Top Banner
Designing a New Train Ian Walmsley Engineering Development Manager Porterbrook 1
35

Designing a new train

Jun 25, 2015

Download

Education

By Ian Walmsley, Engineering Development Manager , Porterbrook.

Delivered on 19 February 2014 to postgraduate students at the Institute for Transport Studies (ITS) University of Leeds.

www.its.leeds.ac.uk/courses/masters/externalseminars
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Designing a new train

Designing a New Train

Ian WalmsleyEngineering Development Manager

Porterbrook

1

Page 2: Designing a new train

ROSCO - Our business

Simple business model Long term assets Short term customers Straight Line depreciation Gosplan economics Market should be predictable Policy isn’t Pre-emptive work = high risk

2

Page 3: Designing a new train

What’s good for us?

Stock stays on lease for 35 years Minimum changes to achieve this Rolling stock should be: -

• Reliable• Comfortable• Energy efficient• Low maintenance• Coupling compatible• Suitable for the service• Adaptable for other services

3

Page 4: Designing a new train

An example

High reliability (90,000 mpc) Regenerative Braking (15% less energy) AC traction, low maintenance Compliant to modern safety standards Compliant to disability regulations Air conditioned, good ride, modern interior Perfectly designed for the service it operates

Risk of displacement?

4

Page 5: Designing a new train

5

Page 6: Designing a new train

6

Page 7: Designing a new train

7

Page 8: Designing a new train

8

Page 9: Designing a new train

9

Page 10: Designing a new train

Lesson learned

The best train doesn’t always win

Economy beats quality

10

The Department is particularly interested to see rolling stock used on airport services that is better suited to the needs of airport passengers; Page 81 TSGN ITT Sept 2013

Page 11: Designing a new train

The UK rolling stock market

is neither free nor controlled

11

Page 12: Designing a new train

Market and cost

12

Rail 2% of market Modal transfer CO2 Reduction Capacity of system

Page 13: Designing a new train

Market and cost

13

Train is 15% of industry cost : 12% capital + 3% Maintenance

Page 14: Designing a new train

New train specification – Non-compliances GSM link to PIS Coupling with doors open GOP panel full function Current standards Ride better than 450 Inter-Vehicle damping Noise – new standard Reliability 340,000 MTIN Water tank gauge Insulation infra-red scan Dead haulage in service to 90 mph Light flash guard position 1450mm wide doors Standbacks at doors Footsteps cannot obstruct doors Emergency brake in Neutral No hill start button Sanding – dedicated power supply Low sand indicator Sandbox trace heating WSP failure alarm P12 Profile wheels

Wheelset coating to minimise UAT Option for flange lubrication GSMR radio fitted Maintenance free batteries PIS letter descenders uncompressed Coach letter display in train Side of train PIS displays Wi-Fi remote upload PIS OTMR – GSMR Interface OTMR 7-day recording OTMR flash card download Train Manager’s office 275 seats (270) Emergency light power supplies No bonded glass Ergonomic layout for vehicle on it’s side Seat re-arrange with same body panels Toilet flush with lid up CCTV viewing screen Power close cab door ERTMS space provision and supply

14

Page 15: Designing a new train

New train requirement

Use existing design?• Capacity• Acceleration• 24 tph• New technology• Competition

Produce new design?• Higher risk• Design costs• Safety Case• Potential market• Maintenance cost

15

Page 16: Designing a new train

Safety is a “given”

Rail Group Standards Codes of practice European standards Disabled legislation Fire regulations Accident reports Design review Acceptance bodies

Crashworthiness Materials used Control logic Redundancy Human Factors Stepping distances Electrical Interference Kinematic Envelope

16

Page 17: Designing a new train

Market divisions

High Speed Lines Inter-City Outer Suburban Commuter Inner Suburban Metro

17

Page 18: Designing a new train

What do you want? – Passenger focus

18

Page 19: Designing a new train

What do you want? (Leeds area figures)

19

2009 2010 2011 2012 2013

Spring Autumn Spring Autumn Spring Autumn Spring Autumn Spring Autumn

Satisfied n/a 86% 84% 78% 83% 87% 87% 78% 75% 78%

Neutral n/a 10% 10% 11% 12% 8% 9% 14% 16% 11%

Dissatisfied

n/a 5% 6% 11% 6% 6% 5% 8% 9% 11%

Page 20: Designing a new train

What do you want?

20

Page 21: Designing a new train

New train decisions - speed

Maximum Speed• 140 mph• 125 mph• 118 mph• 100 mph• 90 mph• 75 mph

Track costs Train weight limits Installed power Braking ability Acceleration No. Powered axles Cost

21

Page 22: Designing a new train

New train decisions - length

3, 4 or 5 car 20m long 23m long 26m long 16.6m long

Platform Lengths Selective Door Opening Station dwell times No. of bogies Weight (Energy, track) Axle load (speed) Expected capacity need

22

Page 23: Designing a new train

New train decisions - doors

End or 1/3 – 2/3? How many? How wide? Standbacks? Swing/Slide Control

Doorway = 8 seats Standbacks = 8 seats Weight (Pass/m2) Speed of operation Reliability FASDO

23

Page 24: Designing a new train

New train decisions - Seats

How many? Legroom Rake angle Armrests Tables

Less seats, More people Crashworthiness Weight Cost Resistance to damage

24

Page 25: Designing a new train

25

Page 26: Designing a new train

Limiting case design

26

24 Trains per hour

Page 27: Designing a new train

Limiting case design

27

Centre section peak operation sets design Bedford – Brighton 2 hrs 15 min Thameslink & Crossrail – same problem Not ideal for off-peak journeys Is there a choice?

Page 28: Designing a new train

The “Platform”

Need to spread design cost Make design flexible around a fixed “platform” New trains around country will be similar Platform designs usually last about 10 years

28

1960s

1970s

1980s

1990s

2000s

Page 29: Designing a new train

Maintenance Options - 1 All inclusive deal with manufacturer

• Capital• Depots• Materials• Depot maintenance• Major overhaul

Only specify number of diagrams to be covered Best incentive to minimise maintenance cost Usually most expensive deal – risk brings reward “Wet” lease with ROSCO “Power by the hour”

29

Page 30: Designing a new train

Maintenance Options - 2 “Soggy” lease with ROSCO

• Capital rental• Non-cap for overhaul• Operator maintains• Network Rail facilities• Contract sets responsibility

Operator controls daily availability “Lumpy” overhaul and repair costs smoothed out Terms to fit franchises System used when privatised in 1994

30

Page 31: Designing a new train

Maintenance Options - 3 “Dry” lease with ROSCO

• Capital rental only• No “maintenance reserve”• Operator maintains• ROSCO audits asset• Redelivery inspections

Operator controls all aspects Lower initial cost Higher risk to operator – design and endemic faults Operators often expect support not paid for

31

Page 32: Designing a new train

Residual Value

Franchise operators come and go ROSCO carries residual value Example:-

• 200 vehicles at £1.7m each = £340M investment.• Assumed a 35 year life• After 7 year franchise residual value is 28/35 of £340M• £272M

Risk may be backed off to Government No more diesels

32

Page 33: Designing a new train

Conclusions

Designing a train is a series of compromises Designs will primarily aim at one of 4 markets

• High Speed• Inter City• Suburban• Metro

Adaptable for different routes – the “Platform” Residual Value (i.e. life) very important

33

Page 34: Designing a new train

http://www.youtube.com/watch?v=BVQYldQpeKY

http://www.youtube.com/watch?v=vZqsdOEdUuA

34

Page 35: Designing a new train

Thank you

35