Top Banner
1. Remove liner from both sides of PETG panels A, B and C. 2. Place cut side down on a flat surface (see image for cut side) 3. Insert rivet post into back of coroplast Panel D. 6. Repeat Steps 4 and 5 for Panel B and Panel C. 7. Insert gripper feet into notched area on bottom of sneeze guard, 8. Remove adhesive liner. 9. Place on desk and press firmly to secure. Guard can be removed and replaced for next student. DESK SHIELD INSTRUCTIONS (SG-DESK-2424 CORO) 4. Place PETG Panel A on top coroplast Panel D lining up holes. 5. Snap rivet caps on rivet posts for each of the holes to secure Panel A to Panel D. Press firmly until you hear the rivets click together.
1

Desk Shield Instructions SG-DESK-2424-CORO

Nov 30, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Desk Shield Instructions SG-DESK-2424-CORO

1. Remove liner from both sides of PETG panels A, B and C.

2. Place cut side down on a �at surface (see image for cut side)

3. Insert rivet post into back of coroplast Panel D.

6. Repeat Steps 4 and 5 for Panel B and Panel C.

7. Insert gripper feet into notched area on bottom of sneeze guard,

8. Remove adhesive liner.

9. Place on desk and press �rmly to secure.

Guard can be removed and replaced for next student.

DESK SHIELD INSTRUCTIONS (SG-DESK-2424 CORO)

4. Place PETG Panel A on top coroplast Panel D lining up holes.5. Snap rivet caps on rivet posts for each of the holes to secure Panel A to Panel D. Press �rmly until you hear the rivets clicktogether.