Professor Marco Albini, Francesca Franceschi, Architect Francesco Bombardi Student: Omid Vernoos, 752100 BRERA IN BRERA SECTION scale 1:50 1. steel reticular beam supporting the glass roof covered with white sheet 2. hinge joint element connecting the beam and the steel rod 3. steel reticular column covered with aluminium white sheet 4. glass or plexiglass roof panels with silicone sealing joints 5. hinge joint element connecting glass or plexiglass panels and steel rod 6. steel rod composed of twisted wires 7. custom made stairs composed by steel structure and plexiglass steps 8. opaque slab composed by 125 mm corrugated structural steel and reinforced concrete, 20 mm acoustic insulation, light weight concrete for resin flooring 9. glass or plexiglass floor panels in differend transparencies 10. with silicone sealing joints 11. 8/10 mm metal sheet for the anchorage of the rails and the protection or concrete walls 12. plexiglass panels as rails to prevent fall 13. concrete wall covered with painted plaster 14. beam composed by no. 2 glass of 25 mm and two interspaces of plastic sheet 15. concrete wall covered with painted plaster 16. steel rod composed of twisted wires adjustable through the draft of the screws 17. 40 mm thick polycarbonate panel of different transparencies hanged by steel L profile at main structure composed by metal plates 18. structural slab composed by 125 mm corrugated structural steel and 19. reinforced concrete, 20 mm acoustic insulation, light weight concrete for resin flooring 20. escalator 21. elevator made by steel substructure and glass covering 22. IPE 200 beam 23. fall prevention glass rail composed by no. 2 laminated glasses, each 20 mm thick, interposed with anti-crushing plastic material 24. no. 2 metal plates connected by spacers and riveted to each other 25. custom made IPE 1500 26. belvedere glass facade arriving to the underground floor. At the second last level there are RELAXING AREAS . These points belong to the bars which occupied the existing rooms in the basement as preparation space close to own platform as serving area. In contrast to the original FAÇADE of the surrounding building in the Yard, the core vertical connection is covered by a THIN SHELL which has two main objectives: firstly it DEFINES the VERTICAL CONNECTION zone which houses the tools and crowd in a clear and definite way, secondly it CONTINUES the three dimensional GEOMETRY of the PLATFORMS through a two dimensional way, like MONDRIAN composition, in order to create a UNIQUE 07 522 282 563 294 325 478 +0,00 +6,05 +9,40 +13,05 +18,65 24 23 22 21 20 18 17 13 16 15 14 19 -0,75 -2,45 -3,25 390 det. 04 det. 03 view of the temporary exhibition space under the platform initial sketch of the facade view of the underground spaces
1

Design Studio 2 - Layout - Home | POLITesi 07... · steps 8. opaque slab composed by 125 mm corrugated structural steel and reinforced concrete, 20 mm acoustic insulation, light weight

Jun 28, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Design Studio 2 - Layout - Home | POLITesi 07... · steps 8. opaque slab composed by 125 mm corrugated structural steel and reinforced concrete, 20 mm acoustic insulation, light weight

Professor Marco Albini, Francesca Franceschi, Architect Francesco Bombardi Student: Omid Vernoos, 752100 BRERA IN BRERA

SECTION scale 1:50

1. steel reticular beam supporting the glass roof covered with white

sheet

2. hinge joint element connecting the beam and the steel rod

3. steel reticular column covered with aluminium white sheet

4. glass or plexiglass roof panels with silicone sealing joints

5. hinge joint element connecting glass or plexiglass panels and steel

rod

6. steel rod composed of twisted wires

7. custom made stairs composed by steel structure and plexiglass

steps

8. opaque slab composed by 125 mm corrugated structural steel and

reinforced concrete, 20 mm acoustic insulation, light weight concrete

for resin fl ooring

9. glass or plexiglass fl oor panels in differend transparencies

10. with silicone sealing joints

11. 8/10 mm metal sheet for the anchorage of the rails and the

protection or concrete walls

12. plexiglass panels as rails to prevent fall

13. concrete wall covered with painted plaster

14. beam composed by no. 2 glass of 25 mm and two interspaces of

plastic sheet

15. concrete wall covered with painted plaster

16. steel rod composed of twisted wires adjustable through the draft

of the screws

17. 40 mm thick polycarbonate panel of different transparencies

hanged by steel L profi le at main structure composed by metal plates

18. structural slab composed by 125 mm corrugated structural steel

and

19. reinforced concrete, 20 mm acoustic insulation, light weight

concrete for resin fl ooring

20. escalator

21. elevator made by steel substructure and glass covering

22. IPE 200 beam

23. fall prevention glass rail composed by no. 2 laminated glasses,

each 20 mm thick, interposed with anti-crushing plastic material

24. no. 2 metal plates connected by spacers and riveted to each other

25. custom made IPE 1500

26. belvedere glass facade

arriving to the

underground floor. At

the second last level

there are RELAXING

AREAS. These points

belong to the bars which

occupied the existing

rooms in the basement

as preparation space

close to own platform

as serving area.

In contrast to the

original FAÇADE of

the surrounding building

in the Yard, the core

vertical connection is

covered by a THIN

SHELL which has

two main objectives:

firstly it DEFINES

the VERTICAL

CONNECTION zone

which houses the tools and crowd in a clear and

definite way, secondly it CONTINUES the three

dimensional GEOMETRY of the PLATFORMS

through a two dimensional way, like MONDRIAN

composition, in order to create a UNIQUE

07

522

282

563

294

325

478

+0,00

+6,05

+9,40

+13,05

+18,65

24

23

22

21

20

18

17

13

16

15

14

19

-0,75

-2,45

-3,25

390

det. 04

det. 03

view of the temporary exhibition space under the platform

initial sketch of the facade

view of the underground spaces