 1st Guda 2nd Prempur Jaspur Veerpur 2nd

Bhaguwala

Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty.

Cost Qty.

Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 B. F 9.63 17.2

4 10.55 0.76 10.97 0.19 49.3

4 Agroforestry - - - - - - - - - - - - - - -

Plants Ha 2.40 0.12 3.89 0.20 2.35 0.12 - - - - - - 8.64 0.44

Horticulture Ha 0.50 .05 1.20 0.12 0.75 0.075 - - - - - - 2.45 0.245

Total 0.17 0.32 0.195 11.09 0.685

Gr. Total 9.80 17.56 10.745 0.76 10.97 0.19 50.025

Livelihood for landless People

No. of SHGs/ No of Beneficiaries

1. Dairy - - - - - - - - - - - - - - -

2. Goitary - 7/80 1.75 6/68 1.50 2/22 0.50 - - 1/11 0.25 - - 16/181 4.00

3. Pattal Making - - - - - 3/36 0.75 - - 1/11 0.25 - - 4/47 1.00

4. Tailoring - - - - - - - - - 2/24 0.50 1/11 0.25 3/35 0.75

TOTAL - 7/80 1.75 6/68 1.50 5/58 1.25 4/46 1.00 1/11 0.25 29/263 5.75

User’s Group 5/56 1.15 5/58 1.30 5/57 1.25 - - 3/24 0.80 1/11 0.25 19/216 4.75

G. Total 12/136 2.90 11/126 2.80 10/115 2.50 - - 7/80 1.80 2/22 0.50 42/479 10.50

Page 134: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

134

iii

Agriculture Production and micro enterprises System

Gudha

No. of farmers /Area (ha)

Gudha 1st Guda 2nd Prempur Jaspur Veerpur 2nd Bhaguwala Total

Qty. Cost Qty. Cost Qty. Cost Qty.

Cost Qty. Cost Qty. Cost Qty. Cost

A- Crop Demonstrations-

24/9.60 0.47 44/17.60 0.89 25/10 0.50 - - 27/10.80

0.54 8/3.20 0.15 120/48.0

2.39

B.Seed Distribution

16.00 0.64 26.20 1.05 14.60 0.59 - - 17.00 0.68 4.50 0.18 71.30 2.86

C.Agroforestry

Ha/Rupees

16.35 0.49 28.90 0.87 0.16 0.47 - - 19.00 0.56 5.00 0.15 79.25 2.36

D.Green manuring

Ha/Rupees

13.35 0.40 23.33 0.70 12.45 0.38 - - 15.00 0.46 5.00 0.12 63.13 1.88

Total 2.00 3.51 1.94 2.24 0.60 9.49

Grand Total 14.70 23.78 15.935 0.76 15.01 1.29 70.765

Page 135: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

135

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Prempur

No., Length

/ ha, Volum

Prempur Moh. Alampur

Vijaypur Veerpur 1st Veerpur 2nd

Sahanpur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

Qty. Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - - - - - - - - -

2. Contour Bund (with Sodding)

cum. 2200 0.86 6125 2.45 7100 2.84 10200 4.08 4750 1.90 1825 0.73 32200 12.86

3.Marginal Bund/PB cum. 8755 3.42 - - 8260 3.30 8250 3.30 7400 2.74 2675 1.05 35340 13.81

B- Water Resource Development

- - - - - - - - - - - - - -

1. Tank/Pond No - - - - - - - - - - - - - -

1a - Water storing capacity cum. - - - - - - - - - - - - - -

1b- Area proposed for irrigation

ha - - - - - - - - - - - - - -

2- Water Harvesting Bundhi/GP

cum. 3857 1.85 - - 7200 3.24 7995 3.03 8500 3.90 - - 27552 12.02

2a- Water storing capacity cum. - - - - - - - - - - - - - -

2b- Area proposed for irrigation

ha - - - - - - - - - - - - - -

3. Check Dam / Drop Spill Way

No. 4 0.48 - - 10 0.97 16 1.83 9 0.90 6 0.58 43 4.76

3a- Water storing capacity cum. - - - - - - - - - - - - - -

3b. Area proposed for irrigation

ha - - - - - - - - - - - - - -

Total 6.61 2.45 10.35 12.24 9.44 2.36 43.45

Page 136: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

136

Sr. N

Particular of

Measures/Activitie

Uni Prempur

No., Length

/ ha, Volum

Prempur Moh. Alampur

Vijaypur Veerpur 1st Veerpur 2nd Sahanpur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

B. F 6.61 2.45 10.35 12.24 9.44 2.36 43.45

Agroforestry - - - - - - - - - - - - - - -

Plants Ha 1.54 0.08 - - 10.70 0.55 11.30 0.58 11.87 0.60 7.00 0.36 42.41 2.17

Horticulture Ha 0.45 0.045 - - 5.50 0.55 5.80 0.58 6.00 0.60 3.56 0.36 21.31 2.135

Total 0.125 - - 1.10 1.16 1.20 0.72 63.72 4.305

Gr. Total 6.735 2.45 11.45 13.40 10.64 3.08 47.755

Livelihood for landless People

No. of SHGs/ No of Beneficiaries

1. Dairy - - - - - - - 1/11 0.25 - - - - 1/11 0.25

2. Goitary - 6/68 1.50 - - 2/24 0.50 - - 2/22 0.50 - - 10/114 2.50

3. Pattal Making - - - -- - - - - - - - - -- - -

4. Tailoring - 2/22 0.25 2/22 0.50 1/11 0.20 1/11 0.25 6/66 1.20

TOTAL - 6/68 1.50 4/46 0.75 3/33 0.75 3/33 0.70 1/11 0.25 17/191 3.95

User’s Group 5/58 1.30 - - 3/34 0.72 3/33 0.75 3/34 0.75 1/11 0.25 15/170 3.77

G. Total 2.80 1.47 - 1.50 1.45 0.50 32/361 7.72

Page 137: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

137

iii

Agriculture Production and micro enterprises System

Prempur

No. of farmers /Area (ha)

Prempur Moh. Alampur

Vijaypur Veerpur 1st Veerpur 2nd Sahanpur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

A- Crop Demonstrations-

17/6.80

0.35 1/.40 0.02 22/8.80

0.44 29/11.60

0.58 22/880

0.44 10/4.00

6.20 92/36.80

1.85

B.Seed Distribution 10.00 0.40 1.00 0.03 14 0.56 17 0.70 14 0.56 4 0.16 55.70 2.19

C.Agroforestry

Ha/Rupees

12.00 0.37 1.00 0.02 15 0.45 19 0.58 15 0.45 4 0.14 60.0 1.85

D.Green manuring

Ha/Rupees

10.25 0.30 1.00 0.02 13 0.39 15 0.46 12 0.37 5 0.13 49.25 1.47

Total 1.42 0.09 1.84 2.32 1.82 0.63 7.36

Grand Total 10.95 2.54 14.76 17.97 13.91 4.21 63.585

Page 138: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

138

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Jaspur Mussepur

No., Length/

ha, Volum

Jaspur Bhaguwala Total Rahmapur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - - - - 2. Contour Bund (with Sodding) cum. 8675 3.47 19425 7.77 28100 11.24 10800 4.32 10800 4.32 3.Marginal Bund/PB cum. 9075 3.63 17050 6.83 36125 10.46 11600 4.64 11600 4.64 B- Water Resource

Development - - - - - - - - - -

1. Tank/Pond No 1/1300 0.65 - - 1/1300 0.65 - - - - 1a - Water storing capacity cum. - - - - - - - - - - 1b- Area proposed for irrigation ha - - - - - - - - - - 2- Water Harvesting Bundhi/GP cum. 1003 4.50 20800 9.36 21803 13.86 11300 5.10 11300 5.10 2a- Water storing capacity cum. - - - - - - - - - -

2b- Area proposed for irrigation ha - - - - - - - - - - 3. Check Dam / Drop Spill Way No. 8 1.00 17 2.50 25 3.50 - - - - 3a- Water storing capacity cum. - - - - - - - - - - 3b. Area proposed for irrigation ha - - - - - - - - - -

Total 13.25 26.46 39.71 14.06 14.06

Page 139: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

139

Sr. N

Particular of

Measures/Activitie

Uni Jaspur Mussepur

No., Length/

ha, Volum

Jaspur Bhaguwala Total Rahmapur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

B. F 13.25 26.46 39.71 14.06 14.06

Agroforestry -

Plants Ha 8 0.40 30 1.50 38 1.90 - - - -

Horticulture Ha - - 15.50 1.50 15.50 1.50 - - - -

Total 0.40 3.00 3.40

Gr. Total 13.65 29.46 43.11 14.06 14.06 Livelihood for landless

People

No. of SHGs/ No of Beneficiaries

5. Dairy - 1/11 0.30 2/22 0.50 3/33 0.80 1/11 0.30 1/11 0.30

6. Goitary - 1/11 0.25 2/22 0.50 3/33 0.75 2/22 0.50 2/22 0.50

7. Pattal Making - - - 3/33 0.80 3/33 0.80 - - - -

8. Tailoring - 2/22 0.50 2/23 0.50 4/45 1.00 2/22 0.50 2/22 0.50

TOTAL - 4/44 1.05 9/100 2.30 13/144 3.35 5/55 1.30 5/55 1.30

User’s Group 4/45 1.05 8/89 2.00 12/134 3.05 4/45 1.00 4/45 1.00

G. Total 2.10 33/76 6.40 2.30 2.30

Page 140: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

140

iii

Agriculture Production and micro enterprises System

No., Length/

ha, Volum

Jaspur Mussepur

Jaspur Bhaguwala Total Rahmapur Total

A- Crop Demonstrations-

31/12.40 0.64 61/24.40 1.22 90/36 1.80 34/13.60 0.70 34/13.60 0.70

B.Seed Distribution No. of farmers /Area (ha)

20 0.78 36 1.46 56 2.34 21 0.84 21 0.84

C.Agroforestry 20 0.605 40 1.27 60 1.87 23 0.665 23 0.665

D.Green manuring Ha/Rupees 15 0.46 32 0.98 47 1.44 17 0.51 17 0.51

Total 18.235 4.93 7.45 2.715 2.715

G. Total 18.235 38.69 56.96 19.075 19.075

Page 141: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

141

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Rahatpur Khurd Vijaypur

No., Length

/ ha, Volum

Rahmapur Moh Alampur Total Moh Alampur Vijaypur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - - - - - - - - -

2. Contour Bund (with Sodding)

cum. 19325 7.74 6125 2.45 25450 10.19 14080 5.63 2600 0.98 16680 6.61

3.Marginal Bund/PB cum. 11500 4.60 7300 2.90 18800 7.50 14500 5.80 - - 14500 5.80

B- Water Resource Development

- - - - - - - - - - - -

1. Tank/Pond No - - - - - - - - - - - -

1a - Water storing capacity cum. - - - - - - - - - - - -

1b- Area proposed for irrigation

ha - - - - - - - - - - - -

2- Water Harvesting Bundhi/GP

cum. 11900 5.34 5600 2.50 7500 7.84 5600 2.54 - - 5600 2.54

2a- Water storing capacity cum. - - - - - - - - - - - -

2b- Area proposed for irrigation

ha - - - - - - - - - - - -

3. Check Dam / Drop Spill Way

No. 15 2.80 10 1.40 25 4.20 - - - - - -

3a- Water storing capacity cum. - - - - - - - - - - - -

3b. Area proposed for irrigation

ha - - - - - - - - - - - -

Total 20.48 9.25 29.73 13.97 0.98 14.95

Page 142: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

142

Sr. N

Particular of

Measures/Activitie

Uni No.,

Length/ ha,

Volum

Rahatpur Khurd Vijaypur

Rahmapur Moh Alampur Total Moh Alampur Vijaypur Total

Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost Qty. Cost

1 2 3 4 5 6 7 8 9 10 11 B. F 20.48 9.25 29.73 13.97 0.98 14.95

Agroforestry - - - - - - - - - - - - -

Plants Ha 31 1.10 16.75 0.80 47.75 1.90 - - - - - -

Horticulture Ha 16 1.65 8.60 0.80 24.60 2.45 - - - - - -

Total 2.75 1.60 4.35

Gr. Total 23.23 10.85 34.08 13.97 0.98 14.95

Livelihood for landless People

No. of SHGs/ No of Beneficiaries

1. Dairy - 2/22 0.50 - - 2/22 0.50 - - - - - -

2. Goitary - 2/22 0.50 1/11 0.25 3/33 0.75 1/12 0.25 - - 1/12 0.25

3. Pattal Making - 2/22 0.50 - - 2/22 0.50 - - - - - -

4. Tailoring - 2/23 0.50 2/24 0.55 4/47 1.05 2/22 0.50 1/11 0.27 3/33 0.77

TOTAL - 8/89 2.00 3/35 0.80 11/124 2.80 3/34 0.75 1/11 0.27 4/45 1.02

User’s Group 7/78 1.78 3/35 0.80 10/113 2.58 3/35 0.75 - - 3/35 0.75

G. Total 27.01 12.45 5.38 15.47 1.25 7/80 1.77

Page 143: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

143

iii

Agriculture Production and micro enterprises System

No. of farmers/Area (ha)

Rahatpur Khurd Vijaypur

Rahmapur Moh Alampur Total Moh Alampur

Vijaypur Total

A- Crop Demonstrations-

52/20.80

1.05 22/880 0.45 74/29.60

1.50 20/8.00

0.40 4/1.60 0.80 24/9.60

0.48

B.Seed Distribution 31 1.26 13 0.54 44 1.80 12 0.48 2.50 0.10 14.50 0.58

C.Agroforestry

Ha/Rupees

35 1.05 15 0.45 50 1.50 13 0.40 3 0.08 16 0.48

D.Green manuring

Ha/Rupees

28 0.85 12 0.36 40 1.21 11 0.32 2 0.6 13 0.38

Total 4.21 1.80 6.01 1.60 0.32 1.92

Grand Total 31.22 14.25 45.47 17.07 1.57 18.64

Page 144: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

144

Watershed Development Activities Proposed Gram sabha wise details of Watershed Development Activities proposed in IWMP-I, Bijnor

Sr. N

Particular of

Measures/Activitie

Uni Bhaguwala

No., Length/

ha, Volum

Bhaguwala Total Gr. Total

Qty. Cost Qty. Cost Qty. Cost

1 2 3 4 5 6 7 10 11 Soil & Water Conservation

Measures

A- Moisture Conservation Measures

1. Field Bund - - - - 819.00 0.32 2. Contour Bund (with Sodding) cum. 6350 2.54 6350 2.54 156572.50 62.52 3.Marginal Bund/PB cum. 5700 2.07 5700 2.07 192068.00 75.67 B- Water Resource

Development - - - - - -

1. Tank/Pond No - - - - 1/1300 0.65 1a - Water storing capacity cum. - - - - - - 1b- Area proposed for irrigation ha - - - - - - 2- Water Harvesting Bundhi/GP cum. - - - - 166232 83.73 2a- Water storing capacity cum. - - - - - -

2b- Area proposed for irrigation ha - - - - - - 3. Check Dam / Drop Spill Way No. 2 0.20 2 0.20 161 19.69 3a- Water storing capacity cum. - - - - - - 3b. Area proposed for irrigation ha - - - - - -

Total 4.81 4.81 242.58

Page 145: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

145

Sr. N

Particular of

Measures/Activitie

Uni Bhaguwala

No., Length/ ha,

Volum

Bhaguwala Total Gr. Total

Qty. Cost Qty. Cost Qty. Cost

2 2 3 4 5 6 7 10 11 B. F 4.81 4.81 242.58

Agroforestry - - - - - - -

Plants Ha - - - - 147.88 6.98

Horticulture Ha - - - - 66.61 6.605

Total - - - - 214.49 13.585

Gra. Total 4.81 4.81 256.165 Livelihood for landless

People

No. of SHGs/ No of Beneficiaries

1. Dairy - - - - - 7/77 1.85

2. Goitary - - - - - 40/458 10.10

3. Pattal Making - - - - - 13/148 3.35

4. Tailoring - 2/23 0.60 2/23 0.60 26/293 6.42

TOTAL - 2/23 0.60 2/23 0.60 86/976 21.72

User’s Group 2/22 0.50 2/22 0.50 77/871 19.47

G. TOTAL - 4/45 1.10 4/45 1.10 162/1847 41.19

Page 146: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

146

iii Agriculture Production and micro enterprises System

Bhaguwala Bhaguwala Total G. Total

A- Crop Demonstrations-

15/6.00 0.30 15/6.00 0.30 569/227.60 11.42

B.Seed Distribution No. of farmers /Area (ha)

9.00 0.36 9.00 0.36 345.39 13.75

C.Agroforestry

Ha/Rupees 10.00 0.30 10.00 0.30 375.60 11.405 D.Green manuring

Ha/Rupees 8.00 0.24 8.00 0.24 305.56 9.15 Total 1.20 1.20 45.725 Grand Total 7.11 7.11 343.08

Page 147: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

147

Chapter-7

Phasing of Programme & Budgeting

Page 148: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

148

7.1: Detail of Item wise Financial Position in Watershed

Total Finance of Project 457.44

Administration @ 10% 45.74

Monitoring @ 1% 4.57

Evaluation @ 1% 4.57

EPA @ 4% 18.30

ICB @ 5% 22.88

DPR @ 1% 4.57

Watershed Devlopment @56% 256.18

Livelihood @ 9% 41.17

Production &Micro Enterprises@10% 45.74

Cousolidotion @4% 13.72

Total 100 457.44

Page 149: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

149

7.2: Detail of Physical & Financial Year wise Phasing

S.

No

.

Budget

Component

Purpose

Finance

2010-11 2011-12 2012-13 2013-14 TOTAL Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial

1 Administration 45.74 - 9.15 - 18.30 - 13.72 - 4.57 - 45.74

2 Monitoring 4.57 - 0.92 - 1.21 - 1.22 - 1.22 - 4.57

3 Evaluation 4.57 - 1.37 - 1.37 - 1.37 - 0.46 - 4.57

4 EPA 18.30 - 18.30 - - - - - - - 18.30

5 ICB 22.88 - 13.72 - 4.58 - 4.58 - - - 22.88

6 DPR 4.57 - 4.57 - - - - - - - 4.57

7 Watershed

Devlopment

256.18 510.80 34.32 1650.60 110.93 1650.60 110.93 - - 3812.0

0

256.18

8 Livelihood 41.17 - 4.57 - 18.30 - 18.30 - - - 41.17

9 Production

system & micro

Enterprises

45.74 - 4.57 - 20.58 - 20.59 - - - 45.74

10 Cousolidation 13.72 - - - - - - - 13.72 - 13.72

TOTAL 457.44 510.80 91.49 1650.60 175.27 1650.60 170.71 - 19.97 3812.0

0

457.44

Page 150: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

150

Chapter-8

8.1: EXPECTED OUTCOMES/ BENEFITS:

S.No. Particulars of Items Unit Pre Execution Post Execution

1 Gross Cultivated area Ha. 2598 3812

2 Cropping intensity % 150 220

3 Agricultural Production

A

I

II

III

IV

Food Production

Cereals-

Pulses-

& Oil seed

Jawan Babare

Qtl.

185

800

3050

335

B

I

II

Fodder Production

Dry Fodder-

Green Fodder-

Qtl.

530

800

920

1215

C

I

Fuel Production (qtls)

Arhar + Mustard Plants

Qtl.

1.50

3.00

4 Average Household Income per annum Rs Lakh 20000 30000

5 Milk Production Liter 77000 130000

6 Irrigated area Ha. 1243 2100

7 Rainfed area Ha. 4243 3386

8 Additional area under Agro-Harte/Forestry. Ha. - 349.39

9 Employment Generation man days. No. 68750 91500

10 Women Benefitted by SHGs and IGA No. - 200

11 Value of land Rs Lakh per Hactare Rs Lakh 8 to 10 12 to 14

12 Average ground water table BGL M 8.00 7.00

13 Benefit Cost Ratio 1.60:1

Page 151: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

151

EPA- PHOTOS

Page 152: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

152

Page 153: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

153

Page 154: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

154

Page 155: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

155

Page 156: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

156

Page 157: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

157

Page 158: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

158

Page 159: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

159

Page 160: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

160

Page 161: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

161

Page 162: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

162

Page 163: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

163

Details of Fund flow of Watershed Committee Accounts in IWMP-I, Bijnor (Amount in Rs.)

S. No

Name of MWS

with code

Name of watershe

d committe

e (WC)

Opening Balance

Deposit Withdrawal Interest accrued

Closing balance

DRDA/ ZP

cheque No./date

Amount / Date of deposit

in WC

Account

Total amount available in WC Account as on

31.03.2011

Amount with dra wn

by Cash/ Cheque

Date of withdra

wal

Purpose of

withdrawal

1 jaspur 2B5C1c3c jaspur ------------ 31/03/11 1.93230 ------------ ------------ ------------ ------------ ------------ 1.93230

2 Bhaguwala 2B5C1c3a Bhaguwala ------------ 31/03/11 4.61565 ------------ ------------ ------------ ------------ ------------ 4.61565

3 Gudha 1st 2B5C1c3f Gudha 1

st ------------ 31/03/11 1.29154 ------------ ------------ ------------ ------------ ------------ 1.29154

4 Prempur 2B5C1d1b Prempur ------------ 31/03/11 2.33316 ------------ ------------ ------------ ------------ ------------ 2.33316

5 Gudha 2nd

2B5C1d2a Gudha 2nd

------------ 31/03/11 2.41893 ------------ ------------ ------------ ------------ ------------ 2.41893

6 Moh Alampur 2B5C1e1a Moh Alampur

------------ 31/03/11 2.02212 ------------ ------------ ------------ ------------ ------------ 2.02212

7 Vijaypur 2B5C1e1b Vijaypur ------------ 31/03/11 1.66266 ------------ ------------ ------------ ------------ ------------ 1.66266

8 GulalWali 2B5C1e1c GulalWali ------------ 31/03/11 1.31180 ------------ ------------ ------------ ------------ ------------ 1.31180

9 Veerpur 2nd

2B5C1e2a Veerpur 2nd

------------ 31/03/11 1.4987 ------------ ------------ ------------ ------------ ------------ 1.4987

10 veerpur 1st 2B5C1e2b veerpur 1

st ------------ 31/03/11 2.71683 ------------ ------------ ------------ ------------ ------------ 2.71683

11 Sahanpur N.P 2B5C1e3b Sahanpur N.P

------------ 31/03/11 1.66086 ------------ ------------ ------------ ------------ ------------ 1.66086

12 Puranpur Gadhi 1

st

2B5C1e4a Puranpur Gadhi 1

st

------------ 13/07/11 2.71080 ------------ ------------ ------------ ------------ ------------ 2.71080

13 Rampur Mangal 2B5C1e4c Rampur Mangal

------------ 15/06/11 1.38672 ------------ ------------ ------------ ------------ ------------ 1.38672

14 Bijori 2B5C1e4d Bijori ------------ 15/06/11 1.43379 ------------ ------------ ------------ ------------ ------------ 1.43379

15 Rehmapur 2B5C1d1a Rehmapur ------------ 31/03/11 5.06096 ------------ ------------ ------------ ------------ ------------ 5.06096

16 Total 34.30799 ------------ ------------ ------------ ------------ ------------ 34.30799

Page 164: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

164

Page 165: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

165

Page 166: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

166

Page 167: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

167

Estimate of drop Spillway For 5 hect.Catchment .

S.no Item Nos. Lenth Width Hight/Depth Qt

1

E/W in Foundation

Head Wall EXN 2 2.00 0.35 0.70 1.54

Side Wall 2 1.65 0.55 0.70 1.27

Side Wall Exn 2 1.00 0.55 0.70 0.77

crest Wall Exn 1 1.30 0.80 0.70 0.728

Toe Wall 1 1.30 0.55 0.70 0.50

Apron 1 1.30 1.30 0.40 0.676

Total 5.484

2

C.C.Work 1:4:8

head Wall EXN 2 2.00 0.55 0.15 0.33

Side well 2 1.65 0.55 0.15 0.272

Side well Exn 2 1.00 0.55 0.15 0.165

Crest Wall 1 1.30 0.8 0.15 0.156

Toe Wall 1 1.30 0.55 0.15 0.107

Apron 1 1.30 1.3 0.20 0.338

Total 1.368

3

B/W 1:4

head Wall EXN 2 1.8 0.45 1.40 0.268

Side Wall Exn 2 1.55 0.45 0.65 0.906

Side wall up to toe Exn Toe 2 1.55+.65/2 0.45 0.80 2.12

Side Well abobe to Exn Top 1 1.30 0.7 0.25 0.227

Crest Well up to Apron 1 1.30 .45+.70/2 0.80 0.598

Crest well abobe to Apron side well Exn 1 0.90 0.45 0.65 0.526

Toe Wall 1 1.30 0.45 0.45 0.263

Total 48.90

Page 168: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

168

4

P/W 1:4

Head Wall EXN Top 2 1.8 0.45

1.62

Crest Top 1 1.3 0.45

0.585

Crest V/S 1 1.3

0.6 0.78

crest D/S 1 1.3

0.84 1.092

Side Well Top 2 .65+1.20/2 0.45

1.665

Side Well Exn 2 0.9 0.45

0.81

Toe Wall Top 1 1.3 0.45

0.585

Toe Wall Top in side 1 1.3

0.2 0.26

Side Wall in abobe the Toe Wall 2

0.45 0.4 0.18

Side Abobe the Crest 2

0.45 0.4 0.36

Head Wall V/S 1 1.3

0.6 0.78

Head Wall Exn V/S 2 1.8

1 3.6

Side Wall inside Botem 2 1.55

0.4 1.24

Side Wall inside Top 2 1.55+.65/2

0.8 1.76

Total 15.317

Say 15.32

Summary of Work

1 Earth Work 5.49

2 C.C Work 1:4:8 1.368

3 Brick Work 6.908

4 PlasteringWork 15.32

Page 169: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

169

Material And Cost Anailysis S.No Name of Work Quantity Brick Cement Course Cend Gitti

1 C.C Work 1:4:8 1.368 0 4.65 0.615 1.258 -----

Brick Work 1:4 6.908 3178 12.43 1.865 0 -----

PlasteringWork 1:4 15.32 0 1.68 0.229 0 -----

Total 3178 18.76 2.709 1.258 -----

Say

3178 18.76 2.71 1.26 -----

Rate

3797 300 1184 1112 Total Cost

Cost

12066.85 5628 3208.65 1401.1 22304.6

Page 170: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

170

Expenditure of Labour

S.No Name of Work Quantity Skilled Unskilled

1 Earth Work 5.49 - 1.66

2 C.C Work 1:4 1.368 0.27 6.29

3 B/W/1:4 6.908 6.9 13.8

4

PlasteringWork

1:4 15.32 1.91 2.87

5 Water Quiring 0 0 5

Total 9.08 29.62

Rate 230 120 Total Cost

Cost 2088.4 3554.4 5642.8

Total Cost

Material -22304.60

Labour -5642.80

Cartage-2230

Toatal-30177.40 Say Rupeesh -30000

Page 171: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

171

Estimate of Field Out let

1 Earth Work Nos. Lenth Width Hight/Depth Qt

Head Wall 1 2.40 0.60 0.80 1.15

Side Wall 2 2.50 0.40 0.50 1.00

Tank 1 1.10 1.00 0.50 0.55

Total 2.70

2 EW 1:4:8

Head Wall 1 2.40 0.60 0.15 0.21

Side Wall 2 2.50 0.40 0.15 0.30

Rapta 1 2.50 0.60 0.15 0.225

Tank 1 1.10 1.00 0.15 0.165

Total 0.90

3 Brick Work 1:4:8

Head Wall 1 2.26 0.35 0.60 0.474

Caller 2 0.60 0.23 0.40 0.110

Side Wall 2 2.50 0.23 0.60 0.690

Rapta 1 2.50 0.60 0.11 0.165

Tank 2 0.73 0.23 0.50 0.167

Tank 1 0.60 0.23 0.50 0.069

Toe Wall 1 1.06 0.23 0.62 0.151

Page 172: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

172

Total 1.661

4 P/W

Coller 2 0.60 0.23 - 0.27

P/W 2 2.00 0.60 0.40 0.96

2 0.23 0.40 - 0.18

Side Wall Top 2 2.50 0.23 - 1.15

2 2.50 0.25 - 1.25

2 2.50 0.30 - 1.50

Rapta 1 2.50 0.60 - 1.50

2 0.50 0.23 - 0.23

Tank 1 1.06 0.23 - 0.24

Total 7.28

5 B/F 2 0.50 0.30 - 0.30

Tank 1 0.60 0.30 - 1.80

1 0.50 0.60 - 0.30

1 1.06 0.23 - 0.24

1 0.60 0.41 - 0.24

1 1.06 0.30 - 0.31

Total 10.47

Page 173: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

173

Summary of Work

1 Earth Work 2.70

2 C.C Work 1:4:8 0.90

3 Brick Work 1:4 11cm 0.165

23cm 1.661

4 PlasteringWork 10.47

Page 174: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

174

Anylysis of Materials

S.no Name of Work Quantity Brick Cement Coarse Sand Gitty

1 C.C Work 1:4:8 0.90 - 3.06 0.405 0.828

2 Brick Work 11cm 0.165 78 0.23 0.039 -

23cm 1.661 764 2.98 0.448 -

3 P/W 1:4 10.47 - 1.15 0.157 -

Total 842 7.42 1.049 0.83

Say 1.05

@ 3797 300 1184 1112

Cost 3197.00 2226 1243.20 922.95

Total Cost ---------- ------ ------- ------- 7589.20

-

Page 175: DETAIL PROJECT REPORT (D.P.R.)upldwr.up.nic.in/.../Bijnor/DPR_Bijnor_IWMP_I_09_10_updated.pdf · 3.8 Details of common property 49 3.9 Ground Water status 64 3.10 Irrigation status

175

Expenditure of Labour

S.No Name of Work Quantity Skilled Unskilled

1 Earth Work 2.70 - 0.81

2 C.C Work 1:4 0.90 0.18 4.14

3 B/W/1:4 1.826 1.82 3.64

4 PlasteringWork 1:4 10.47 1.30 1.96

5 Water Quiring - - 5.00

Total 3.30 15.55

Rate 230.00 120.00 Total Cost

Cost 759.00 1866.00 2625.00

Cost on material -7589.20

Cost on Labour -2625.00

Total-10214.20

Say Rupees-10000