Page 1: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

Design Phase Coordinationand

the Regional Environmental Coordinator’s Role

Page 2: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

Environmental Document Types

Environmental Document Example ProjectEnvironmental Impact Statement (EIS) New Alignment/Hwy. Relocation

Environmental Assessment (EA) Addition of Lanes

Environmental Report (ER) Minor Realignment

Programmatic Environmental Report (pER) Mill and Overlay

Categorical Exclusion (CE) Painting Centerline

The complexity of the project dictates the type of Environmental Document.

Page 3: Design Phase Coordination and the Regional Environmental Coordinator’s Role.
Page 4: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

INVESTIGATION

Page 5: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

Initiate Data Gathering…

Page 6: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

…which is incorporated into an environmental document

Page 7: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

WHAT Environmental Analyses does WisDOT complete?

Natural Environment

Physical Environment

Socio-Economic

Cultural Environment

Page 8: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

WHAT Environmental Analyses does WisDOT complete?

Natural Environment

Physical Environment

Socio-Economic

Cultural Environment

Page 9: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

NATURAL ENVIRONMENT Factors WisDOT Considers

Wetlands Rivers, Streams and

Floodplains Lakes and Other Open

Water Groundwater, Wells and

Springs Upland Wildlife and

Habitat Coastal Zones Threatened/Endangered

Species

Page 10: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

WHAT Environmental Analyses does WisDOT complete?

Natural Environment

Physical Environment

Socio-Economic

Cultural Environment

Page 11: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

PHYSICAL ENVIRONMENTFactors WisDOT Considers

Air Quality Construction Stage

Sound Quality Traffic Noise Hazardous Substances

or Contamination Erosion Control Storm water

Management

Page 12: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

WHAT Environmental Analyses does WisDOT complete?

Natural Environment

Physical Environment

Socio-Economic

Cultural Environment

Page 13: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

SOCIO-ECONOMICFactors WisDOT Considers

General Economics Community and

Residential Economic

Development and Business

Agriculture Environmental Justice Indirect and

Cumulative Effects

Page 14: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

WHAT Environmental Analyses does WisDOT complete?

Natural Environment

Physical Environment

Socio-Economic

Cultural Environment

Page 15: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

CULTURAL ENVIRONMENTFactors WisDOT Considers

Unique Lands Aesthetics Historic Resources Archaeological

Resources Tribal Issues

Page 16: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

4500*CULTURAL ENVIRONMENT

WisDOT Considerations

* Pertains to only IH, USH, & STH system

Page 17: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

CULTURAL ENVIRONMENTWisDOT Policy/Guidance

FDM 26

Page 18: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

CULTURAL ENVIRONMENT

Questions ?

Jim [email protected]

Page 19: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

DETERMINATION

Page 20: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

FINAL DESIGN

Page 21: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

Actions (if applicable) during Final Design:

Purchase Right-of-Way Reevaluate Traffic Noise Analysis Prepare Structure Survey Report & Submit Plan

to DNR for review Request 401 Water Quality Certification/Final

Concurrence from DNR Submit 404 Permit application to USACE Complete Railroad crossing design report Coordinate for utility adjustment of facilities

Page 22: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

PRE-CONTRACT ADMINISTRATION

Page 23: Design Phase Coordination and the Regional Environmental Coordinator’s Role.

We need to work together!