Top Banner
6/19/13 1 C Creative Thinkers, Cleverly Disguised as Engineers. Design of a 35 Story Building In Los A ngeles Using the LADBS Performance Based Design Methodology LA Tall Building Structural Design Council Conference May 3, 2013 C Creative Thinkers, Cleverly Disguised as Engineers. Contents  Project Summary  Summary of Design Development Options  Computer Modelling  Aspects  Main Results   Advantag es  Material Savings  Summary
8

Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

Jan 05, 2016

Download

Documents

MREFAAT

stood
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 1/8

6/19/13

1

C

Creative Thinkers, Cleverly Disguised as Engineers.

Design of a 35 Story Building In

Los Angeles Using the LADBS

Performance Based Design

Methodology

LA Tall Building Structural Design Council

Conference

May 3, 2013

C

Creative Thinkers, Cleverly Disguised as Engineers.

Contents

•  Project Summary

•  Summary of Design

Development Options

•  Computer Modelling Aspects

•  Main Results

•   Advantages

•  Material Savings

• 

Summary

Page 2: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 2/8

6/19/13

2

C

Creative Thinkers, Cleverly Disguised as Engineers.

Project Summary

•  888 Olive Street Los Angeles (9th & Olive)

•  35 Story Tower – 358 ft.

above grade

•  4 story podium over 2 level

basement

•  700,000 sq. ft. ofsuspended structure.

•  Reinforced Concrete

C

Creative Thinkers, Cleverly Disguised as Engineers.

Stage 1

Conventional Design• Dual System• Concrete Shearwalls

• Special Moment Resisting Frames• Linear Dynamic Analysis

Page 3: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 3/8

6/19/13

3

C

Creative Thinkers, Cleverly Disguised as Engineers.

Stage 2

Performance Based• First Trial• Concrete Shearwalls only

• Capacity Design – Cross Sectional Analysis

• Too many walls

C

Creative Thinkers, Cleverly Disguised as Engineers.

Stage 3

Performance Based• Optimized Structural Performance• Non-Linear Analysis PERFORM 3D

• Iterations during Peer Review• Modified coupling beams combined

with shearwalls for best combination

Page 4: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 4/8

6/19/13

4

C

Creative Thinkers, Cleverly Disguised as Engineers.

Modelling Aspects•  Fibers – Walls

•  Shear springs – Headers•  Beams – column/slab outriggers

•  Shell (in-plane) – Slabs (podium)

•  Upper and Lower bound stiffness

T1 = 5.8s

C

Creative Thinkers, Cleverly Disguised as Engineers.

Modelling Aspects•  Input Earthquake Ground Motions

 –  MCE level

 –  7 Pairs (spectral matching)

 –  PEER GM Database

 –  NEHRP Class C

Page 5: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 5/8

6/19/13

5

C

Creative Thinkers, Cleverly Disguised as Engineers.

Main Results•  Shear forces Elevator Core

C

Creative Thinkers, Cleverly Disguised as Engineers.

Main Results•  Maximum Drift

!"#$% '(")*" +(,* -. /012

!"

#

"

$

%

&

'#

'"

'$

'%

'&

"#

""

"$

"%

"&

(#

("

($

!#)#$ !#)#" #)## #)#" #)#$

!"#$%

        3      *      4      *        5

*+'

*+"

*+(

*+$

*+,

*+%

*+-

.*/0

.*/01234*5

.*/0!234*5

!"#$% '(")*" +(,* -. /012

!"

#

"

$

%

&

'#

'"

'$

'%

'&

"#

""

"$

"%

"&

(#

("

($

!#)#( !#)#" !#)#' #)## #)#' #)#" #)#(

!"#$%

        3      *      4      *        5

*+'

*+"

*+(

*+$

*+,

*+%

*+-

.*/0

.*/01234*5

.*/0!234*5

Page 6: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 6/8

6/19/13

6

C

Creative Thinkers, Cleverly Disguised as Engineers.

Main Results•  Coupling Beams dissipate

most energy

C

Creative Thinkers, Cleverly Disguised as Engineers.

Main Results•  Core walls governed by

maximum shear stress

Page 7: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 7/8

6/19/13

7

C

Creative Thinkers, Cleverly Disguised as Engineers.

 Advantages•  PBD allow us to Optimize the

performance of elements of theLateral Force Resisting System

•  NLDA better captures changinginelastic damage state of thestructure

•  Directly addresses the level ofredundancy & safety of thestructure

•  Increased Useable space due toelimination of frame beams andcolumns of Dual System

•  More flexibility for parkingcirculation

•  More flexibility for distribution ofMech/Elec systems

• 

Reduction of Materials fromConventional Dual System

C

Creative Thinkers, Cleverly Disguised as Engineers.

Material Savings•  Reduction in Materials

from Stage 1 to Stage 3

 –  Concrete 6,000 Cu. Yds

 –  Rebar 3.2 M lbs

 –  Formwork 27,000 s.f.

•  15% reduction in total

structural materials

Stage 1 – Dual System

Stage 3 - PBD

Page 8: Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

7/17/2019 Design of a 35 Story Building in Los Angeles Using the LADBS Performance Based Design Methodology

http://slidepdf.com/reader/full/design-of-a-35-story-building-in-los-angeles-using-the-ladbs-performance-based 8/8

6/19/13

8

C

Creative Thinkers, Cleverly Disguised as Engineers.

Summary

•  Performance Based Design(PBD) better captures thecomplex sway effects of tallbuildings

•  PBD directly addresses the levelof redundancy & safety of thebuilding structure

•  PBD is a good alternative forowners to increase useablespace and reduce constructionmaterials.

•  PBD takes advantage of

Leading Edge Design tools andmethods, and latest knowledgein tall building design.