Design Project-National Highway Report By Group-7 Ch.Madhav (CE11B063) P.Nava Teja(CE11B066) P.Sreedhar(CE11B067) Deepak Patel(CE11B084)
13

Design Project of NH (India)

Dec 19, 2015

Download

Documents

Nava Teja

Bentley student project
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Design Project of NH (India)

Design Project-National Highway Report

By Group-7

Ch.Madhav (CE11B063)

P.Nava Teja(CE11B066)

P.Sreedhar(CE11B067)

Deepak Patel(CE11B084)

Page 2: Design Project of NH (India)

Outline

1. Abstract

2. Data and constraints

3. Methodology

4. Outcome

5. Conclusion

Page 3: Design Project of NH (India)

Abstract

The NH13 is to be upgraded to a four lane highway from a two lane

highway. The stretch modified is five kilometer long starting from

(646721.176, 1655881.061) and ending at (647444.850, 1658756.352).

The existing two lane width is 3.5 meters and with shoulders on either

side roughly 1.5 meter. This is to be up-graded to a four lane national

highway of 7 meter carriageway, 1.5 meter hard shoulder and 1 meter

Earth shoulder on either side of a 5m median. The four lane highway

should be able to cater a design speed of 80 Kmph.

Page 4: Design Project of NH (India)

Data and constraints

Data:

Levels are provided at every 10 meter along longitudinal section.

The Carriageway should cater 150MSA traffic loading.

The CBR value of pavement is 5%.

The design of pavement is done in accordance with IRC-37.

Coordinates of wall (left): 646916.245, 1656830.393 (CL start)

646891.321, 1656874.478 (CL end)

Coordinates of wall (right): 646825.115, 1656985.391 (CL start)

646808.021, 1657031.127 (CL End)

Coordinates of Temple: 646947.084, 1656713.089 (CL)

Constraints:

The Proposed alignment should not cross the irrigation lines at skew.

The Temple cannot be demolished.

The two walls are to be avoided.

Page 5: Design Project of NH (India)

Methodology

Data Import

Editing CAD Data

Surface Analysis

Triangulation

Horizontal alignment

Vertical alignment

Super elevation Correction

Four lane Highway editing

Earthwork Calculations

Pavement thickness

Page 6: Design Project of NH (India)

Data Import

Page 7: Design Project of NH (India)

Editing CAD Data

Page 8: Design Project of NH (India)

Surface Analysis

Page 9: Design Project of NH (India)

Triangulation

Page 10: Design Project of NH (India)

Horizontal alignment (IPMethod)

Page 11: Design Project of NH (India)

Vertical Alignment

Page 12: Design Project of NH (India)

Pavement thickness

As per IRC-37 pavement cross-section has four layers

1. Base Course- 50 mm

2. DBM- 145 mm

3. Granular Base- 250mm

4. Granular Sub Base- 300 mm

Outcome

Page 13: Design Project of NH (India)

Conclusion

The national highway 13 is upgraded to a 4 lane

highway with the required design speed of 80 Kmph

Without demolishing the Temple, Walls. There are 3

curves in the new alignment. One reverse curve and

the rest two normal curves. The vertical alignment is

done such that cut fill ratio is equal making the

design economical.